CN101838997B - 潮间带风电场风机基础及其生产方法 - Google Patents

潮间带风电场风机基础及其生产方法 Download PDF

Info

Publication number
CN101838997B
CN101838997B CN2010101749372A CN201010174937A CN101838997B CN 101838997 B CN101838997 B CN 101838997B CN 2010101749372 A CN2010101749372 A CN 2010101749372A CN 201010174937 A CN201010174937 A CN 201010174937A CN 101838997 B CN101838997 B CN 101838997B
Authority
CN
China
Prior art keywords
steel pipe
support platform
pipe pile
basic steel
welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010101749372A
Other languages
English (en)
Other versions
CN101838997A (zh
Inventor
许世俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Haili Wind Power Equipment Technology Co., Ltd.
Original Assignee
JIANGSU HAILI WIND POWER EQUIPMENT TECHNICAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU HAILI WIND POWER EQUIPMENT TECHNICAL CO Ltd filed Critical JIANGSU HAILI WIND POWER EQUIPMENT TECHNICAL CO Ltd
Priority to CN2010101749372A priority Critical patent/CN101838997B/zh
Publication of CN101838997A publication Critical patent/CN101838997A/zh
Application granted granted Critical
Publication of CN101838997B publication Critical patent/CN101838997B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Wind Motors (AREA)

Abstract

本发明公开了一种潮间带风电场风机基础及其生产方法,支撑平台上焊接设置多根与基础钢管桩配合的连接管,支撑平台中央设置与风机塔筒配合的连接筒,连接筒与支撑架焊接,连接管与基础钢管桩焊接;连接管有沿圆周均布的多根外围连接管和设置在支撑平台中央的中央连接管;连接筒上表面呈水平状。生产方法包括设置基础钢管桩、将支撑平台各部件焊接,支撑平台上焊接设置多根与基础钢管桩配合的连接管,支撑平台中央设置与风机塔筒配合的连接筒,连接筒与支撑架焊接,再对支撑平台进行消除应力处理,然后将支撑平台与基础钢管桩连接。本发明结构合理,有效消除了支撑平台的焊接应力,工作效果好。

Description

潮间带风电场风机基础及其生产方法
技术领域:
本发明涉及一种潮间带风电场风机基础及其生产方法。
背景技术:
我国拥有海岸线总长度3.2万公里,其中大陆海岸线1.8万公里,岛屿海岸线1.4万公里,邻近海域具有丰富的风资源,充分利用这些风能,将有助于解决我国的能源和环境问题。我国的海上风力发电技术刚刚起步,开发设计适合我国海域特点并具有自主知识产权的海上风力发电设备,对我国的风力发电技术及能源战略具有重要意义,但由于海上风机基座的材料和建设费用一直居高不下,海上风力发电的发展迫切需要在风机基座研究和开发上有新的突破。
发明内容:
本发明的目的在于提供一种结构合理,工作效果好的潮间带风电场风机基础及其生产方法。
本发明的技术解决方案是:
一种潮间带风电场风机基础,其特征是:包括支撑平台,支撑平台上焊接设置多根与基础钢管桩配合的连接管,支撑平台中央设置与风机塔筒配合的连接筒,连接筒与支撑架焊接,连接管与基础钢管桩焊接;连接管有沿圆周均布的多根外围连接管和设置在支撑平台中央的中央连接管;连接筒上表面呈水平状。
连接管插入相对应的基础钢管桩中,并在连接管与基础钢管桩之间的间隙中灌注有混凝土层。
连接管与基础钢管桩通过调节螺栓连接,调节螺栓的调整缝中设置混凝土灌注层。
一种潮间带风电场风机基础的生产方法,其特征是:包括设置基础钢管桩、将支撑平台各部件焊接,支撑平台上焊接设置多根与基础钢管桩配合的连接管,支撑平台中央设置与风机塔筒配合的连接筒,连接筒与支撑架焊接,再对支撑平台进行消除应力处理,然后将支撑平台与基础钢管桩连接;其中对支撑平台进行消除应力处理的方法是:将支撑平台放在枕木或橡皮垫上,用振动器捆绑在支撑平台上,贴好应力应变片,用振动仪调节振动器的振动频率,达到整个支撑平台进行振动,并用应力应变测试仪监测其应变值,达到消除应力60%以上。
支撑平台与基础钢管桩连接时,连接管插入相对应的基础钢管桩中,用千斤顶顶住支撑平台,使连接筒上表面呈水平状,这时将连接管与基础钢管桩焊接,在连接管与基础钢管桩之间的间隙中灌注混凝土层。
连接管与基础钢管桩通过调节螺栓连接,调整调节螺栓的位置,使连接筒上表面呈水平状,然后连接管与基础钢管焊接,在调整缝中设置混凝土灌注层。
本发明结构合理,大大缩短了施工工期,降低了工程投资,工作效果好。安全可靠,满足强度、稳定、抗倾覆、耐疲劳、防共振、防冲刷、耐久性等要求。
附图说明:
下面结合附图和实施例对本发明作进一步说明。
图1是本发明一个实施例的结构示图。
图2是图1的俯视图。
图3是连接管与基础钢管的一种连接结构图。
图4是连接管与基础钢管的另一种连接结构图。
具体实施方式:
一种潮间带风电场风机基础的生产方法,包括设置基础钢管桩1、将支撑平台各部件焊接,支撑平台上焊接设置多根与基础钢管桩配合的连接管2,支撑平台中央设置与风机塔筒3配合的连接筒4,连接筒与支撑架5焊接,再对支撑平台进行消除应力处理,然后将支撑平台与基础钢管桩连接;其中对支撑平台进行消除应力处理的方法是:将支撑平台放在枕木或橡皮垫上,用振动器捆绑在支撑平台上,贴好应力应变片,用振动仪调节振动器的振动频率,达到整个支撑平台进行振动,并用应力应变测试仪监测其应变值,达到消除应力60%以上。
支撑平台与基础钢管桩连接时,连接管2插入相对应的基础钢管桩1中,用千斤顶顶住支撑平台,使连接筒上表面呈水平状,这时将连接管与基础钢管焊接,在连接管与基础钢管桩之间的间隙中灌注混凝土层6。
或者:连接管与基础钢管桩通过调节螺栓7连接,调整调节螺栓的位置,使连接筒上表面呈水平状,然后连接管与基础钢管桩焊接,在调整缝中设置混凝土灌注层8。
制得的潮间带风电场风机基础,包括支撑平台,支撑平台上焊接设置多根与基础钢管桩配合的连接管,支撑平台中央设置与风机塔筒配合的连接筒,连接筒与支撑架焊接,连接管与基础钢桩管焊接;连接管有沿圆周均布的多根外围连接管和设置在支撑平台中央的中央连接管;连接筒上表面呈水平状。连接管插入相对应的基础钢管桩中,并在连接管与基础钢管桩之间的间隙中灌注有混凝土层。
或者:连接管与基础钢管桩通过调节螺栓连接,调节螺栓的调整缝中设置混凝土灌注层。

Claims (3)

1.一种潮间带风电场风机基础的生产方法,其特征是:包括设置基础钢管桩、将支撑平台各部件焊接,支撑平台上焊接设置多根与基础钢管桩配合的连接管,支撑平台中央设置与风机塔筒配合的连接筒,连接筒与支撑架焊接,再对支撑平台进行消除应力处理,然后将支撑平台与基础钢管桩连接;其中对支撑平台进行消除应力处理的方法是:将支撑平台放在枕木或橡皮垫上,用振动器捆绑在支撑平台上,贴好应力应变片,用振动仪调节振动器的振动频率,达到整个支撑平台进行振动,并用应力应变测试仪监测其应变值,达到消除应力60%以上。
2.根据权利要求1所述的潮间带风电场风机基础的生产方法,其特征是:支撑平台与基础钢管桩连接时,连接管插入相对应的基础钢管桩中,用千斤顶顶住支撑平台,使连接筒上表面呈水平状,这时将连接管与基础钢管桩焊接,在连接管与基础钢管桩之间的间隙中灌注混凝土层。
3.根据权利要求1所述的潮间带风电场风机基础的生产方法,其特征是:连接管与基础钢管桩通过调节螺栓连接,调整调节螺栓的位置,使连接筒上表面呈水平状,然后连接管与基础钢管桩焊接,在调整缝中设置混凝土灌注层。
CN2010101749372A 2010-05-18 2010-05-18 潮间带风电场风机基础及其生产方法 Active CN101838997B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101749372A CN101838997B (zh) 2010-05-18 2010-05-18 潮间带风电场风机基础及其生产方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101749372A CN101838997B (zh) 2010-05-18 2010-05-18 潮间带风电场风机基础及其生产方法

Publications (2)

Publication Number Publication Date
CN101838997A CN101838997A (zh) 2010-09-22
CN101838997B true CN101838997B (zh) 2011-08-31

Family

ID=42742641

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101749372A Active CN101838997B (zh) 2010-05-18 2010-05-18 潮间带风电场风机基础及其生产方法

Country Status (1)

Country Link
CN (1) CN101838997B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2400430B1 (es) * 2011-03-08 2014-03-26 Abengoa Solar New Technologies S.A. Dispositivo y método para la cimentación al terreno de una estructura de soporte de colectores solares
CN102587405A (zh) * 2012-02-27 2012-07-18 广东明阳风电产业集团有限公司 海上风机导管架基础安装方法及分离式导管架装置
CN103726505B (zh) * 2012-10-12 2016-01-27 上海勘测设计研究院 海上风电场风机基础
EP2719833B1 (en) * 2012-10-15 2015-08-05 Openhydro IP Limited A Hydroelectric Turbine System
KR102530139B1 (ko) 2022-06-23 2023-05-10 최종석 파이프 홈 가공 장치

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202005003425U1 (de) * 2005-03-03 2006-07-20 Oevermann Gmbh & Co. Kg Gründung, insbesondere für eine Offshore-Windenergieanlage
CN200978412Y (zh) * 2006-12-13 2007-11-21 中国水利水电科学研究院 防沉陷易调平易拆除的大型海上风电基础承台
CN200978431Y (zh) * 2006-12-13 2007-11-21 中国水利水电科学研究院 适合淤泥层海床的大型风机组合桩基础
CN201390974Y (zh) * 2009-04-10 2010-01-27 中国水电顾问集团华东勘测设计研究院 用于沿海潮间带的风力发电机基础结构
WO2010029766A1 (ja) * 2008-09-11 2010-03-18 三井造船株式会社 緊張係留浮体と緊張係留浮体の曳航及び設置方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202005003425U1 (de) * 2005-03-03 2006-07-20 Oevermann Gmbh & Co. Kg Gründung, insbesondere für eine Offshore-Windenergieanlage
CN200978412Y (zh) * 2006-12-13 2007-11-21 中国水利水电科学研究院 防沉陷易调平易拆除的大型海上风电基础承台
CN200978431Y (zh) * 2006-12-13 2007-11-21 中国水利水电科学研究院 适合淤泥层海床的大型风机组合桩基础
WO2010029766A1 (ja) * 2008-09-11 2010-03-18 三井造船株式会社 緊張係留浮体と緊張係留浮体の曳航及び設置方法
CN201390974Y (zh) * 2009-04-10 2010-01-27 中国水电顾问集团华东勘测设计研究院 用于沿海潮间带的风力发电机基础结构

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李静等.海上风力发电机组的基础形式.《上海电力》.2008,(第3期),314-317. *
林毅峰等.东海大桥海上风电场风机地基基础特性及设计.《上海电力》.2007,(第2期),153-157. *

Also Published As

Publication number Publication date
CN101838997A (zh) 2010-09-22

Similar Documents

Publication Publication Date Title
CN101838997B (zh) 潮间带风电场风机基础及其生产方法
CN102505636B (zh) 一种双薄壁墩连续刚构桥0号块施工方法
CN201874761U (zh) 风力发电机组基础环调平装置
CN206917805U (zh) 全向预应力抗疲劳组合钢结构风塔
CN102094418B (zh) 一种混凝土薄壁管桩木质托板接桩施工方法
CN103114604B (zh) 预应力混凝土圆筒型风力发电机组基础
CN201730109U (zh) 新型潮间带风电场风机基础
CN203049635U (zh) 锚桩法静载试验快捷链接装置
CN204676584U (zh) 一种高桩桁架式海上风机基础结构
CN107063020B (zh) 一种孔桩开挖爆破飞石防护装置
CN201953582U (zh) 具有调平结构的海上风机基础
CN205894049U (zh) 用于海上升压站的先插桩式导管架结构
CN202543954U (zh) 一种海上风电风机多角架基础
CN102852154A (zh) 一种复合桩基
CN203007977U (zh) 一种钢筋网面挡墙的复合防护结构
CN206190458U (zh) 全向预应力抗疲劳组合钢结构风塔
CN201756699U (zh) 一种围箍式钢板桩围堰平台
CN106592622A (zh) 一种基于环形砼带竖向预应力的风机基础结构
CN201610548U (zh) 用于截断预制桩多余部分的破桩机构
CN103215934B (zh) 一种海上基础平台
CN201730110U (zh) 潮间带风电场风机基础
CN205776297U (zh) 一种带有环形钢板箍的潮流发电灌注桩基础
CN108331007A (zh) 一种用于海上风电大功率机组的基础结构及安装方法
CN103046574A (zh) 一种软基础风机四叶梅型混凝土承台预应力管基础结构
CN204849773U (zh) 一种增加封底混凝土和钢护筒握裹力的装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 226400 north side of Jinshajiang Road and east side of Jinggangshan Road, Rudong Economic Development Zone, Nantong City, Jiangsu Province

Patentee after: Jiangsu Haili Wind Power Equipment Technology Co., Ltd.

Address before: 226400 north side of Jialing River Road, Rudong Economic Development Zone, Nantong, Jiangsu

Patentee before: Jiangsu Haili Power Equipment Technology Co.,Ltd.