CN102432108B - Three-dimensional ecological restoration method for supereutrophic lake water body - Google Patents

Three-dimensional ecological restoration method for supereutrophic lake water body Download PDF

Info

Publication number
CN102432108B
CN102432108B CN2011103320012A CN201110332001A CN102432108B CN 102432108 B CN102432108 B CN 102432108B CN 2011103320012 A CN2011103320012 A CN 2011103320012A CN 201110332001 A CN201110332001 A CN 201110332001A CN 102432108 B CN102432108 B CN 102432108B
Authority
CN
China
Prior art keywords
enclosure
water
plant
ecological
water body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2011103320012A
Other languages
Chinese (zh)
Other versions
CN102432108A (en
Inventor
过龙根
倪乐意
曹特
张萌
张静
张霄林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Hydrobiology of CAS
Original Assignee
Institute of Hydrobiology of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Hydrobiology of CAS filed Critical Institute of Hydrobiology of CAS
Priority to CN2011103320012A priority Critical patent/CN102432108B/en
Publication of CN102432108A publication Critical patent/CN102432108A/en
Application granted granted Critical
Publication of CN102432108B publication Critical patent/CN102432108B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Landscapes

  • Revetment (AREA)

Abstract

The invention discloses a three-dimensional ecological restoration method for a supereutrophic lake water body. The method comprises the following steps of: inserting a plurality of fixed piles into a hard layer at the bottom of a lake, transversely connecting the tops and middle parts of the fixed piles with steel cables to form an enclosure structure, connecting water-proof canvas serving as enclosure cloth with the fixed piles, and fixing the bottom end of the enclosure cloth and a gabion at the bottom of the lake after sewing to constitute an enclosure; transforming a substrate in the enclosure; partitioning the water surface into multiple layers according to water plants needing to be planted; transplanting the water plants; establishing an ecological floating island; performing biological alga control; and running an ecological enclosure system, maintaining and managing. By adopting the method, the water quality can be improved remarkably, the water transparency is enhanced remarkably, the nutrient salt content is lowered remarkably, and remarkable ecological benefit and landscape effect are achieved.

