CN200978431Y - 适合淤泥层海床的大型风机组合桩基础 - Google Patents

适合淤泥层海床的大型风机组合桩基础 Download PDF

Info

Publication number
CN200978431Y
CN200978431Y CN 200620165809 CN200620165809U CN200978431Y CN 200978431 Y CN200978431 Y CN 200978431Y CN 200620165809 CN200620165809 CN 200620165809 CN 200620165809 U CN200620165809 U CN 200620165809U CN 200978431 Y CN200978431 Y CN 200978431Y
Authority
CN
China
Prior art keywords
pile
supplemental support
supporting pile
main supporting
support stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620165809
Other languages
English (en)
Inventor
高季章
张金接
符平
杨锋
赵卫全
邢占清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING IWHR TECHNOLOGY Co Ltd
China Institute of Water Resources and Hydropower Research
Original Assignee
BEIJING IWHR TECHNOLOGY Co Ltd
China Institute of Water Resources and Hydropower Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING IWHR TECHNOLOGY Co Ltd, China Institute of Water Resources and Hydropower Research filed Critical BEIJING IWHR TECHNOLOGY Co Ltd
Priority to CN 200620165809 priority Critical patent/CN200978431Y/zh
Application granted granted Critical
Publication of CN200978431Y publication Critical patent/CN200978431Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

本实用新型涉及一种适合淤泥层海床的大型风机组合桩基础,属于近海基础工程领域,主要技术方案为:组合桩基础由主支撑桩、辅助支撑桩及支撑架组成,其中主支撑桩和辅助支撑桩截面为圆形,且主支撑桩直径大于辅助支撑桩;支撑架由导管、斜支撑和连接钢管组成,套于主支撑桩和辅助支撑桩外并连接固定;主支撑桩为一根,辅助支撑桩为两根、三根或四根。本实用新型采用主支撑桩和辅助桩的组合;这样单个桩的直径减小,打桩设备易解决;辅助桩施工时控制方向更加容易,施工质量可靠,也便于检测。

