CN102398304A - Pile splicing mechanism of finished piles - Google Patents

Pile splicing mechanism of finished piles Download PDF

Info

Publication number
CN102398304A
CN102398304A CN2011104106853A CN201110410685A CN102398304A CN 102398304 A CN102398304 A CN 102398304A CN 2011104106853 A CN2011104106853 A CN 2011104106853A CN 201110410685 A CN201110410685 A CN 201110410685A CN 102398304 A CN102398304 A CN 102398304A
Authority
CN
China
Prior art keywords
rotating shaft
platform
over
pile extension
turns over
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011104106853A
Other languages
Chinese (zh)
Other versions
CN102398304B (en
Inventor
耿山河
曾先任
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU ZHONGJI PILE INDUSTRY CO LTD
Original Assignee
JIANGSU ZHONGJI PILE INDUSTRY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ZHONGJI PILE INDUSTRY CO LTD filed Critical JIANGSU ZHONGJI PILE INDUSTRY CO LTD
Priority to CN 201110410685 priority Critical patent/CN102398304B/en
Publication of CN102398304A publication Critical patent/CN102398304A/en
Application granted granted Critical
Publication of CN102398304B publication Critical patent/CN102398304B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a pile splicing mechanism of finished piles. The pile splicing mechanism comprises a lifting mechanism, a pile splicing frame and a pile overturning mechanism, wherein the pile overturning mechanism is respectively connected with the lifting mechanism and the pile splicing mechanism; the lifting mechanism is used for controlling the height and position of the pile overturning mechanism; and the pile overturning mechanism is used for controlling an angle of the pile splicing frame. With the pile splicing mechanism of the finished piles, the finished piles which are overturned outside a mold can be automatically caught and conveyed to a finished pile kettle-entering vehicle through a plate chain conveyor.

Description

Finished peg pile extension mechanism
Technical field
The production field of the side of the present invention relates to stake is specifically related to a kind of finished peg pile extension mechanism.
Background technology
Could finished peg be separated from the stake mould in going out in the operation of the concrete pre-stress pretensioning hollow square pile line flow procedure operations such as machine scene, artificial hook of must holding funeral rites through manual work; Hang on the still car with loop wheel machine again; Very dangerous in practical operation, often there is casualty accident to take place.For solving this difficult problem, company's import is arranged a kind of attraction inhale a stake mechanism, but purchase cost height and inefficiency, inconvenience is adopted.
Summary of the invention
Goal of the invention: to the problem and shortage of above-mentioned existing existence, the purpose of this invention is to provide a kind of finished peg pile extension mechanism, can will rout up the outer finished peg of mould and catch automatically.
Technical scheme: for realizing the foregoing invention purpose; The technical scheme that the present invention adopts is an a kind of finished peg pile extension mechanism; Comprise hoisting mechanism, pile extension frame and turn over a mechanism; A said mechanism of turning over connects hoisting mechanism and pile extension mechanism respectively, and said hoisting mechanism is used to control the height and the position of turning over a mechanism, saidly turns over the angle that a mechanism is used to control the pile extension frame.
Said hoisting mechanism can comprise the lifting cylinder block, promote cylinder, lift arm and lifting rotating shaft; Said lifting cylinder is fixed on and promotes on the cylinder block; Said lifting cylinder connects the lifting rotating shaft, and said lifting rotating shaft connects lift arm, and a mechanism is turned in said lift arm connection.
For guaranteeing enough power, preferred 2 of the quantity of said lifting cylinder, preferred 2 of the quantity of said lifting cylinder block, preferred 2 of the quantity of said lift arm.
A said mechanism of turning over can comprise and turns over a rotating shaft, turns over a cylinder, turns over a platform and turn over a platform rotating shaft; A said platform that turns over connects hoisting mechanism; A said end that turns over a platform also is connected with and turns over a platform rotating shaft, saidly turns over the angle that a platform is turned in platform rotating shaft control, and a said cylinder that turns over is fixed on and turns on the platform; Said the cylinder of turning over connects and turns over a rotating shaft, saidly turns over a rotating shaft and connects a pile extension frame.
For guaranteeing enough power, preferred 2 of said quantity of turning over a cylinder.
Beneficial effect: finished peg pile extension of the present invention mechanism can catch automatically and rout up the outer finished peg of mould, and finished peg is delivered to finished peg through plate-and-chain conveyer go on the still car.The present invention is simple in structure; Be easy to make and cost low (total price of finished peg pile extension mechanism and corresponding switching mechanism be merely attraction inhale stake mechanism about 20%); Efficient is inhaled stake mechanism than attraction and is improved 3 times, and unmanned contact product in operation (finished peg) is guaranteed being perfectly safe of personnel; For industry production has solved a difficult problem for many years, the also extremely long-pending simultaneously technological progress that has promoted industry equipment.
Description of drawings
Fig. 1 is a finished peg pile extension mechanism structure sketch map;
Working state schematic representation when Fig. 2 is finished peg pile extension mechanism pile extension;
Working state schematic representation when Fig. 3 unloads for finished peg pile extension mechanism.
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment; Further illustrate the present invention; Should understand these embodiment only be used to the present invention is described and be not used in the restriction scope of the present invention; After having read the present invention, those skilled in the art all fall within the application's accompanying claims institute restricted portion to the modification of the various equivalent form of values of the present invention.
As shown in Figure 1; Finished peg pile extension mechanism comprises hoisting mechanism, pile extension frame 3 and turns over a mechanism, wherein turns over a mechanism and connects hoisting mechanism and pile extension mechanism respectively; Hoisting mechanism is used to control the height and the position of turning over a mechanism, turns over the angle that a mechanism is used to control the pile extension frame.
Hoisting mechanism comprises that 2 promote cylinder block 1,2 liftings, 2,2 lift arms 8 of cylinder and promote the rotating shaft 9 and first bearing 10; Wherein promoting cylinder is fixed on the lifting cylinder block; Promote cylinder and connect the lifting rotating shaft; Promote rotating shaft and be connected with first bearing is rotating, promote rotating shaft and also connect lift arm, a platform 7 is turned in the lift arm connection.
Turn over a mechanism and comprise that turning over 4,2 of rotating shafts turns over a cylinder 5, turns over a platform 7, turns over a platform rotating shaft 6 and second bearing 11; Turn over a platform and connect hoisting mechanism, an end that turns over a platform also is connected with and turns over a platform rotating shaft, turns over the angle that a platform is turned in a platform rotating shaft control; Turning over a cylinder is fixed on and turns on the platform; Turn over a cylinder connection and turn over a rotating shaft, turn over a rotating shaft and be connected, turn over a rotating shaft and connect a pile extension frame with second bearing is rotating.
Operation principle:
1, pile extension process:
As shown in Figure 2; Promote air cylinder driven and promote the rotating shaft rise; The lift arm that drive to connect promotes rotating shaft will turn over a platform jack-up, turn over a platform and rotate through turning over a platform rotating shaft, be fixed on an air cylinder driven of turning over of turning on the platform and turn over a rotating shaft and drive pile extension frame rotation 45 degree and catch pile body.
2, unload a process:
As shown in Figure 3; Promote air cylinder driven lifting rotating shaft and fall back initial position; The lift arm that drives connection lifting rotating shaft will turn over a platform and fall back initial position; Turn over a platform and rotate, be fixed on an air cylinder driven of turning over of turning on the platform and turn over a rotating shaft and drive pile extension frame rotation 45 degree through turning over a platform rotating shaft, parallel with the plate-and-chain conveyer (not shown) and during when making the pile extension frame recover horizontal a little less than plate-and-chain conveyer; By plate-and-chain conveyer the finished product pile body is delivered to the lifting point into the still car, whole operation is accomplished.

Claims (5)

1. finished peg pile extension mechanism; Comprise hoisting mechanism, pile extension frame and turn over a mechanism; A said mechanism of turning over connects hoisting mechanism and pile extension mechanism respectively, and said hoisting mechanism is used to control the height and the position of turning over a mechanism, saidly turns over the angle that a mechanism is used to control the pile extension frame.
2. according to the said finished peg pile extension of claim 1 mechanism; It is characterized in that: said hoisting mechanism comprises the lifting cylinder block, promotes cylinder, lift arm and lifting rotating shaft; Said lifting cylinder is fixed on and promotes on the cylinder block; Said lifting cylinder connects the lifting rotating shaft, and said lifting rotating shaft connects lift arm, and a mechanism is turned in said lift arm connection.
3. according to the said finished peg pile extension of claim 2 mechanism, it is characterized in that: the quantity of said lifting cylinder is 2, and the quantity of said lifting cylinder block is 2, and the quantity of said lift arm is 2.
4. according to the said finished peg pile extension of claim 1 mechanism; It is characterized in that: a said mechanism of turning over comprises and turns over a rotating shaft, turns over a cylinder, turns over a platform and turn over a platform rotating shaft that a said platform that turns over connects a hoisting mechanism, and a said end that turns over a platform also is connected with and turns over a platform rotating shaft; Saidly turn over the angle that a platform is turned in platform rotating shaft control; A said cylinder that turns over is fixed on and turns on the platform, and a said cylinder that turns over connects and turns over a rotating shaft, saidly turns over a rotating shaft and connects a pile extension frame.
5. according to the said finished peg pile extension of claim 4 mechanism, it is characterized in that: said quantity of turning over a cylinder is 2.
CN 201110410685 2011-12-09 2011-12-09 Pile splicing mechanism of finished piles Expired - Fee Related CN102398304B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110410685 CN102398304B (en) 2011-12-09 2011-12-09 Pile splicing mechanism of finished piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110410685 CN102398304B (en) 2011-12-09 2011-12-09 Pile splicing mechanism of finished piles

Publications (2)

Publication Number Publication Date
CN102398304A true CN102398304A (en) 2012-04-04
CN102398304B CN102398304B (en) 2013-05-01

Family

ID=45881153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110410685 Expired - Fee Related CN102398304B (en) 2011-12-09 2011-12-09 Pile splicing mechanism of finished piles

Country Status (1)

Country Link
CN (1) CN102398304B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105599128A (en) * 2016-02-29 2016-05-25 周兆弟 Fully-automatic tubular pile production line
CN109339049A (en) * 2018-12-03 2019-02-15 中铁上海设计院集团有限公司 A kind of safeguard and its application method for construction of prefabricated piles

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5414423A (en) * 1977-07-04 1979-02-02 Kato Tetsukoushiyo Kk Clamper for concrete pile mold flask
CN2308637Y (en) * 1997-11-04 1999-02-24 顺德市伦教镇荔村伟力机械五金厂 Obliqueable tower frame of pile press
CN1827516A (en) * 2006-03-29 2006-09-06 中山市三和建材有限公司 Automatic hooking device for hoisting concrete pipe pile mould
CN2928445Y (en) * 2006-07-22 2007-08-01 张清臣 Pipe connector
CN101077595A (en) * 2007-06-16 2007-11-28 黎志中 Process for making concrete pile and its special-purpose equipment
CN201605091U (en) * 2010-01-12 2010-10-13 广东三和管桩有限公司 Clamp for clamping tubular pile dies
CN201756405U (en) * 2010-08-17 2011-03-09 浙江美科斯叉车有限公司 Tubular pile lower mold clamp structure
CN102001134A (en) * 2010-09-20 2011-04-06 浙江金鑫管桩有限公司 Pipe pile lower die and lifting system thereof
CN102248601A (en) * 2011-06-24 2011-11-23 俞晓东 Method for producing precast concrete piles by transverse running water

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5414423A (en) * 1977-07-04 1979-02-02 Kato Tetsukoushiyo Kk Clamper for concrete pile mold flask
CN2308637Y (en) * 1997-11-04 1999-02-24 顺德市伦教镇荔村伟力机械五金厂 Obliqueable tower frame of pile press
CN1827516A (en) * 2006-03-29 2006-09-06 中山市三和建材有限公司 Automatic hooking device for hoisting concrete pipe pile mould
CN2928445Y (en) * 2006-07-22 2007-08-01 张清臣 Pipe connector
CN101077595A (en) * 2007-06-16 2007-11-28 黎志中 Process for making concrete pile and its special-purpose equipment
CN201605091U (en) * 2010-01-12 2010-10-13 广东三和管桩有限公司 Clamp for clamping tubular pile dies
CN201756405U (en) * 2010-08-17 2011-03-09 浙江美科斯叉车有限公司 Tubular pile lower mold clamp structure
CN102001134A (en) * 2010-09-20 2011-04-06 浙江金鑫管桩有限公司 Pipe pile lower die and lifting system thereof
CN102248601A (en) * 2011-06-24 2011-11-23 俞晓东 Method for producing precast concrete piles by transverse running water

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105599128A (en) * 2016-02-29 2016-05-25 周兆弟 Fully-automatic tubular pile production line
CN105599128B (en) * 2016-02-29 2018-01-16 周兆弟 Full-automatic pile tube production line
CN105599128B8 (en) * 2016-02-29 2018-03-06 周兆弟 Full-automatic pile tube production line
CN109339049A (en) * 2018-12-03 2019-02-15 中铁上海设计院集团有限公司 A kind of safeguard and its application method for construction of prefabricated piles
CN109339049B (en) * 2018-12-03 2023-07-04 中铁上海设计院集团有限公司 Protective equipment for precast pile construction and application method thereof

Also Published As

Publication number Publication date
CN102398304B (en) 2013-05-01

Similar Documents

Publication Publication Date Title
CN102335957B (en) Concrete building block cutting device
CN205294555U (en) Lift conveyor
CN205045438U (en) Road bridge charger of being under construction
CN207142213U (en) One kind turns over ingot equipment
CN205838046U (en) A kind of charging device of tumbler
CN102423906A (en) Turning mechanism in process of discharging finished pile from mold
CN102398304B (en) Pile splicing mechanism of finished piles
CN102991977A (en) Potted flower transfer device in greenhouse
CN208377921U (en) A kind of turning plate structure on automatic production line
CN202448227U (en) Finished pile splicing mechanism
CN207903535U (en) Brick device is grabbed in a kind of rotation of novel intelligent stacking machine
CN109319511A (en) A kind of vacuum chuck flood unstacker
CN204643181U (en) A kind of improved type gate-type brick stacking machine
CN104229486B (en) Heap unstacker
CN105752882A (en) Multifunctional lifting platform device
CN106429477B (en) A kind of full-automatic unstacking and stacking machine
CN202321669U (en) Band plate conveying platform for concrete-molded product
CN102674218A (en) Steel coil turning machine for automatically stopping coil
CN203558531U (en) Packing machine
CN201801197U (en) Vacuum transporter
CN107618997A (en) A kind of small-sized remote control handling equipment
CN205274465U (en) Special trimmer conveyor of building engineering
CN104860078B (en) What the ripe base of intersection double rocking lever life was general picks up brick machine up and down
CN204548571U (en) With saturating coiled material plastic floor bull ladle installation
CN103924988B (en) Jib crane in shield machine inverted arch block transportation system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130501

Termination date: 20181209