CN102535849B - 构造柱柱顶混凝土浇筑方法 - Google Patents
构造柱柱顶混凝土浇筑方法 Download PDFInfo
- Publication number
- CN102535849B CN102535849B CN201210033725.1A CN201210033725A CN102535849B CN 102535849 B CN102535849 B CN 102535849B CN 201210033725 A CN201210033725 A CN 201210033725A CN 102535849 B CN102535849 B CN 102535849B
- Authority
- CN
- China
- Prior art keywords
- constructional column
- concreting
- constructional
- sleeve pipe
- stack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210033725.1A CN102535849B (zh) | 2012-02-15 | 2012-02-15 | 构造柱柱顶混凝土浇筑方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210033725.1A CN102535849B (zh) | 2012-02-15 | 2012-02-15 | 构造柱柱顶混凝土浇筑方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102535849A CN102535849A (zh) | 2012-07-04 |
CN102535849B true CN102535849B (zh) | 2014-06-25 |
Family
ID=46343741
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210033725.1A Active CN102535849B (zh) | 2012-02-15 | 2012-02-15 | 构造柱柱顶混凝土浇筑方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102535849B (zh) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103233520B (zh) * | 2013-01-21 | 2017-03-22 | 宿迁市明远建筑安装工程有限公司 | 一种建筑外墙结构自防水施工方法 |
CN103255921A (zh) * | 2013-05-07 | 2013-08-21 | 中建八局第一建设有限公司青岛分公司 | 一种混凝土构造柱的回顶浇注方法 |
CN105155843A (zh) * | 2015-08-05 | 2015-12-16 | 中国华冶科工集团有限公司 | 构造柱的施工方法及装置 |
CN105155669B (zh) * | 2015-09-15 | 2017-12-12 | 成都市第四建筑工程公司 | 暗梁楼板构造柱结构施工方法 |
CN106285005B (zh) * | 2016-08-31 | 2018-08-21 | 山西四建集团有限公司 | 构造柱顶部灌浆施工方法 |
CN107165411A (zh) * | 2017-05-22 | 2017-09-15 | 中国五冶集团有限公司 | 一种构造柱施工工艺 |
CN107178209A (zh) * | 2017-05-22 | 2017-09-19 | 中国五冶集团有限公司 | 一种构造柱与主体结构一体施工方法 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202787992U (zh) * | 2012-02-15 | 2013-03-13 | 中建三局第二建设工程有限责任公司 | 构造柱柱顶混凝土浇筑结构 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0913534A (ja) * | 1995-06-27 | 1997-01-14 | Nobutomo Imamura | 積層建材 |
JPH10204996A (ja) * | 1997-01-24 | 1998-08-04 | Taisei Corp | 充填鋼管コンクリート構造柱及び該柱の構築方法 |
CN201660973U (zh) * | 2010-03-09 | 2010-12-01 | 北京六建集团公司 | 混凝土后浇带预封闭排气构造 |
-
2012
- 2012-02-15 CN CN201210033725.1A patent/CN102535849B/zh active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202787992U (zh) * | 2012-02-15 | 2013-03-13 | 中建三局第二建设工程有限责任公司 | 构造柱柱顶混凝土浇筑结构 |
Also Published As
Publication number | Publication date |
---|---|
CN102535849A (zh) | 2012-07-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102535849B (zh) | 构造柱柱顶混凝土浇筑方法 | |
CN204298825U (zh) | 基坑浇筑溜管支撑调节装置 | |
CN103306208A (zh) | 1.6次抛物线形新型四柱板式空心变截面高墩爬模方法 | |
CN203429641U (zh) | 建筑施工用单侧支模加固结构体系 | |
CN104405123A (zh) | 现浇钢筋砼薄壁矩形小截面空心柱用模板组件及其施工方法 | |
CN110206144A (zh) | 一种钢骨柱梁柱节点的施工方法 | |
CN106032704A (zh) | 一种以混凝土柱支顶后浇带两侧结构的施工方法 | |
CN103952979B (zh) | 一种钢砼叠合梁顶板无支架施工装置及施工方法 | |
CN106284428A (zh) | 一种建筑结构后浇带的混凝土立柱支撑方法 | |
CN201554034U (zh) | 逆作施工后浇带水平嵌固支撑结构 | |
CN104164951A (zh) | 楼梯休息平台及其施工方法 | |
CN112627241A (zh) | 地下室墙柱节点不同强度等级砼浇筑的质量控制方法 | |
CN203834370U (zh) | 圆拱涵拱圈钢模台车 | |
CN103031892A (zh) | 钢桁架支柱及钢桁架平台制造方法 | |
CN202787992U (zh) | 构造柱柱顶混凝土浇筑结构 | |
CN105317230A (zh) | 一种梁、墙预埋水平套管固定方法 | |
CN111058619A (zh) | 一种钢筋混凝土梁板后浇带临时支撑体系及应用方法 | |
CN107859061A (zh) | 一种箱涵一次性浇筑的施工方法 | |
CN101666069A (zh) | 现浇预应力箱梁张拉槽口施工工艺 | |
CN203668894U (zh) | 可快速安装的混凝土预制模板结构 | |
CN203755422U (zh) | 一种可拆装带台口的排水沟模板装置 | |
CN203569699U (zh) | 梁柱节点箍筋骨架 | |
CN105735136B (zh) | 箱梁顶板钢筋整体成型模架及施工方法 | |
CN205521875U (zh) | 箱梁底腹板钢筋整体成型模架 | |
CN204080820U (zh) | 一种混凝土结构基坑换撑装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20221129 Address after: Room 2105, 21st Floor, Tongda Plaza, No. 111 Wenhua Avenue, Jiangxia District, Wuhan City, Hubei Province 430000 Patentee after: THE SECOND CONSTRUCTION Co.,Ltd. OF CHINA CONSTRUCTION THIRD ENGINEERING BUREAU Patentee after: China Construction Third Engineering Bureau Group (Jiangsu) Co.,Ltd. Patentee after: China Construction Third Engineering Bureau second construction and installation Co.,Ltd. Patentee after: CHINA CONSTRUCTION THIRD ENGINEERING BUREAU GREEN INDUSTRY INVESTMENT Co.,Ltd. Address before: 430074 No. 306 Lu Lu, Hongshan District, Hubei, Wuhan Patentee before: THE SECOND CONSTRUCTION Co.,Ltd. OF CHINA CONSTRUCTION THIRD ENGINEERING BUREAU |
|
TR01 | Transfer of patent right |