CN102418508B - Using method of water jet packing tool - Google Patents

Using method of water jet packing tool Download PDF

Info

Publication number
CN102418508B
CN102418508B CN201110407916.5A CN201110407916A CN102418508B CN 102418508 B CN102418508 B CN 102418508B CN 201110407916 A CN201110407916 A CN 201110407916A CN 102418508 B CN102418508 B CN 102418508B
Authority
CN
China
Prior art keywords
tool
water jet
construction
well head
constructed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110407916.5A
Other languages
Chinese (zh)
Other versions
CN102418508A (en
Inventor
邓小强
陈平
苏敏文
曹欣
韩虎成
王建树
张宏波
张波
张文
高银锁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd filed Critical Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN201110407916.5A priority Critical patent/CN102418508B/en
Publication of CN102418508A publication Critical patent/CN102418508A/en
Application granted granted Critical
Publication of CN102418508B publication Critical patent/CN102418508B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention provides a water jet packing tool, which is formed by connecting water jet packing tools of different sizes according to the preset sequence. A construction method for the process pipe column is mainly characterized in that: the corresponding water jet packing tools are opened in a mode of delivering balls to drive sliding sleeves, and the construction layers are sequentially constructed in a mode of uplifting the pipe column. The water jet packing tool is simple in structure and convenient to operate, is not limited by the size of a shaft, prevents a packer from easily failing due to long-time repeated setting in a high-temperature and high-pressure environment, and has good adaptability and long service life.

