CN104790418A - 钢围堰或吊箱下水过程设计方法 - Google Patents
钢围堰或吊箱下水过程设计方法 Download PDFInfo
- Publication number
- CN104790418A CN104790418A CN201510214677.XA CN201510214677A CN104790418A CN 104790418 A CN104790418 A CN 104790418A CN 201510214677 A CN201510214677 A CN 201510214677A CN 104790418 A CN104790418 A CN 104790418A
- Authority
- CN
- China
- Prior art keywords
- air bag
- steel cofferdam
- bearing capacity
- box
- buoyancy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/02—Restraining of open water
- E02D19/04—Restraining of open water by coffer-dams, e.g. made of sheet piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D23/00—Caissons; Construction or placing of caissons
- E02D23/08—Lowering or sinking caissons
Abstract
本发明涉及一种钢围堰或吊箱下水过程设计方法,它包括用于确定钢围堰或吊箱初始入水角的步骤,具体为:步骤(1)、实地测量入水处坡角的步骤;步骤(2)、计算的步骤。本发明方法简便易行,能较为准确地进行钢围堰或吊箱气囊下水过程的计算校核,为钢围堰、吊箱的施工提供技术支持。
Description
技术领域
本发明属于公路桥梁施工领域,具体涉及可用于进行钢吊箱或围堰下水过程的设计、计算、校核方法。
背景技术
随着大跨度桥梁的建设,通过围堰、吊箱进行桥墩施工成为一种常用的施工手段。近年来,大型钢围堰、吊箱越来越多地采用气囊下水工艺。
但随着钢围堰、吊箱越来越大,纯工程经验已经不满足安全下水的需要,需要科学方法为钢围堰、吊箱顺利下水进行设计、计算、校核。
发明内容
本发明所要解决的技术问题是:提供一种钢围堰或吊箱下水过程设计方法,该方法可以为钢围堰或吊箱安全下水提供技术支持。
本发明为解决上述提出的问题所采用解决方案为:
钢围堰或吊箱下水过程设计方法,它包括用于确定钢围堰或吊箱初始入水角的步骤,具体为:
步骤(1)、实地测量入水处坡角的步骤;
步骤(2)、计算的步骤,具体为:
步骤(2.1)、设定钢围堰或吊箱前移距离,当前移距离小于等于0时完成计算;
步骤(2.2)、假定入水角A,初始入水角为步骤(1)测量入水处坡角;
步骤(2.3)、计算入水部分的入水部分浮力和浮心位置;
步骤(2.4)、求解各气囊承载力;
步骤(2.5)、将步骤(2.4)得到的各气囊承载力与气囊最大承载力进行比较,并做出以下选择:
若某个气囊承载力大于气囊最大承载力,退出计算;
或,各气囊承载力小于等于气囊最大承载力,进行下一步;
步骤(2.6)、计算各气囊受力不同造成的偏转角并与初始坡角相加,得到B;
步骤(2.7)、对比A、B,并做出以下选择:
若∣A-B∣≤1°,将前移距离减一个设定值,返回步骤(2.1)进行循环,进入下一工况计算;
或,若∣A-B∣>1°,向B的大小方向调整A,返回步骤(2.2)进行循环。
上述方案中,步骤(2.4)具体为:
建立钢围堰或吊箱的力平衡方程和力矩平衡方程:
i为气囊编号,k为开始工作气囊编号,n为终止工作气囊编号;
Fk为气囊承载力;dk为气囊工作力臂;F浮为浮力;d浮为浮力力臂;G为重力;d重为重力力臂。
求解各气囊承载力。
上述方案中,步骤(2.3)具体为:采用Solidworks计算入水部分的入水部分浮力和浮心位置。
本发明方法简便易行,能较为准确地进行钢围堰或吊箱气囊下水过程的计算校核,为钢围堰、吊箱的施工提供技术支持。
附图说明
图1计算过程流程图。
图2钢围堰三维实体模型图。
图3模拟工况1下水过程示意图。
图4模拟工况2下水过程示意图。
图5模拟工况2入水体积图。
图6模拟工况3下水过程示意图。
图7模拟工况3入水体积图。
图8模拟工况4入水过程示意图。
图9模拟工况4入水体积图。
图10模拟工况5入水过程示意图。
图11模拟工况5入水体积图。
图12模拟工况6入水过程示意图。
图13模拟工况6入水体积图。
具体实施方式
下面通过实施例进一步介绍本发明,该实施例为钢围堰下水过程设计方法,它包括用于确定钢围堰初始入水角的步骤,具体为:
步骤(1)、实地测量入水处坡角的步骤,入水处坡角为1:8;
步骤(2)、计算的步骤,具体为:
步骤(2.1)、设定钢围堰前移距离,一般为钢围堰下水方向的长度,当前移距离小于等于0时完成计算;
步骤(2.2)、假定入水角A,初始入水角为步骤(1)测量入水处坡角;
步骤(2.3)、计算入水部分的入水部分浮力和浮心位置,具体采用Solidworks计算入水部分的入水部分浮力和浮心位置,如图5、7、9、11所示。
步骤(2.4)、求解各气囊承载力,具体为:
建立钢围堰或吊箱的力平衡方程和力矩平衡方程:
i为气囊编号,k为开始工作气囊编号,n为终止工作气囊编号;
Fk为气囊承载力;dk为气囊工作力臂;F浮为浮力;d浮为浮力力臂;G为重力;d重为重力力臂。
求解各气囊承载力。
步骤(2.5)、将步骤(2.4)得到的各气囊承载力与气囊最大承载力进行比较,并做出以下选择:
若某个气囊承载力大于气囊最大承载力,退出计算,重新这种设计方案或/和重新选择气囊;
或,各气囊承载力小于等于气囊最大承载力,进行下一步;
步骤(2.6)、计算各气囊受力不同造成的偏转角并与初始坡角相加,得到B;计算各气囊受力不同造成的偏转角的具体方法为:
假设两个未知数,最前端气囊承载力F1、相邻气囊承载力之差f。两个未知数带入力和力矩平衡方程,可求解得到两个未知数。
查气囊说明书得到单个气囊的刚度系数K,进而得到相邻气囊在垂直于坡面方向上的高度差f/K。
得到各气囊受力不同造成的偏转角为arctan(f/K/l),其中l为相邻气囊的距离。
步骤(2.7)、对比A、B,并做出以下选择:
若∣A-B∣≤1°,将前移距离减一个设定值(如5cm),返回步骤(2.1)进行循环,进入下一工况计算;模拟工况如图3-图13所示。
或,若∣A-B∣>1°,向B的大小方向调整A,返回步骤(2.2)进行循环。
本发明实施例循环至前移距离小于等于0完成计算时,即可按本设计方法最终确定的假定入水角A(改变或不改变如水处的坡度),进行钢围堰下水作业。
本发明方法也可以作为吊箱下水过程设计方法。
Claims (2)
1.钢围堰或吊箱下水过程设计方法,其特征在于:它包括用于确定钢围堰或吊箱初始入水角的步骤,具体为:
步骤(1)、实地测量入水处坡角的步骤;
步骤(2)、计算的步骤,具体为:
步骤(2.1)、设定钢围堰或吊箱前移距离,当前移距离小于等于0时完成计算;
步骤(2.2)、假定入水角A,初始入水角为步骤(1)测量入水处坡角;
步骤(2.3)、计算入水部分的入水部分浮力和浮心位置;
步骤(2.4)、求解各气囊承载力;
步骤(2.5)、将步骤(2.4)得到的各气囊承载力与气囊最大承载力进行比较,并做出以下选择:
若某个气囊承载力大于气囊最大承载力,退出计算;
或,各气囊承载力小于等于气囊最大承载力,进行下一步;
步骤(2.6)、计算各气囊受力不同造成的偏转角并与初始坡角相加,得到B;
步骤(2.7)、对比A、B,并做出以下选择:
若∣A-B∣≤1°,将前移距离减一个设定值,返回步骤(2.1)进行循环,进入下一工况计算;
或,若∣A-B∣>1°,向B的大小方向调整A,返回步骤(2.2)进行循环。
2.如权利要求1所述的下水过程设计方法,其特征在于:步骤(2.4)具体为:
建立钢围堰或吊箱的力平衡方程和力矩平衡方程:
i为气囊编号,k为开始工作气囊编号,n为终止工作气囊编号;
Fk为气囊承载力;dk为气囊工作力臂;F浮为浮力;d浮为浮力力臂;G为重力;d重为重力力臂。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510214677.XA CN104790418B (zh) | 2015-04-29 | 2015-04-29 | 钢围堰或吊箱下水过程设计方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510214677.XA CN104790418B (zh) | 2015-04-29 | 2015-04-29 | 钢围堰或吊箱下水过程设计方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104790418A true CN104790418A (zh) | 2015-07-22 |
CN104790418B CN104790418B (zh) | 2016-09-14 |
Family
ID=53555573
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510214677.XA Expired - Fee Related CN104790418B (zh) | 2015-04-29 | 2015-04-29 | 钢围堰或吊箱下水过程设计方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104790418B (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01256627A (ja) * | 1988-04-07 | 1989-10-13 | Kayaba Ind Co Ltd | 沈埋函の沈設制御装置 |
JPH0711656A (ja) * | 1993-06-24 | 1995-01-13 | Maeda Corp | 人工島建設方法 |
CN101033613A (zh) * | 2006-06-21 | 2007-09-12 | 苗德政 | 一种运用气囊移送下水沉箱的施工方法 |
CN101033606A (zh) * | 2007-03-23 | 2007-09-12 | 中铁大桥局集团第二工程有限公司 | 一种桥梁大型钢围堰气囊下河方法 |
CN102182149A (zh) * | 2011-04-06 | 2011-09-14 | 中铁大桥局集团有限公司 | 无平行边围堰气囊下河方法 |
CN102409689A (zh) * | 2011-09-21 | 2012-04-11 | 中铁大桥局股份有限公司 | 利用气囊实现双壁钢围堰平转下河的方法 |
-
2015
- 2015-04-29 CN CN201510214677.XA patent/CN104790418B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01256627A (ja) * | 1988-04-07 | 1989-10-13 | Kayaba Ind Co Ltd | 沈埋函の沈設制御装置 |
JPH0711656A (ja) * | 1993-06-24 | 1995-01-13 | Maeda Corp | 人工島建設方法 |
CN101033613A (zh) * | 2006-06-21 | 2007-09-12 | 苗德政 | 一种运用气囊移送下水沉箱的施工方法 |
CN101033606A (zh) * | 2007-03-23 | 2007-09-12 | 中铁大桥局集团第二工程有限公司 | 一种桥梁大型钢围堰气囊下河方法 |
CN102182149A (zh) * | 2011-04-06 | 2011-09-14 | 中铁大桥局集团有限公司 | 无平行边围堰气囊下河方法 |
CN102409689A (zh) * | 2011-09-21 | 2012-04-11 | 中铁大桥局股份有限公司 | 利用气囊实现双壁钢围堰平转下河的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104790418B (zh) | 2016-09-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104480962B (zh) | 一种有限填土挡墙的土压力分布计算方法 | |
CN102720295A (zh) | 一种基于索穹顶张拉和承载全过程分析的预应力确定方法 | |
CN103244134B (zh) | 负覆土工况下盾构隧道抗浮压重的方法 | |
CN106529150B (zh) | 复合地层盾构隧道拱顶荷载计算方法 | |
CN103334418B (zh) | 确定地基承载力的新方法 | |
CN110765695A (zh) | 一种基于高阶有限元法获取混凝土重力坝裂纹扩展路径的模拟计算方法 | |
CN104111137B (zh) | 基于三次多项式模型的锚杆承载力预测方法 | |
CN115391904A (zh) | 一种江河崩岸预警方法及系统 | |
CN104790418A (zh) | 钢围堰或吊箱下水过程设计方法 | |
CN203772858U (zh) | 一种用于路基边坡三维模型试验平台的可加载移动侧壁 | |
CN105447319A (zh) | 拱坝坝肩滑动块体不同地质界面计算参数的确定方法 | |
CN206736984U (zh) | 现场地基沉降模拟装置 | |
CN103488877A (zh) | 一种适用于高耸佛像的风振系数计算方法 | |
CN103981855B (zh) | 带支腿地连续墙沉降计算方法 | |
CN104196061B (zh) | 桥梁基础水平受荷试验装置及试验方法 | |
Chen et al. | Working mechanism of pile group with different pile spacing in dense sand | |
CN112431236B (zh) | 一种新型支护桩危险点的判定方法 | |
He et al. | Evaluating the safety of high arch dams with fractures based on numerical simulation and geomechanical model testing | |
CN209760318U (zh) | 一种模拟沉井发生翻砂突沉的试验装置 | |
CN109684752B (zh) | 一种道路标志牌基础设计方法 | |
Zhao | Three-dimensional collapse simulation on the spatial structure of concrete assembly building based on BIM | |
CN112883454A (zh) | 一种快速评估地震作用下非饱和边坡永久变形的方法和装置 | |
Li et al. | Experimental study on the force characteristics of superlong pile groups in silty sand | |
Aubé et al. | On the impact of anisotropic mesh adaptation on computational wind engineering | |
CN202705985U (zh) | 一种浅层平板荷载试验移动反力装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160914 Termination date: 20170429 |