Description

A kind of stereo ecological restorative procedure of ultra nutrition-enriched water of lake
Technical field
The present invention relates to a kind of water body restorative procedure, be specifically related to a kind of ecological restoring method of ultra nutrition-enriched water of lake.
Background technology
The lake ecosystem major function is purification function (nutrition, organism and pollutent), function vector (species diversity and rare species), the function of regulating and storing (flood and arid), production function (fishery and water source), and other also have regulatory function (greenhouse gases), Social Culture function.The lake eutrophication of increasingly extensive generation then causes lake ecosystem degeneration (species diversity descends and functional deterioration), water quality property lack of water (deteriorating water quality and bad V class water increase) and environmental disaster (blue-green alga bloom outburst etc.).Eutrophication is that shallow lake aquatic vegetation is degenerated and the main driving factors that disappear.Overnutrition not only causes summer, the hydrobiont raised growth destroyed water landscape, and caused serious problems such as anoxic at night.Therefore, research adapts to the technology of serious eutrophic water body aquatic vegetation recovery, ecosystem restoration, finally improves the detergent power of water body, realizes continuing to improve the target of water quality, and is significant.But at present; Existing reduction lake eutrophication; The improvement engineering of recovering the normal ecosystem in lake all exists measure single, after implementing the recovery of the ecosystem slower, and the lake of higher, the easy appearance of treatment cost after the administering problem of eutrophication once more.
Summary of the invention
The objective of the invention is to remedy the deficiency of prior art, a kind of stereo ecological restorative procedure of ultra nutrition-enriched water of lake is provided.
Technical scheme provided by the invention is: a kind of stereo ecological restorative procedure of ultra nutrition-enriched water of lake, and this method may further comprise the steps:
(1) making up enclosure isolates water body and the outer water body of enclosure in the enclosure:
Thoroughly remove the foreign material of the lakebed of enclosure yet to be built; Some spud piles are inserted in the lakebed hard layers, and the degree of depth of inserting in the hard layer is no less than 1 meter, and the top of spud pile is not less than the trestle height in waters to be repaired, and the top of all spud piles and middle part are connected to form Fence structure with cable wire between laterally; Select waterproof and the water-proof canvas of tool as enclosure cloth; Enclosure cloth is fixedly connected on the inboard of spud pile with cable wire; The trestle level of blocking water height and waters to be repaired of enclosure cloth; Make enclosure cloth surround waters to be repaired, the bottom of enclosure cloth is fixed on the lakebed hard layer through gabion, and water body and the outer water body of enclosure in the enclosure are isolated fully;
(2) stereo ecological system constructing:
A. substrate transformation:
Remove the sharp object of waters substrate in the enclosure, by the consumption of 180~225 kg/ha white lime is sprayed the processing of cleaning up the pond after with water-dispersion with white lime then comprehensively;
B. lay waterplant by different level:
I. be lower than 1.5 meters offshore place employing sandbag or the bank protection under water of timber laying height 30~50cm in the depth of water, be used to make up the life condition of emergent and floatingleaved plant;
Ii. substrate is transformed and is finished after 5~7 days; Implement to lay by different level the waterplant kind: the depth of water is lower than 1.5 meters waters laying emergent and floatingleaved plant; Submerged plant is laid in the waters that the depth of water is 1.5~2 meters, and it is 60~100m that the waters of the depth of water more than 2 meters makes up area 2Ecological floating island, the total area of ecological floating island accounts for 5%~10% of water surface area in the enclosure;
Iii. waterplant is transplanted:
Connect root band earth to early April by the end of March in every year and transplant emergent, transplanting density is every square metre 2~3 strain; Annual mid or late April band root is transplanted floatingleaved plant, and transplanting density is every square metre 4~6 strain; Mid or late May in every year is transplanted submerged plant, and transplanting density is every square metre 5~8 strain;
C. biological control algae:
After waterplant is laid completion by different level; Throw in the silver carp bighead class of the long 3~5cm of body algae is controlled, the release time is annual late June, and quantity is every square metre 5~10 tail; The input ratio of silver carp class and bighead class is 1: 1, forms enclosure water body stereo ecological system;
(3) enclosure water body stereo ecological system running maintenance:
At enclosure water ecosystem run duration, periodic monitoring water body concentration of nitrogen and phosphorus changes; The upgrowth situation of periodic monitoring planktonic organism and waterplant, annual March~safeguard that waterplant, July carry out supplementary maintenance June; Dead plants and plant residue are cleared up or changed to the plant of regular maintenance ecological floating island, keeps the chinampa plant normal growth; Monitor the fish growth situation annual winter, carry out new and old replacement according to the fish growth situation to fish annual February~June; Maintenance service circulation to enclosure water body stereo ecological system is carried out, and gets into oneself's maintenance stage until it.
Wherein, spud pile is steel pipe or timber described in the step (1), and wherein steel pipe is for crossing the seamless GB steel pipe of zinc, is spaced apart 3~6 meters between adjacent steel pipe or the timber; The water tolerance of canvas is more than 5 years; The inboard of spud pile is fixed with hook, and enclosure cloth is fixedly connected on cable wire on the fixed hook of inboard of steel pipe or timber.
Wherein, The construction process of ecological floating island is described in the step (2): select for use wood materials to make up circle or quadra; Be fixed in lakebed with cable wire around the framework, framework upper is fixed with hard foam, lays 9~12 holes that the aperture is 5~8cm for every square metre on the hard foam; Plant according to selecting to be fit to plantation season in the hole, is built into ecological floating island with plant cultivating.The plant of spring and summer plantation in season is trifolium or chrysanthemum, and the plant that autumn and winter season plants is rye grass or arabian cron.
Can know by technique scheme; The present invention is fully recognized that ultra eutrophication water has obviously the solid space structure of gradation sense clearly; And shallow lake coastal belt proportion is big; Waterplant is an ecosystem primary structure component, waterplant through fixedly nutrition, suppress algae, the habitat function is provided and suppresses substrate resuspending function to purify water and stable environment; Through the accumulation of autotrophic organism living weight and food chain formation function system biological variety and resources bank.Stable and the Sustainable development of aquatic vegetation are lake ecosystem function and stable basis.Therefore lay special stress on is at first implemented enclosure structure and substrate transformation in the technical scheme of the present invention, and purpose is to utilize physical measure to create the envrionment conditions of aquatic plants growth; Consider the living environment demand of different waterplant then; Habit according to different plants from the offshore to the ballow disposes the dissimilar waterplant and the plant of water surface ecological floating island; Promptly lay waterplant by different level; With the recovery of promotion aquatic vegetation structure, and combine the ecological characteristic of ultra eutrophication water and the habit of plant, the migration process of strict control waterplant; Implement biological control algae besides, get rid of the disturbing influence of algal grown aquatic plants growth; Make ultra nutrition-enriched water of lake obtain comprehensive, omnibearing stereo ecological reparation, through implementing the running maintenance of enclosure water body stereo ecological system, get into oneself's maintenance stage at last, accomplish restoration of the ecosystem ultra nutrition-enriched water of lake until the ecosystem.Through to adopting the inventive method to repair that the monitoring data of water quality compares inside and outside the trial plot of water body, find in the trial plot water quality be improved significantly, water transparency significantly improves, nutrient concentrations is significantly reduction also.And weak point repair time that ultra eutrophication water is ecological, the enclosure ecosystem operation just can get into oneself's maintenance stage after 1~2 year.The situation that eutrophication do not occur repeatedly.
Compared with prior art, the present invention has the following advantages:
(1) takes into full account the solid space structure of ultra eutrophication water; Has obviously gradation sense clearly; Consider the habitat demand of different waterplant; From the offshore to the ballow, dispose the configuration of different waterplant types and water surface ecological floating island plant, have tangible ecological benefits and landscape effect.
(2) present technique each link around the rejuvenation of waterplant in implementation process is carried out; As implement at first that enclosure makes up and the substrate transformation; Purpose is to utilize physical measure to create the envrionment conditions of aquatic plants growth; Next is that the different plants configuration of shoaling water and the biological floating island of ballow make up, and further promotes the recovery of aquatic vegetation structure; Be to implement biological control algae once more, get rid of the disturbing influence of algal grown aquatic plants growth; Implement the maintenance and management of the ecosystem at last, get into oneself's maintenance stage until the ecosystem.
(3) present technique is specially adapted to the ecosystem restoration in the local waters of middle-size and small-size or large-scale eutrophication water, can significantly improve water quality, improves landscape effect.
Description of drawings
Fig. 1 is the connection state synoptic diagram of enclosure cloth, gabion and drill rod;
Fig. 2 is the enclosure structural representation;
Fig. 3 is an enclosure water body stereo ecological system schematic;
Among the figure, 1-lakebed hard layer; The 2-steel pipe; The 3-clasp; The 4-cable wire; 5-enclosure cloth; The 6-gabion; The 7-drill rod; The 8-steel rope sleeve; The 9-ecological floating island; The 10-emergent; The 11-floatingleaved plant; The 12-submerged plant; 13-lake surface; The 14-bank protection; 15-control algae fish.
Embodiment
Through specific embodiment the present invention is further described below, but protection content of the present invention is not limited to following examples.
Embodiment 1:
Eutrophication zone with the coastal belt at certain lake ecological station is the trial plot, and area is 1140m altogether 2, be divided into two zones of A, B and make up enclosures with as testing repetition, enclosure area: A:588m 2And B:552m 2
(1) make up enclosure:
The rake that takes off with spacing 5cm waits instrument to carry out the foreign material salvaging in advance, thoroughly removes the foreign material of lakebed in the enclosure yet to be built.Adopting some diameters then is that 80mm, thickness are crossing the seamless GB steel pipe 2 of zinc and (also can adopting timber as spud pile as spud pile of 3-4mm; The quantity of steel pipe or timber is confirmed according to enclosure area yet to be built) it is every that (common 3~6 meters get final product at a distance from a segment distance; The spacing of steel pipe or timber is 3 meters in the present embodiment) insert in the lakebed hard layer 1; The degree of depth of inserting can be decided according to the depth of water, silt depth; At least 1 meter the degree of depth in the requirement insertion hard layer; And the top that makes steel pipe 2 is not less than the trestle height in waters to be repaired, and the top of all steel pipes 2 and middle part welding clasp 3 with cable wire 4 is connected to form Fence structure with the top of steel pipe 2 and middle part between laterally through clasp 3.Select waterproof and water tolerance be canvas more than 5 years as enclosure cloth 5, the connection between the enclosure cloth 5 can be with the stainless steel substrates stitching that interlocks.On enclosure cloth 5, establish several holes (also can adopt fixedly other modes such as clasp); Cable wire 4 passes the inboard that enclosure cloth 5 vertical holes are fixedly connected on enclosure cloth 5 steel pipe 2; The height of enclosure cloth 5 can be confirmed according to the depth of water and lineament; Make the trestle level in water height and A or the B zone of blocking of enclosure cloth 5, surround waters to be repaired.Like Fig. 1; The bottom of enclosure cloth 5 and gabion 6 are sewed up the every steel rope sleeve 8 at a distance from about 1.5 meters sheathed diameter 1cm in the left and right sides in back; The fore-telling type drill rod 7 of steel rope sleeve 8 about through diameter 1cm is fixed on the lakebed hard layer 1; Water body and the outer water body of enclosure in the enclosure are isolated fully, be built into enclosure A and enclosure B, the enclosure structure is seen Fig. 2.Gabion 6 preferably adopts the higher stone of hardness to process, and the diameter of gabion 6 is 8cm in the present embodiment.
(2) stereo ecological system constructing:
A. substrate transformation:
Remove the sharp object of waters substrate in the enclosure, by the consumption of 180~225 kg/ha white lime is sprayed the processing of cleaning up the pond after with water-dispersion with white lime then comprehensively.
B. lay waterplant by different level:
I. the height apart from lake surface 13 is lower than 1.5 meters lakebed offshore place employing sandbag or the bank protection under water 14 of mud bag or timber laying height 30~50cm, to accumulate some settlings, is used to make up the life condition of emergent 10 and floatingleaved plant 11.
Ii. the base transformation finished after 5~7 days; The enclosure water transparency improves a lot; According to enclosure water body offshore characteristics; Implement to lay by different level the waterplant kind: the depth of water is lower than 1.5 meters waters laying emergent 10 and floatingleaved plant 11, and submerged plant 12 is laid in the waters that the depth of water is 1.5~2 meters, and it is 60~100m that the waters of the depth of water more than 2 meters makes up area 2Ecological floating island 9, the total area of ecological floating island 9 accounts for 5%~10% of water surface area in the enclosure.The construction method of ecological floating island 9 is: select for use wood materials to make up circle or quadra; Framework tiltedly draws with the cable wire latch closure all around and is fixed in lakebed; Framework upper is hard foam fixedly, lays 9~12 holes that the aperture is 5~8cm for every square metre on the hard foam; Select the suitable plant of planting based on Various Seasonal, the plant of spring and summer plantation in season is clover or chrysanthemum, selects rye grass or sudangrass to change autumn and winter to be got into, and the root system of selected plant is planted in the hole, is built into ecological floating island.
Iii. waterplant is transplanted:
Connect root band earth to early April by the end of March in every year and transplant emergent 10, transplanting density is every square metre 2~3 strain; Annual mid or late April band root is transplanted floatingleaved plant 11, and transplanting density is every square metre 4~6 strain; Mid or late May in every year is transplanted submerged plant 12, and transplanting density is every square metre 5~8 strain.
C. biological control algae:
After waterplant is laid completion by different level, because eutrophication water nutrition load is high, therefore; At enclosure water body initial operating stage, the phenomenon that algae grows (especially blue-green algae is preponderated, even situations such as wawter bloom occur) appears easily; Throwing in 15 pairs of algae of control algae fish such as silver carp bighead of the long 3~5cm of body this period controls; Release time is annual late June, and quantity is every square metre 5~10 tail, and the input ratio of silver carp class and bighead class is 1: 1; Form enclosure water body stereo ecological system, its structure is seen Fig. 3.
(3) enclosure water body stereo ecological system running maintenance:
At enclosure water ecosystem run duration, periodic monitoring water body concentration of nitrogen and phosphorus changes; The upgrowth situation of periodic monitoring planktonic organism and waterplant, annual March~safeguard that waterplant, July carry out supplementary maintenance June; Dead plants and plant residue are cleared up or changed to the plant of regular maintenance ecological floating island 9, keeps the chinampa plant normal growth; Monitor the fish growth situation annual winter, carry out new and old replacement according to the fish growth situation to fish annual February~June; Maintenance service circulation to enclosure water body stereo ecological system is carried out, and gets into oneself's maintenance stage until it.In general, the enclosure ecosystem operation just can get into oneself's maintenance stage after 1~2 year.
With the above-mentioned trial plot of distance apart from the website I of about 200m as contrast.After 1 month and 2 months, enclosure A, enclosure B and website I are carried out WQM respectively, concrete monitoring data is seen table 1.In addition, through detecting, the chlorophyll a content of enclosure A and enclosure B is respectively 28.47 μ g/L and 27.54 μ g/L after 3 months, and the chlorophyll a of website I is 43.27 μ g/L.Can know by above result, in the trial plot water quality be improved significantly, water transparency significantly improves, nutrient concentrations also significantly reduces.
The inside and outside WQM result in table 1 trial plot
Figure BDA0000102795930000061

Claims (4)

1. the stereo ecological restorative procedure of a ultra nutrition-enriched water of lake is characterized in that this method may further comprise the steps:
(1) making up enclosure isolates water body and the outer water body of enclosure in the enclosure:
Thoroughly remove the foreign material of the lakebed of enclosure yet to be built; Some spud piles are inserted in the lakebed hard layers, and the degree of depth of inserting in the hard layer is no less than 1 meter, and the top of spud pile is not less than the trestle height in waters to be repaired, and the top of all spud piles and middle part are connected to form Fence structure with cable wire between laterally; Select waterproof and the water-proof canvas of tool as enclosure cloth; Enclosure cloth is fixedly connected on the inboard of spud pile with cable wire; The trestle level of blocking water height and waters to be repaired of enclosure cloth; Make enclosure cloth surround waters to be repaired, the bottom of enclosure cloth is fixed on the lakebed hard layer through gabion, and water body and the outer water body of enclosure in the enclosure are isolated fully;
(2) stereo ecological system constructing:
A. substrate transformation:
Remove the sharp object of waters substrate in the enclosure, by the consumption of 180~225 kg/ha white lime is sprayed the processing of cleaning up the pond after with water-dispersion with white lime then comprehensively;
B. lay waterplant by different level:
I. be lower than 1.5 meters offshore place employing sandbag or the bank protection under water of timber laying height 30~50cm in the depth of water, be used to make up the life condition of emergent and floatingleaved plant;
Ii. substrate is transformed and is finished after 5~7 days; Implement to lay by different level the waterplant kind: the depth of water is lower than 1.5 meters waters laying emergent and floatingleaved plant; Submerged plant is laid in the waters that the depth of water is 1.5~2 meters, and it is 60~100m that the waters of the depth of water more than 2 meters makes up area 2Ecological floating island, the total area of ecological floating island accounts for 5%~10% of water surface area in the enclosure;
Iii. waterplant is transplanted:
Connect root band earth to early April by the end of March in every year and transplant emergent, transplanting density is every square metre 2~3 strain; Annual mid or late April band root is transplanted floatingleaved plant, and transplanting density is every square metre 4~6 strain; Mid or late May in every year is transplanted submerged plant, and transplanting density is every square metre 5~8 strain;
C. biological control algae:
After waterplant is laid completion by different level; Throw in the silver carp bighead class of the long 3~5cm of body algae is controlled, the release time is annual late June, and quantity is every square metre 5~10 tail; The input ratio of silver carp class and bighead class is 1: 1, forms enclosure water body stereo ecological system;
(3) enclosure water body stereo ecological system running maintenance:
At enclosure water ecosystem run duration, periodic monitoring water body concentration of nitrogen and phosphorus changes; The upgrowth situation of periodic monitoring planktonic organism and waterplant, annual March~safeguard that waterplant, July carry out supplementary maintenance June; Dead plants and plant residue are cleared up or changed to the plant of regular maintenance ecological floating island, keeps the chinampa plant normal growth; Monitor the fish growth situation annual winter, carry out new and old replacement according to the fish growth situation to fish annual February~June; Maintenance service circulation to enclosure water body stereo ecological system is carried out, and gets into oneself's maintenance stage until it.
2. the stereo ecological restorative procedure of ultra nutrition-enriched water of lake according to claim 1; It is characterized in that: spud pile is steel pipe or timber described in the step (1); Wherein steel pipe is for crossing the seamless GB steel pipe of zinc, is spaced apart 3~6 meters between adjacent steel pipe or the timber; The water tolerance of canvas is more than 5 years; The inboard of spud pile is fixed with hook, and enclosure cloth is fixedly connected on cable wire on the fixed hook of inboard of steel pipe or timber.
3. the stereo ecological restorative procedure of ultra nutrition-enriched water of lake according to claim 1; The construction process that it is characterized in that ecological floating island described in the step (2) is: select for use wood materials to make up circle or quadra; Be fixed in lakebed with cable wire around the framework; Framework upper is fixed with hard foam, lays 9~12 holes that the aperture is 5~8cm for every square metre on the hard foam; Plant according to selecting to be fit to plantation season in the hole, is built into ecological floating island with plant cultivating.
4. the ecological restoring method of ultra nutrition-enriched water of lake according to claim 3 is characterized in that: the plant of spring and summer plantation in season is trifolium or chrysanthemum on the ecological floating island, autumn and winter season the plant of plantation be rye grass or arabian cron.
CN2011103320012A 2011-10-27 2011-10-27 Three-dimensional ecological restoration method for supereutrophic lake water body Active CN102432108B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103320012A CN102432108B (en) 2011-10-27 2011-10-27 Three-dimensional ecological restoration method for supereutrophic lake water body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103320012A CN102432108B (en) 2011-10-27 2011-10-27 Three-dimensional ecological restoration method for supereutrophic lake water body

Publications (2)

Publication Number Publication Date
CN102432108A CN102432108A (en) 2012-05-02
CN102432108B true CN102432108B (en) 2012-11-28

Family

ID=45980518

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103320012A Active CN102432108B (en) 2011-10-27 2011-10-27 Three-dimensional ecological restoration method for supereutrophic lake water body

Country Status (1)

Country Link
CN (1) CN102432108B (en)

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103663801A (en) * 2012-09-07 2014-03-26 宁波清川环保工程有限公司 Cofferdam pollutant source purifying system
CN102976494A (en) * 2012-12-06 2013-03-20 东南大学 Multi-habitat ecological pond system
CN103073112B (en) * 2013-02-01 2013-12-18 江苏省农业科学院 Aquatic plant system for recovering original ecology of polluted water
CN103392457B (en) * 2013-05-21 2014-10-29 四川大学 Environmental protection method combining eutrophic water body treatment, conservation of water and soil and landscape planting as whole
CN103253773B (en) * 2013-05-28 2015-01-21 温州大学 Floating floor device applied to water body ecological restoration
CN103663708A (en) * 2013-12-12 2014-03-26 复旦大学 Method and system for controlling ecological sensitive area blue algae bloom of eutrophic large-size lakes and reservoirs
CN104176829B (en) * 2014-08-25 2016-05-25 郑丙辉 Administer large system control method and the device of shallow lake water ecological environment
CN104230001B (en) * 2014-09-30 2016-04-20 浙江海洋学院 Freshwater lake ecological algae control method
CN104909447B (en) * 2015-06-25 2017-06-27 四川鑫淼环保科技有限责任公司 It is applied to the purse seine partition apparatus of lake library partition ecological system degradation
CN105540808B (en) * 2016-01-18 2018-12-18 北京绿景行科技发展有限公司 A kind of method of medium eutrophic water body dephosphorization control algae
CN106192873B (en) * 2016-07-21 2018-08-24 广西红树林研究中心 Island Wetland ecological water-retaining method
CN106242064B (en) * 2016-08-31 2023-08-18 广州市水务科学研究院有限公司 Ecological restoration method for high hydraulic load artificial lake shore zone
CN107381941B (en) * 2017-07-27 2023-05-19 中国环境科学研究院 Three-stage barrier ecological wall
CN107935184A (en) * 2017-11-17 2018-04-20 南京大学 A kind of method for building the small-sized more phenological type aquatic vegetation buffer belts in river
CN110182954B (en) * 2018-03-01 2021-12-28 建基建设集团有限公司 Method for treating blue algae
CN109179857B (en) * 2018-05-04 2022-01-07 暨南大学 Eutrophic water body remediation method based on ecological isolation, fish remediation, substrate phosphorus locking and plant capture
CN109468997B (en) * 2018-11-05 2020-04-03 中国科学院南京地理与湖泊研究所 Substrate improvement and terrain remodeling method for eutrophic water body
CN109763560B (en) * 2019-03-12 2023-12-08 中铁四川生态城投资有限公司 Terrace type ecological landscape lake and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5820759A (en) * 1996-10-09 1998-10-13 Mfm Environmental Co. Integrated aquaculture and bioremediation system and method
US6065245A (en) * 1997-10-10 2000-05-23 Seawright; Damon E. Integrated aquaculture-hydroponics systems: nutrient dynamics and designer diet development
CN1562810A (en) * 2004-03-27 2005-01-12 中国科学院水生生物研究所 Method for renovating zoology in lakeshore zone
CN101041539A (en) * 2007-03-07 2007-09-26 北京城市排水集团有限责任公司 Water quality purification method in source-free water area and facilities
CN101108746A (en) * 2006-07-21 2008-01-23 上海市南洋模范中学 Comprehensive treatment method restoring polluted aquifer ecology
CN101161944A (en) * 2006-10-12 2008-04-16 天津市环境保护科学研究院 Construction technique for beach saline land landscape water aquatic plant system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5820759A (en) * 1996-10-09 1998-10-13 Mfm Environmental Co. Integrated aquaculture and bioremediation system and method
US6065245A (en) * 1997-10-10 2000-05-23 Seawright; Damon E. Integrated aquaculture-hydroponics systems: nutrient dynamics and designer diet development
CN1562810A (en) * 2004-03-27 2005-01-12 中国科学院水生生物研究所 Method for renovating zoology in lakeshore zone
CN101108746A (en) * 2006-07-21 2008-01-23 上海市南洋模范中学 Comprehensive treatment method restoring polluted aquifer ecology
CN101161944A (en) * 2006-10-12 2008-04-16 天津市环境保护科学研究院 Construction technique for beach saline land landscape water aquatic plant system
CN101041539A (en) * 2007-03-07 2007-09-26 北京城市排水集团有限责任公司 Water quality purification method in source-free water area and facilities

Also Published As

Publication number Publication date
CN102432108A (en) 2012-05-02

Similar Documents

Publication Publication Date Title
CN102432108B (en) Three-dimensional ecological restoration method for supereutrophic lake water body
CN102668831B (en) Submerged plant breeding blanket and application thereof
CN203968948U (en) Seabed drift sand environment coral is transplanted reef base
CN103858632B (en) A kind of production method of combined type submerged plant turf
CN102976492B (en) Water ecological purification system and method
CN106171816A (en) A kind of construction method of breeding pollution beach Rhizophora apiculata Blume
CN104351034B (en) A kind of happiness salt grass fingerlings artificial cultural method repaired for marine ecology
CN101982069A (en) Method for constructing integrated submarine forest
CN104787891A (en) Algal blooming ecological control system based on micro-terrain reconstruction, ecological method for controlling algal blooming and application
CN105129998A (en) Three-dimensional ecological restoration and purification technology applied to deep reservoirs
Hashemloian et al. Alien and exotic Azolla in northern Iran
CN104521731A (en) Sargassum horneri seaweed bed human-induced restoration device and restoration method thereof
JP4948945B2 (en) Restoration, creation and maintenance methods for biodegradable eel nursery sheets and eelgrass beds
CN104129859B (en) A kind of method utilizing aquatic floating plant floating bed to purify water
CN102633367A (en) Ecological restoration method for treating eutrophic water body by utilizing Nuphar sinensis
CN108793413A (en) Nearshore waters ecological restoring method
CN107306629A (en) A kind of method for building the ecological sloping bank of near-nature forest
CN104938323B (en) Over-summer seedling culture method for juvenile sporophytes of gulfweeds in mixed water area
CN208850443U (en) Floating drum cage type biological floating island device
JP5089507B2 (en) Environmental improvement material, environmental restoration material in coastal area, artificial tidal flat, artificial tidal flat creation method, soil layer improvement material, crop cultivation soil, crop cultivation soil creation method, and crop production method
KR20150048372A (en) Afforestation methods and devices that expand vegetation to lake surfaces to prevent algal blooms
CN207404949U (en) The ecological restoration device in type semienclosed sea area
CN105961230A (en) Cultivation and planting method for madrepore in natural sea area
CN107522288A (en) The ecological restoration device and its application method in type semienclosed sea area
KR101748240B1 (en) The step artificial reef of pyramid shape

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant