CN103266875A - Fracturing operation method of multistage hydraulic jet staged fracturing tubular column - Google Patents
Fracturing operation method of multistage hydraulic jet staged fracturing tubular column Download PDFInfo
- Publication number
- CN103266875A CN103266875A CN2013100634464A CN201310063446A CN103266875A CN 103266875 A CN103266875 A CN 103266875A CN 2013100634464 A CN2013100634464 A CN 2013100634464A CN 201310063446 A CN201310063446 A CN 201310063446A CN 103266875 A CN103266875 A CN 103266875A
- Authority
- CN
- China
- Prior art keywords
- spray gun
- sliding sleeve
- construction
- nozzle
- tubing string
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 44
- 238000012856 packing Methods 0.000 claims abstract description 99
- 238000010276 construction Methods 0.000 claims abstract description 93
- 238000005553 drilling Methods 0.000 claims abstract description 38
- 238000011010 flushing procedure Methods 0.000 claims abstract description 13
- 239000007921 spray Substances 0.000 claims description 233
- 239000012530 fluid Substances 0.000 claims description 53
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 47
- 238000002347 injection Methods 0.000 claims description 45
- 239000007924 injection Substances 0.000 claims description 45
- 229910000831 Steel Inorganic materials 0.000 claims description 27
- 239000010959 steel Substances 0.000 claims description 27
- 238000003825 pressing Methods 0.000 claims description 23
- 239000004576 sand Substances 0.000 claims description 23
- 239000003292 glue Substances 0.000 claims description 18
- 238000003672 processing method Methods 0.000 claims description 18
- 238000013461 design Methods 0.000 claims description 17
- 239000007788 liquid Substances 0.000 claims description 13
- 230000003628 erosive effect Effects 0.000 claims description 9
- 230000008859 change Effects 0.000 claims description 6
- 238000005520 cutting process Methods 0.000 claims description 6
- 238000011022 operating instruction Methods 0.000 claims description 5
- 230000009471 action Effects 0.000 claims description 4
- 238000007689 inspection Methods 0.000 claims description 4
- 238000012360 testing method Methods 0.000 claims description 4
- 239000002253 acid Substances 0.000 abstract description 5
- 238000005516 engineering process Methods 0.000 description 17
- 239000010410 layer Substances 0.000 description 15
- 230000008569 process Effects 0.000 description 14
- 239000000956 alloy Substances 0.000 description 11
- 229910045601 alloy Inorganic materials 0.000 description 11
- 230000000694 effects Effects 0.000 description 9
- PXHVJJICTQNCMI-UHFFFAOYSA-N Nickel Chemical group [Ni] PXHVJJICTQNCMI-UHFFFAOYSA-N 0.000 description 6
- 238000005507 spraying Methods 0.000 description 6
- UONOETXJSWQNOL-UHFFFAOYSA-N tungsten carbide Chemical compound [W+]#[C-] UONOETXJSWQNOL-UHFFFAOYSA-N 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 238000005086 pumping Methods 0.000 description 5
- 230000006378 damage Effects 0.000 description 4
- 230000015572 biosynthetic process Effects 0.000 description 3
- 239000004568 cement Substances 0.000 description 3
- JPNWDVUTVSTKMV-UHFFFAOYSA-N cobalt tungsten Chemical compound [Co].[W] JPNWDVUTVSTKMV-UHFFFAOYSA-N 0.000 description 3
- 238000011161 development Methods 0.000 description 3
- 230000018109 developmental process Effects 0.000 description 3
- 239000011229 interlayer Substances 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 229910052759 nickel Inorganic materials 0.000 description 3
- 239000003129 oil well Substances 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- 101100175010 Caenorhabditis elegans gbf-1 gene Proteins 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 239000011248 coating agent Substances 0.000 description 2
- 238000000576 coating method Methods 0.000 description 2
- 230000008014 freezing Effects 0.000 description 2
- 238000007710 freezing Methods 0.000 description 2
- 208000014674 injury Diseases 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000007747 plating Methods 0.000 description 2
- 239000000843 powder Substances 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 210000000664 rectum Anatomy 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 230000011218 segmentation Effects 0.000 description 2
- GOLXNESZZPUPJE-UHFFFAOYSA-N spiromesifen Chemical compound CC1=CC(C)=CC(C)=C1C(C(O1)=O)=C(OC(=O)CC(C)(C)C)C11CCCC1 GOLXNESZZPUPJE-UHFFFAOYSA-N 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000005856 abnormality Effects 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000000178 monomer Substances 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000009418 renovation Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 230000001568 sexual effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000000638 stimulation Effects 0.000 description 1
- 230000008719 thickening Effects 0.000 description 1
- 238000000844 transformation Methods 0.000 description 1
- 235000020681 well water Nutrition 0.000 description 1
Images
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The invention discloses a fracturing operation method of a multistage hydraulic jet staged fracturing tubular column. The method comprises the following steps that S1: pigging and well flushing are carried out firstly to the multistage hydraulic jet staged fracturing tubular column before descent; S2: the multistage hydraulic jet staged fracturing tubular column is assembled; S3: a drilling tool is fed and adjusted to a construction position; and S4: wellhead and surface pipelines are arranged, and the pressure is tested. The fracturing operation method is simple, multistage jet packing tools can be connected according to the number of stratums needing acid fracturing, and different stratums are fractured, so that six or more sections of hydraulic jet and fracturing combined construction can be realized currently by one time of drilling in a mode of dragging the tubular column, the tandem connection of the multistage jet packing tools can greatly accelerate the construction speed, and the construction time is saved.
Description
Technical field
The present invention relates to the pressure break method of work that a kind of multi-stage water power sprays the staged fracturing tubing string, be used for the completion well stimulation of oil and gas well drilling process, relate to acid fracturing construction tool design and manufacturing technology field.
Background technology
Jetting segmentation renovation technique is to grow up, use technology more widely the end of the nineties abroad, it is the product that jetting and fracturing technique combine, it is the technology that beam hole, fracturing yield increasing measure technology and one-trip string are realized the construction of horizontal well multistage, this technology can be at bore hole, the fixed sleeve pipe of cement, do not carry out pressure break under the multiple completion mode such as fixed screen casing, compare with packer, bridging plug, back-up sand, plug technology mode, efficiency of construction can be greatly improved.Jetting staged fracturing know-why is that pressure energy is changed into kinetic energy, the jet velocity that the oil pipe pressurized with fluid goes out by nozzle ejection is greater than the high-speed jet of 126 m/s, jet becomes seam in the stratum, after the hydraulic jet perforation, then improve discharge capacity, in the well of penetrating the perforate top and the bottom, produce negative pressure value and form isolation, high-velocity fluid forms hole in formation rock, directly act on the hole bottom, generation is higher than the pressure gesture of formation fracture pressure, in the stratum, produce crack, a sand fracturing then.
Realize the technology of horizontal well multistage construction in order to implement one-trip string, just need to adopt a kind of multi-stage water power to spray the pressure break method of work of staged fracturing tubing string.According to technical literature retrieval situation, the situation relevant with present technique is as follows:
1. the existing report of combined string jetting staged fracturing method domestic literature of spray gun sliding sleeve is opened in fixed tubular column jetting staged fracturing technology, ball-off, the pitching of employing pitching sliding sleeve technology.
2. adopt shift sleeve structure fixed tubular column jetting segmentation multiple fracturing instrument, adopt the packer of sliding sleeve+backwash passage etc. to optimize structure+a multiple fracturing QHY341 packer development of gradually deblocking and use the existing report of domestic literature, but not mentioned alternative sets, has the technology contents of the packer of shift sleeve structure and fluid course control.
3. the fracturing fluid of the row of returning fast tubing string, fracturing string that anti-" sand plug " of backwash sliding sleeve be set in the pump barrel bottom is difficult for existing report of pilot sandblast packer domestic literature of a pressure break multilayer of fixed tubular column of the pressure break of the press seal of sand card+sandblast body inner sliding sleeve+step by step+step by step and multistage use+passage.
4. spray gun and nozzle surface carry out jetting separate stratum fracfturing instrument, nozzle installation external surface and the sealing positioning sleeve front end face of antirust processing and existing report of the anti-backwash erosion structure domestic literature of sand jet perforator that nozzle is installed external surface coating thickness 1mm cemented carbide powder wear-resistant coating.
Publication number is CN202500541U, the Chinese patent literature that open day is on October 24th, 2012 discloses a kind of gas well straight well multilevel hierarchy fracturing technology tubing string, for realizing the multistage several separate stratum fracfturing transformations of gas well straight well and combination producing is integrated designs, namely tubing string connects safety joint, multi-level throttle sandblaster, packer and sleeve base with oil pipe; Wherein throttling sandblaster, packer and sleeve base are close to each other; Hydraulic anchor is connected in throttling sandblaster below; The oil pipe that is connected different length between throttling sandblasters at different levels and the higher level's sleeve base according to interlamellar spacing.This process pipe string is realized multistage separate stratum fracfturing transformation by constantly repeating " pitching-cover skids ", closes layer at last and asks product.Multilevel hierarchy fracturing reform and combination producing are integrated, can reduce conventional dividing potential drop flow chart, shorten construction period, reduce the development operation cost, reduce the injury to reservoir, improve the vertical development degree of reservoir.
Be that the defective of the prior art of representative is with above-mentioned patent documentation:
1. the conventional fixed tubular column multi-stage water power spray technology tubing string mode of mainly opening sliding sleeve by pitching is opened the waterpower spray gun step by step and is carried out the perforating and fracturing connection and do, carry out in jetting and the pressing crack construction at multistage, because tubing string is long, also to prevent the sand card, so should not increase packer between the spray gun, can only utilize hydraulic jet self compartmentation to produce the interlayer packing, therefore, in the construction interlayer interference may take place between the multilayer, but this type tubing string fixed tubular column jetting pressure break still need be with the airbrush tool of progression more than 12 sections at present, the tool pipe string is long, use at oil well, construction cost compares higher, and little to interlayer interference control dynamics.
2. jetting and pressure break combination operation process have become the main means that transform on long celebrating block oil well horizontal well stratum, it is beam hole, fracturing yield increasing measure technology, one-trip string is realized the construction of horizontal well multistage, can be at bore hole, the fixed sleeve pipe of cement, do not carry out pressure break under the multiple completion mode such as fixed screen casing, compare with other technology mode (packer, bridging plug, back-up sand, plug), efficiency of construction is greatly improved.But be subject to nozzle material and packer performance, if will construct more than 3 sections, need to change tubing string, increase operating cost and duty cycle, economic benefit and social benefit have disadvantageous one side.
3. adopting single-stage spray gun band packer to carry out jetting pressure break connection does, be subjected to the nozzle material performance limitations, the monomer spray gun uses continuously more than 2 hours and might lose efficacy because of the excessive spray gun that causes of wearing and tearing, packer also may cause seal failure because of setting repeatedly, can only construct at present 3 sections,, then need to pull out of hole and change drilling tool more than 6 sections if design and construct, increased construction operation cycle and operating cost.
Summary of the invention
For solving the technical problem that above-mentioned prior art exists, the present invention proposes the pressure break method of work that a kind of multi-stage water power sprays the staged fracturing tubing string, this pressure break method of work is simple, the ground number of plies of acid fracturing connects multi-stage jet packing instrument as required, Different Strata is carried out pressing crack construction, therefore, can realize drilling through for one time the mode that drags tubing string at present and realize 6 sections or surpass 6 sections jetting and pressure break connection and construct, the serial connection of multi-stage jet packing instrument can be accelerated speed of application greatly, saves the engineering time.
The present invention realizes by adopting following technical proposals:
A kind of multi-stage water power sprays the pressure break method of work of staged fracturing tubing string, it is characterized in that step is as follows:
S1: multi-stage water power sprays staged fracturing tubing string advanced person before going into the well work well, well-flushing;
S2: the assembly multi-stage water power sprays the staged fracturing tubing string;
S3: bore down, adjust drilling tool to construction location;
S4: well head and surface line are installed, and pressure testing;
S5: according to first section of the infusion program construction of pressing crack construction design, finish construction back oil pipe open flow, the spray gesture weakens the back with the anti-circulation of the 600L/min row of helping;
S6: adjust the drilling tool position, make ejector face toward second section specking of design, then according to second section of infusion program construction, finish the construction back by adjusting drilling tool behind the S5 step open flow, repeat this step, until judging tool failures;
S7: drop into steel ball from well head, 8~12 Mpa build the pressure in the oil pipe, cut off shear pin fixing between spray gun body and the sliding sleeve, sliding sleeve comes downwards to sliding sleeve and is located joint, stop up lower passage, open the fluid hole of spray gun on the jetting packing instrument and the inlet opening of packer simultaneously, packing element is because the throttling action expansion packing element of spray gun sets the oil jacket annular space of packing bottom; Jetting packing instrument eyelet place forms jet, and cutting casing wall and stratum pore-forming carry out pressing crack construction then;
S8: after the open flow recoil is finished, adjust drilling tool to lower floor's construction location, drop into steel ball (preventing that steel ball is discharged with returning discharge opeing the open flow process, the influence construction) from well head and carry out lower floor's construction, until tool failures, pull out of hole and change drilling tool;
S9: repeat above-mentioned S2-S8 step, until finishing all construction intervals;
Opening multi-stage water power injection staged fracturing tubing string, when implementing the spray gun abrasive perforating in S5, S6, S7 and the S8 step, it is higher unusually that oil pressure takes place, oil pressure in the time of should checking contrast interval rerum natura and abrasive perforating earlier,
(1) if rerum natura is close between interval, and the expulsion pressure of each interval is all higher unusually, and cover to emit liquid normal, then predicate the stratum reason, but not the instrument reason, the processing method of this moment: under the situation of superpressure not, continue construction;
(2) if rerum natura is close between interval, but it is big to spray oil pressure between interval, and otherness is higher unusually, judges that then nozzle is stopped up or sand plug by foreign matter, the processing method of this moment: should check and in time regulate liquid glue to join ratio, guarantee that the glue connection is good, anti-flushing well de-plugging in time.
It is on the low side unusually that oil pressure takes place when opening the spray gun abrasive perforating, and earlier with the contrast of last layer section expulsion pressure, if expulsion pressure obviously reduces, it is serious to be judged to be the nozzle erosion, the processing method of this moment:
(1) according to operating instruction, the next one of opener string " injection unit " or the inspection replacing instrument that pulls out of hole;
(2) breaking point appears in multi-stage water power injection staged fracturing tubing string, and trip-out is checked.
In the described S2 step, the mode that the assembly multi-stage water power sprays the staged fracturing tubing string is: each grade spraycan of multi-stage jet instrument includes a jetting packing instrument and the hydraulic centralizing device that is connected with jetting packing instrument, each grade spraycan joins end to end, jetting packing instrument in the first order spraycan with set upright ball-and-seat and be connected, set upright ball-and-seat and connect eye pipe and guiding plug successively, the afterbody spraycan of multi-stage jet instrument connects safety joint, connect oil pipe in safety joint, up to well head.
Described jetting packing instrument comprises that spray gun, packer and sliding sleeve are located joint, one end of packer connects spray gun, the other end of packer connects sliding sleeve and is located joint, in spray gun, be provided with sliding sleeve, the internal diameter of described sliding sleeve is reducing, be located the joint direction from spray gun toward sliding sleeve, the inwall of described sliding sleeve is to be made of the three-stage structure that internal diameter diminishes successively, is provided with ball seat in the sliding sleeve.
Described spray gun outer wall runs through and is provided with shear pin, and the outer wall of sliding sleeve is provided with the shear pin groove that cooperates with described shear pin, and sliding sleeve is fixed through shear pin and described spray gun.
Described spray gun comprises spray gun body, nozzle cage and nozzle, spray gun body two ends are respectively top connection and lower contact, the spray gun body is provided with the injection hydrophthalmia, nozzle cage is arranged on and sprays in the hydrophthalmia, nozzle is arranged in the nozzle cage, nozzle outer surface and nozzle cage front end face are provided with topping, and the spray gun body outer wall around the described injection hydrophthalmia is provided with topping; Sliding sleeve is arranged in the inner chamber of spray gun, and sliding sleeve is that interference fits is connected with the spray gun inner chamber; Described sliding sleeve is located joint and comprises that sliding sleeve is located upper end of joint, sliding sleeve is located the joint lower end and sliding sleeve is located the joint baffle plate; Described packer comprises packing element and the central tube that is arranged in the packing element, the packing element upper end is connected with last glue tube base, the packing element lower end is connected with the lower rubber cylinder seat, spray gun body upper end connects oil pipe, spray gun body lower end is connected with last glue tube base respectively at described central tube upper end, lower rubber cylinder seat and central tube lower end are connected with packer lower contact upper end, and packer lower contact lower end is located upper end of joint with sliding sleeve and is connected, and sliding sleeve is located the joint lower end and is located the joint baffle plate with sliding sleeve and is connected.
Spray gun inner body wall between sliding sleeve and spray gun body is disposed with first fluid course and second fluid course of indent, and first fluid course communicates with nozzle.
Described second fluid course communicates with the 3rd fluid course, and the 3rd fluid course is axially disposed within spray gun body lower end along the spray gun body, and the 3rd fluid course communicates with the packing element upper end.
Described hydraulic centralizing device comprises centralizer body, sets upright rib and wiper block, set upright and have mounting groove on the rib, wiper block outwards embeds in centralizer body and is arranged on the mounting groove, be arranged with the anti-sandpipe of elasticity on the described centralizer body inwall, and elasticity is prevented the place that is communicated with of closed front mounting groove with the centralizer body inner chamber of sandpipe.
The length of the anti-sandpipe of described elasticity is communicated with the diameter at place greater than mounting groove and centralizer body inner chamber, and elasticity prevents that the outer wall of sandpipe is connected with the centralizer body inner thread.
Described safety joint comprises top connection, lower contact, safety joint body, locking tile, locking sliding sleeve and hollow shear pin, described top connection, safety joint body are connected successively with lower contact, the locking sliding sleeve is arranged among the safety joint body, and the locking sliding sleeve is fixed on the safety joint body through hollow shear pin, described locking tile is arranged on the terraced structure of safety joint inner body wall, and the locking tile cooperates with the locking sliding sleeve.
Described multi-stage jet instrument comprises two-stage, and first order spraycan connects second level spraycan, and second level spraycan connects safety joint.
Described multi-stage jet instrument comprises three grades, and first order spraycan connects second spraycan, and second level spraycan connects third level spraycan, and third level spraycan connects safety joint.
The equal surfacing matcoveredn of described nozzle outer surface and nozzle cage front end face, and surfacing matcoveredn on the spray gun body outer wall around the described injection hydrophthalmia.
The topping of described nozzle cage front end face extends to and sprays on the hydrophthalmia spray gun body outer wall all around, and the spray gun body outer wall around the injection hydrophthalmia forms topping.
The topping of surfacing covers whole spray gun body 2 outer walls on described spray gun body 2 outer walls.
Described topping is prefabricated component, is welded on respectively on nozzle outer surface, nozzle cage front end face and the injection hydrophthalmia spray gun body outer wall all around.
Prefabricated component welding back on the described spray gun body outer wall covers whole spray gun body outer wall.
Described nozzle is provided with 3-9, and diameter is 3.5 mm-6.5mm.
Described nozzle and nozzle cage are integrally welded, and nozzle cage and spray gun body are by being threaded.
Described nozzle is the tungsten-cobalt hard alloy nozzle that hardness reaches HRA90.
Described nozzle is nickel base alloy nozzle or tungsten carbide nozzle.
Described topping can be tungsten carbide topping or carbide alloy topping.
The anti-sandpipe outer wall of described wiper block and elasticity closely cooperates.
The described external diameter of rib of setting upright is greater than the external diameter of centralizer body.
In concrete the application, the specification of three sections internal diameters that diminish successively is respectively: 28mm, 32mm and 35mm.
When carrying out horizontal section pressing crack construction, owing to be connected with external upset tubing in the PSK344-110 jetting packer upper end that upper level sprays the packing instrument, the effect that can play is:
The waterpower spray gun that arranges can be in bore hole, the fixed sleeve pipe of cement, do not carry out pressure break under the multiple completion mode such as fixed screen casing, load fluid stream in the tubing string penetrates through the nozzle of waterpower spray gun, when the flow velocity of load fluid stream reaches Metal Cutting speed, high speed load fluid stream is penetrated out casing wall, and penetrate the layer of turning up the soil, efficiency of construction is greatly improved.
The hydraulic centralizing device set upright the wiper block that arranges on the rib, can start grappling by the fluid power effect, reach the purpose of hydraulic pressure seat card, can reduce the tubing string wriggling, improved the efficient of packer life-span and abrasive perforating, the inner sand control cover that arranges has reduced sand card risk.After construction finished pressure release, the upper lifting pipe post can make wiper block regain, and can play and trip out the effect of changing drilling tool smoothly.
Firm the linking together under the effect of locking tile and locking sliding sleeve of the lower contact of safety joint and body, whole safety joint seals, and what can guarantee to construct normally carries out.When needing safety joint to slip out of the hand after construction is finished, can be from pitching in the oil pipe, little discharge capacity builds the pressure, and forces the locking sliding sleeve to shift out locked position downwards, and the purpose that trips out the above oil pipe of drilling tool is played in the safety joint release.
Carbide alloy in the external surface spraying plating in spray gun body top nozzle hole can make spray gun bear five sections hydraulic perforations and pressing crack construction, reduces significantly and sprays sand to the backwash injury of nozzle bore, effectively raises the safety that instrument uses.
Compared with prior art, the beneficial effect that reaches of the present invention is as follows:
1, among the present invention, adopt S1-S9 to amount to the pressure break method of work of 9 steps, the pressure break method of work is simple, the ground number of plies of acid fracturing connects multi-stage jet packing instrument as required, Different Strata is carried out pressing crack construction, therefore, can realize drilling through for one time the mode that drags tubing string and realize 6 sections or surpass 6 sections jetting and pressure break connection and construct, the serial connection of multi-stage jet packing instrument can be accelerated speed of application greatly, saves the engineering time.
2, among the present invention, the S8 step of employing after the open flow recoil is finished, is adjusted drilling tool to lower floor's construction location, drops into steel ball from well head, can prevent that steel ball is discharged with returning discharge opeing in the open flow process, the influence construction.
3, among the present invention, opening multi-stage water power injection staged fracturing tubing string, when implementing the spray gun abrasive perforating in S5, S6, S7 and the S8 step, it is higher unusually that oil pressure takes place, oil pressure in the time of should checking contrast interval rerum natura and abrasive perforating earlier, different processing method at different situation employings, can understand the working condition that multi-stage water power sprays the staged fracturing tubing string at any time, grasp the use state of tubing string, thereby implement to continue construction or reconcile liquid glue connection ratio, be conducive to ensure effectively carrying out of whole pressure break work.
4, among the present invention, adopt " it is on the low side unusually that oil pressure takes place when opening the spray gun abrasive perforating; earlier with the contrast of last layer section expulsion pressure; if expulsion pressure obviously reduces; it is serious to be judged to be the nozzle erosion; the processing method of this moment: (1) according to operating instruction, the next one of opener string " injection unit " or pull out of hole and check the replacing instrument; (2) breaking point appears in multi-stage water power injection staged fracturing tubing string, pulls out of hole and checks " such technical scheme, can judge nozzle erosion situation in real time, check or the replacing instrument in order to pull out of hole at any time.
5, among the present invention, adopt " each grade spraycan of multi-stage jet instrument includes a jetting packing instrument and the hydraulic centralizing device that is connected with jetting packing instrument; each grade spraycan joins end to end; the jetting packing instrument in the first order spraycan with set upright ball-and-seat and be connected; set upright ball-and-seat and connect the eye plug of managing and lead successively; the afterbody spraycan connection safety joint of multi-stage jet instrument " such frame mode, because tubular column structure is connect by many covers pressure break tool string and forms, simple in structure, the ground number of plies of acid fracturing connects multi-stage jet packing instrument as required, Different Strata is carried out pressing crack construction, therefore, can realize drilling through for one time the mode that drags tubing string at present and realize 6 sections or surpass 6 sections jetting and pressure break connection and construct, the serial connection of multi-stage jet packing instrument can be accelerated speed of application greatly, saves the engineering time.
6, among the present invention, employing is at " being provided with sliding sleeve in spray gun; the internal diameter of described sliding sleeve is reducing; be located the joint direction from spray gun toward sliding sleeve, the inwall of described sliding sleeve is to be made of the three-stage structure that internal diameter diminishes successively, is provided with ball seat in the sliding sleeve " such frame mode, therefore, the sliding sleeve of latus rectum in different is fitted over corresponding position, throw the steel ball of different size during construction as required, just can open corresponding multi-stage water power and spray fracturing tool.
7, among the present invention, adopt " run through at the spray gun outer wall and be provided with shear pin; the outer wall of sliding sleeve is provided with the shear pin groove that cooperates with described shear pin, and sliding sleeve is fixed through shear pin and described spray gun " such frame mode, shear pin is stuck in the shear pin groove of sliding sleeve, therefore, under the effect of no external force, can limit sliding sleeve and move down, reach safety and finish the water conservancy injection pressure break that a layer is, when needs carry out water conservancy injection pressure break to the second level, as long as cast an envelope steel ball, under the promotion of pressure.Steel ball promotes sliding sleeve and moves down, and opens the spray gun that is sealed by sliding sleeve, just can realize partial water conservancy injection pressure break, and the like, just can finish the construction that multi-stage water power sprays pressure break.
8, among the present invention, packer is made of packing rubber sleeve, because packing element is flexible, the rubber-like packing element can expand under pressure, and the packing effect with other layers position is played in being attached on the borehole wall tightly, so that when the water conservancy of implementing a layer position is sprayed pressure break, guarantee that other layers position can not gang up.
9, among the present invention, three fluid courses of design, after opening, first fluid course can guarantee that highly pressurised liquid carries out jetting by nozzle to the stratum of setting, after opening, second fluid course and the 3rd fluid course can guarantee that highly pressurised liquid leads to the packing element upper end, and by the distortion of packing element upper end promotion packing element, realize the packing to layer position.
10, among the present invention, because sliding sleeve is arranged in the interior circle of spray gun, and fixed by shear pin, sliding sleeve after fixing is shutoff nozzle and fluid course simultaneously, open spray gun and packer simultaneously so can reach a ball, the design of such shift sleeve structure and fluid course has realized that abrasive perforating, mechanical packing are integrated, can effectively reduce the risk of bringing because of the instrument complexity in the construction.
11, among the present invention, be arranged with the anti-sandpipe of elasticity on the described centralizer body inwall, and the closed front mounting groove of the anti-sandpipe of elasticity and the place that is communicated with of centralizer body inner chamber, adopt this structure, under the pressure effect of intraluminal fluid power, promote the anti-sandpipe of elasticity, because elasticity sand control pipe is flexible, therefore under pressure, the anti-sandpipe of elasticity is expanded in mounting groove, outwards promote wiper block, reach the purpose of hydraulic pressure seat card, and because elasticity is prevented the place that is communicated with of closed front mounting groove with the centralizer body inner chamber of sandpipe, make the grit in the liquid can not enter in the mounting groove, wiper block can not blocked by sand, can effectively reduce sand card risk.
12, among the present invention, the length of the anti-sandpipe of described elasticity is communicated with the diameter at place greater than mounting groove and centralizer body inner chamber, when this structure is expanded the anti-sandpipe of elasticity in the mounting groove under the effect of intraluminal fluid pressure, the anti-sandpipe two ends of elasticity and centralizer body inwall also can be connected firmly, guaranteed the reliability of elasticity sand control duct occlusion connection place, and the outer wall of the anti-sandpipe of elasticity is connected with the centralizer body inner thread, employing is threaded and not only is easy for installation and removal, but also is convenient to adjust the anti-position of sandpipe in centralizer body of elasticity.
13, among the present invention, spray gun comprises the spray gun body, nozzle cage and nozzle, spray gun body two ends are respectively top connection and lower contact, the spray gun body is provided with the injection hydrophthalmia, nozzle cage is arranged on and sprays in the hydrophthalmia, nozzle outer surface and nozzle cage front end face are provided with topping, and the spray gun body outer wall around the described injection hydrophthalmia is provided with topping, adopt this structure, because nozzle outer surface and nozzle cage front end face are provided with topping, can effectively prevent sand jet perforator in the backwash erosion of sandblast process, can guarantee that therefore multi-stage hydraulic sprays the multi-stage hydraulic injection fracture acidizing technology that fracturing string is implemented design; And the spray gun body outer wall around the described injection hydrophthalmia is provided with topping, can guarantee that the spray gun body has the backwash erosion that better prevents the sandblast process, guarantees that multi-stage hydraulic sprays finishing smoothly of fracture acidizing technology.
Description of drawings
The present invention is described in further detail below in conjunction with specification drawings and specific embodiments, wherein:
Fig. 1 is two-stage injection fracturing string structural representation;
Fig. 2 is three grades and sprays the fracturing string structural representation;
Fig. 3 is safety joint detailed construction schematic diagram;
Among Fig. 1-3: 31, guiding plug, 32, eye pipe, 33, set upright ball-and-seat, 34, packer, 35, spray gun, 36, the hydraulic centralizing device, 37, jetting packing instrument, 39, safety joint, 391, the safety joint top connection, 392, safety joint body, 393, locking tile, 394, locking sliding sleeve, 395, hollow shear pin, 396, the safety joint lower contact;
Fig. 4 is the structural representation of jetting packing instrument;
Fig. 5 is A-B section enlarged diagram among Fig. 4;
Fig. 6 is B-C section enlarged diagram among Fig. 4;
Fig. 7 is C-D section enlarged diagram among Fig. 4;
Among Fig. 4-7: 1, spray gun body upper end; 2, spray gun body; 3, shear pin; 4, first fluid course; 5, nozzle; 6, steel ball; 7, O RunddichtringO; 8, sliding sleeve; 9, second fluid course; 10, the 3rd fluid course; 11, spray gun body lower end; 12, II type O RunddichtringO; 13, central tube upper end; 14, go up glue tube base; 15, packing element upper end; 16, packing element; 17, central tube; 18, packing element lower end; 19, lower rubber cylinder seat; 20, central tube lower end; 21, III type O RunddichtringO; 22, packer lower contact upper end; 23, packer lower contact; 24, packer lower contact lower end; 25, sliding sleeve is located upper end of joint; 26, sliding sleeve is located joint; 27, sliding sleeve is located the joint lower end; 28, sliding sleeve is located the joint baffle plate;
Fig. 8 is the spray gun structure schematic diagram;
Be labeled as among Fig. 8: 41, top connection, 2, the spray gun body, 43, spray hydrophthalmia, 5, nozzle, 45, nozzle cage, 46, topping, 47, lower contact;
Fig. 9 is hydraulic centralizing device structural representation;
Be labeled as among Fig. 9: 51, centralizer body, 52, set upright rib, 53, wiper block, 54, the anti-sandpipe of elasticity, 55, mounting groove.
The specific embodiment
The invention discloses the pressure break method of work that a kind of multi-stage water power sprays the staged fracturing tubing string, its step is as follows:
S1: multi-stage water power sprays staged fracturing tubing string advanced person before going into the well work well, well-flushing;
S2: the assembly multi-stage water power sprays the staged fracturing tubing string;
S3: bore down, adjust drilling tool to construction location;
S4: well head and surface line are installed, and pressure testing;
S5: according to first section of the infusion program construction of pressing crack construction design, finish construction back oil pipe open flow, the spray gesture weakens the back with the anti-circulation of the 600L/min row of helping;
S6: adjust the drilling tool position, make ejector face toward second section specking of design, then according to second section of infusion program construction, finish the construction back by adjusting drilling tool behind the S5 step open flow, repeat this step, until judging tool failures;
S7: drop into steel ball from well head, 8~12 Mpa build the pressure in the oil pipe, cut off shear pin fixing between spray gun body and the sliding sleeve, sliding sleeve comes downwards to sliding sleeve and is located joint, stop up lower passage, open the fluid hole of spray gun on the jetting packing instrument and the inlet opening of packer simultaneously, packing element is because the throttling action expansion packing element of spray gun sets the oil jacket annular space of packing bottom; Jetting packing instrument eyelet place forms jet, and cutting casing wall and stratum pore-forming carry out pressing crack construction then;
S8: after the open flow recoil is finished, adjust drilling tool to lower floor's construction location, drop into steel ball (preventing that steel ball is discharged with returning discharge opeing the open flow process, the influence construction) from well head and carry out lower floor's construction, until tool failures, pull out of hole and change drilling tool;
S9: repeat above-mentioned S2-S8 step until finishing all construction intervals;
Opening multi-stage water power injection staged fracturing tubing string, when implementing the spray gun abrasive perforating in S5, S6, S7 and the S8 step, it is higher unusually that oil pressure takes place, oil pressure in the time of should checking contrast interval rerum natura and abrasive perforating earlier,
(1) if rerum natura is close between interval, and the expulsion pressure of each interval is all higher unusually, and cover to emit liquid normal, then predicate the stratum reason, but not the instrument reason, the processing method of this moment: under the situation of superpressure not, continue construction;
(2) if rerum natura is close between interval, but it is big to spray oil pressure between interval, and otherness is higher unusually, judges that then nozzle is stopped up or sand plug by foreign matter, the processing method of this moment: should check and in time regulate liquid glue to join ratio, guarantee that the glue connection is good, anti-flushing well de-plugging in time.
Spray gun abrasive perforating in described S5, S6, S7 and the S8 step, specifically refer to: the infusion program according to the pressing crack construction design in the S5 step is constructed first section, constructing second section according to the infusion program in the S6 step, jetting packing instrument eyelet place in the S7 step forms jet, cutting casing wall and stratum pore-forming, carry out dropping into steel ball from well head and carry out lower floor's construction in pressing crack construction and the S8 step then.Rerum natura mainly refers to fracture pressure and the permeability of formation rock between described interval.
On the basis of embodiment 1, it is on the low side unusually that oil pressure takes place when opening the spray gun abrasive perforating, and earlier with the contrast of last layer section expulsion pressure, if expulsion pressure obviously reduces, it is serious to be judged to be the nozzle erosion, the processing method of this moment:
(1) according to operating instruction, the next one of opener string " injection unit " or the inspection replacing instrument that pulls out of hole;
(2) breaking point appears in multi-stage water power injection staged fracturing tubing string, and trip-out is checked.
As a preferred embodiments of the present invention, the invention discloses the pressure break method of work that a kind of multi-stage water power sprays the staged fracturing tubing string, in the described S2 step, the mode that the assembly multi-stage water power sprays the staged fracturing tubing string is: each grade spraycan of multi-stage jet instrument includes a jetting packing instrument and the hydraulic centralizing device that is connected with jetting packing instrument, each grade spraycan joins end to end, jetting packing instrument in the first order spraycan with set upright ball-and-seat and be connected, set upright ball-and-seat and connect eye pipe and guiding plug successively, the afterbody spraycan of multi-stage jet instrument connects safety joint, connect oil pipe in safety joint, up to well head.
On the basis of above-described embodiment, described jetting packing instrument comprises that spray gun, packer and sliding sleeve are located joint, one end of packer connects spray gun, the other end of packer connects sliding sleeve and is located joint, be provided with sliding sleeve in spray gun, the internal diameter of described sliding sleeve is reducing, is located the joint direction from spray gun toward sliding sleeve, the inwall of described sliding sleeve is to be made of the three-stage structure that internal diameter diminishes successively, is provided with ball seat in the sliding sleeve.In concrete the application, the specification of three sections internal diameters that diminish successively is respectively: 28mm, 32mm and 35mm.Described spray gun outer wall runs through and is provided with shear pin, and the outer wall of sliding sleeve is provided with the shear pin groove that cooperates with described shear pin, and sliding sleeve is fixed through shear pin and described spray gun.Described spray gun comprises spray gun body, nozzle cage and nozzle, spray gun body two ends are respectively top connection and lower contact, the spray gun body is provided with the injection hydrophthalmia, nozzle cage is arranged on and sprays in the hydrophthalmia, nozzle is arranged in the nozzle cage, nozzle outer surface and nozzle cage front end face are provided with topping, and the spray gun body outer wall around the described injection hydrophthalmia is provided with topping; Sliding sleeve is arranged in the inner chamber of spray gun, and sliding sleeve is that interference fits is connected with the spray gun inner chamber; Described sliding sleeve is located joint and comprises that sliding sleeve is located upper end of joint, sliding sleeve is located the joint lower end and sliding sleeve is located the joint baffle plate; Described packer comprises packing element and the central tube that is arranged in the packing element, the packing element upper end is connected with last glue tube base, the packing element lower end is connected with the lower rubber cylinder seat, spray gun body upper end connects oil pipe, spray gun body lower end is connected with last glue tube base respectively at described central tube upper end, lower rubber cylinder seat and central tube lower end are connected with packer lower contact upper end, and packer lower contact lower end is located upper end of joint with sliding sleeve and is connected, and sliding sleeve is located the joint lower end and is located the joint baffle plate with sliding sleeve and is connected.Spray gun inner body wall between sliding sleeve and spray gun body is disposed with first fluid course and second fluid course of indent, and first fluid course communicates with nozzle.Described second fluid course communicates with the 3rd fluid course, and the 3rd fluid course is axially disposed within spray gun body lower end along the spray gun body, and the 3rd fluid course communicates with the packing element upper end.The equal surfacing matcoveredn of described nozzle outer surface and nozzle cage front end face, and surfacing matcoveredn on the spray gun body outer wall around the described injection hydrophthalmia.The topping of described nozzle cage front end face extends to and sprays on the hydrophthalmia spray gun body outer wall all around, and the spray gun body outer wall around the injection hydrophthalmia forms topping.The topping of surfacing covers whole spray gun body outer wall on the described spray gun body outer wall.Described topping is prefabricated component, is welded on respectively on nozzle outer surface, nozzle cage front end face and the injection hydrophthalmia spray gun body outer wall all around.Prefabricated component welding back on the described spray gun body outer wall covers whole spray gun body outer wall.Described nozzle is provided with 3-9, and diameter is 3.5 mm-6.5mm.Described nozzle and nozzle cage are integrally welded, and nozzle cage and spray gun body are by being threaded.Described nozzle is the tungsten-cobalt hard alloy nozzle that hardness reaches HRA90.Described nozzle is nickel base alloy nozzle or tungsten carbide nozzle.Described topping can be tungsten carbide topping or carbide alloy topping.
Further, preferred embodiment of the present invention is, described hydraulic centralizing device comprises centralizer body, sets upright rib and wiper block, set upright and have mounting groove on the rib, wiper block outwards embeds in centralizer body and is arranged on the mounting groove, be arranged with the anti-sandpipe of elasticity on the described centralizer body inwall, and elasticity is prevented the place that is communicated with of closed front mounting groove with the centralizer body inner chamber of sandpipe.The length of the anti-sandpipe of elasticity is communicated with the diameter at place greater than mounting groove and centralizer body inner chamber, and elasticity prevents that the outer wall of sandpipe is connected with the centralizer body inner thread.The anti-sandpipe outer wall of described wiper block and elasticity closely cooperates.The described external diameter of rib of setting upright is greater than the external diameter of centralizer body.All the other are with embodiment 2.
As another preferred embodiment of the present invention, on the basis of above-described embodiment, each grade spraycan of described multi-stage jet instrument includes a jetting packing instrument and the hydraulic centralizing device that is connected with jetting packing instrument, each grade spraycan joins end to end, jetting packing instrument in the first order spraycan with set upright ball-and-seat and be connected, set upright ball-and-seat and connect eye pipe and guiding plug successively, the afterbody spraycan of multi-stage jet instrument connects safety joint.Described jetting packing instrument comprises that spray gun, packer and sliding sleeve are located joint, one end of packer connects spray gun, the other end of packer connects sliding sleeve and is located joint, in spray gun, be provided with sliding sleeve, the internal diameter of described sliding sleeve is reducing, be located the joint direction from spray gun toward sliding sleeve, the inwall of described sliding sleeve is to be made of the three-stage structure that internal diameter diminishes successively, is provided with ball seat in the sliding sleeve.Described spray gun outer wall runs through and is provided with shear pin, and the outer wall of sliding sleeve is provided with the shear pin groove that cooperates with described shear pin, and sliding sleeve is fixed through shear pin and described spray gun.Described spray gun comprises spray gun body, nozzle cage and nozzle, spray gun body two ends are respectively top connection and lower contact, the spray gun body is provided with the injection hydrophthalmia, nozzle cage is arranged on and sprays in the hydrophthalmia, nozzle is arranged in the nozzle cage, nozzle outer surface and nozzle cage front end face are provided with topping, and the spray gun body outer wall around the described injection hydrophthalmia is provided with topping; Sliding sleeve is arranged in the inner chamber of spray gun, and sliding sleeve is that interference fits is connected with the spray gun inner chamber; Described sliding sleeve is located joint and comprises that sliding sleeve is located upper end of joint, sliding sleeve is located the joint lower end and sliding sleeve is located the joint baffle plate; Described packer comprises packing element and the central tube that is arranged in the packing element, the packing element upper end is connected with last glue tube base, the packing element lower end is connected with the lower rubber cylinder seat, spray gun body upper end connects oil pipe, spray gun body lower end is connected with last glue tube base respectively at described central tube upper end, lower rubber cylinder seat and central tube lower end are connected with packer lower contact upper end, and packer lower contact lower end is located upper end of joint with sliding sleeve and is connected, and sliding sleeve is located the joint lower end and is located the joint baffle plate with sliding sleeve and is connected.Spray gun inner body wall between sliding sleeve and spray gun body is disposed with first fluid course and second fluid course of indent, and first fluid course communicates with nozzle.Described second fluid course communicates with the 3rd fluid course, and the 3rd fluid course is axially disposed within spray gun body lower end along the spray gun body, and the 3rd fluid course communicates with the packing element upper end.Described hydraulic centralizing device comprises centralizer body, sets upright rib and wiper block, set upright and have mounting groove on the rib, wiper block outwards embeds in centralizer body and is arranged on the mounting groove, be arranged with the anti-sandpipe of elasticity on the described centralizer body inwall, and elasticity is prevented the place that is communicated with of closed front mounting groove with the centralizer body inner chamber of sandpipe.The length of the anti-sandpipe of described elasticity is communicated with the diameter at place greater than mounting groove and centralizer body inner chamber, and elasticity prevents that the outer wall of sandpipe is connected with the centralizer body inner thread.Described safety joint comprises top connection, lower contact, safety joint body, locking tile, locking sliding sleeve and hollow shear pin, described top connection, safety joint body are connected successively with lower contact, the locking sliding sleeve is arranged among the safety joint body, and the locking sliding sleeve is fixed on the safety joint body through hollow shear pin, described locking tile is arranged on the terraced structure of safety joint inner body wall, and the locking tile cooperates with the locking sliding sleeve.Described multi-stage jet instrument comprises three grades, and first order spraycan connects second spraycan, and second level spraycan connects third level spraycan, and third level spraycan connects safety joint.The equal surfacing matcoveredn of described nozzle outer surface and nozzle cage front end face, and surfacing matcoveredn on the spray gun body outer wall around the described injection hydrophthalmia.The topping of described nozzle cage front end face extends to and sprays on the hydrophthalmia spray gun body outer wall all around, and the spray gun body outer wall around the injection hydrophthalmia forms topping.The topping of surfacing covers whole spray gun body 2 outer walls on described spray gun body 2 outer walls.Described topping is prefabricated component, is welded on respectively on nozzle outer surface, nozzle cage front end face and the injection hydrophthalmia spray gun body outer wall all around.Prefabricated component welding back on the described spray gun body outer wall covers whole spray gun body outer wall.Described nozzle is provided with 3-9, and diameter is 3.5 mm-6.5mm.Described nozzle and nozzle cage are integrally welded, and nozzle cage and spray gun body are by being threaded.Described nozzle is the tungsten-cobalt hard alloy nozzle that hardness reaches HRA90.Described nozzle is nickel base alloy nozzle or tungsten carbide nozzle.Described topping can be tungsten carbide topping or carbide alloy topping.The anti-sandpipe outer wall of described wiper block and elasticity closely cooperates.The described external diameter of rib of setting upright is greater than the external diameter of centralizer body.In concrete the application, the specification of three sections internal diameters that diminish successively is respectively: 28mm, 32mm and 35mm.
This multi-stage water power sprays the structure of staged fracturing tubing string:
This multi-stage water power sprays the staged fracturing tubing string and is made of the multi-stage jet instrument, each grade spraycan all comprises a separator, a spray gun and a centralizer, front end at bottom one-level spraycan is connected with the guiding plug from bottom to top in turn, and ball-and-seat is managed and set upright to eye; The afterbody of guiding plug is rounded shape, at interior circle the spiral screw thread is arranged, and on the outer garden of round end afterbody lower end fusiform structure is arranged, and fusiform structure can be that a plurality of planes rib is arranged, and also can be the spill fusiform structure that depression is gone down, and external diameter is not more than 116mm; The eye pipe is the cylinder barrel-like structure, and section is respectively arranged with thread before and after it, and the body of eye pipe is provided with aperture; Ball-and-seat is circular structure, and there is thread at ball-and-seat Wai Yuan two ends, sets upright rib for axial thickening in the middle of the outer garden, and steel ball and baffle plate are arranged in ball-and-seat, and the centre is the through hole that connects; The K344-108 packer is made of top connection, cylinder sleeve, packing element, central tube and lower contact, is cylinder sleeve between top connection and lower contact, and interlude is provided with packing element, at central tube hydrophthalmia is arranged; The waterpower spray gun comprises upper and lower joint, sprays hydrophthalmia, nozzle, be provided with the injection hydrophthalmia in the stage casing of waterpower spray gun, gun body is provided with 3-9 nozzle, and according to a large amount of construction embodiments, selecting quantity the best of nozzle is 3,4,6,8 or 9; Nozzle diameter is 3.5-6.5mm, and nozzle diameter is chosen as 3.5 mm, 4.5 mm, 5.5 mm, 6.3 mm for best; The two ends of hydraulic centralizing device are that thread, cylindrical interlude are provided with and set upright rib, set upright rib and are provided with wiper block, are provided with anti-sandpipe in hydraulic centralizing device inside.Safety joint is made of lower contact, body, locking tile, locking sliding sleeve and hollow shear pin.The last hypomere of spray gun is provided with thread, and the body of spray gun is provided with nozzle bore, and the external surface spraying plating in spray gun body top nozzle hole has carbide alloy.
This multi-stage water power sprays the connected mode of staged fracturing tubing string:
The first order: be that the first order is sprayed the packing instrument in the described upper end of setting upright ball-and-seat, the first order is sprayed the packing instrument and is connected a K344-108 packer and an one-level waterpower spray gun from bottom to top successively.
The second level: the upper end of spraying the one-level waterpower spray gun of packing instrument in the first order connects the second level and sprays the packing instrument, and the second level is sprayed the packing instrument and comprised PSK344-110 packer, a spray gun and a hydraulic centralizing device;
Spray in the second level that the upper end of packing instrument is every to be repeated to connect a PSK344-110 separator, a spray gun and a hydraulic centralizing device and can increase one-level and spray the packing instrument.
Upper end at the afterbody hydraulic centralizing device that reaches design progression connects safety joint;
Between every grade of waterpower spray gun and upper level PSK344-110 separator, all be connected with and be located joint;
The upper end of spraying the packing instrument at upper level is safety joint, connects external upset tubing in the upper end of safety joint, up to well head.
The implication of K344-108 is: the K-inflatable packer; 3-suspension strut mode; The hydraulic base sealed mode of 4-; 4-hydraulic pressure deblocking mode; 108-instrument maximum outside diameter 108mm.
The implication of PSK344-110 is: the PS-spraycan; 3-suspension strut mode; The hydraulic base sealed mode of 4-; 4-hydraulic pressure deblocking mode; 110-instrument maximum outside diameter 110mm.
The field conduct example:
(1) considers that the conventional jetting tubing string that uses can not satisfy current oil well water power and spray and the requirement of pressure break combination operation process, the jetting packing instrument of different progression is connected into tubing string according to the above-mentioned order of connection be lowered to predetermined depth location, well head continues pumping liquid, earlier with the first order hydrajet tool first floor is carried out perforation and pressing crack construction, termination of pumping after having constructed, the mode that upwards drags tubing string by well head will be mentioned predeterminated position on the hydrajet tool, upper two layers is constructed, this moment, the PSK hydrajet tool was closed condition, spray gun does not start, and packer does not set; After first order hydrajet tool had been finished the multilayer construction, hydrajet tool in the tubing string was opened in pitching, and spray gun starts, packer setting.Carry out above-mentioned construction with same step and can finish the multi-stage water power sprayed construction.
(2) tubular column structure: " external upset tubing is to well head for external upset tubing (horizontal segment)+2 7/8 for guiding plug+eye pipe+2 7/8 " box cupling+ball-and-seat (dribbling and baffle plate)+K344-108 packer+one-level spray gun+be located joint+PSK344-110 jetting packing instrument+2 7/8 ".
(3) implementation procedure:
1. PSK jetting fracturing tool must carry out drifting, well-flushing before going into the well;
2. assembly tubing string, " external upset tubing is to well head for external upset tubing (horizontal segment)+2 7/8 for guiding plug+eye pipe+2 7/8 " box cupling+ball-and-seat (dribbling and baffle plate)+K344-108 packer+one-level spray gun+be located joint+PSK344-110 jetting packing instrument+2 7/8 " for structure
3. bore down, adjust drilling tool to construction location.
4. well head and surface line are installed, and pressure testing.
5. construct first section according to the infusion program of pressing crack construction design.Finish construction back oil pipe open flow, the spray gesture weakens the back with the anti-circulation of the 600L/min row of helping, until
6. adjust the drilling tool position, make ejector face toward second section specking of design, then according to second section of infusion program construction, finish the construction back by adjusting drilling tool behind the last one step process open flow, repeat this step, until judging tool failures.
7. drop into φ 34 steel balls from well head, 8~12 Mpa build the pressure in the oil pipe, cut off pin, sliding sleeve comes downwards to and is located in joint, stop up lower passage, open the inlet opening of II level PSK344-110 jetting packing instrument spray gun fluid hole and packer simultaneously, packing element is because the throttling action expansion packing element of waterpower spray gun sets the oil jacket annular space of packing bottom.II level PSK344-110 jetting packing instrument eyelet place forms jet, and cutting casing wall and stratum pore-forming carry out pressing crack construction then;
8. after the open flow recoil is finished, adjust drilling tool to lower floor's construction location, drop into φ 34 steel balls (preventing that steel ball is discharged with returning discharge opeing the open flow process, the influence construction) from well head and carry out lower floor's construction.Until tool failures, pull out of hole and change drilling tool.
9. repeat above-mentioned steps until finishing all construction intervals.
Before going into the well multi-stage hydraulic is sprayed the preparation of fracturing tool pipe string and enforcement well.
1, must conscientiously check the quality certification and description before the use drilling tool, the instrument that exceeds at 1 year date of manufacture is forbidden into use; The tools production that use is exceeded the time limit damages in the time of may causing the packer construction in advance.
2, drilling tool must thoroughly lead to well-flushing before going into well, guarantees that pit shaft and operating tool string are unimpeded, can not leave bulky grain (diameter is greater than 3mm) solids in pit shaft and the operating tool string;
3, going into the well drilling tool must guarantee correctly to be linked in sequence;
4, pierce and at the uniform velocity go into well, forbid drilling string not well braked to be upset and bore;
When 5, drilling tool is used for horizontal well construction, when going into well tool when being connected in series nearly kickoff point (KOP) position, must slow down running speed (lowering velocity is less than 5m/min), make tool string slowly by the horizontal well kickoff point (KOP); Too fastly may cause the tool focus pipe by bending by kickoff point (KOP).
6, construct in strict accordance with working design, forbid increasing substantially or reduce operational discharge capacity and sand concentration;
7, after every interval was constructed and finished, in time the control open flow forbade violation to open wide open flow entirely; Complete spacious blowout prevention may cause casing pressure moment much larger than oil pressure, causes injector nozzle to drop, and also might cause pressure reduction moment of casing pressure and oil pressure to cause oil pipe to damage greater than the oil pipe collapse resistance.
8, every interval open flow finishes, and thorough anti-flushing well is rinsed well in the pit shaft after the residual proppant, can adjust construction location by the upper lifting pipe post, to prevent drilling tool sand card;
9, before three grades of PSK instruments are gone into the well use, must check that with the steel ball latus rectum of diameter 34mm steel ball passes through smoothly to qualified;
10, open the PSK instrument and must correctly select steel ball for use, secondary PSK instrument is opened the steel ball that uses diameter 34mm, three grades of PSK use the steel ball of selecting diameter 38mm for use, and the PSK instrument is in case open use, after the operation of open flow anti-flushing well is finished in every interval construction, the steel ball of employed same size when opening must be delivered again, next section construction can be carried out;
The accumulative total sand-passing amount was less than 80 cubic metres when 11, each on the tool string " injection unit " constructed;
12, this process pipe string is not suitable for vertical depth and presses the oil gas well construction operation that is higher than 60MPa greater than 3500 meters, stratum are broken.
Field conduct example: water horizontal well, the long 6-3 in construction layer position, finishing drilling well depth 2965.0m, 9 speckings of horizontal segment are implemented the jetting sand fracturing, and operating tool string adopts the efficient pipe string combination of horizontal well: 2 7/8 〞 external upset tubings+three PSK344-110 injection packer+three grade sliding sleeve is located joint+secondary PSK344-110 injection packer+secondary sliding sleeve and is located joint+one-level waterpower spray gun+K344-108 packer+ball-and-seat+eye pipe+plug.
Earlier drag tubing string with the one-level spray gun and carry out jetting and pressing crack construction to first, second, third section, each section perforation stage pressure is steady, and pressing crack construction process shows normal.
Lost efficacy at the 4th section perforation for fear of the one-level spray gun, throw Φ 34mm steel ball and open secondary PSK344-110 injection packer instrument, sliding sleeve is opened normal, spray the packer instrument with secondary PSK344-110 and continue to finish the the 4th, the 5th, the 6th section jetting and pressing crack construction, each section perforation stage is steady, and pressing crack construction is normal.
For spraying packer, secondary PSK344-110 do not lose efficacy at the 7th section perforation, throw Φ 38mm steel ball and open three grades of PSK344-110 injection packer instruments, sliding sleeve is opened normal, spray the packer instrument with three grades of PSK344-110 and continue to finish the the 7th, the 8th, the 9th section jetting and pressing crack construction, each section perforation stage is steady, and pressing crack construction is normal.
This enforcement, there do not have instrument to use to be effectively normal, compares with secondary PSK jetting fracturing tool tubing string, and three grades of PSK jetting fracturing tools can be constructed two to three sections more, have further improved operating efficiency, reduce labour intensity and operating cost.This time last 7 days before and after the construction, instrument soak time in well is longer, but the packing element seal did not lose efficacy, and has guaranteed normally carrying out of construction.
The present invention runs into judgement and the processing of abnormal conditions in implementation process:
The unusual higher situation of oil pressure is judged during abrasive perforating:
Situation: oil pressure when checking contrast interval rerum natura and abrasive perforating earlier, if rerum natura is close between interval, expulsion pressure is all higher unusually, and cover to emit liquid normal, then can predicate the stratum reason, but not the instrument reason.
Processing method: under the situation of superpressure not, can continue construction.
Situation: if rerum natura is close between interval, but injection oil pressure big-difference sexual abnormality is higher between interval.
Judge: nozzle is stopped up or sand plug by foreign matter.
Processing method: check and in time regulate liquid glue to join ratio, guarantee that the glue connection is good, anti-flushing well de-plugging in time
2, the unusual situation on the low side of oil pressure is judged during abrasive perforating:
(1) situation: with the contrast of last layer section expulsion pressure, if expulsion pressure obviously reduces.
Judge: the nozzle erosion is serious.
Processing method: according to next " injection unit " on the operating instruction opener string or the inspection replacing instrument that pulls out of hole
(2) breaking point appears in operating tool string: pull out of hole and check.
3, close cover when putting prepad fluid extruding stratum broken press not obvious:
(1) situation: casing pressure was compared when casing pressure was with the last layer termination of pumping during with squeeze note, if the squeeze note casing pressure is starkly lower than upper strata termination of pumping casing pressure,
Judge: the packer badly broken can not reliably set.
Processing method: open next " spraying the packing unit " or the trip-out replacing instrument of using
(2) situation: if the squeeze note casing pressure is apparently higher than last layer termination of pumping casing pressure, but there is not obvious pressure drop,
Judge: due to nearly well band microcrack growth is abundant.
Processing method: after the pressure release, improve squeeze note discharge capacity squeeze note again, perhaps low concentration adds the powder pottery in the squeeze note prepad fluid.
4, put forward the phenomenon that is hampered when operating tool string is adjusted construction location on:
(1) situation: under big upper lifting force effect, tubing string is carried on can be slowly, also can transfer tubing string,
Judge: the sand setting bit freezing.
Processing method: on force the unfreezing of upper lifting pipe post, the perhaps thorough anti-flushing well unfreezing of big discharge capacity under the power that the lifts situation about allowing.
(2) situation: can transfer tubing string, but can not the upper lifting pipe post;
Judge: the junk bit freezing.
Processing method: according to conventional junk lock of tool drilling disposal methods.
Claims (10)
1. a multi-stage water power sprays the pressure break method of work of staged fracturing tubing string, it is characterized in that step is as follows:
S1: multi-stage water power sprays staged fracturing tubing string advanced person before going into the well work well, well-flushing;
S2: the assembly multi-stage water power sprays the staged fracturing tubing string;
S3: bore down, adjust drilling tool to construction location;
S4: well head and surface line are installed, and pressure testing;
S5: according to first section of the infusion program construction of pressing crack construction design, finish construction back oil pipe open flow, the spray gesture weakens the back with the anti-circulation of the 600L/min row of helping;
S6: adjust the drilling tool position, make ejector face toward second section specking of design, then according to second section of infusion program construction, finish the construction back by adjusting drilling tool behind the S5 step open flow, repeat this step, until judging tool failures;
S7: drop into steel ball from well head, 8~12 Mpa build the pressure in the oil pipe, cut off shear pin fixing between spray gun body and the sliding sleeve, sliding sleeve comes downwards to sliding sleeve and is located joint, stop up lower passage, open the fluid hole of spray gun on the jetting packing instrument and the inlet opening of packer simultaneously, packing element is because the throttling action expansion packing element of spray gun sets the oil jacket annular space of packing bottom; Jetting packing instrument eyelet place forms jet, and cutting casing wall and stratum pore-forming carry out pressing crack construction then;
S8: after the open flow recoil is finished, adjust drilling tool to lower floor's construction location, drop into steel ball from well head and carry out lower floor's construction, until tool failures, pull out of hole and change drilling tool;
S9: repeat above-mentioned S2-S8 step until finishing all construction intervals;
Opening multi-stage water power injection staged fracturing tubing string, when implementing the spray gun abrasive perforating in S5, S6, S7 and the S8 step, it is higher unusually that oil pressure takes place, oil pressure in the time of should checking contrast interval rerum natura and abrasive perforating earlier,
(1) if rerum natura is close between interval, and the expulsion pressure of each interval is all higher unusually, and cover to emit liquid normal, then predicate the stratum reason, but not the instrument reason, the processing method of this moment: under the situation of superpressure not, continue construction;
(2) if rerum natura is close between interval, but it is big to spray oil pressure between interval, and otherness is higher unusually, judges that then nozzle is stopped up or sand plug by foreign matter, the processing method of this moment: should check and in time regulate liquid glue to join ratio, guarantee that the glue connection is good, anti-flushing well de-plugging in time.
2. a kind of multi-stage water power according to claim 1 sprays the pressure break method of work of staged fracturing tubing string, it is characterized in that: it is on the low side unusually that oil pressure takes place when opening the spray gun abrasive perforating, earlier with the contrast of last layer section expulsion pressure, if expulsion pressure obviously reduces, it is serious to be judged to be the nozzle erosion, the processing method of this moment:
(1) according to operating instruction, the next one of opener string " injection unit " or the inspection replacing instrument that pulls out of hole;
(2) breaking point appears in multi-stage water power injection staged fracturing tubing string, and trip-out is checked.
3. a kind of multi-stage water power according to claim 1 sprays the pressure break method of work of staged fracturing tubing string, it is characterized in that: in the described S2 step, the mode that the assembly multi-stage water power sprays the staged fracturing tubing string is: each grade spraycan of multi-stage jet instrument includes a jetting packing instrument and the hydraulic centralizing device that is connected with jetting packing instrument, each grade spraycan joins end to end, jetting packing instrument in the first order spraycan with set upright ball-and-seat and be connected, set upright ball-and-seat and connect eye pipe and guiding plug successively, the afterbody spraycan of multi-stage jet instrument connects safety joint, connect oil pipe in safety joint, up to well head.
4. a kind of multi-stage water power according to claim 3 sprays the pressure break method of work of staged fracturing tubing string, it is characterized in that: described jetting packing instrument comprises that spray gun, packer and sliding sleeve are located joint, one end of packer connects spray gun, the other end of packer connects sliding sleeve and is located joint, in spray gun, be provided with sliding sleeve, the internal diameter of described sliding sleeve is reducing, be located the joint direction from spray gun toward sliding sleeve, the inwall of described sliding sleeve is to be made of the three-stage structure that internal diameter diminishes successively, is provided with ball seat in the sliding sleeve.
5. a kind of multi-stage water power according to claim 4 sprays the pressure break method of work of staged fracturing tubing string, it is characterized in that: described spray gun outer wall runs through and is provided with shear pin, the outer wall of sliding sleeve is provided with the shear pin groove that cooperates with described shear pin, and sliding sleeve is fixed through shear pin and described spray gun.
6. a kind of multi-stage water power according to claim 4 sprays the pressure break method of work of staged fracturing tubing string, it is characterized in that: described spray gun comprises spray gun body, nozzle cage and nozzle, spray gun body two ends are respectively top connection and lower contact, the spray gun body is provided with the injection hydrophthalmia, nozzle cage is arranged on and sprays in the hydrophthalmia, nozzle is arranged in the nozzle cage, and nozzle outer surface and nozzle cage front end face are provided with topping, and the spray gun body outer wall around the described injection hydrophthalmia is provided with topping; Sliding sleeve is arranged in the inner chamber of spray gun, and sliding sleeve is that interference fits is connected with the spray gun inner chamber; Described sliding sleeve is located joint and comprises that sliding sleeve is located upper end of joint, sliding sleeve is located the joint lower end and sliding sleeve is located the joint baffle plate; Described packer comprises packing element and the central tube that is arranged in the packing element, the packing element upper end is connected with last glue tube base, the packing element lower end is connected with the lower rubber cylinder seat, spray gun body upper end connects oil pipe, spray gun body lower end is connected with last glue tube base respectively at described central tube upper end, lower rubber cylinder seat and central tube lower end are connected with packer lower contact upper end, and packer lower contact lower end is located upper end of joint with sliding sleeve and is connected, and sliding sleeve is located the joint lower end and is located the joint baffle plate with sliding sleeve and is connected.
7. a kind of multi-stage water power according to claim 6 sprays the pressure break method of work of staged fracturing tubing string, it is characterized in that: the spray gun inner body wall between sliding sleeve and spray gun body is disposed with first fluid course and second fluid course of indent, and first fluid course communicates with nozzle.
8. a kind of multi-stage water power according to claim 7 sprays the pressure break method of work of staged fracturing tubing string, it is characterized in that: described second fluid course communicates with the 3rd fluid course, the 3rd fluid course is axially disposed within spray gun body lower end along the spray gun body, and the 3rd fluid course communicates with the packing element upper end.
9. a kind of multi-stage water power according to claim 3 sprays the pressure break method of work of staged fracturing tubing string, it is characterized in that: described hydraulic centralizing device comprises centralizer body, sets upright rib and wiper block, set upright and have mounting groove on the rib, wiper block outwards embeds in centralizer body and is arranged on the mounting groove, be arranged with the anti-sandpipe of elasticity on the described centralizer body inwall, and elasticity is prevented the place that is communicated with of closed front mounting groove with the centralizer body inner chamber of sandpipe.
10. a kind of multi-stage water power according to claim 9 sprays the pressure break method of work of staged fracturing tubing string, it is characterized in that: the length of the anti-sandpipe of described elasticity is communicated with the diameter at place greater than mounting groove and centralizer body inner chamber, and elasticity prevents that the outer wall of sandpipe is connected with the centralizer body inner thread.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310063446.4A CN103266875B (en) | 2013-02-28 | 2013-02-28 | A kind of multi-stage water power sprays the fracture job method of fracturing strings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310063446.4A CN103266875B (en) | 2013-02-28 | 2013-02-28 | A kind of multi-stage water power sprays the fracture job method of fracturing strings |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103266875A true CN103266875A (en) | 2013-08-28 |
CN103266875B CN103266875B (en) | 2015-12-02 |
Family
ID=49010529
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310063446.4A Expired - Fee Related CN103266875B (en) | 2013-02-28 | 2013-02-28 | A kind of multi-stage water power sprays the fracture job method of fracturing strings |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103266875B (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103470242A (en) * | 2013-09-14 | 2013-12-25 | 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 | Oilfield horizontal well volume fracturing method |
CN104727787A (en) * | 2015-02-09 | 2015-06-24 | 德惠同利(北京)石油技术服务有限公司 | Screen pipe press-through packing sand control method |
CN105672957A (en) * | 2016-01-20 | 2016-06-15 | 中国石油化工股份有限公司 | Tool for multi-directional pressure control type jet packing and fracturing and tubular column including tool |
CN105672935A (en) * | 2016-01-20 | 2016-06-15 | 中国石油化工股份有限公司 | Multidirectional pressure control type spraying, sealing and pressing device and pipe column comprising same |
CN106869893A (en) * | 2017-03-16 | 2017-06-20 | 中国石油集团渤海钻探工程有限公司 | Perforation/pressure break/packing integrated apparatus and its multistage fracturing process pipe string |
CN109826597A (en) * | 2017-11-22 | 2019-05-31 | 中国石油化工股份有限公司 | Straight well determines face hydraulic perforating fracturing device and method |
CN109958422A (en) * | 2019-04-19 | 2019-07-02 | 中国石油天然气股份有限公司 | Blowout prevention and anti-sticking process suitable for large-displacement pressure drive |
CN110578507A (en) * | 2019-09-18 | 2019-12-17 | 曹永泉 | Reusable sand blower for fracturing stratum of oil field |
CN111594123A (en) * | 2020-05-09 | 2020-08-28 | 大庆辰平钻井技术服务有限公司 | Jet staged fracturing method for bare hole immovable pipe column of ultra-short radius horizontal well |
CN114837629A (en) * | 2022-03-29 | 2022-08-02 | 郝爱国 | Acidifiable switch type sand filtering pipe |
CN114876370A (en) * | 2022-06-01 | 2022-08-09 | 中国石油大学(北京) | Multi-point directional jet drilling tool and method of use |
CN115126464A (en) * | 2022-08-04 | 2022-09-30 | 中国石油大学(北京) | Multistage positioning flexible fracturing tool and ultra-short radius radial horizontal well fracturing method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2420421Y (en) * | 2000-04-07 | 2001-02-21 | 朱福金 | Composite fracturing and slotting tool |
CN201786344U (en) * | 2010-09-29 | 2011-04-06 | 中国石油集团西部钻探工程有限公司 | Multistage fracturing tool |
CN202181857U (en) * | 2011-07-18 | 2012-04-04 | 海城市石油机械制造有限公司 | Multifunctional safe joint |
CN102536185A (en) * | 2011-12-08 | 2012-07-04 | 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 | Multi-stage draggable water-jet packer tubular column and technology |
CN202381064U (en) * | 2011-11-25 | 2012-08-15 | 中国石油天然气股份有限公司 | Separate layer fracturing integrated special tool |
CN202500541U (en) * | 2011-12-15 | 2012-10-24 | 中国石油天然气股份有限公司 | Multistage layered fracturing process pipe column for gas well vertical well |
US20120312536A1 (en) * | 2011-06-10 | 2012-12-13 | Barry Mccallum | Multi-Stage Downhole Hydraulic Stimulation Assembly |
-
2013
- 2013-02-28 CN CN201310063446.4A patent/CN103266875B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2420421Y (en) * | 2000-04-07 | 2001-02-21 | 朱福金 | Composite fracturing and slotting tool |
CN201786344U (en) * | 2010-09-29 | 2011-04-06 | 中国石油集团西部钻探工程有限公司 | Multistage fracturing tool |
US20120312536A1 (en) * | 2011-06-10 | 2012-12-13 | Barry Mccallum | Multi-Stage Downhole Hydraulic Stimulation Assembly |
CN202181857U (en) * | 2011-07-18 | 2012-04-04 | 海城市石油机械制造有限公司 | Multifunctional safe joint |
CN202381064U (en) * | 2011-11-25 | 2012-08-15 | 中国石油天然气股份有限公司 | Separate layer fracturing integrated special tool |
CN102536185A (en) * | 2011-12-08 | 2012-07-04 | 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 | Multi-stage draggable water-jet packer tubular column and technology |
CN202500541U (en) * | 2011-12-15 | 2012-10-24 | 中国石油天然气股份有限公司 | Multistage layered fracturing process pipe column for gas well vertical well |
Non-Patent Citations (1)
Title |
---|
张波等: "水平井多级水力喷射压裂封隔工具", 《石油机械》, vol. 40, no. 12, 31 December 2012 (2012-12-31) * |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103470242B (en) * | 2013-09-14 | 2015-08-19 | 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 | A kind of oilfield horizontal well volume fracturing method |
CN103470242A (en) * | 2013-09-14 | 2013-12-25 | 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 | Oilfield horizontal well volume fracturing method |
CN104727787B (en) * | 2015-02-09 | 2018-01-09 | 德惠同利(北京)石油技术服务有限公司 | Pressure wears screen casing filling anti-sand method |
CN104727787A (en) * | 2015-02-09 | 2015-06-24 | 德惠同利(北京)石油技术服务有限公司 | Screen pipe press-through packing sand control method |
CN105672935B (en) * | 2016-01-20 | 2018-03-02 | 中国石油化工股份有限公司 | The device and include its tubing string that multidirectional pressure control type spray envelope is pressed |
CN105672935A (en) * | 2016-01-20 | 2016-06-15 | 中国石油化工股份有限公司 | Multidirectional pressure control type spraying, sealing and pressing device and pipe column comprising same |
CN105672957B (en) * | 2016-01-20 | 2018-02-09 | 中国石油化工股份有限公司 | The instrument of envelope pressure is sprayed for multidirectional pressure control type and includes its tubing string |
CN105672957A (en) * | 2016-01-20 | 2016-06-15 | 中国石油化工股份有限公司 | Tool for multi-directional pressure control type jet packing and fracturing and tubular column including tool |
CN106869893A (en) * | 2017-03-16 | 2017-06-20 | 中国石油集团渤海钻探工程有限公司 | Perforation/pressure break/packing integrated apparatus and its multistage fracturing process pipe string |
CN109826597B (en) * | 2017-11-22 | 2021-08-13 | 中国石油化工股份有限公司 | Vertical well fixed face hydraulic perforation fracturing device and method |
CN109826597A (en) * | 2017-11-22 | 2019-05-31 | 中国石油化工股份有限公司 | Straight well determines face hydraulic perforating fracturing device and method |
CN109958422A (en) * | 2019-04-19 | 2019-07-02 | 中国石油天然气股份有限公司 | Blowout prevention and anti-sticking process suitable for large-displacement pressure drive |
CN110578507A (en) * | 2019-09-18 | 2019-12-17 | 曹永泉 | Reusable sand blower for fracturing stratum of oil field |
CN111594123A (en) * | 2020-05-09 | 2020-08-28 | 大庆辰平钻井技术服务有限公司 | Jet staged fracturing method for bare hole immovable pipe column of ultra-short radius horizontal well |
CN114837629A (en) * | 2022-03-29 | 2022-08-02 | 郝爱国 | Acidifiable switch type sand filtering pipe |
CN114876370A (en) * | 2022-06-01 | 2022-08-09 | 中国石油大学(北京) | Multi-point directional jet drilling tool and method of use |
CN114876370B (en) * | 2022-06-01 | 2023-03-28 | 中国石油大学(北京) | Multi-point directional jet drilling tool and method of use thereof |
CN115126464A (en) * | 2022-08-04 | 2022-09-30 | 中国石油大学(北京) | Multistage positioning flexible fracturing tool and ultra-short radius radial horizontal well fracturing method |
CN115126464B (en) * | 2022-08-04 | 2023-08-11 | 中国石油大学(北京) | Multistage positioning flexible fracturing tool and ultra-short radius radial horizontal well fracturing method |
Also Published As
Publication number | Publication date |
---|---|
CN103266875B (en) | 2015-12-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103266875B (en) | A kind of multi-stage water power sprays the fracture job method of fracturing strings | |
CN103266876B (en) | Multi-stage water power sprays the fracture job method of fracturing strings | |
CN103266873A (en) | Connecting structure of multilevel hydraulic spraying segmentation fracturing tubular column | |
CN101457640B (en) | Abradant jet downhole perforation, and kerf multiple fracturing method | |
CN100562645C (en) | High pressure water jet-flow deep penetrating perforating and auxiliary crushing method and device thereof | |
CN101539007B (en) | Abrasive jetting device and method for abrasive jetting flow and jetting perforation and multiple fracturing | |
CN104695927B (en) | Coiled tubing and production tubing combined string fracturing and well completion integrated method | |
CN201802376U (en) | Open hole well completion hydraulic sand blasting immovable pipe string staged fracturing pipe string | |
CN104564001B (en) | The method of many cluster pressure breaks of horizontal well and many cluster perforating and fracturing tubing strings of implementation the method | |
CN106593389B (en) | Fracturing method for realizing high-angle natural fracture oil reservoir by adopting permanent plugging agent | |
CN103184856A (en) | Hydraulic jet packer applicable to multilevel hydraulic jet fracturing | |
CN102493791A (en) | Abrasive material jet injection device | |
CN104612624A (en) | Staged fracturing method for degradable bridge plug, timing sliding sleeve, staged fracturing tubular column and strata | |
CN112814640B (en) | Multilayer pressured fracturing operation device for medium-low pressure well and application method | |
CN105888638A (en) | Timing sliding sleeve fracturing pipe column | |
CN204476347U (en) | Degradable bridging plug, timing sliding sleeve and fracturing strings | |
CN104564003A (en) | Drilling plug-free pumping type hydraulic bridge plug staged fracturing method | |
CN103452542A (en) | Switchable fracturing sliding sleeve | |
CN103184867A (en) | Packer jetting tool ground simulation method suitable for multistage hydraulic jetting fracturing | |
CN107654213B (en) | High-energy negative pressure blocking remover | |
CN206071557U (en) | Anti-jamming ball sliding sleeve hydraulic ejector and fracturing string | |
CN103821490A (en) | Special ejector with multilevel hydraulic ejecting and staged fracturing | |
CN203188992U (en) | Multistage hydraulic jetting staged fracturing pipe column structure | |
CN115822530A (en) | Long horizontal section under-pressure drill rod transmission well-flushing and perforation integrated tool and method | |
CN116146126B (en) | Double-seal single-clamping-belt-pressure continuous-dragging horizontal well volume repeated fracturing transformation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211020 Address after: 100007 Oil Mansion, 9 North Avenue, Dongcheng District, Beijing, Dongzhimen Patentee after: CHINA NATIONAL PETROLEUM Corp. Patentee after: CNPC CHUANQING DRILLING ENGINEERING Co.,Ltd. Address before: 710018 room 1207, Changqing building, Changqing Xing Long Yuan District, Xi'an, Shaanxi Patentee before: CNPC CHUANQING DRILLING ENGINEERING Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151202 |