Description

适合淤泥层海床的大型风机组合桩基础
所属技术领域
本实用新型是在近海,水深5~15m,淤泥层海床条件下,一种安全可靠、施工方便,成本较低的大型风机组合桩基础。
背景技术
中国到目前为止,还没有建设海上大型风电场的经验。国外在建设海上大型电场时,采用单桩和四桩较多,但其基础多为砂层或砂质土层,承载力较高。对于砂层或砂质土层上的单桩基础,桩径4m,可用于2~3MW的风机,如丹麦的Vestas;对于砂层或砂质土层上的多桩基础,采用先安装四柱的支撑架,再利用联结在支撑架上的导管打入四根桩,支撑架与桩水下焊接并化学灌浆联结,可用于2~5MW的风机,如德国的Repower。
由于中国黄海和东海的近海相当范围由古黄河泥沙淤积而成,地质勘探表明,海床表面淤泥层厚度达5m,该层几乎不能持力。持力层约在海床以下20多m。在这样的地质条件下,如果采用国外已有的技术和方式,就遇到两方面的问题:对于单桩,桩径需要增大,对2~3MW的风机,桩径为4.8~5.0m,由于单桩需要整根打入,长约50m,重约260t~300t,国内尚无适合的打桩设备。对于多桩,虽然打桩能力可以解决,但安装支撑架时,由于表层淤泥过于软弱,支撑架易下沉且难以保证水平度。
由于海上风机的基础成本较高,技术比较复杂,迫切需要在这方面取得技术进展。
发明内容
本发明的目的是针对上述缺陷,提供一种施工方便、质量可靠且易于检测的适合于淤泥层海床的大型风机组合桩基础。
本发明的技术方案是:
一种适合淤泥层海床的大型风机组合桩基础,由主支撑桩、辅助支撑桩及支撑架组成,其中主支撑桩和辅助支撑桩截面为圆形,且主支撑桩直径大于辅助支撑桩;支撑架由导管、斜支撑和连接钢管组成,套于主支撑桩和辅助支撑桩外并连接固定。
主支撑桩为一根。
辅助支撑桩为两根,三根支撑桩呈直角三角形布置,主支撑桩位于三角形直角顶点。
辅助支撑桩为三根,三辅助支撑桩呈等边三角形布置,主支撑桩位于三角形重心位置。
辅助支撑桩为四根,四根辅助支撑桩呈正方形布置,主支撑桩位于正方形中心位置。
主支撑桩竖直向下,辅助支撑桩竖直或者倾斜,且倾斜度不小于8∶1;
支撑架与主支撑桩和辅助支撑桩通过焊接或螺栓连接;
使用时,操作平台和塔筒通过调节段即连接段钢管与主支撑桩连接。
该发明的有益效果是:
1、采用主支撑桩和辅助桩的组合。这样单个桩的直径减小,打桩设备易解决;
2、施工顺序改变。先打入垂直的主支撑桩,垂直度比较容易控制;然后将预制好的支撑架吊装,与主支撑桩连接(利用预留的上部孔,焊接或螺栓连接);由主支撑桩承受支撑架的自重,既不会下沉也易于保持水平;
3、支撑架兼作导管架。一方面使辅助桩施工时控制方向更加容易,另一方面,导管架与主支撑桩的连接(焊接或螺栓连接)可在水上进行,质量更加可靠,也便于检测;
组合桩基础形式:
1、桩数:根据风机的要求,采用一主两辅,一主三辅,一主四辅三种类型;
2、支撑架:支撑架兼作导管架与支撑架不兼作导管架两种,前者避免了水下连接,连接质量更加可靠且易于检测,但要增加一定的钢材用量;后者需要水下连接,但节省一定的钢材用量;增减的钢材用量与水深有关;
3、辅助桩:辅助桩分垂直和微斜(倾斜度不小于8∶1)两种。前者易控制且施工时对主桩的影响小,但由于桩底支撑面积较小,稳定性较差;后者由于桩底支撑面积较大,稳定性较好;但施工时要严格控制辅助桩的倾斜度,减少对主桩的影响。
因此,可组合成12种形式,根据风场、风机、地质、地震、波浪海流等特性,经动、静结构分析,并根据施工装备、施工经验与造价选择。
附图说明
图1:一主二辅垂直水下连接风机基础结构示意图;
图2:图1中I-I剖面示意图;
图3:一主二辅倾斜水下连接风机基础结构示意图;
图4:图2中I-I剖面示意图;
图5:一主二辅垂直水上连接风机基础结构示意图;
图6:图5中I-I剖面示意图;
图7:一主二辅倾斜水上连接风机基础结构示意图;
图8:图7中I-I剖面示意图;
图9:一主三辅垂直水下连接风机基础结构示意图;
图10:图9中I-I剖面示意图;
图11:一主三辅倾斜水下连接风机基础结构示意图;
图12:图11中I-I剖面示意图;
图13:一主三辅垂直水上连接风机基础结构示意图;
图14:图13中I-I剖面示意图;
图15:一主三辅倾斜水上连接风机基础结构示意图;
图16:图15中I-I剖面示意图;
图17:一主四辅垂直水下连接风机基础结构示意图;
图18:图17中I-I剖面示意图;
图19:一主四辅倾斜水下连接风机基础结构示意图;
图20:图19中I-I剖面示意图;
图21:一主四辅垂直水上连接风机基础结构示意图;
图22:图21中I-I剖面示意图;
图23:一主四辅倾斜水上连接风机基础结构示意图;
图24:图23中中I-I剖面示意图。
图25:以组合桩图23为例的施工步骤1-打主桩
图26:以组合桩图23为例的施工步骤2-沉放导管架
图27:以组合桩图23为例的施工步骤3-导管架调平、定位
图28:以组合桩图23为例的施工步骤4-打4根辅桩
图29:以组合桩图23为例的施工步骤5-导管架与基桩有效连接
其中:1-主支撑桩,2-辅助支撑桩,3-支撑架,4-导管,5-斜支撑,6-连接钢管,7-海底滩面,8-调节段(连接段钢管),9-操作平台,10-风机塔筒。
具体实施方式
结合附图1~24所示,一种适合淤泥层海床的大型风机组合桩基础,由主支撑桩(1)、辅助支撑桩(2)及支撑架(3)组成,其中主支撑桩(1)和辅助支撑桩(2)截面为圆柱形,且主支撑桩(1)直径大于辅助支撑桩(2);主支撑桩(1)竖直向下,辅助支撑(2)桩竖直或者倾斜,且倾斜度不超过8∶1;支撑架(3)由导管(4)、斜支撑(5)和连接钢管(6)组成,套于主支撑桩(1)和辅助支撑桩(2)外并连接固定;辅助支撑桩为两根、三根或者四根,当辅助支撑桩(2)为两根时,三根支撑桩呈直角三角形布置,主支撑桩(1)位于三角形直角顶点。当辅助支撑桩为三根时,三辅助支撑桩呈等边三角形布置,主支撑桩位于三角形重心位置。当辅助支撑桩为四根时,四根辅助支撑桩呈正方形布置,主支撑(1)桩位于正方形中心位置。支撑架(3)与辅助支撑桩(2)连接的导管(4)位于海底滩面(7)上。对于水下短导管结构,支撑架(3)与辅助支撑桩(2)连接的导管(4)整体位于水下,主支撑桩(1)与导管焊接或通过螺栓连接;辅助支撑桩(2)与导管(4)为水下焊接及高强度化学注浆固接。对于水上长导管结构,支撑架(3)与辅助支撑桩(2)相连导管(4)的上端部分位于海平面之上,主支撑桩(1)和辅助支撑桩(2)与导管(4)焊接或通过螺栓连接。使用时,操作平台(9)和风机塔筒(10)通过调节段(8)与主支撑桩(1)相连。
该大型风机组合桩基础的施工过程(以组合桩图23为例)如下:
1、根据设计图在陆上金属结构加工基地加工主桩、辅助桩、支撑架、调节段,选购合格的高强螺栓;尺寸复核;组合桩V进行支撑架和调节段的预组装后拆开。
2、装船运至GPS定位的安装点。
3、利用打桩船起吊和打入主支撑桩至指定深度,保持垂直度;桩顶高程测量与微调。
4、利用船上起吊设备吊装支撑架,支撑架主导管套在主支撑桩上,调整到设计高程后利用预留的锁定孔固定,微调保持支撑架顶面的水平度。
5、利用打桩机吊起并打入辅助桩,注意尽可能减少对主桩的垂直度的影响。利用预留的锁定孔固定。
6、按设计要求进行焊接与化灌。
7、安装调节段,使调节段顶面的水平度满足设计要求。
8、安装操作平台及风机塔架结构等。
该大型风机组合桩基础施工时打桩设备易解决,施工精确度高,质量更加可靠且便于检测。

Claims (9)

1、一种适合淤泥层海床的大型风机组合桩基础,其特征在于,由主支撑桩、辅助支撑桩及支撑架组成,其中主支撑桩和辅助支撑桩截面为圆形,且主支撑桩直径大于辅助支撑桩;支撑架由导管、斜支撑和连接钢管相互焊接组成,支撑架套于主支撑桩和辅助支撑桩外并连接固定。
2、如权利要求1所述的适合淤泥层海床的大型风机组合桩基础,其特征在于,所述的主支撑桩为一根。
3、如权利要求2所述的适合淤泥层海床的大型风机组合桩基础,其特征在于,所述的辅助支撑桩为两根,三根支撑桩呈直角三角形布置,主支撑桩位于三角形直角顶点。
4、如权利要求2所述的适合淤泥层海床的大型风机组合桩基础,其特征在于,所述的辅助支撑桩为三根,三根辅助支撑桩呈等边三角形布置,主支撑桩位于三角形形心位置。
5、如权利要求2所述的适合淤泥层海床的大型风机组合桩基础,其特征在于,所述的辅助支撑桩为四根,四根辅助支撑桩呈正方形布置,主支撑桩位于正方形中心位置。
6、如权利要求1至5中任何一项所述的适合淤泥层海床的大型风机组合桩基础,其特征在于,支撑架的导管置于海底滩面线的基座上,基座下用高强土工网袋碎石加固。
7、如权利要求6所述的适合淤泥层海床的大型风机组合桩基础,其特征在于,对于水下短导管结构,支撑架与辅助支撑桩连接的导管整体均位于水下,主支撑桩与导管焊接或通过螺栓连接;辅助支撑桩与导管为水下焊接,并用高强度化学浆液灌注连接。
8、如权利要求6所述的适合淤泥层海床的大型风机组合桩基础,其特征在于,对于水上长导管结构,支撑架与主支撑桩、辅支撑桩相连导管的上端部分均位于海平面之上,主支撑桩、辅助支撑桩与导管焊接或通过螺栓连接。
9、如权利要求1所述的适合淤泥层海床的大型风机组合桩基础,其特征在于,主支撑桩竖直向下,辅助支撑桩竖直或者倾斜,且倾斜度不小于8∶1。
CN 200620165809 2006-12-13 2006-12-13 适合淤泥层海床的大型风机组合桩基础 Expired - Fee Related CN200978431Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620165809 CN200978431Y (zh) 2006-12-13 2006-12-13 适合淤泥层海床的大型风机组合桩基础

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620165809 CN200978431Y (zh) 2006-12-13 2006-12-13 适合淤泥层海床的大型风机组合桩基础

Publications (1)

Publication Number Publication Date
CN200978431Y true CN200978431Y (zh) 2007-11-21

Family

ID=38978809

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620165809 Expired - Fee Related CN200978431Y (zh) 2006-12-13 2006-12-13 适合淤泥层海床的大型风机组合桩基础

Country Status (1)

Country Link
CN (1) CN200978431Y (zh)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101838997A (zh) * 2010-05-18 2010-09-22 江苏海力风电设备科技有限公司 潮间带风电场风机基础及其生产方法
CN101852035A (zh) * 2008-11-24 2010-10-06 维斯塔斯风力系统集团公司 海上风轮机以及架设风轮机塔架的方法
CN101798815B (zh) * 2010-01-29 2011-09-14 道达(上海)风电投资有限公司 一种钢混组合结构的海上风电机组地基基础
CN102337746A (zh) * 2010-07-27 2012-02-01 宝山钢铁股份有限公司 水上风力发电塔架基础和结构及其安装施工方法
CN102482860A (zh) * 2009-06-10 2012-05-30 钥石工程公司 海上支撑结构和相关的安装方法
CN102808742A (zh) * 2012-07-21 2012-12-05 广东明阳风电产业集团有限公司 风力发电机的塔筒与支撑塔架的连接结构
CN102852154A (zh) * 2012-08-01 2013-01-02 天津大学 一种复合桩基
CN102852156A (zh) * 2012-08-01 2013-01-02 天津大学 一种复合桩基础结构
CN102852155A (zh) * 2012-08-01 2013-01-02 天津大学 一种复合桩基础
CN102953942A (zh) * 2012-10-23 2013-03-06 广东明阳风电产业集团有限公司 一种风力发电机塔筒与导管架基础多边形斜撑连接结构
CN103161174A (zh) * 2011-12-08 2013-06-19 华锐风电科技(集团)股份有限公司 海上风电机组安装基础组件
CN103470003A (zh) * 2013-09-30 2013-12-25 朱秋东 一种智能型超大拼接平台系统
CN103669312A (zh) * 2013-12-19 2014-03-26 广东明阳风电产业集团有限公司 海上风机的导管架平台
CN103953055A (zh) * 2014-04-21 2014-07-30 广东明阳风电产业集团有限公司 一种海上风电机组水上四桩基础
CN104060625A (zh) * 2014-06-11 2014-09-24 河海大学 一种钢杆连接竖直桩与斜桩的海上风电基础
CN104099917A (zh) * 2014-08-07 2014-10-15 熊翱 一种多层多脚架结构及其施工方法
CN104988892A (zh) * 2015-05-22 2015-10-21 南通中远船务工程有限公司 一种全地形桩腿及全地形桩腿使用方法
CN106013213A (zh) * 2016-07-25 2016-10-12 福建永福电力设计股份有限公司 一种可增加单机容量的海上风电桩基础及其使用方法
DE102019213165A1 (de) * 2019-08-30 2021-03-04 Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. Verfahren zur herstellung eines gründungssystems für eine offshore-windenergieanlage

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101852035A (zh) * 2008-11-24 2010-10-06 维斯塔斯风力系统集团公司 海上风轮机以及架设风轮机塔架的方法
CN102482860B (zh) * 2009-06-10 2014-10-22 钥石工程公司 海上支撑结构和相关的安装方法
CN102482860A (zh) * 2009-06-10 2012-05-30 钥石工程公司 海上支撑结构和相关的安装方法
CN101798815B (zh) * 2010-01-29 2011-09-14 道达(上海)风电投资有限公司 一种钢混组合结构的海上风电机组地基基础
CN101838997A (zh) * 2010-05-18 2010-09-22 江苏海力风电设备科技有限公司 潮间带风电场风机基础及其生产方法
CN101838997B (zh) * 2010-05-18 2011-08-31 江苏海力风电设备科技有限公司 潮间带风电场风机基础及其生产方法
CN102337746B (zh) * 2010-07-27 2013-09-04 宝山钢铁股份有限公司 水上风力发电塔架基础和结构的安装施工方法
CN102337746A (zh) * 2010-07-27 2012-02-01 宝山钢铁股份有限公司 水上风力发电塔架基础和结构及其安装施工方法
CN103161174A (zh) * 2011-12-08 2013-06-19 华锐风电科技(集团)股份有限公司 海上风电机组安装基础组件
CN102808742A (zh) * 2012-07-21 2012-12-05 广东明阳风电产业集团有限公司 风力发电机的塔筒与支撑塔架的连接结构
CN102852156A (zh) * 2012-08-01 2013-01-02 天津大学 一种复合桩基础结构
CN102852155A (zh) * 2012-08-01 2013-01-02 天津大学 一种复合桩基础
CN102852154A (zh) * 2012-08-01 2013-01-02 天津大学 一种复合桩基
CN102953942A (zh) * 2012-10-23 2013-03-06 广东明阳风电产业集团有限公司 一种风力发电机塔筒与导管架基础多边形斜撑连接结构
CN103470003A (zh) * 2013-09-30 2013-12-25 朱秋东 一种智能型超大拼接平台系统
CN103669312A (zh) * 2013-12-19 2014-03-26 广东明阳风电产业集团有限公司 海上风机的导管架平台
CN103953055A (zh) * 2014-04-21 2014-07-30 广东明阳风电产业集团有限公司 一种海上风电机组水上四桩基础
CN104060625A (zh) * 2014-06-11 2014-09-24 河海大学 一种钢杆连接竖直桩与斜桩的海上风电基础
CN104060625B (zh) * 2014-06-11 2016-02-10 河海大学 一种钢杆连接竖直桩与斜桩的海上风电基础
CN104099917A (zh) * 2014-08-07 2014-10-15 熊翱 一种多层多脚架结构及其施工方法
CN104988892A (zh) * 2015-05-22 2015-10-21 南通中远船务工程有限公司 一种全地形桩腿及全地形桩腿使用方法
CN106013213A (zh) * 2016-07-25 2016-10-12 福建永福电力设计股份有限公司 一种可增加单机容量的海上风电桩基础及其使用方法
CN106013213B (zh) * 2016-07-25 2018-05-25 福建永福电力设计股份有限公司 一种可增加单机容量的海上风电桩基础及其使用方法
DE102019213165A1 (de) * 2019-08-30 2021-03-04 Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. Verfahren zur herstellung eines gründungssystems für eine offshore-windenergieanlage

Similar Documents

Publication Publication Date Title
CN200978431Y (zh) 适合淤泥层海床的大型风机组合桩基础
CN200978412Y (zh) 防沉陷易调平易拆除的大型海上风电基础承台
CN201649118U (zh) 导管架式海上风电机组基础结构
CN101545462B (zh) 一种钢-混凝土组合重力式海上风电机组基础结构
CN101761090A (zh) 海上风电机组的空间桁架式多桶基础
CN110984214A (zh) 海上风电单桩-翼板-堆石体复合基础及其施工方法
CN211646450U (zh) 海上风电单桩-翼板-堆石体复合基础
CN108867684A (zh) 海上风力发电机组重力式沉箱基础及其安装方法
CN105862905A (zh) 一种海上风电嵌岩单桩基础及其施工方法
WO2022127466A1 (zh) 一种适用于浅覆盖层的海上风电新型基础及其施工方法
CN104234069A (zh) 具有下插式蜂窝结构底盘的海上风力发电机基础
CN103556651A (zh) 预制混凝土导管架式海上风机基础
CN110439022A (zh) 具有压密注浆加固地基的海上单桩基础
EP2463524B1 (en) Marine wind turbine whole machine
CN113818476A (zh) 海上风力发电的基础构件及其施工方法
CN103243732A (zh) 一种海上测风塔基础结构的安装方法
CN201713827U (zh) 海上风电场风机基础结构
CN201593193U (zh) 海上风电机组的空间桁架式多桶基础
CN202247928U (zh) 多桩门架式海上风力发电机组基础结构
CN105862906A (zh) 海上风电场风机单桩基础及施工方法
CN203145066U (zh) 近海单桩基础水平承载力加载装置
CN114855865A (zh) 一种锚固于岩基海床的张紧式风机基础及布置方法
CN201952811U (zh) 在浅海软土基础上风力发电机的基座
CN102628277B (zh) 无过渡段单桩式海上风机基础结构
CN206031706U (zh) 漂浮式动态调平组件及测风装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20071121

Termination date: 20131213