Description

A kind of using method of Water jet packing tool
Technical field
The invention belongs to oil gas field stimulation technology field, relate to a kind of using method of Water jet packing tool.
Background technology
Jetting process pipe string is the conventional process tubing string of oil field compression fracture perforation continuous cropping construction operation, and its feature is that perforation and pressure break are effectively combined in a process pipe string, saves perforation working procedure one.But, straight well and perforating and fracturing number of plies of horizontal well increase at present, the exploitation of multilayer layering fixed tubular column Water jet packing tool has been subject to the restriction of borehole size and has been difficult to realize, and packer repeatedly sets easy inefficacy for a long time in high temperature and high pressure environment, so develop this kind of Water jet packing process pipe string in multilayer hydraulic jetting fracturing, by dragging the mode of tubing string, can effectively protect the Water jet packing tool of construction layer not and can guarantee, under construction quality and safe prerequisite, the performance of Water jet packing tool packing element and nozzle is performed to maximum.
Summary of the invention
The object of the present invention is to provide a kind of using method of Water jet packing tool, existing because being subject to the restriction of borehole size to be difficult to realize to overcome existing Water jet packing process pipe string, and packer repeatedly sets the problem of easy inefficacy for a long time in high temperature and high pressure environment.
For reaching above-mentioned purpose, the invention provides a kind of Water jet packing tool, its special character is, by the Water jet packing tool of different size, according to reservation, is linked in sequence and forms.
A kind of Water jet packing tool, its using method comprises the following steps:
1), by the process pipe string being linked in sequence according to reservation by the Water jet packing tool of different progression, be lowered to predetermined depth location;
2) steel ball of corresponding size is dropped into this process pipe string from well head; (when horizontal segment, need to use the pumping of pump small displacement);
3) steel ball can, by the internal diameter hydrajet tool larger than its outside dimension, be seated on the sliding sleeve of hydrajet tool of corresponding size;
4) well head continues small displacement pumping liquid;
5) oil pressure is increased to while being greater than opening pressure, and the hydrajet tool of this corresponding size is unlocked and first floor construction layer is constructed;
6) the rear termination of pumping of having constructed, upwards drags tubing string by well head, will in the hydrajet tool of this corresponding size, mention second layer construction layer predeterminated position;
8) well head continues small displacement pumping liquid;
9) oil pressure is increased to while being greater than opening pressure, the hydrajet tool of this corresponding size is unlocked and second layer construction layer is constructed;
10) the rear termination of pumping of having constructed, upwards drags tubing string by well head, just in the hydrajet tool of this corresponding size, mentions tri-level construction layer predeterminated position;
12) well head continues small displacement pumping liquid;
13) oil pressure is increased to while being greater than opening pressure, and the hydrajet tool of this corresponding size is unlocked and tri-level construction layer is constructed;
14) hydrajet tool of this corresponding size is completed after the construction of tri-level construction layer, in well head, throw another steel ball, by opening with the corresponding hydrajet tool of this another ball size in described process pipe string, carry out equally above-mentioned construction, so repeatedly, until whole construction layer constructed.
Step 2) in when the steel ball of corresponding size is dropped into from well head to described process pipe string, if need with this steel ball of pump small displacement pumping at the horizontal segment of oil pipe.
According to how many decisions of the construction number of plies, be lowered to how many grades of hydrajet tool, the 3 × construction number of plies=1 × be lowered to progression.
Advantage of the present invention is: the Water jet packing tool of different size is synthesized to a process pipe string according to certain der group, by pitching skid cover mode open corresponding Water jet packing tool, mode by upper lifting pipe post is constructed to different construction layers position successively, simple in structure, easy to operate, be not subject to the restriction of borehole size, avoided packer in high temperature and high pressure environment, repeatedly to set for a long time the phenomenon of easy inefficacy, there is good compliance and longer application life.
Accompanying drawing explanation
Below with reference to accompanying drawing, the present invention is described in further details:
Fig. 1 is structural representation of the present invention;
Fig. 2 is to first floor construction schematic diagram after first order Water jet packing tool of the present invention is opened;
Fig. 3 makes first order Water jet packing tool to the second layer schematic diagram of constructing by well head upper lifting pipe post;
Fig. 4 makes first order Water jet packing tool to tri-level construction schematic diagram by well head upper lifting pipe post;
Fig. 5 throws another firm ball to open second level Water jet packing tool to the 4th layer of construction schematic diagram.
In figure: 1, one-level Water jet packing tool; 2, secondary Water jet packing tool; 3, three grades of Water jet packing tools; 4, guide shoe; 5, oil pipe; 6, first floor construction layer; 7, second layer construction layer; 8, tri-level construction layer; 9, N layer construction layer; 10, well head; 11, steel ball; 12, another steel ball.
The specific embodiment
Be illustrated in figure 1 the structural representation of the Water jet packing tool that the present embodiment provides, be not difficult to find out, this multi-stage water power sprays packing process pipe string and is linked in sequence and forms according to reservation by the Water jet packing tool of different size, it is three grades of Water jet packing process pipe strings that multi-stage water power shown in this figure sprays packing process pipe string, mainly the guide shoe 4 that is arranged on one-level Water jet packing tool 1 outside oil pipe 5, secondary Water jet packing tool 2, three grades of Water jet packing tools 3 from bottom to top and is arranged on the bottom of oil pipe 5, consists of; Certainly, in this figure, giving construction layer is first floor construction layer 6, second layer construction layer 7, tri-level construction layer 8 ... N construction layer 9 and well head 10.
On the basis of Fig. 1, we are in conjunction with Fig. 2,3,4 and 5, and the work progress that the multi-stage water power injection packing process pipe string that the present embodiment is provided will carry out is that method is described in detail:
The using method of the Water jet packing tool providing by the present embodiment, the process pipe string being linked in sequence of first Water jet packing tool by different progression being opened according to pitching, is lowered to predetermined depth location; Then the steel ball 11 of (Ф 34-Ф 47) is dropped into this process pipe string from well head 10; (when horizontal segment, need to use pump little Pai Liang≤0.5m 3/ min pumping); Steel ball 11 can, by the internal diameter hydrajet tool larger than its outside dimension, be seated on the sliding sleeve of one-level Water jet packing tool 1; Well head continues small displacement pumping liquid; Oil pressure is increased to while being greater than opening pressure, and one-level hydrajet tool 1 is unlocked and to first floor construction layer 6 (see figure 2) of constructing; The rear termination of pumping of having constructed, upwards drags tubing string by well head, will in one-level hydrajet tool 1, mention second layer construction layer 7 predeterminated positions; Well head is by operational discharge capacity pumping liquid and to second layer construction layer 7 construct (shown in Fig. 3); The rear termination of pumping of having constructed, upwards drags tubing string by well head, will in one-level hydrajet tool 1, mention tri-level construction layer 8 predeterminated position; Well head is by operational discharge capacity pumping liquid and to tri-level construction layer 8 construct (shown in Fig. 4); One-level hydrajet tool 1 is completed after the construction of tri-level construction layer, in well head, throw another steel ball 12, by in process pipe string with this another steel ball 12(Ф 39-Ф 47), secondary hydrajet tool 2 is opened to (see figure 5), carry out equally above-mentioned construction, so repeatedly, until whole construction layer complete.
The concrete progression that the multi-stage water power that the present embodiment provides sprays packing process pipe string determines according to the construction number of plies.3 × construction the number of plies=1 × be lowered to progression.
The multi-stage water power that provides by the present embodiment sprays packing process pipe string in multilayer hydraulic jetting fracturing, by dragging the mode of tubing string, can effectively protect the Water jet packing tool of construction layer not and can guarantee, under construction quality and safe prerequisite, the performance of Water jet packing tool packing element and nozzle is performed to maximum.
More than exemplifying is only to illustrate of the present invention, does not form the restriction to protection scope of the present invention, within the every and same or analogous design of the present invention all belongs to protection scope of the present invention.

Claims (1)

1. a using method for Water jet packing tool, is characterized in that: it comprises the following steps:
1) process pipe string being linked in sequence of the Water jet packing tool by different progression being opened according to pitching, is lowered to predetermined depth location;
2) steel ball of Ф 34-Ф 47 is dropped into this process pipe string from well head; When horizontal segment, need to use pump little Pai Liang≤0.5m 3/ min pumping;
3) steel ball can, by the internal diameter hydrajet tool larger than its outside dimension, be seated on the sliding sleeve of hydrajet tool of corresponding size;
4) well head continues small displacement pumping liquid;
5) oil pressure is increased to while being greater than opening pressure, and the hydrajet tool of this corresponding size is unlocked and first floor construction layer is constructed;
6) the rear termination of pumping of having constructed, upwards drags tubing string by well head, will in the hydrajet tool of this corresponding size, mention second layer construction layer predeterminated position;
7) well head continues small displacement pumping liquid;
8) oil pressure is increased to while being greater than opening pressure, and the hydrajet tool of this corresponding size is opened and second layer construction layer is constructed;
9) the rear termination of pumping of having constructed, upwards drags tubing string by well head, will in the hydrajet tool of this corresponding size, mention tri-level construction layer predeterminated position;
10) well head continues small displacement pumping liquid;
11) oil pressure is increased to while being greater than opening pressure, and the hydrajet tool of this corresponding size is opened and tri-level construction layer is constructed;
12) hydrajet tool of this corresponding size is completed after the construction of tri-level construction layer, in well head, throw another steel ball that is of a size of Ф 39-Ф 47, by opening with the corresponding hydrajet tool of this another ball size in described process pipe string, carry out equally in order step 2-11 construction sequence, so repeatedly, until whole construction layer constructed;
According to how many decisions of the construction number of plies, be lowered to how many grades of hydrajet tool, the 3 × construction number of plies=1 × be lowered to progression.
CN201110407916.5A 2011-12-09 2011-12-09 Using method of water jet packing tool Active CN102418508B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110407916.5A CN102418508B (en) 2011-12-09 2011-12-09 Using method of water jet packing tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110407916.5A CN102418508B (en) 2011-12-09 2011-12-09 Using method of water jet packing tool

Publications (2)

Publication Number Publication Date
CN102418508A CN102418508A (en) 2012-04-18
CN102418508B true CN102418508B (en) 2014-05-07

Family

ID=45943128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110407916.5A Active CN102418508B (en) 2011-12-09 2011-12-09 Using method of water jet packing tool

Country Status (1)

Country Link
CN (1) CN102418508B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103470242B (en) * 2013-09-14 2015-08-19 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of oilfield horizontal well volume fracturing method
CN104879159B (en) * 2015-06-11 2017-07-28 河南理工大学 A kind of devices and methods therefor of weak seam stope anti-reflection mash gas extraction
CN106481329A (en) * 2015-08-27 2017-03-08 中国石油化工股份有限公司 A kind of volume fracturing tubing string and its fracturing process
CN107313761B (en) * 2016-04-26 2019-06-07 中国石油化工股份有限公司 A kind of pressure break hole opening/closing system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003056131A1 (en) * 2001-12-31 2003-07-10 Sofitech N.V. Method and apparatus for placement of multiple fractures in open hole wells
CN201090188Y (en) * 2007-09-18 2008-07-23 中国石油天然气股份有限公司 Fixedly tubular pile delamination hydraulic jet perforating and compression fracture integration tubular pile
CN101270639A (en) * 2008-04-30 2008-09-24 中国石油天然气股份有限公司 Packer packing multi-layer hydropower abrasive perforating and fracturing integrated technique
CN201372774Y (en) * 2009-02-23 2009-12-30 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Multistage hydraulic jetting and fracturing technological tubular column
CN201802376U (en) * 2010-09-07 2011-04-20 中国石油天然气股份有限公司 Barefoot well completion hydraulic power sand blast immovable pipe column staged fracturing string

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9249652B2 (en) * 2009-07-20 2016-02-02 Conocophillips Company Controlled fracture initiation stress packer

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003056131A1 (en) * 2001-12-31 2003-07-10 Sofitech N.V. Method and apparatus for placement of multiple fractures in open hole wells
CN201090188Y (en) * 2007-09-18 2008-07-23 中国石油天然气股份有限公司 Fixedly tubular pile delamination hydraulic jet perforating and compression fracture integration tubular pile
CN101270639A (en) * 2008-04-30 2008-09-24 中国石油天然气股份有限公司 Packer packing multi-layer hydropower abrasive perforating and fracturing integrated technique
CN201372774Y (en) * 2009-02-23 2009-12-30 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Multistage hydraulic jetting and fracturing technological tubular column
CN201802376U (en) * 2010-09-07 2011-04-20 中国石油天然气股份有限公司 Barefoot well completion hydraulic power sand blast immovable pipe column staged fracturing string

Also Published As

Publication number Publication date
CN102418508A (en) 2012-04-18

Similar Documents

Publication Publication Date Title
CN102536185B (en) Multi-stage draggable water-jet packer tubular column and technology
CN102562019A (en) Sand jet perforation annular mechanical packing multilayer fracturing tool pipe column and modification process
CN201902202U (en) Staged fracturing string of oil-gas horizontal well
CN101270639A (en) Packer packing multi-layer hydropower abrasive perforating and fracturing integrated technique
CN103867177A (en) Horizontal well fracturing method
CN102022104A (en) Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method
CN104213891B (en) Old well repeats transformation coiled tubing controllable confining process pipe string
CN102418508B (en) Using method of water jet packing tool
CN101979823A (en) Hydraulic jet perforation, fracturing and gas lift liquid drainage integrated technical pipe column
CN102691495A (en) High-broken-pressure stratum horizontal well sectional-fracturing method for well cementation and completion of casing
CN107489405B (en) Method for dragging sand-blasting perforation and annular sand-filling staged fracturing by continuous oil pipe
CN104564003A (en) Drilling-plug-free pumping-in hydraulic bridge plug staged fracturing method
CN105484719A (en) Method for improving multi-cluster crack initiation effectiveness by blocking seams through multi-scale soluble balls
CN104213895A (en) Hydraulic sand jet perforation, fracture and sand filling integrated technological method
CN103266875A (en) Fracturing operation method of multistage hydraulic jet staged fracturing tubular column
CN103266873A (en) Connecting structure of multilevel hydraulic spraying segmentation fracturing tubular column
CN104695923A (en) Method for realizing sectional multi-cluster fracture of horizontal well by adopting soluble balls
CN104213894A (en) Selective re-fracturing technology for old well of oil field
CN103266876A (en) Fracturing working method of multilevel hydraulic spraying segmentation fracturing tubular column
CN104563997A (en) Water-jet and bridge plug combined process tubing string and work thereof
CN201412134Y (en) Small-casing pipe string for multilayer fracturing
CN202832439U (en) Oil filed in-layer subdivision water injection technology tubular column
CN203188991U (en) Sliding sleeve type layered eight-level fracturing pipe column
CN202645526U (en) Jet flow sand blasting cracking device
CN110107263B (en) Method for exploiting coal bed gas from tectonic coal reservoir

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201027

Address after: 100007 Dongcheng District, Dongzhimen, China, North Street, No. 9 Oil Mansion, No.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC CHUANQING DRILLING ENGINEERING Co.,Ltd.

Address before: 710018 Shaanxi province Xi'an Weiyang Changqing Changqing prosperous Park District Building Room 1207

Patentee before: CNPC CHUANQING DRILLING ENGINEERING Co.,Ltd.