CN102409689A - 利用气囊实现双壁钢围堰平转下河的方法 - Google Patents

利用气囊实现双壁钢围堰平转下河的方法 Download PDF

Info

Publication number
CN102409689A
CN102409689A CN2011102803167A CN201110280316A CN102409689A CN 102409689 A CN102409689 A CN 102409689A CN 2011102803167 A CN2011102803167 A CN 2011102803167A CN 201110280316 A CN201110280316 A CN 201110280316A CN 102409689 A CN102409689 A CN 102409689A
Authority
CN
China
Prior art keywords
cofferdam
air bag
river
center line
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102803167A
Other languages
English (en)
Other versions
CN102409689B (zh
Inventor
田继开
秦顺全
涂满明
李军堂
宋小三
郑大超
傅战工
刘润泽
何加江
张爱花
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CN201110280316.7A priority Critical patent/CN102409689B/zh
Publication of CN102409689A publication Critical patent/CN102409689A/zh
Application granted granted Critical
Publication of CN102409689B publication Critical patent/CN102409689B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

利用气囊实现双壁钢围堰平转下河的方法,涉及桥梁工程的水中基础施工,包括:将围堰下布置至少两块托板,每块托板下布置N个气囊;将气囊斜放,靠近围堰入水端的最前端气囊与围堰中心线夹角为90°+α,其中α是围堰下河需要转动的角度;将远离围堰入水端的最后端气囊与围堰中心线垂直,其余气囊由最前端至最后端依次与围堰中心线按照90°+α-(n-1)α/(N-1)布置,其中n=1,2,…N;逐渐释放钢丝绳,让围堰沿着气囊摆放的方向斜行;围堰至入河口15~20m处,断开钢丝绳,实现围堰入水。该方法解决围堰平转的问题,当河边有较大障碍物或加工场地不正对河口时,使围堰平转至正对河口的位置,实现围堰入水。

Description

利用气囊实现双壁钢围堰平转下河的方法
技术领域
本发明涉及桥梁工程的水中基础施工,具体来讲是一种利用气囊实现双壁钢围堰平转下河的方法。
背景技术
双壁钢围堰是桥梁水中基础施工时,用于水中承台施工的挡水或挡土结构。先围堰后钻孔的方法是双壁钢围堰施工中常用的一种,采用先围堰后钻孔的方法时,首先在加工厂制造底节或全高围堰,然后进行围堰下河。通常围堰采用气囊法下河时,加工场地需要选用靠近河边的场地,这样才能够顺利使用气囊法将围堰拖下河。如果在围堰的下河过程中,河边有较大障碍物或加工场地不正对河口时,则无法实施气囊法围堰下河。
发明内容
针对现有技术中存在的缺陷,本发明的目的在于提供一种利用气囊实现双壁钢围堰平转下河的方法,解决围堰平转的问题,当河边有较大障碍物或加工场地不正对河口时,使围堰平转至正对河口的位置,实现围堰入水。
为达到以上目的,本发明采取的技术方案是:一种利用气囊实现双壁钢围堰平转下河的方法,包括如下步骤:
101.将围堰下布置至少两块托板,每块托板下布置N(N≥1)个气囊,且N个气囊呈一排布置;
102.将所述气囊斜放,靠近围堰入水端的最前端气囊与围堰中心线夹角为90°+α,其中α是围堰下河需要转动的角度;
103.将远离围堰入水端的最后端气囊与围堰中心线垂直,其余气囊由最前端至最后端依次与围堰中心线按照90°+α-(n-1)α/(N-1)布置,其中n=1,2,…N;
104.所述围堰通过钢丝绳连接转向地锚,逐渐释放所述钢丝绳,让所述围堰沿着所述气囊摆放的方向斜行,实现围堰下河前的角度平转。
105.所述围堰调整至正对入河口,将连接在转向地锚上的钢丝绳断开,将所述钢丝绳连接至下河地锚,逐渐释放钢丝绳,围堰至入河口15~20m处,断开钢丝绳,实现围堰入水。
在上述技术方案的基础上,所述围堰通过上述步骤调整后,将气囊反向回拉,反复通过所述步骤进行调整。
在上述技术方案的基础上,所述反向回拉时,每块托板下布置N个气囊,靠近入水端的最前端气囊与围堰中心线垂直,远离入水端的最后端气囊与围堰中心线按照夹角90°+φ设置,φ为一次回拉调整所需转角,其余气囊由最前端至最后端与围堰中心线按照夹角90°+φ-(n-1)φ/(N-1)布置,其中n=1,2,…N。
在上述技术方案的基础上,所述围堰下布置支撑架,支撑架与围堰通过螺栓连接,支撑架下布置托板,托板下布置气囊,共同形成围堰下滑滑道。
在上述技术方案的基础上,所述围堰入水后,破坏支撑架与围堰的螺栓连接,支撑架与围堰自行脱离。
本发明的有益效果在于:解决围堰平转的问题,当河边有较大障碍物或加工场地不正对河口时,利用所述气囊的转角实现整个围堰的转角,若所需转动角度较大,还可通过多次围堰的转角逐步转动,使围堰平转至正对河口的位置,实现围堰入水。
附图说明
图1为围堰平转时气囊平面布置图;
图2为图1中A-A方向的立面布置图;
图3为围堰回拉时气囊平面布置图;
图4为围堰平转下河的总体布置图。
附图标记:围堰1,托板2,气囊3,最前端气囊31,最后端气囊32,转向地锚4,支撑架5,钢丝绳6,下河地锚7,围堰中心线L。
具体实施方式
以下结合附图及实施例对本发明作进一步详细说明。
如图1、图2、图3和图4所示,本法发明所述利用气囊实现双壁钢围堰平转下河的方法,包括如下步骤:
101.将围堰1下布置至少两块托板2,每块托板2下布置N(N≥1)个气囊3,且N个气囊3在每块托板2下方呈一排布置。其中,围堰1下部通过螺栓连接支撑架5,托板2布置于支撑架5的下方,托板2和气囊3共同形成围堰1的下滑滑道。
102.如图4,D是围堰1下河所遇障碍物边线,需要转动α角度下河时,下和方向为B方向,将所述气囊3斜放,靠近围堰1入水端的最前端气囊31与围堰中心线L夹角为90°+α。
103.将远离围堰1入水端的最后端气囊32与围堰中心线L垂直,其余气囊3由最前端至最后端依次与围堰中心线L按照90°+α-(n-1)α/(N-1)布置,其中n=1,2,…N,L′为转向后的围堰中心线。此时,气囊3的摆放角度为:最前端气囊31斜放角度最大,向后斜放角度逐渐减小,最后端气囊32斜放角度最小。
104.转向时,通过钢丝绳6将所述围堰1连接转向地锚4,逐渐释放所述拉围堰1的钢丝绳6,让所述围堰1沿着所述气囊3摆放的方向斜行,利用气囊3和下河地锚7实现围堰1下河前的角度平转。
105.将所述围堰1调整至正对入河口C(图4中C表示入河口)处,将连接在转向地锚4上的钢丝绳6断开,将所述钢丝绳6连接至下河地锚7,逐渐释放钢丝绳6,直至围堰1距离入河口15~20m处断开钢丝绳6,围堰1入水后,由于自重的作用,破坏支撑架5与围堰1的螺栓连接,支撑架5与围堰1自行脱离,实现围堰入水。
上述步骤102、103、104中,如果围堰1需要平转的角度较小,一次斜行即可转向到位;如果围堰1需要平转的角度较大,可以分次对围堰1进行角度调整,即:所述围堰1通过上述步骤调整后,将气囊3反向角度布置后回拉,再次进行上述步骤,调整围堰1至下河角度,如不够可再次回拉,再次按照上述步骤调整。当可供围堰1斜行的距离过短,可让围堰1一次斜行后,将气囊3反向角度布置后回拉,再次进行斜行,反复通过所述步骤进行调整。
如图3所示,气囊3反向回拉角度可以按照如下方式布置:若需要回拉转角φ,靠入水端的最前端气囊31与围堰中心线L垂直,最后端气囊32与围堰中心线L夹角为90°+φ,其余气囊3由最前端至最后端依次按照与围堰中心线L呈90°+φ-(n-1)φ/(N-1)布置,其中n=1,2,…N,L′为转向后的围堰中心线。
本发明不局限于上述实施方式,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也视为本发明的保护范围之内。本说明书中未作详细描述的内容属于本领域专业技术人员公知的现有技术。

Claims (5)

1.一种利用气囊实现双壁钢围堰平转下河的方法,其特征在于,包括如下步骤:
101.将围堰下布置至少两块托板,每块托板下布置N(N≥1)个气囊,且N个气囊呈一排布置;
102.将所述气囊斜放,靠近围堰入水端的最前端气囊与围堰中心线夹角为90°+α,其中α是围堰下河需要转动的角度;
103.将远离围堰入水端的最后端气囊与围堰中心线垂直,其余气囊由最前端至最后端依次与围堰中心线按照90°+α-(n-1)α/(N-1)布置,其中n=1,2,…N;
104.所述围堰通过钢丝绳连接转向地锚,逐渐释放所述钢丝绳,让所述围堰沿着所述气囊摆放的方向斜行,实现围堰下河前的角度平转。
105.所述围堰调整至正对入河口,将连接在转向地锚上的钢丝绳断开,将所述钢丝绳连接至下河地锚,逐渐释放钢丝绳,围堰至入河口15~20m处,断开钢丝绳,实现围堰入水。
2.如权利要求1所述的利用气囊实现双壁钢围堰平转下河的方法,其特征在于:所述围堰通过步骤102、103、104转向后,将气囊反向回拉,反复通过上述三个步骤进行调整。
3.如权利要求2所述的利用气囊实现双壁钢围堰平转下河的方法,其特征在于:所述反向回拉时,每块托板下布置N个气囊,靠近入水端的最前端气囊与围堰中心线垂直,远离入水端的最后端气囊与围堰中心线按照夹角90°+φ设置,φ为一次回拉调整所需转角,其余气囊由最前端至最后端与围堰中心线按照夹角90°+φ-(n-1)φ/(N-1)布置,其中n=1,2,…N。
4.如权利要求1所述的利用气囊实现双壁钢围堰平转下河的方法,其特征在于:所述围堰下布置支撑架,支撑架与围堰通过螺栓连接,支撑架下布置托板,托板下布置气囊,共同形成围堰下滑滑道。
5.如权利要求1所述的利用气囊实现双壁钢围堰平转下河的方法,其特征在于:所述围堰入水后,破坏支撑架与围堰的螺栓连接,支撑架与围堰自行脱离。
CN201110280316.7A 2011-09-21 2011-09-21 利用气囊实现双壁钢围堰平转下河的方法 Active CN102409689B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110280316.7A CN102409689B (zh) 2011-09-21 2011-09-21 利用气囊实现双壁钢围堰平转下河的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110280316.7A CN102409689B (zh) 2011-09-21 2011-09-21 利用气囊实现双壁钢围堰平转下河的方法

Publications (2)

Publication Number Publication Date
CN102409689A true CN102409689A (zh) 2012-04-11
CN102409689B CN102409689B (zh) 2014-07-09

Family

ID=45912009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110280316.7A Active CN102409689B (zh) 2011-09-21 2011-09-21 利用气囊实现双壁钢围堰平转下河的方法

Country Status (1)

Country Link
CN (1) CN102409689B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852152A (zh) * 2012-09-29 2013-01-02 中铁八局集团第一工程有限公司 一种适用于浅水区域的钢围堰下水施工方法
CN102992242A (zh) * 2012-12-07 2013-03-27 中铁十局集团济南铁路工程有限公司 一种利用滚动气囊托运大型重物时的转向方法
CN104790418A (zh) * 2015-04-29 2015-07-22 武汉理工大学 钢围堰或吊箱下水过程设计方法
CN104863170A (zh) * 2015-05-13 2015-08-26 中铁大桥局集团有限公司 大型沉井或围堰的浮运方法
CN104947695A (zh) * 2015-05-19 2015-09-30 中铁大桥局集团有限公司 一种围堰下水方法
CN107604932A (zh) * 2017-10-16 2018-01-19 中铁大桥局集团有限公司 一种高窄钢围堰整体下河的方法、装置及全封闭托架

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182149A (zh) * 2011-04-06 2011-09-14 中铁大桥局集团有限公司 无平行边围堰气囊下河方法

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182149A (zh) * 2011-04-06 2011-09-14 中铁大桥局集团有限公司 无平行边围堰气囊下河方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
周荣贵: "论大型钢吊围堰的浮运与定位施工技术", 《现代商贸工业》, no. 09, 1 May 2009 (2009-05-01) *
黄旺明: "南京大胜关长江大桥主桥6号墩围堰下河及定位施工技术", 《高速铁路技术》, no. 03, 30 June 2011 (2011-06-30) *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852152A (zh) * 2012-09-29 2013-01-02 中铁八局集团第一工程有限公司 一种适用于浅水区域的钢围堰下水施工方法
CN102992242A (zh) * 2012-12-07 2013-03-27 中铁十局集团济南铁路工程有限公司 一种利用滚动气囊托运大型重物时的转向方法
CN102992242B (zh) * 2012-12-07 2015-04-29 中铁十局集团济南铁路工程有限公司 一种利用滚动气囊托运大型重物时的转向方法
CN104790418A (zh) * 2015-04-29 2015-07-22 武汉理工大学 钢围堰或吊箱下水过程设计方法
CN104863170A (zh) * 2015-05-13 2015-08-26 中铁大桥局集团有限公司 大型沉井或围堰的浮运方法
CN104947695A (zh) * 2015-05-19 2015-09-30 中铁大桥局集团有限公司 一种围堰下水方法
CN107604932A (zh) * 2017-10-16 2018-01-19 中铁大桥局集团有限公司 一种高窄钢围堰整体下河的方法、装置及全封闭托架

Also Published As

Publication number Publication date
CN102409689B (zh) 2014-07-09

Similar Documents

Publication Publication Date Title
CN102409689A (zh) 利用气囊实现双壁钢围堰平转下河的方法
CN107517768A (zh) 一种具有防雨功能的中草药多层种植架
EP2072933A3 (en) Tracking system for a solar energy panel for azimuthally tracing the position of the sun
CN207193979U (zh) 建筑钻孔灌注桩桩孔清渣装置
CN107191021A (zh) 隐藏式生态电动停车位
CN202689002U (zh) 混凝土浇筑旋转滑槽布料系统
CN111017139A (zh) 一种船舶艏艉线型较大区域总段的搭载操作方法
CN109610920A (zh) 输电线路单柱钢管塔吊装施工方法
CN202108298U (zh) 倾斜电杆校正装置
CN101838997B (zh) 潮间带风电场风机基础及其生产方法
CN206844199U (zh) 一种水利工程用清淤装置
CN201730109U (zh) 新型潮间带风电场风机基础
CN107059689A (zh) 伸缩升降电动栅栏
CN206417540U (zh) 一种用于托辊更换的皮带顶升器
CN203538010U (zh) 树木隐形支撑系统
CN102877479A (zh) 一种抗拔桩基础结构
CN206942293U (zh) 一种可调式电杆校正装置
CN206672539U (zh) 智能型低耗抗风广告牌
CN202416320U (zh) 水下钢管桩基打桩扶正架
CN203475435U (zh) 自动锁紧式杠杆拔桩器
CN2729149Y (zh) 钢管桩防腐用圈连悬焊式牺牲阳极
CN207447832U (zh) 桨叶预装液压螺母安装小车
CN108730127A (zh) 塔架系固系统
CN207427948U (zh) 一种园林用方便盆栽修剪的植物底部固定座
CN205336192U (zh) 一种太阳能电池板角度调节装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150215

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 430074 WUHAN, HUBEI PROVINCE TO: 430050 WUHAN, HUBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150215

Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau

Address before: 430074 Hubei province Wuhan Dongxin East Lake New Technology Development Zone Road SBI Venture Street No. 6 Building 12 layer

Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd.