CN102395938B - 电源和数据中心控制 - Google Patents

电源和数据中心控制 Download PDF

Info

Publication number
CN102395938B
CN102395938B CN201080016514.6A CN201080016514A CN102395938B CN 102395938 B CN102395938 B CN 102395938B CN 201080016514 A CN201080016514 A CN 201080016514A CN 102395938 B CN102395938 B CN 102395938B
Authority
CN
China
Prior art keywords
server
data center
parameter
electric power
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201080016514.6A
Other languages
English (en)
Other versions
CN102395938A (zh
Inventor
卡尔·爱德华·马丁·萨科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Schneider Electric IT Corp
Original Assignee
American Power Conversion Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by American Power Conversion Corp filed Critical American Power Conversion Corp
Publication of CN102395938A publication Critical patent/CN102395938A/zh
Application granted granted Critical
Publication of CN102395938B publication Critical patent/CN102395938B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • G06F1/32Means for saving power
    • G06F1/3203Power management, i.e. event-based initiation of a power-saving mode
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • G06F1/32Means for saving power
    • G06F1/3203Power management, i.e. event-based initiation of a power-saving mode
    • G06F1/3234Power saving characterised by the action undertaken
    • G06F1/3287Power saving characterised by the action undertaken by switching off individual functional units in the computer system
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • G06F1/32Means for saving power
    • G06F1/3203Power management, i.e. event-based initiation of a power-saving mode
    • G06F1/3234Power saving characterised by the action undertaken
    • G06F1/329Power saving characterised by the action undertaken by task scheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5083Techniques for rebalancing the load in a distributed system
    • G06F9/5088Techniques for rebalancing the load in a distributed system involving task migration
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2209/00Indexing scheme relating to G06F9/00
    • G06F2209/50Indexing scheme relating to G06F9/50
    • G06F2209/5019Workload prediction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Software Systems (AREA)
  • Computer Hardware Design (AREA)
  • Computing Systems (AREA)
  • Power Sources (AREA)

Abstract

本发明提供了用于数据中心电源控制的系统和方法,所述系统和方法识别多个服务器中的至少一个服务器的参数,所述多个服务器形成数据中心的至少一部分,所述数据中心包括不间断电源。虚拟服务器的估计参数可被识别,并且至少部分地根据所述参数和所述估计参数,所述多个服务器中的一个服务器可被选择。所述虚拟服务器可被提供给所选择的服务器,并且被提供给所述多个服务器中的至少一个服务器的电力可减少、关闭或以其他方式被调整。

Description

电源和数据中心控制
相关申请的交叉引用
本申请在此通过引用将2009年2月13日提交的题为“Data CenterControl”的并转让给本申请的受让人的美国临时申请号12/371,355全部并入。所引用的申请通常公开用于控制数据中心的系统和方法。
发明背景
1.发明领域
本发明的至少一个实施方式通常涉及电源和数据中心控制,且更具体地,涉及不间断电源环境中的能量管理。
2.相关技术的讨论
响应于工业、发展和基于信息的经济的日益增长的需求,电子装置和相关的技术网络在全球持续激增。不间断电源(UPS)可被用来向许多不同类型的电子装置供电。因为电子装置的数量、类型、大小、互连性、位置和复杂性持续增长和扩展,与它们的操作相关联的成本也可能增加。这些成本包括与电力使用相关联的能量成本。
发明概述
至少一个方面目的在于数据中心电源控制的方法。该方法识别多个服务器中的至少一个服务器的参数,所述多个服务器形成包括不间断电源的数据中心的至少一部分。虚拟服务器的估计参数可被识别,且所述多个服务器中的一个服务器可至少部分地根据所述参数和所述估计参数而被选择。虚拟服务器可被提供给所选择的服务器,且被提供给所述多个服务器中的至少一个服务器的电力可被调整。
至少一个方面目的在于数据中心电源控制系统。该系统包括数据中心,数据中心具有不间断电源和多个服务器。数据中心控制器可识别所述多个服务器中的至少一个服务器的参数,并可识别虚拟服务器的估计参数。数据中心控制器也可至少部分地基于所述参数和所述估计参数来将虚拟服务器添加至所述多个服务器之一的第一服务器。数据中心控制器可调整从不间断电源提供到所述多个服务器之一的所述第一服务器以及第二服务器的电力的量。
至少一个其他方面目的在于计算机可读介质,其上存储有指令序列。指令序列包括当由处理器执行时可促使处理器识别多个服务器中的至少一个服务器的参数的指令,所述多个服务器形成数据中心的至少部分,所述数据中心包括不间断电源。所述指令也可促使处理器识别虚拟服务器的估计参数,并且至少部分地根据所述参数和所述估计参数来选择所述多个服务器中的一个作为对所述虚拟服务器的所选择的服务器。所述指令可促使处理器将虚拟服务器提供给所选择的服务器,并调整不间断电源以调整提供给所述多个服务器中的至少一个服务器的电力。
至少一个其他方面目的在于数据中心控制系统。所述系统可包括具有第一不间断电源的第一数据中心和具有第二不间断电源的第二数据中心,每个数据中心与网络关联,并且每个数据中心包括多个服务器。与所述网络关联的数据中心控制器可识别第一数据中心和第二数据中心的参数,并可识别估计参数以用于在虚拟服务器上执行应用。数据中心可评估第一数据中心和第二数据中心的参数以及所述估计参数,并且可至少部分地基于该评估来将虚拟服务器从第一数据中心的服务器转移至第二数据中心的服务器。第一不间断电源可响应于虚拟服务器的转移来减少给第一数据中心的服务器的电力。
至少一个方面目的在于数据中心控制的方法。该方法可识别第一数据中心和第二数据中心的参数,每个数据中心包括多个服务器。用于在虚拟服务器上执行应用的估计参数可被识别,并且,至少部分地根据对第一数据中心和第二数据中心的参数以及所述估计参数的评估,虚拟服务器可从第一数据中心的服务器被转移至第二数据中心的服务器。与第一数据中心的服务器关联的不间断电源的至少部分可被可逆地关闭。
在各种实施方式中,提供给所选择的服务器的电力可被增加,并且提供给所述多个服务器中的与所选择的服务器不同的至少一个服务器的电力可被减少。向所述多个服务器中的可与所选择的服务器不同的至少一个服务器提供电力的不间断电源的一部分可被关闭。在一些实施方式中,可将应用提供给虚拟服务器。所选择的服务器的温度也可被调整。在一个实施方式中,与所述多个服务器中的可与所选择的服务器不同的至少一个服务器关联的冷却单元的一部分可被关闭。
在一些实施方式中,可至少部分地根据估计参数生成对一定量的电力的请求,且所请求的量的电力可被提供给所选择的服务器。在一个实施方式中,可识别所述多个服务器中的至少一个服务器的模拟参数,并且可至少部分地根据该模拟参数选择所述多个服务器中的至少一个服务器。在一个实施方式中,可识别至少一个数据中心组件的估计寿命,并且可至少部分地根据该估计寿命创建数据中心维护计划表。
在一些实施方式中,可确定多个服务器中的至少一个服务器的测量参数。也可确定所述多个服务器中的至少一个服务器在一时间段内的估计的未来电力需求,该时间段是小于一秒、介于一秒和10秒之间、以及大于10秒的至少一个。在一个实施方式中,虚拟服务器可从第一服务器被重定位至所选择的服务器,且数据中心的冷却单元的参数可被调整以调整或保持至少一个服务器的温度。
从结合附图理解的下面的详细描述中,这些示例性方面和实施方式的其他方面、实施方式和优势将变得明显,附图仅作为例子示出本发明的原理。应当理解,前述的信息和接下来的详细描述包括各种方面和实施方式的例证性实施例,并旨在提供对理解所主张的方面和实施方式的性质和特征的概述或框架。附图连同说明书的其余部分用来解释所描述和主张的方面和实施方式的原理和操作。
附图的简要说明
附图并没有被规定为按比例绘制。在附图中,各个图中所示出的每个相同或几乎相同的组件由相似的数字表示。为了清楚起见,可能不是每个组件都被标注在每个图中,在附图中:
图1是描绘根据实施方式的不间断电源的功能方块图;
图2是描绘根据实施方式的数据中心的俯视图;
图3是描绘根据实施方式的数据中心控制系统的实例的方块图;
图4是描绘根据实施方式的数据中心中的服务器配置的实例的方块图;
图5是示出根据实施方式的数据中心电源控制的示例性方法的流程图;
图6是根据实施方式的计算机系统的功能方块图;以及
图7是根据实施方式的储存系统的功能方块图。
详细描述
在此描述的系统和方法在其应用中不限于在说明书中所列出的或在附图中所示出的组件的结构和布置的细节。本发明能够有其他的实施方式并且能够以不同的方式被实践或执行。此外,在此使用的措辞和术语是用于描述的目的,而不应当被认为是限制性的。在此,“包括”、“包含”、“具有”、“含有”、“涉及”及其各种变形的使用意指涵盖其后所列的项和其等同项以及额外的项。
各种方面和实施方式目的在于数据中心的电源控制,该数据中心可包括服务器和电源。服务器的参数、虚拟服务器的参数、以及对服务器和其他数据中心组件的电力分配的参数可被一个或多个数据中心控制器识别、监测或估计。这些服务器参数、虚拟服务器估计参数和电力分配参数可被评估以识别并选择适合于虚拟服务器的服务器。该虚拟服务器可被提供给所选择的服务器,并且数据中心的不间断电源可被调整来平衡或控制一个或多个数据中心的服务器——包括可能已经接收到虚拟服务器的所选择的服务器——之间的电力分配。服务器参数和虚拟服务器估计参数可包括监测或模拟参数。
图1为描绘根据实施方式的不间断电源(UPS)100的功能方块图。在一个实施方式中,在线UPS 100向至少一个负载105提供调节的电力和备用电力。类似于图1所示的UPS 100的UPS可从美国罗德艾兰州WestKingston的电力转换公司(APC)获得。UPS 100可包括整流器/升压转换器110、逆变器115、控制器120和电池125。在一个实施方式中,UPS 100具有可分别耦合到输入AC电源的线端子和中性端子的输入130和135。UPS 100也可包括输出140和145以向负载105提供输出线和中性。
在一些实施方式中,UPS 100可在线模式下操作,并且整流器/升压转换器110可接收输入AC电压,并在输出线150和155处提供相对于公共线160的正的和负的输出DC电压。在一些实施方式中,UPS 100可在电池模式下操作。例如,UPS 100在输入AC电力损失时可在电池模式下操作。在这个实施例中,整流器/升压转换器可从电池125生成DC电压。公共线160可耦合到输入中性线135和输出中性线145以通过UPS 100提供持续的中性。在这个实施例中,逆变器115可从整流器/升压转换器110接收DC电压并在线140和145处提供输出AC电压。
UPS 100为典型的不间断电源,且在此描述的各种实施方式不限于诸如UPS 100的电源。可以使用各种其他电源,例如,连接到电子装置并向电子装置提供电力的电源、非不间断电源、辅助电源,利用预测电压或电流控制或以超前滞后补偿器利用比例积分电压控制的电源、利用隔离变压器来对电池125充电的电源、或者利用具有双极输入的非隔离充电器给电池125充电的电源。进一步地,可在此使用的各种电源可使用氢燃料单体电池作为电池125的替代或补充,并且不间断电源可包括独立设备或者可构成其他电子装置如计算机的一部分。
在此描述的实施方式可以被用来设计、管理、控制并改进至少一个数据中心,如图2所示的数据中心200。数据中心200可包括支持或确保数据中心组件功能的各种资源、装置或设备。数据中心200的资源的实例包括电力、电力供应、冷却、物理空间、重量支持、远程装置控制容量、物理和逻辑安全以及物理和逻辑网络连接。电力数据中心资源可包括电力分配资源,如变压器、电力分配单元、不间断电源——包括UPS 100、电源插座和可供分配的电力,例如供应给数据中心200的公用电力、由现场发电机所生成的电力和由电力分配单元供应的电力。数据中心200中的物理空间资源可包括数据中心占地面积和机架U空间。数据中心200中的冷却资源可包括冷却分配容量和冷却生成容量。数据中心200中的物理安全资源可包括安全摄像机和门锁。数据中心200中的逻辑网络连接资源可包括虚拟局域网、域名服务和动态主机配置协议服务。物理网络连接资源可包括网络布线和插线面板。数据中心200中的远程装置控制容量资源可包括键盘视频鼠标服务。
数据中心200可包括一个或多个行205、冷却单元210和至少一个活地板(raised floor)215。行205可包括至少一个机架220,机架220在操作中时可从机架220的前面抽取冷空气并将暖空气返回至机架220的尾部或顶部。在一个实施方式中,机架220可包含U空间位置,其被设计成容纳安装在机架上的数据中心组件,例如服务器、计算机、冷却装置、子系统、或者网络连接或其他装置。
在一个实施方式中,数据中心200的行205可被定位成产生交替的冷通道和热通道。如图2的实施方式所示,通道225可以是热通道且通道230可以是冷通道。为了向机架220提供冷却,在冷通道230中的每个机架220的前面,穿孔的地砖235可被用来从活地板215之下提供冷空气。在数据中心200中,除了或代替穿孔的地砖235,活地板215还可包括实心地砖。冷却单元210可向活地板215下面的区域提供冷空气,并且冷却单元210可从与数据中心的天花板相邻的空间接收暖空气。
在一个实施方式中,除了或代替冷却单元210,还可使用行内冷却单元,例如可从美国罗德艾兰州West Kingston的电力转换公司(APC)获得的那些冷却单元。在一个实施方式中,可使用例如具有12英寸的宽度的半机架行内冷却单元,该宽度为标准数据中心机架宽度的大约一半。
数据中心200可包括多个不同类型的服务器。例如,服务器可以是物理服务器,专用服务器或虚拟服务器。物理服务器通常包括硬件,硬件上运行操作系统。专用服务器通常包括在物理服务器上运行的服务应用。例如,专用服务器可包括操作系统上的web服务或文件传输协议(FTP)服务,其中服务应用可被耦合到物理服务器。虚拟服务器可包括独立于物理服务器硬件的服务。例如,虚拟服务器可包括物理服务器分割成多个服务器,每个服务器具有的外观和容量就好像它们正运行在它们自己的专用服务器上一样。在一个实施方式中,每个物理服务器可具有一个专用服务器操作系统且每个物理服务器可具有多个虚拟服务器。虚拟服务器可以与专用服务器并行地(例如,紧接着)运行。
数据中心200为代表性的数据中心,且在此描述的各种实施方式不限于诸如数据中心200的数据中心。可以使用例如不包括活地板的各种其他的数据中心和设施。数据中心200或其他数据中心可与容纳更多、更少的设施、或不同装置、或不同于计算装置的装置——包括电信设施和其他设施——一起使用。在一个实施方式中,数据中心200包括由子系统支持的计算机。数据中心200可以但不需要是专用空间或房间。进一步地,数据中心组件布局不需要如图2所示那样整齐地排列。
图3为描绘根据一实施方式的数据中心控制系统300的实例的方块图。在一个实施方式中,系统300包括至少一个数据中心200。多个数据中心200可以通过至少一个网络305和至少一个数据中心控制器310彼此关联。网络305可以包括至少一个计算机互连网络,例如因特网、任何广域、局域、地下铁道、无线、电话、蜂窝、卫星、或其他区域网络或其组合。网络305可例如包括网络基础装置,例如服务器、路由器、节点或交换机。在一个实施方式中,数据中心200的组件通过至少一个网络305与数据中心控制器310互连或彼此互连。数据中心200中的服务器和网络305的网络基础装置可被分组到网络区域或集群中,使得网络305的安全性在服务器的添加或变更期间或之后保持完好。
在一个实施方式中,数据中心控制器310监测数据中心组件——包括物理服务器和电源系统——的特征。数据中心控制器310也可监测虚拟服务器参数。根据服务器、虚拟服务器和电源信息,数据中心控制器310可将虚拟服务器分配给一个或多个物理服务器以控制数据中心和其组件之间或内部的电力分配。
在各种实施方式中,数据中心控制器310可以位于一个或多个数据中心200内部,或被远程地定位于数据中心200的外部。例如,数据中心控制310可位于数据中心200外部并通过网络305连接至数据中心200。在一个实施方式中,数据中心控制器310包括装置如处理器、微芯片或电路,以识别、管理和控制数据中心特征。在一个实施方式中,数据中心控制器310可以接收与至少一个数据中心200相关的数据。例如,数据中心控制器310可以接收、测量、估计或监测指示数据中心200的负载、温度、容量、电力或电流消耗的数据,或指示数据中心200或其任何组件的操作状态的其他数据。在一个实施方式中,数据中心控制器310可模拟数据中心200的操作。在这个实施方式中,数据中心特征可基于模拟或估计的——而不是测量的——数据中心条件如负载、电力、温度、容量或能量数据。这个模拟的数据可由数据中心控制器310生成或接收。
数据中心控制器310也可包含指示数据中心200的最大容限、负载或容量的数据。在一个实施方式中,至少一个数据库315存储指示数据中心200或数据中心200的组件的容限、负载或最大容量的数据。数据库315可以是数据中心控制器310的一部分或者位于其他地方,且例如通过网络305对数据中心控制器310是可访问的。数据库315可包括来自一个以上的数据中心200的数据。在一个实施方式中,每个数据中心200包括至少一个数据库315,其存储指示数据中心200的信息的数据,例如容限或容量范围,或关于电力分配的数据。在一个实施方式中,数据中心控制器310可包括可从美国罗德艾兰州West Kingston的电力转换公司获得管理平台。
在各种实施方式中,数据中心控制器310确定一个或多个数据中心200的实时、近实时、或估计的未来参数。例如,数据中心控制器310可确定数据中心200是否以全部电力容量操作。数据中心控制器310还可确定或接收指示数据中心200的各个设备、组件或子系统的操作状态的信息。例如,数据中心200可包括多个服务器。数据中心200可直接或通过网络305向数据中心控制器310提供指示数据中心200中的特定服务器未以全部电力容量操作的数据,因此能够执行额外的应用。
在一个实施方式中,数据中心控制器310确定在数据中心组件如服务器之间的电力分配。例如,数据中心控制器310可识别位于一个或多个数据中心200内的多个服务器的参数,如电力消耗。在一个实施方式中,如果服务器执行某些应用,或者如果可执行应用的虚拟服务器被提供给服务器,数据中心控制器310可识别或确定该服务器的估计的未来电力需求。
在一个实施方式中,数据中心200包括一个或多个子系统。子系统可包括共同执行某些功能的一个或多个数据中心组件。例如,数据中心200可包括具有一个或多个电源单元、电力分配单元、分支电路或电力储存单元的电源子系统。该电源子系统可向至少一个数据中心200的全部或部分共同地分配电力。子系统的实例包括一个或多个装置子系统320、电力生成子系统325、不间断电源子系统330、冷却子系统335、安全子系统340、能量储存子系统345和通信子系统350。如在图1至图3的实施方式中所示的,冷却子系统335可包括一个或多个冷却单元210以调整数据中心200或者至少一些其组件的温度。在另一个实施例中,装置子系统320可包括服务器或执行计算功能的其他逻辑设备。在另一实施例中,不间断电源子系统330可包括不间断电源100。
在一个实施方式中,通信子系统350包括通过网络305向数据中心控制器310提供数据的计算机硬件。例如,至少部分地根据来自不间断电源子系统330或来自电力生成子系统325的电力消耗,通信子系统350可指示数据中心200的装置子系统320正以其电力容量的80%操作。在另一实施例中,通信子系统350可指示特定的设备例如来自装置子系统320的服务器正在使用其可用电力的45%。在这个实施例中,不间断电源子系统330可部分地关闭,使得更少的电力被提供给服务器。在一个实施方式中,通信子系统350可向数据中心控制器310提供数据中心200、其关联的子系统、或者各个数据中心组件或设备的最大值、最小值、或容限和操作数据。通信子系统350也可指示数据中心200具有或没有用于插入额外的组件的足够的物理空间。在一个实施方式中,通信子系统350包括至少一个数据库。
一般来说,通信子系统350也可指示数据中心200或其关联的子系统的状态。例如,通信子系统350可以指示电力故障发生。电力故障可以由于局部电网的故障或者数据中心200的子系统或设备例如电力生成子系统325的失效。通信子系统350然后可以向数据中心控制器310提供指示电力故障已经发生的信息。
在一个实施方式中,数据中心控制器310持续或周期性地接收或监测关于一个或多个数据中心200的信息。从这个信息中,数据中心控制器310可从整体上确定数据中心200及其各个设备(例如,服务器)或子系统(例如,装置子系统320、不间断电源子系统330或冷却子系统335)的操作状态、范围、电力使用、估计的未来电力使用、电力消耗和容限。至少部分地根据所识别的信息,数据中心310可在一个或多个数据中心200的服务器之间重新分配应用,将一个或多个数据中心200的服务器识别为运行应用的位置,或者将数据中心200中的服务器识别为增加新的硬件或虚拟服务器的位置,该硬件或虚拟服务器可被用来运行应用。在一个实施方式中,所识别的信息包括模拟或估计的服务器信息,例如当前或预测的未来电力需求。
例如,数据中心200中的第一服务器能以大于其电力容量的90%操作。这个信息可从通信子系统350提供给数据中心控制器310。第二服务器能以其电力容量的5%操作,且这个信息也可被提供给数据中心控制器310。在这个实施例中,数据中心控制器310可识别第一服务器和第二服务器的电力容量参数,并可确定与第二服务器关联的电源的至少一部分可被关闭。在另一个实施例中,数据中心控制器310可将第二服务器识别为一个或多个虚拟服务器的位置。这些虚拟服务器可被提供给第二服务器,在那里它们可以执行应用并增加第二服务器的电力消耗,导致在第一服务器和第二服务器之间的更加平衡的电力分配。在一个实施例中,数据中心控制器310可以指示虚拟服务器从数据中心200的第一服务器转移到第二服务器。在这个实施例中,转移虚拟服务器降低了第一服务器的电力消耗,这可允许与第一服务器关联的不间断电源100的至少部分关闭。
在一个实施方式中,数据中心控制器310可识别数据中心200中的一个或多个服务器作为虚拟服务器执行应用的位置。例如,数据中心200的服务器能以关于温度、电力或其他参数的不同的容量操作。数据中心控制器310可评估数据中心200的一个或多个服务器的参数以识别作为虚拟服务器的位置的服务器。在这个实施例中,虚拟服务器于是可以被提供给这个选择的服务器,在那里虚拟服务器可以运行或执行应用。在各种实施方式中,服务器的识别可基于温度、电力、电流、冷却、能量、安全性或其他服务器参数如位置的任何组合。例如,数据中心200中的两个服务器可以消耗实质上等量的电力,但是可以位于数据中心200的具有不同温度的不同区域中。数据中心控制器310可以识别这两个服务器中的一个作为添加虚拟服务器以执行新的应用的位置,因为,例如数据中心控制器310评估信息,该信息指示增加这两个服务器中的一个服务器处的负载可允许冷却系统335的冷却单元210至少暂时关闭,从而节省与冷却单元210关联的能量成本。在这个实施例中,两个服务器都可以有能力托管虚拟服务器,然而能量成本使得服务器中的一个成为更加合适的位置。
在一个实施方式中,数据中心控制器310识别两个服务器中的一个作为选择的服务器来接收虚拟服务器,其中这两个服务器位于地理上不同的数据中心200。例如,数据中心控制器310可以通过网络305控制两个数据中心200。在这个实施例中,根据服务器参数的评估以及根据虚拟服务器参数的评估,虚拟服务器可以从第一数据中心的服务器被重新定位到第二数据中心的服务器。这些参数可以包括例如服务器和虚拟服务器的测量的、采样的、周期性采样的、当前的、模拟的、或估计的未来电力使用或冷却要求。
应当认识到,当数据中心控制器310识别出虚拟服务器的位置时,能量成本和其他外部因素不需要是决定性的。数据中心控制器310可以评估一个或多个数据中心200的操作数据(例如,实时数据)、数据中心设备参数(例如,数据中心200、它们的子系统或各个组件的服务器电力耗费、冷却性能、效率、可靠性、冗余、备份运行时间、容限)以及外部因素(例如,本地时间、本地能量、安全性或劳动成本)的组合,以识别一个或多个服务器作为虚拟服务器的位置。确定虚拟服务器的位置允许对数据中心200的组件的有效及平衡的电力分配和再分配。
在一个实施方式中,这种控制的电力分配允许数据中心310关闭全部或部分子系统,包括不间断电源100或冷却单元210。例如,向可能已经在操作中的特定服务器增加虚拟服务器可以使应用能够由那个虚拟服务器而不是第二服务器运行。在这个实施例中,这可能允许第二服务器保持休眠。由于第二服务器保持休眠,其关联的子系统或它们的组件(例如,不间断电源子系统330)可关闭,从而节省电力。在各种实施方式中,数据中心控制器310评估一个或多个数据中心100、它们的子系统或各个组件如服务器的模拟数据如模拟的电力消耗、模拟的冷却能力、模拟的效率、模拟的冗余以及模拟的备份运行时间的组合。
在一个实施方式中,数据中心控制器310提供数据中心200在操作过程中以及在计划事件如例行维护或非计划事件如停电或其他非计划中断过程中的概观。在一个实施方式中,数据中心控制器310可确定数据中心200(包括其组件)的电力和冷却特征,如在2006年1月27号递交的标题为“Methods and Systems for Managing Facility Power and Cooling”的美国专利申请序列号11/342,300中所描述的,该申请在此通过引用被全部并入。
在一个实施方式中,数据中心控制器310确定多个服务器的容量。例如,数据中心控制器310可包括识别数据中心容量的处理器或逻辑设备如电路或微控制器。这种容量可包括运行新的应用或配置虚拟服务器的服务器容量、存储或处理数据的服务器容量,并可指示服务器的实际、最小或最大电力容量。在一个实施方式中,通信子系统350向数据中心控制器310提供关于数据中心200的信息。例如,数据中心控制器310可指示数据中心200的实时容量。显示器可向负责数据中心200的管理的技术人员或个人提供该信息。
在一个实施方式中,数据中心控制器310可采样或监测服务器或数据中心200的其他装置以确定装置的参数,如操作状态(例如,电力消耗)和操作范围(例如,容量)。例如,数据中心控制器310可指示被提供给特定服务器的虚拟服务器将使相关的不间断电源100以95%的容量操作,并将降低或消除对第二电源100向同一数据中心200或不同数据中心中的第二服务器提供电力的需要。在这个实施例中,第二电源100可被关闭并进入深度休眠模式,或进入热待机模式。
在一个实施方式中,数据中心控制器310管理并监测位于数据中心200中的物理、专用或虚拟服务器的性能标准。例如,数据中心控制器310可监测服务器性能并确定一服务器正以其处理容量的某个百分比操作,或正使用相关的不间断电源100的某个百分比的电力容量。在一个实施方式中,数据中心控制器310维护并配置网络装置,使得服务器位于特定的网络、群集或区域中。数据中心控制器310也可指示服务器或虚拟服务器将被添加到一个或多个数据中心200、将从一个或多个数据中心200移除或将从一个数据中心200移至另一个数据中心200。
在一个实施方式中,冗余应用可在一个或多个服务器或虚拟服务器上运行。例如,应用可具有用于备份目的的冗余需求。这种应用的实例包括工资表、账目、安全、投资、银行业务或通常要避免应用故障的其他应用。在这个实施例中,数据中心控制器310可识别并管理一个或多个服务器或虚拟服务器的冗余容量。在一个实施方式中,一个或多个数据中心控制器310可存在于一个或多个物理位置上。数据中心控制器或其部分如服务器管理器可例如通过在一个或多个数据中心200中的不同服务器上操作来在物理位置之间移动。
在一个实施方式中,数据中心控制器310的服务器管理操作可在位于数据中心控制器310内或数据中心200内的专用硬件上实现。进一步地,服务器管理特征可以响应于例如来自技术人员的输入或在特定时间指示应用被提供给特定的服务器用于执行。在一个实施方式中,数据中心控制器310可指示将虚拟服务器的全部或部分从第一服务器移至第二服务器。在这个例证性实施方式中,第一服务器和第二服务器可位于相同或不同的数据中心200。在另一个实施方式中,数据中心控制器310可以指示在位于多于一个的数据中心200中的多个虚拟服务器之间分配应用。
数据中心控制器310也可包括硬件管理器,其通过监测服务器或其他装置参数、能量效率、总拥有成本、维护、以及灾害性事件以在数据中心200的服务器内和之间分配资源来大致优化数据中心200的性能。在一个实施方式中,数据中心控制器310可评估关于服务器容量的变化的信息,以提供关于将虚拟服务器定位在哪里的指示。数据中心控制器310在识别一个或多个服务器中的虚拟服务器位置时所考虑的因素包括电力服务器的实际的,估计的和潜在的使用、电网断电、维护、环境变化、当地时间、现场工作人员的空闲性、或数据中心200的增加或减少的利用率。
在一个实施方式中,技术人员可提供执行应用的指示、服务器或数据中心200的操作要求。例如,技术人员可向数据中心控制器310提供指示不再向数据中心200添加新的物理服务器的参数。在这个实施例中,数据中心控制器310可向数据中心200中的选择的服务器提供虚拟服务器,并将该虚拟服务器识别为执行应用的位置。在这个实施例中,不间断电源子系统330可调整以向包括虚拟服务器的服务器提供更多电力。不间断电源子系统330然后可向其他服务器提供更少的电力,因为在本例中它们不包括虚拟服务器且不运行其应用。应当认识到,数据中心控制器310由此可调整对数据中心200的服务器的电力分配。这种调整可包括关闭电力分配系统如不间断电源100。在另一个实施例中,由于向数据中心200供应电力的不可靠的局部电网,技术人员可为数据中心200或其服务器提供最大的电力消耗。在这个实施例中,数据中心控制器310可将应用时移或分配到任何数据中心200中的服务器,以使特定服务器或数据中心200的电力消耗保持在特定水平之下。
在一个实施方式中,数据中心控制器310提供将虚拟服务器从第一数据中心200的第一服务器移至第一数据中心或第二数据中心200中的第二服务器的指令。在一个实施方式中,至少部分地根据数据中心200的信息,数据中心控制器310可评估虚拟服务器电力需求和多个服务器的电力需求以将虚拟服务器移至数据中心200中的多个服务器中的所选择的一个服务器或提供将虚拟服务器移至数据中心200中的多个服务器中的所选择的一个服务器的指令。数据中心200的信息可包括数据中心组件的电力、冷却、状态以及参数信息、总拥有成本因素如劳动力和能量成本、安全性、可用性要求、动态需求如电力、冷却、延长的运行时间和冗余需求。数据中心控制器310也可识别服务器、网络装置或数据中心200中的其他设备的可靠性或其他需求。这些参数的实例包括与数据中心设备或应用关联的冗余、运行时间、电力使用、处理速度或容量、热生成、安全性、电力供应、电力要求以及网络区域。在一个实施方式中,数据中心控制器310在识别或选择将被提供有虚拟服务器的服务器时可评估由虚拟服务器执行的应用的性质。
数据中心控制器310可包括其他元件,例如可监测数据中心200的服务器和虚拟服务器的参数、需求或使用的一个或多个处理器或电路。在一个实施方式中,响应于从数据中心200或其组件接收到的信息,数据中心控制器310可以识别至少一个服务器作为虚拟服务器执行应用的位置,以便通过最小化不间断电源100或冷却单元200的操作来降低能量消耗。
在一个实施方式中,数据中心控制器310可识别并跟踪服务器位置。例如,数据中心控制器310可以被提供有指示特定的服务器位于特定的数据中心200的信息。数据中心控制器310可通过评估服务器、数据中心200、电源以及网络305的信息如参数、需求、或其他操作状态信息来优化数据中心内的服务器的位置。在一个实施方式中,数据中心控制器310请求虚拟、专用、或物理服务器移动、放置、添加或重定位。这可以例如响应于应用需求、数据中心200的操作条件如计划或非计划的服务或维护、或网络305的操作条件如电网断电或温度。对虚拟服务器移动或重定位的请求可响应于数据中心200的电力、冷却、或容量操作条件。由数据中心控制器310请求移动的服务器可分配或重新分配数据中心电力配额以提高数据中心200的效率、可靠性和性能,并可降低操作电力消耗和成本。
在一个实施方式中,数据中心控制器310可以识别特定的数据中心200,或者可以识别服务器或虚拟服务器可以存在或者被插入的特定机架220。例如,数据中心控制器310可以识别数据中心200中已有的服务器,并指示该已有的服务器被修改为包括虚拟或专用的服务器。在一个实施方式中,数据中心控制器310评估来自多个服务器和不间断电源100的信息,并识别可接收具有最大的不间断电源效率的虚拟服务器的服务器。在这个例证性实施方式中,剩余的数据中心200的物理硬件、冷却子系统335、或不间断电源子系统330的至少部分可被关闭或被置于低电力待机模式中。这节省了能量并降低了数据中心200的冷却需求。
在一个实施例中,数据中心200可以被布置成使得冷却单元210是无效或低效的。在这个实施例中,根据数据中心200所评估的信息如电力数据、温度数据或冷却数据,数据中心控制器310可以识别出包括虚拟服务器并生成不适当量的热的一个或多个服务器(或其他设备)。继续这个实施例,数据中心控制器310可识别用于重定位较靠近冷却单元210的虚拟服务器的服务器。数据中心控制器310也可识别生成过量热的服务器,并且作为回应,可将与那个物理服务器关联的一个或多个虚拟服务器转移至相同或不同数据中心200中的不同位置。这可减小相关的冷却单元210上的应变,并可允许冷却单元或其相关联的不间断电源100的至少一部分关闭或在节电模式中操作。
可以评估数据中心组件以提高数据中心200的性能或操作。例如,数据中心控制器310可以识别低效操作的服务器。在这个实施例中,数据中心控制器310可以识别硬件或软件升级。数据中心控制器310然后可以继续安装或请求服务器的升级。
在一个实施方式中,数据中心控制器310可以评估数据中心信息以识别或确定可用的服务器或不间断电源的容量。例如,数据中心控制器310可以从总体上识别数据中心200的可用容量,或者识别单个数据中心组件如服务器的可用容量。在这个实施例中,数据中心控制器310可指示可用的服务器容量可用于租借、出租或销售。在一个实施方式中,空闲服务器的租借通过服务器容量租借系统而发生,该系统可被统一管理,并且可识别和指示数据中心200的一个或多个服务器的容量的可用性。在一个实施方式中,虚拟服务器可以被提供给具有多余的数据中心容量的服务器,以提高数据中心200的性能或不间断电源100的效率。数据中心控制器310也可指示对运行应用的额外的服务器容量的需要,并可从一个或多个数据中心200引入或引出虚拟服务器。应当认识到,这个额外的容量可以用作商品。例如,像电和其他能量资源一样,服务器容量可被出售、租借、交易或保存。
在一个实施方式中,数据中心控制器310可确定从不间断电源到多个服务器以及虚拟服务器的估计的电力分配。例如,数据中心控制器310可以估计到与一个或多个数据中心200关联的任何组件、子系统、设备或网络的电力分配。在一个实施方式中,数据中心控制器310确定从不间断电源100到一个或多个数据中心200中的多个服务器和至少一个虚拟服务器的估计的电力分配。在各种实施方式中,数据中心控制器310确定估计的单相或三相电力分配。例如,数据中心控制器310可以为三相电力分配系统的每一相估计电力分配。在各种实施方式中,数据中心控制器310可以确定从数据中心200的一个或多个子系统、分支电路、UPS、或PDU到一个或多个数据中心组件例如数据中心服务器、机架220、冷却单元210或子系统的估计的电力分配。
在一个实施方式中,数据中心控制器310可估计在规定的时间段到数据中心组件或相关设备的电力分配。例如,如果专用或虚拟服务器在物理服务器执行应用,数据中心控制器310可以在下一个一秒间隔内估计物理服务器的电力消耗。在各种实施方式中,这个时间间隔可以变化。例如,时间间隔可以是小于一秒、介于一秒和10秒之间、或大于10秒的时间段。数据中心控制器310也可估计在其他时间段的电力分配。
在一个实施方式中,数据中心200可由控制器310控制并由三相电源供电,其中不间断电源子系统330包括三相不间断电源(UPS)。在这个实施例中,该三相UPS可分配三相电力以给数据中心200的断路器面板或电力分配单元(PDU)供电。电力可通过一个或多个单相或三相分支电路从PDU传送到机架220。在这个实施例中,数据中心设备(如子系统、服务器或装置)的电力利用可以是单相或三相,且服务器或其他装置可以不知道它正使用的相。在一个实施方式中,数据中心控制器310可监测来自数据中心200的服务器的服务器报告的电力消耗值。在另一实施方式中,数据中心控制器310监测数据中心200的三相电力系统内的相加载。在具有三相电力系统的这个实施方式中,除了服务器上报的指示电力消耗而未指定相的任何电力消耗信息以外,还可给数据中心控制器310提供相特有的信息(例如,服务器所连接到的相)。
在一个实施方式中,可确定机架220或其中的服务器的可用的未使用的UPS容量。在例如三相UPS的可用的未使用的容量不提供数据中心200的电力特征的足够准确的指示的另一实施方式中,在UPS处、在PDU输入处以及在分支电路处的单独的相的负载可以被确定。例如,在一个三相电力分配系统中,最有效地确定数据中心可用容量的电力容量测量可以是分支电路电力容量,(例如,IT设备或其他数据中心组件连接至电源的点)。在这个实施例中,数据中心组件可以为单相的并连接至三相UPS电力系统的三相中的一个。
在一个实施方式中,除了分支电路处可用的电力容量以外,数据中心控制器310也可确定或者被提供有与分支电路关联的UPS处的相应相的可用电力容量数据,以及与分支电路关联的PDU处的相应相的可用电力容量数据。在一个实施方式中,当容量在分支电路本身、以及在与那个分支电路关联的PDU和UPS处的其相应的相处是可用的时,分支电路处的容量可能是可用的。
应当认识到,该容量在PDU、UPS和分支电路之间可变得搁浅(stranded)。换句话说,数据中心200的一些设备可以具有可用的电力容量,但是这个可用的容量不可由数据中心的其他设备访问来使用。例如机柜如装置机架220之一可以没有IT负载,并可具有由三相UPS的相A供电的单相分支电路,其中该UPS被加载至33%,且该负载全部在相A上。在这个实施例中,对相A没有剩余的UPS电力,因此对机架220来说将没有可用的容量。在这个实施例中,机架220可被重新布线以从不同的相给相关的分支电路供电。
在另一实施例中,没有IT负载的机架220可以具有由相A供电的单相分支电路,其中相关的PDU被加载至33%,负载全部在相A上。在这个实施例中,对相A没有剩余的PDU电力,因此对机架220来说没有可用的容量。在这个实施例中,机架220可被重新布线以从不同的相给相关的分支电路供电。
在另一个实施例中,具有功率设定在15kW的到机架220的三相电力分配的机架220可以被装有具有在所有三个相中相等地分配的9kW容量的装置。在这个实施例中,当电力分配在三个相之间均衡时,每个相将具有2kW的可用容量。在这个实施例中,尽管可能看起来6kW的容量是可用的,(即,15kW-9kW)由于均衡的分配,每个相具有2kW的容量,以及在这个实施例中,大于2kW的设备不能安装在机架220中。
应当认识到,在世界各地的很多电网上,数据中心组件可被连接至230V分支电路,以及在北美,三相电力分配可连接具有120V或者208V的负载,如数据中心组件。在一个实施方式中,120V和208V负载可在数据中心200的分支电路上被混合。120V和230V负载都可与特定的相关联,而208V负载可被连接在两个相之间并且可消耗两个相上的电流容量。因此,在数据中心200消耗来自北美电网的电力的一个实施方式中,可根据该分支电路处的容量的可用性和连接到负载的相关相的两个上的其关联的UPS和PDU来确定分支电路上的容量。
在各种实施方式中,数据中心200控制包括与数据中心200的电力供应和数据中心200的电力要求相关的信息。例如,数据中心控制器310可以管理关于数据中心200的结构例如其电力分配系统、其与IT负载如数据中心服务器或其他装置的连接、以及该连接的相关相的信息。
在一个实施方式中,数据中心组件如服务器或其他装置或设备可包括允许服务器电流和服务器电力消耗信息的上报的仪表。进一步地,数据中心组件的物理位置可存储在与该组件关联的数据库中,或另一数据库如数据库315中。
在一个实施方式中,机架220的电力消耗可以根据上报的装置和该装置的电力消耗信息来确定,数据库指示该装置位于机架220中。例如,数据中心控制器310可以利用来自服务器的服务器仪表的这个上报的电力消耗来确定具有该仪表的服务器、相关的机架220、或数据中心200的总体或部分的电力或冷却容量,其中服务器已知位于数据中心200的机架220中。
在一些服务器内构造的服务器仪表可提供不充分的信息来向数据中心控制器310指示它连接到哪个分支电路或相。在这个实施例中,在没有这个信息的情况下,数据中心控制器310可能由于例如在此讨论的搁浅的电力容量的情况而无法识别具有可用电力容量的服务器或机架220来接收虚拟服务器。在这个实施例中,可将仪表引入数据中心200来向数据中心控制器310提供信息。
在一个实施例中,服务器、机架220或其他数据中心组件的电力消耗可以至少部分地根据装置制造商数据来确定。例如,当装置的相连接是已知的时,分支电路、UPS和PDU容量可以至少部分地根据制造商提供的装置参数来确定。为简化这些确定,在一个实施方式中,分支电路可专用于服务器或数据中心200的其他设备或一台装置,并且分支电路电流负载也可被测量。应当认识到,由于例如大量的相连接和分支电路配置,这种基于制造商数据的电力容量确定对一些较高密度的数据中心来说可能是不够的,在该分支电路配置中,分支电路可专用于单台设备。
在一个实施方式中,仪表可在整个电力分配系统中被实现。例如,仪表可被引进到具有新设备的数据中心200中,或者,已有的数据中心组件可以被翻新。在一个实施方式中,在数据中心200的电力分配系统的PDU输入、UPS输出、以及一个或多个分支电路处的电流可被测量,且这个信息可被提供给数据中心控制器310,该数据中心控制器310可至少部分地根据这个信息来量化数据中心200的电力要求。例如,当数据中心控制器310包括数据中心200的服务器、机架220、PDU和UPS之间的互连的逻辑表示时,对数据中心200的所有分支电路可确定考虑相加载效应的可用电力容量。
如所讨论的,数据中心控制器310可以帮助新数据中心组件如服务器、虚拟服务器、或其他IT装置或设备的部署。在一个实施方式中,数据中心控制器310可以识别在数据中心200中的用于以平衡三相电源的相之间的负载的方式来放置设备的位置。例如,虚拟服务器可以被添加到服务器,或者从一个服务器重新定位到另一个服务器,以平衡不间断电源100的三个相之间的负载。当数据中心组件——包括虚拟服务器——被添加到数据中心200或者被移进数据中心200内时,数据中心控制器310可以指示该装置耦合到服务于数据中心200的电力系统的没有充分使用的相。例如,在高于平均数据中心设计密度的电力密度处操作的装置负载可由数据中心控制器310指示来耦合到未充分使用的相。类似地,在低于平均数据中心设计密度的电力密度处操作的装置负载可由数据中心控制器310指示来耦合到过度使用的相。在一个实施例中,对设备——包括被添加到或被移进数据中心200的虚拟服务器——重复这个基于相利用的方法可优化相平衡和机架220的空间利用。
在一个实施方式中,未能以平衡的方式部署数据中心组件可能导致搁浅的电力容量,该容量看起来存在于一些数据中心组件如PDU、分支电路或UPS中,但是由于数据中心组件如其电力系统的配置而不能被利用,从而降低数据中心200的效率及可部署的组件的数量。
平衡三相电源的相利用可影响机架220的电力分配和数据中心200的电力密度。在一个实施方式中,数据中心控制器310可在数据中心200内识别装置外壳的区域。例如,关于图2,行205可以是数据中心200的区域。在这个实施例中,数据中心控制器310可以为每个区域确定或指定平均机架电力或峰均机架比。继续这个实施例,峰均比可影响可能存在的被搁浅的电力容量的量。在一个实施方式中,数据中心控制器310可以将峰均比增加至比从典型的机架220的变化所预期的值大20%的值。这可减少由于分支电路之间的不平衡而搁浅的电力容量的量。
在一个实施方式中,对机架220的三相电力分配使数据中心控制器310能够将包括虚拟服务器的装置分派给该机架220的电力的不同相,产生电力相的平衡应用。在具有对机架220的单相电力分配的实施方式中,数据中心控制器310可以指示分支电路在机架220之间的重定位。
在图4中显示了数据中心200中的服务器配置的实施例。在一个实施方式中,图4包括第一服务器405和第二服务器410,其参照图2可以位于一个或多个机架220中。第一服务器405和第二服务器410每个可以包括一个或多个虚拟、物理或专用服务器。在一个实施方式中,参照图3,第一服务器405和第二服务器410可以是构成网络305的一部分的物理基础设施组件。
如图4所示,第二服务器410包括数据中心控制器310的至少一部分,该数据中心控制器310可以作为第二服务器410内部的硬件来实现。在一个实施方式中,数据中心控制器310的服务器和网络管理操作可在运行于虚拟或物理服务器上的应用中实现,该虚拟或物理服务器被包括在第一服务器405、第二服务器410或二者内。数据中心200可包括多于一个的数据中心控制器310以提供足够的冗余和可靠性水平。例如,如图4所示,第一服务器405可位于不间断电源(UPS)区域1中,以及第二服务器410可位于UPS区域2中。在一个实施方式中,第一服务器405和第二服务器410都包括以虚拟或物理服务器应用的形式的数据中心控制器310的至少一部分。例如,在第一和第二区域之一中的电力故障的情况下,未受该电力故障影响的第一或第二服务器405和410以及其关联的数据中心控制器310可保持在操作中。因此,数据中心控制器310可以跟踪并优化服务器的物理位置,以在断电、服务或维护中断的情况下识别或请求虚拟服务的添加或其他服务器移动。
可以给数据中心控制器310提供参数,例如第二服务器410、以及第一服务器405或包括虚拟服务器的其他服务器的需求或操作参数。在一个实施方式中,至少部分地根据服务器或数据中心参数,数据中心控制器310可以指示第一服务器405和第二服务器410中的一个或多个执行应用。
参照图1-4,在一个实施方式中,数据中心200的不间断电源子系统330包括至少一个不间断电源100,且数据中心200也可包括多个服务器。数据中心控制器310可识别至少一个服务器的参数。例如,数据中心控制器可识别数据中心200的至少一个服务器所消耗的电力的量。在各种实施方式中,服务器参数可包括例如来自服务器仪表的测量或采样的数据。在一些实施方式中,服务器参数可基于服务器制造商提供的数据或容限数据。
在一个实施方式中,服务器参数可基于模拟的服务器数据。这个模拟的数据可根据已知的服务器特征和性能而不是根据测量的操作性服务器数据来计算。服务器参数也可基于未来服务器操作的估计的参数。例如,服务器或其关联的机架220能以其可用电力容量的某个百分比操作。在这个实施例中,如果服务器将被提供有额外的虚拟服务器以便执行一个或多个应用,数据中心控制器310可以估计服务器电力容量。服务器参数可以包括这个估计的服务器电力容量。在一个实施方式中,服务器参数包括测量的、模拟的、或估计的服务器温度。
在一个实施方式中,参数包括一个或多个服务器的测量参数。这些测量参数的实例包括服务器电力或电流消耗、散热或处理容量。该参数也可包括估计的未来参数,例如估计在未来一段时间服务器电力消耗将是多少。例如,服务器的电力使用(或其它参数)可以在一个时间点被测量并被提供给数据中心控制器310。在这个实施例中,如果虚拟服务器被提供给服务器,或者如果应用在未来在该服务器上运行,数据中心控制器310也可估计该服务器的未来的电力使用将是多少。
在一个实施方式中,估计的未来参数例如基于虚拟服务器的添加的估计的未来电力使用可包括未来在给定的时间段该服务器的电力使用。例如,估计的未来参数可包括在未来小于一秒的时间、在未来介于一秒和10秒之间的时间段、以及在未来大于10秒的时间段在所识别的条件下的服务器的电力需求。这些时间段是实例,且可以估计数据中心200的组件在其他时间间隔内的未来参数。
在各种实施方式中,数据中心控制器310可识别虚拟服务器的估计的参数。例如,虚拟服务器的电力、温度和其他资源需求可被估计。这些估计可以基于模拟的、测量的、或已知的虚拟服务器操作特征,包括可由虚拟服务器执行的应用的特征。在一个实施方式中,虚拟服务器的估计的参数包括可由该虚拟服务器执行的应用的参数。例如,应用可能要求一定的处理速度,这在由服务器的处理器执行时消耗一定量的电力或生成一定量的热。在这个实施例中,假如应用由服务器执行,虚拟服务器的估计的参数可包括服务器的电力消耗或热生成的估计。
在一个实施方式中,数据中心控制器310估计或确定从不间断电源100到数据中心200的多个服务器的电力分配。数据中心控制器310也可估计或确定从不间断电源100到一个或多个虚拟服务器的单相或三相电力分配。例如,以及如以上所解释的,服务器或不间断电源仪表可以测量服务器电力消耗或不间断电源100的输出。不间断电源分配也可根据制造商提供的数据或数据中心操作的模拟来确定或估计。在一个实施方式中,不间断电源分配的估计可以在不间断电源100的电力分配单元或分支电路上确定。
在一个实施方式中,数据中心控制器310评估多个服务器的参数、一个或多个虚拟服务器的参数、以及不间断电源分配以识别服务器作为虚拟服务器的位置。例如,数据中心控制器310可以确定,将虚拟服务器从第一服务器重定位至第二服务器重新分配了不间断电源100的电力分配,以减少提供给第一服务器的电力并增加提供给第二服务器的电力。在这个实施例中,数据中心控制器310可以确定,在虚拟服务器的重定位之后在第一服务器需要的电力的减少允许给第一服务器供电的不间断电源100的至少部分被关闭。在各种实施方式中,不间断电源100的这些部分包括其关联的PDU和将不间断电源100电连接至第一服务器的分支电路。
在一些实施方式中,数据中心控制器310选择在服务器之间平衡负载分配的服务器、或降低一个或多个服务器的电力需求的服务器。例如,数据中心控制器可以评估服务器、虚拟服务器和电力分配参数以识别或选择服务器。在这个实施例中,虚拟服务器可以从另一个服务器转移或重定位至所选择的服务器。继续这个实施例,虚拟服务器所转移自的服务器可以具有降低的电力需求,因为它不再与虚拟服务器关联。
在各种实施方式中,与具有降低的电力需求的服务器关联的不间断电源100的至少一部分可以进入热待机模式,该模式降低了电力消耗。在例如期望进一步的省电的另一个实施方式中,与第一服务器关联的不间断电源100的至少一部分可以进入关闭状态,其中例如不同于热待机模式,在关闭状态中仅支持通过遥控重新启动不间断电源100的能力。在一个实施方式中,由于不间断电源100和其他数据中心组件可被重新启动,关闭状态可以是可逆的。关闭状态通常实现比热待机模式省电更大的省电。关闭模式也可具有重新启动或重启时间,该时间不长于不间断电源100在热待机模式中的重新启动时间。
在一个实施方式中,如所讨论的,数据中心控制器310将虚拟服务器提供给所选择的服务器。应当认识到,在数据中心200的服务器上添加虚拟服务器、或者在一个或多个数据中心200之间转移或重定位虚拟服务器改变了各种数据中心组件如服务器和冷却单元210的电力分配。因此,数据中心控制器310可以调整不间断电源100以平衡负载分配、节省电力或提高数据中心效率。
对不间断电源100的调整可增加提供给包括虚拟服务器的所选择的服务器的电力,使得该虚拟服务器可以例如执行应用。在一个实施方式中,对不间断电源100的调整可减少通过不间断电源100提供给多个服务器中的一个或多个服务器的电力,该一个或多个服务器未被选择为虚拟服务器的位置。例如,当虚拟服务器从第一服务器被重定位至第二服务器时,数据中心控制器310可以关闭将电力提供到不是所选择的服务器的另一个服务器的不间断电源100的一部分。可选地,数据中心控制器310可以指示不间断电源100的给未被选择的服务器提供电力的那部分进入热待机模式。在一个实施方式中,对不间断电源100的调整是可逆的。例如,不间断电源100可从热待机模式或关闭模式重启。在一个实施方式中,不间断电源100在小于关闭模式的重启时间的一段时间从热待机模式重启。
在一个实施方式中,数据中心控制器310识别一个或多个虚拟服务器的估计参数。该估计参数可包括例如当虚拟服务器在物理服务器操作时足以在虚拟服务器上执行应用的所估计的量的电力。在这个实施例中,数据中心控制器310可将应用提供或引导至该虚拟服务器。数据中心控制器310也可控制不间断电源100以给接收该虚拟服务器的物理服务器提供所估计的量的电力。因此,数据中心控制器310在一个或多个数据中心200内通过根据电力供应和需求分配虚拟服务器并在适当时分配电力来控制电力分配,以例如平衡负载分配或调节数据中心温度。
在一个实施方式中,不间断电源子系统330的负责例如到数据中心200的服务器、特定机架220或行205的电力分配的一部分可处于深关闭模式,该部分需要一定量的时间来从该深度关闭模式重新供电。在这个实施方式中,通过估计与关闭的电源子系统330关联的设备中的一个设备的电力需求,数据中心控制器310可提前控制那个电源子系统330的重启。在这个实施方式中,关闭的电源子系统330(或其组件)可以根据所估计的参数来保持关闭模式并进入活动状态,使得例如服务器及时地是活动的以接收虚拟服务器。
虚拟服务器可以被最新引入到数据中心200的服务器,并且虚拟服务器也可在服务器之间被重新定位,例如以平衡负载或温度参数。在一个实施方式中,根据虚拟服务器从第二服务器到第一服务器的重定位,不间断电源100增加提供给第一服务器的电力并减少提供给第二服务器的电力。例如,数据中心控制器310可以引导该重定位,以便在第一服务器和第二服务器之间平衡电力分配。这个虚拟服务器重定位也可出现,例如以通过减少其负载或通过在第二服务器或任何其他服务器处或周围引导增加的冷却子系统335的输出来冷却在第二服务器处或周围的温度。在一个实施方式中,数据中心控制器310可关闭负责调节一个或多个数据中心200中的一个或多个服务器的温度的冷却子系统335的至少一部分。例如,服务器温度可以由于变化的负载而保持、提高或降低。例如数据中心控制器310可调整冷却单元210的参数以调整针对一个或多个服务器、行205或机架220的冷却。
在各种实施方式中,数据中心控制器310可以模拟参数,或者可以被提供有模拟参数。例如,参数或估计的参数如电力分配可以包括模拟的参数。模拟的参数可以基于统计设备参数或容限、计算机模拟结果、或不直接从数据中心组件实时地测量的其他数据。例如,计算机程序可以根据服务器和其他装置容限、数据中心大小、应用、电力需求或其他信息来模拟一个或多个数据中心的操作。在一个实施方式中,被提供给数据中心控制器310的参数或估计参数可包括这个模拟的数据。继续这个实施方式,至少部分地根据该模拟的参数或模拟的估计参数,数据中心控制器310然后可以引导虚拟服务器到一个或多个数据中心200的一个或多个服务器的放置或重定位。
在一个实施方式中,数据中心控制器310可生成数据中心200或其组件的估计的工作寿命。例如,数据中心控制器310可根据数据中心组件的参数、估计参数、统计数据、装置制造商数据、或不间断电源100的电力分配来估计冷却单元210的寿命。在一个实施方式中,根据数据中心组件的估计的寿命,数据中心控制器310可生成数据中心200的维护计划表。例如,冷却单元210中的一个可以在一定的时间段内以全部容量接近全部容量操作,这可能缩短那个冷却单元210的寿命。数据中心控制器310可以利用这个信息来排定那个冷却单元210或其关联的数据中心200的维护检查。
图5为示出了数据中心电源控制的示例性方法500的流程图。在各种实施方式中,方法500包括计算机实现的方法。在一些实施方式中,方法500包括绑定至特定机器的计算机实现的方法,该机器被明确地构造和布置成执行在此描述的行为。
在一个实施方式中,方法500包括识别服务器参数的行为(ACT 505)。例如,识别服务器参数(ACT 505)可以包括识别多个服务器中的至少一个服务器的参数,所述多个服务器构成一个或多个数据中心的至少部分。识别服务器参数(ACT 505)可以包括例如识别操作数据(例如,实时数据)、服务器电力消耗、冷却容量、效率、可靠性、冗余、备份运行时间或容限、以及服务器被物理定位的位置处的时间、能量、安全性或劳动力成本的组合。在一个实施方式中,识别服务器参数(ACT 505)包括识别数据中心中的服务器的电力消耗。识别服务器参数(ACT 505)也可包括测量、采样、确定或接收服务器参数如服务器操作数据、电力或处理参数。在一个实施方式中,识别服务器参数(ACT 505)包括识别一个或多个物理服务器、虚拟服务器或专用服务器的参数。
方法500也可包括识别估计的参数(ACT 510)的行为。识别估计的参数(ACT 510)可以包括识别至少一个虚拟服务器的估计的参数,该虚拟服务器构成或者可以变成一个或多个数据中心的一部分。在一个实施方式中,识别估计的参数(ACT 510)包括在不同的操作场景下识别虚拟服务器电力、冷却或处理需求。例如,识别估计的虚拟服务器参数(ACT 510)可以包括识别物理服务器的估计的电力消耗,如果虚拟服务器被提供给该物理服务器并在该物理服务器执行应用。这可以包括该物理服务器的归因于该虚拟服务器的估计的电力消耗,或者该物理服务器总体的估计的电力消耗。
识别估计的参数(ACT 510)可以包括估计未来的服务器或虚拟服务器参数。例如,识别估计的参数(ACT 510)可以包括根据物理服务器或与该物理服务器关联的虚拟服务器的操作特征或者根据能够由该物理服务器或其关联的虚拟服务器执行的应用来估计在未来一定量的秒(例如,小于一秒,介于一秒和10秒之间、或者大于10秒)的物理服务器电力需求。
在一个实施方式中,方法500包括识别至少一个模拟参数(ACT 515)的行为。识别模拟参数(ACT 515)可以包括识别模拟数据例如一个或多个数据中心100、其子系统或各个组件如服务器的模拟的备份运行时间、模拟的电力消耗、模拟的冷却容量、模拟效率、和模拟的冗余的组合。识别模拟的参数(ACT 515)也可包括识别统计设备参数或容限、计算机模拟结果、或不直接从数据中心组件实时地测量的其他数据,例如以预测一个或多个数据中心的全部设备中的负载模式。例如,识别模拟的参数(ACT515)可以包括计算机程序以根据服务器和其他装置容限、数据中心大小、应用、电力需求或其他信息来模拟一个或多个数据中心的操作。在一个实施方式中,识别服务器参数(ACT 505)、识别估计的参数(ACT 510)或二者可包括识别一个或多个模拟的参数(ACT 515)。
方法500也可包括识别一个或多个数据中心组件的估计的寿命(ACT520)。例如,识别估计的数据中心组件寿命(ACT 520)可以包括生成数据中心或其组件的估计的工作寿命。识别估计的寿命(ACT 520)可包括根据例如数据中心组件的参数、估计的参数、统计数据、装置制造商数据或不间断电源电力分配来确定冷却单元的寿命估计。
方法500可包括确定估计的电力分配(ACT 525)的行为。例如,确定估计的电力分配(ACT 525)可以包括估计对与一个或多个数据中心关联的网络、组件、子系统、设备的电力分配。在一个实施方式中,确定估计的电力分配(ACT 525)包括确定从不间断电源到一个或多个数据中心中的多个服务器和至少一个虚拟服务器的电力分配。在各种实施方式中,确定估计的电力分配(ACT 525)包括确定单相或三相电力分配。在一个实施方式中,确定估计的电力分配(ACT 525)包括为三相电力分配系统的每一相估计电力分配。确定估计的电力分配(ACT 525)可以包括估计从一个或多个数据中心的一个或多个子系统、分支电路、UPS、或PDU到一个或多个数据中心组件如数据中心服务器、机架、冷却单元或子系统的电力分配。
在一个实施方式中,确定估计的电力分配(ACT 525)包括在指定的时间段估计对数据中心组件或关联的设备的电力分配。例如,确定估计的电力分配(ACT 525)可以包括估计在下一秒时间间隔内的物理服务器电力消耗,如果专用服务器或虚拟服务器在该物理服务器执行应用。应当认识到,这个时间间隔可以变化。例如,该时间间隔可以是小于一秒、介于一秒和10秒之间、或大于10秒的时间段。估计电力分配(ACT 525)也可以包括在其他时间段估计电力分配。
在一个实施方式中,方法500包括选择服务器(ACT 530)的行为。例如,选择服务器(ACT 530)可以包括选择位于一个或多个数据中心的一个或多个服务器作为整个或部分虚拟服务器的位置。在一个实施方式中,选择服务器(ACT 530)包括至少部分地根据标识符服务器参数、一个或多个虚拟服务器的所识别的估计参数、以及从电源到多个服务器和虚拟服务器的估计的电力分配来选择多个服务器中的一个作为选择的服务器。例如,响应于参数、估计的参数和电力分配信息的评估,一个或多个数据中心中的服务器可以被选择(ACT 530)。在一个实施方式中,选择服务器(ACT 530)包括至少部分地根据模拟的参数来选择服务器。选择服务器(ACT 530)也可包括将在数据中心中的服务器识别为具有足以执行应用的容量。
选择服务器(ACT 530)可包括从多个服务器中选择一个服务器来被提供有虚拟服务器,以在所述多个服务器之间平衡负载分配。例如,如果在一个或多个数据中心中的一个服务器与其他服务器比较正在执行不成比例份额的应用,那么另一个服务器可以被选择(ACT 530)来从负担过重的服务器接收虚拟服务器。在这个实施例中,虚拟服务器可以从不成比例地繁忙的服务器被重定位至所选择的服务器。在一个实施方式中,选择服务器(ACT 530)作为虚拟服务器的位置在一个或多个数据中心之间或在单个数据中心的组件或子系统之间平衡了负载和冷却需求。
方法500也可包括生成数据中心维护计划表(ACT 535)的行为。在一个实施方式中,生成维护计划表(ACT 535)包括根据一个或多个数据中心组件的估计的寿命来生成数据中心维护计划表。例如,由于相关的数据中心的电力要求,不间断电源的估计的寿命可被确定(ACT 525)为在接下来的4到6个月内结束。在这个实施例中,生成维护计划表(ACT 535)可以包括警告技术服务人员需要对不间断电源或其关联的数据中心进行检查。在另一实施例中,数据中心的冷却单元在一定的时间段内能以全部容量或接近全部容量操作,这将缩短其寿命。在这个实施例中,生成维护计划表可以包括排定冷却单元或其关联的数据中心的维护检查。
方法500可以包括生成电力请求(ACT 540)的行为。在一个实施方式中,生成电力请求(ACT 540)可以包括至少部分地根据虚拟服务器的估计的参数来生成对一定量的电力的请求。例如,可以确定虚拟服务器运行应用可能消耗的估计的量的电力(ACT 510)。在一个实施方式中,响应于确定虚拟服务器电力消耗的估计的参数(ACT 510),方法500可生成将电力从不间断电源提供到与该虚拟服务器关联的所选择的服务器的电力请求(ACT 540)。
在一个实施方式中,生成电力请求(ACT 540)包括识别虚拟服务器在所选择的服务器上操作所需的电力的量。例如,产生电力请求(ACT 540)可以包括确定电力在一个时间点或在一段时间内例如在生成电力请求(ACT 540)的10秒内被供应给所选择的服务器的估计的未来电力需求。在这个实施例中,响应于估计的未来电力需求,不间断电源的至少一部分可以从关闭模式重新启动,使得它可在期望的时间段例如在10秒内提供对应于该估计的未来电力需求的电力。
方法500也可包括向至少一个选择的服务器提供至少一个虚拟服务器(ACT 545)的行为。在一个实施方式中,向选择的服务器提供虚拟服务器(ACT 545)可包括指示选择的服务器接收该虚拟服务器。在一个实施方式中,向选择的服务器提供虚拟服务器(ACT 545)也可包括给选择的服务器安装虚拟服务器。在进一步的实施方式中,向选择的服务器提供虚拟服务器(ACT 545)包括将一个物理服务器分割成一个或多个虚拟服务器,每个虚拟服务器具有专用服务器的外观和容量。向选择的服务器提供虚拟服务器(ACT 545)可使虚拟服务器能够在所选择的服务器的物理位置处运行或执行应用,以及向选择的服务器或其他特定的硬件提供虚拟服务器(ACT 545)可在一个或多个数据中心的服务器之间更加准确地重新分配负载。
在一个实施方式中,方法500包括重定位虚拟服务器(ACT 550)的行为。例如,重定位虚拟服务器(ACT 550)可以包括将虚拟服务器从第一物理服务器或专用服务器转移到第二物理服务器或专用服务器。在这个实施例中,第一服务器和第二服务器可以在相同的数据中心中或者在可以处于不同地理位置上的两个分离的数据中心中。重定位虚拟服务器(ACT550)可以包括从一个服务器移除虚拟服务器,并将该虚拟服务器添加至相同或不同数据中心中的另一个服务器。在各种实施方式中,重定位虚拟服务器(ACT 550)也可包括在一个或多于一个的数据中心的相同或不同的机架或行内重定位虚拟服务器。在一个实施方式中,向所选择的服务器提供虚拟服务器(ACT 545)包括将虚拟服务器从多个服务器中的一个服务器重定位至所选择的服务器(ACT 550)。
方法500也可包括向虚拟服务器提供应用(ACT 555)的行为。在一个实施方式中,响应于所生成的电力请求(ACT 540)和向所选择的服务器提供虚拟服务器(ACT 545),方法500可包括向虚拟服务器提供一个或多个应用以由该虚拟服务器实现或执行(ACT 555)的行为。在这个实施方式中,到应用被提供给虚拟服务器(ACT 555)时为止,从例如不间断电源子系统到虚拟服务器的适当的电力分配可使虚拟服务器能够执行该应用。然而应当认识到,在一个实施方式中,生成电力请求(ACT 540)或向选择的服务器提供虚拟服务器(ACT 545)都不是向虚拟服务器提供应用(ACT 555)的必要条件。例如,应用可在没有产生电力请求(ACT 540)的情况下被提供给虚拟服务器(ACT 555),因为可以确定对更多或更少电力的请求对由该虚拟服务器执行应用不是必要的。
在一个实施方式中,方法500包括调整不间断电源(ACT 560)的行为。例如,调整不间断电源(ACT 560)可以包括调整不间断电源(UPS)以调整提供给多个服务器中的至少一个服务器的电力,所述多个服务器可包括一个或多个选择的服务器。在各种实施方式中,调整不间断电源(ACT560)可以包括增加、减少或保持由UPS提供到一个或多个数据中心组件的电力。由UPS供应的电力可以是三相或单相电力。在一个实施方式中,调整UPS电力(ACT 560)包括平衡对数据中心的断路器面板或电力分配单元(PDUs)的三相电力分配。
在一些实施方式中,调整UPS电力(ACT 560)包括调整提供给虚拟服务器的电力。调整UPS电力(ACT 560)也可包括调整提供给虚拟服务器所转移自的服务器的电力,即,从该服务器转移至所选择的不同的服务器的电力。例如,调整不间断电源(ACT 560)可以包括增加从不间断电源提供给所选择的服务器的电力。调整不间断电源(ACT 560)也可包括调整提供给多个服务器中的不同于所选择的服务器的至少一个服务器的电力。例如,提供给服务器中的不是所选择的服务器的一个服务器的电力可以被减少。在一个实施方式中,调整不间断电源(ACT 560)可以包括关闭向多个服务器中的不同于所选择的服务器的至少一个服务器提供电力的不间断电源的至少一部分。关闭不间断电源的至少一部分可以包括例如关闭该不间断电源的分支电路和电力分配单元中的至少一个。
方法500可以包括调整一个或多个数据中心的冷却单元(ACT 565)的行为。在一个实施方式中,调整冷却单元(ACT 565)包括调整冷却单元的参数以调整所选择的服务器的温度。例如,调整冷却单元(ACT 565)可以包括增加提供给该冷却单元的电力,使得送往所选择的服务器的冷却单元输出增加。调整冷却单元(ACT 565)也可包括减少提供给该冷却单元的电力以减少该冷却单元的应用于一个或多个服务器的冷却容量,所述一个或更多服务器是不同于所选择的服务器的服务器。在各种实施方式中,调整冷却单元(ACT 565)包括调整一个或多个数据中心的冷却子系统的组件。
方法500也可包括向虚拟服务器提供所请求的量的电力(ACT 570)的行为。在一个实施方式中,不间断电源可被调整(ACT 560)以生成所请求的量的电力(ACT 540)。这个量的电力然后可以被提供给虚拟服务器(ACT 570),使得该虚拟服务器可以例如执行一个或多个应用。在一个实施方式中,向虚拟服务器提供所请求的电力(ACT 570)在一个或多于一个的数据中心中的多个服务器之间产生平衡的或更加平衡的负载分配。例如,被选择的服务器(ACT 530)相对于在相同或不同数据中心内的其他服务器可能是未充分利用的。这种不充分利用可能导致多个服务器之间的不平衡的电力分配,其中,例如,比较忙的服务器比未充分利用的服务器消耗更多的电力。这可导致整个数据中心或其机架或行中的散热的不一致,以及不均匀的冷却需求和冷却单元负载要求。在一个实施方式中,向所选择的服务器提供所请求的电力(ACT 570)纠正了这些不一致并更有效地利用数据中心电力、冷却和数据处理资源。
应认识到,虽然关于图5描述了一系列的行为,但这些行为的顺序是非限制性的,并且可在其他实现、方面和实施方式中被修改。进一步地,不相关的行为可以并行地执行。
在此描述的各个方面和实施方式可以在如以上所讨论的一个或多个计算机系统上实现。例如,系统300可以在单个计算机系统或在多个计算机系统上实现。这些计算机系统可以是例如通用计算机如基于IntelPENTIUM型处理器、摩托罗拉PowerPC、Sun UltraSPARC、Hewlett-Packard PA-RISC处理器或任何其他类型的处理器的计算机。
例如,各个方面可以作为在通用计算机系统600中执行的专门的软件来实现,如图6中所示。计算机系统600可以包括连接至一个或多个存储器设备610如磁盘驱动器、存储器或用于存储数据的其它设备的处理器605。存储器610一般用于存储在计算机系统600的操作期间的数据和程序。计算机系统600也可包括提供额外的存储容量的储存系统615。计算机系统600的组件可以由互连机构620耦合,该互连机构620可包括一个或多个总线(例如,在集成于同一机器内的组件之间)和/或网络(例如,在存在于单独的分立的机器上的组件之间)。互连机构620使通信(例如,数据、指令)能够在系统600的系统组件之间被交换。
计算机系统600也包括一个或多个输入设备625如键盘、鼠标、轨迹球、麦克风、触摸屏以及一个或多个输出设备630如打印设备、显示屏、扬声器。此外,计算机系统600可包含将计算机系统600连接至通信网络(除了或代替互连机构620)的一个或多个接口(未示出)。
在图7中更详细地显示的储存系统615一般包括存储有信号的计算机可读和可写非易失性记录介质705,所述信号定义由处理器执行的程序或者存储在介质705内或上的由该程序处理以执行与在此描述的实施方式关联的一种或多种功能的信息。该介质可以是例如磁盘或闪存。一般,在操作中,处理器促使数据从该非易失性记录介质705被读到另一个存储器710中,与介质705相比,存储器710允许通过处理器对信息的更快的访问。这个存储器710一般为易失性随机存取存储器,如动态随机存取存储器(DRAM)或静态存储器(SRAM)。它可如所示位于储存系统615中或存储系统610中。处理器605通常操纵集成电路存储器610、710内的数据,并在处理完成之后将数据拷贝至介质705。各种机构可以管理介质705和集成电路存储元件610、710之间的数据移动,且在此提供的实例为非限制性的,包括存储系统610和储存系统615的实例。
在此实现的计算机系统可以包括特别编程的专用硬件,例如专用集成电路(ASIC)。在此描述的各个方面可以在软件、硬件或固件或其任何组合中实现。进一步地,这种方法、行为、系统、其系统元件和组件可以作为以上所描述的计算机系统的部分或作为独立的组件来实现。
尽管计算机系统600作为例子被显示为在其上可实践在此描述的各种方面的一种类型的计算机系统,应当认识到,方面和实施方式并不限于在如图6所示的计算机系统上实现。各种方面可以在具有不同于图6所显示的结构或组件的一个或多个计算机上被实践。进一步地,在这里(或在权利要求中)描述的实施方式的功能或过程在处理器或控制器上被执行的场合,这种描述旨在包括使用多于一个的处理器或控制器来执行功能的系统。
计算机系统600可以是可使用高级计算机编程语言进行编程的通用计算机系统。计算机系统600也可使用特别编程的专用硬件来实现。在计算机系统600中,处理器605可以是市场上可买到的处理器,例如可从Intel公司获得的著名的Pentium类处理器。其他处理器是可用的,例如可执行操作系统的那些处理器,该操作系统可以是例如可从微软公司获得的Windows 95、Windows 98、Windows NT、Windows 2000(Windows ME)、Windows XP或Windows Vista操作系统,可从苹果计算机公司获得的MACOS系统X操作系统,可从Sun微系统公司获得的Solaris操作系统,或者可从各种资源获得的UNIX操作系统。可使用许多其他的操作系统。
处理器和操作系统共同定义计算机平台,对该计算机平台用高级编程语言编写应用程序。应当理解,在此描述的系统和方法的实施方式并不限于特定的计算机系统平台、处理器、操作系统或网络。此外,应当认识到,这些系统和方法也不限于特定的编程语言或计算机系统。可以使用其他合适的编程语言和其他合适的计算机系统。
计算机系统的一个或多个部分可以分布在耦合至通信网络的一个或多个计算机系统中。例如,如以上所讨论的,数据中心控制器310的组件可以彼此远程地定位。这些计算机系统也可以是通用计算机系统。例如,系统300的元件可分布在一个或多个计算机系统中,这些计算机系统被配置成向一个或多个客户端计算机提供服务(例如,虚拟服务器),或作为分布式系统的部分执行总任务。例如,可在包括分布在一个或多个服务器系统之间的组件的客户端-服务器或多层系统上执行操作,这些组件根据在此描述的各种实施方式执行各种功能。这些组件可以是使用通信协议(例如,TCP/IP)在通信网络(例如,英特网)上进行通信的可执行代码、中间代码(例如,IL)或解释代码(例如,Java)。例如,一个或多个数据库服务器可以被用来储存在设计布局中使用的设备数据,以及一个或多个服务器可以被用来有效地执行与在此描述的实施方式关联的冷却计算。
应当认识到,在此描述的方面和实施方式并不限于在任何特定的系统或系统组上执行。此外,应当认识到,在此描述的实施方式和方面并不限于任何特定的分布式结构、网络或通信协议。
各种方面和实施方式可以使用面向对象的编程语言如SmallTalk,Java、C++、Ada或C#(C-Sharp)来编程。也可使用其他的面向对象的语言。可选地,可使用功能性、脚本、和/或逻辑编程语言。各种方面和实施方式可在非编程环境(例如,以HTML、XML或其他格式创建的文件,这些文件当在浏览器程序的窗口中被查看时提供图形用户界面(GUI)的方面或实现其他功能)中实现。各种方面和实施方式可作为编程的或非编程的元素或其任何组合来实现。
在此描述了提供装置外壳的剩余冷却容量的指示的系统和方法。剩余冷却容量的指示可以是例如以每小时千瓦或BTU为单位的剩余冷却的直接提示,或者该指示可以是间接的,例如提供例如以百分比为单位的外壳可用的总冷却容量和正在使用多少冷却的指示。进一步地,计算值——包括捕获指数和再循环指数——可以被用来确定特定设计的充分性,并在警告或错误条件将产生之前确定额外的冷却容量。
注意,在图1至图7中,所列举的项被示为单独的元件。然而,在这里描述的方法和系统的实际实现中,它们可以是其他电子设备如数字计算机的不可分离的组件。因此,以上所描述的行动可以至少部分地在软件中实现,该软件可以体现在包括程序存储介质的制造物品中。程序存储介质包括体现在载波、计算机盘片(磁的或光的,例如,CD或DVD或二者))、非易失性存储器、磁带、系统存储器和计算机硬盘驱动器中的一个或多个中的数据信号。
从前述内容中,应当认识到,在此描述的方面和实施方式提供有效的数据中心控制。这些方面和实施方式能够识别来自多于一个的数据中心的服务器及其关联的子系统、设备和网络的多个参数。通过评估这些参数和虚拟服务器的估计的参数例如它们的电力消耗需求,以及对包括服务器和虚拟服务器的数据中心组件的估计的或测量的UPS电力分配,这些方面和实施方式可选择一个或多个服务器作为虚拟服务器执行应用的位置,以优化数据服务器之间或内部的电力分配。虚拟服务器的执行应用的这个分配或放置提高了数据中心效率和兼容性,节省了能量并降低了操作成本。
在此描述的实施方式和方面适合于用在具有大量装置机架的相对大的数据中心以及相对小的或非正式的数据中心中,并可用在除了数据中心以外的设施上。分支电路容量的估计和相平衡在高密度的数据中心中可能变得复杂。内部服务器仪表可向数据中心控制器提供识别电力或冷却子系统容量的信息。在各种实施方式例如利用三相电源或缺少服务器仪表的那些实施方式中,电力分配系统仪表可提供用来确定负载消耗、可用容量和相平衡的信息。这个信息可由数据中心控制器使用来将数据中心设备、子系统或装置例如服务器或虚拟服务器分配或重新分配到一个或多个数据中心上或内。这改进了数据中心电力分配并降低了操作成本。
对前和后、左和右、顶部和底部、以及上和下的任何提及旨在为了描述的方便,而并不将本系统和方法或其组件限制于任一位置或空间上的方位。
在此以单数提到的系统和方法的行为或元件或实施方式的任何提及也可包含包括多个这些元件的实施方式,并且在此对任何实施方式或元件或行为的复数形式的任何提及也可包含仅包括单个元件的实施方式。单数或复数形式的提及并不打算限制当前公开的系统或方法、其组件、行为或元件。
在此公开的任何实施方式可与任何其他实施方式组合,并且对“实施方式”、“一些实施方式”、“可选的实施方式”、“各种实施方式”、“一个实施方式”或类似用语的提及并不一定是相互排他的,并且旨在指示结合实施方式所描述的特定的特性、结构或特征可被包括在至少一个实施方式中。如在此所使用的这种术语并不一定都指同一实施方式。任何实施方式可以用与在此公开的需要、目标和目的相一致的任何方式与任何其他实施方式组合。
对“或”的提及可以被解释为包含性的,使得使用“或”所描述的任何项可以指示被描述的项的单个、多于一个或全部中的任何一种情况。
在附图、详细描述或任何权利要求中的技术特征跟随有参考标记的场合,参考标记为了提高附图、详细描述和权利要求的可理解性的唯一目的而被包括。因此,有或没有参考标记对任何权利要求元素的范围没有任何限制影响。
本领域技术人员将认识到,在此描述的系统和方法可以体现在其他特定的形式中,而不偏离其精神或本质特征。例如,应用可以在物理服务器或专用服务器之间被分配,而并不使用虚拟服务器来调整服务器之间的负载分配,使数据中心设备如不间断电源或冷却单元能够进入关闭模式。未来负载需求的估计允许这些设备及时地从关闭模式重新启动以在所选择的服务器接收应用或虚拟服务器用于执行。因此,前述的实施方式在各个方面被认为是例证性的,而不是限制所描述的系统和方法。在此描述的方法和系统的范围因此由所附的权利要求而不是前述的描述指示,并且出现在权利要求的等同形式的含意和范围内的所有变化因此被规定为包含在其中。

Claims (29)

1.一种用于数据中心电源控制的计算机实现的方法,包括:
识别多个服务器中的至少一个服务器的参数,所述多个服务器形成数据中心的至少部分;
识别虚拟服务器的估计参数,所述估计参数包括所述虚拟服务器的估计电力消耗和所述虚拟服务器的估计冷却需求;
确定从电源到所述多个服务器的估计电力分配;
至少部分地根据所述参数、所述估计参数和所述估计电力分配来选择所述多个服务器中的一个服务器;
至少部分地根据所述估计参数生成电力请求;
向所选择的服务器提供所述虚拟服务器;
根据所述估计参数调整冷却单元以调整所述冷却单元到所选择的服务器的输出;以及
响应于所述电力请求调整所述电源以调整被提供给所述多个服务器中的至少一个服务器的电力。
2.如权利要求1所述的方法,其中调整所述电源包括:
增加被提供给所选择的服务器的电力;以及
减少被提供给所述多个服务器中的不同于所选择的服务器的至少一个服务器的电力。
3.如权利要求1所述的方法,其中调整所述电源包括:
关闭向所述多个服务器中的不同于所选择的服务器的至少一个服务器提供电力的所述电源的一部分。
4.如权利要求3所述的方法,其中关闭所述电源的所述部分包括:
关闭所述电源的电力分配单元和分支电路中的至少一个。
5.如权利要求1所述的方法,还包括:
向所述虚拟服务器提供应用;
调整所述冷却单元的参数以调整所选择的服务器的温度。
6.如权利要求5所述的方法,包括:
关闭与所述多个服务器中的不同于所选择的服务器的至少一个服务器关联的所述冷却单元的一部分。
7.如权利要求1所述的方法,包括:
向所述虚拟服务器提供应用。
8.如权利要求1所述的方法,其中所述参数和所述估计参数中的至少一个包括模拟参数;所述方法还包括:
至少部分地根据所述模拟参数来选择所述多个服务器中的所述一个服务器。
9.如权利要求1所述的方法,包括:
根据所述参数、所述估计参数和所述估计电力分配中的至少一个来确定至少一个数据中心组件的估计寿命;以及
根据所述估计寿命生成数据中心维护计划表。
10.如权利要求1所述的方法,其中识别所述参数还包括:
确定在一时间段内所述多个服务器中的至少一个服务器的估计的未来电力需求,所述时间段为小于一秒、介于一秒和十秒之间、以及大于10秒的至少一个。
11.如权利要求10所述的方法,包括:
响应于所述估计的未来电力需求,来从关闭模式重新启动所述电源的至少一部分。
12.如权利要求10所述的方法,其中向所选择的服务器提供所述虚拟服务器包括:将所述虚拟服务器从所述多个服务器中的服务器重定位至所选择的服务器。
13.一种数据中心电源控制系统,包括:
数据中心,其包括多个服务器;
数据中心控制器,其配置成识别所述多个服务器中的至少一个服务器的参数,并配置成识别虚拟服务器的估计参数;
所述数据中心控制器配置成估计从电源到所述多个服务器和所述虚拟服务器的电力分配;
所述数据中心控制器配置成至少部分地根据所述估计参数生成电力请求,所述估计参数包括所述虚拟服务器的估计电力消耗和所述虚拟服务器的估计冷却需求;
所述数据中心控制器配置成至少部分地根据所述参数、所述估计参数和所述估计电力分配来将所述虚拟服务器添加至所述多个服务器之一的第一服务器;
所述数据中心控制器配置成至少部分地根据所述估计参数调整冷却单元以调整所述冷却单元到所述第一服务器的输出;以及
所述数据中心控制器配置成响应于所述电力请求调整从所述电源提供到所述多个服务器的电力的量。
14.如权利要求13所述的系统,其中所述数据中心控制器配置成可逆地关闭向所述多个服务器中的至少一个服务器分配电力的所述电源的一部分。
15.如权利要求14所述的系统,其中所述电源的所述部分包括电力分配单元和分支电路中的至少一个。
16.如权利要求13所述的系统,其中:
所述虚拟服务器的所述估计参数包括在所述虚拟服务器上执行应用的所估计的量的电力;其中
所述数据中心控制器配置成向所述虚拟服务器提供所述应用;以及其中
所述电源配置成向所述第一服务器提供所估计的量的电力。
17.如权利要求13所述的系统,其中,在操作期间,所述电源增加提供给所述第一服务器的电力,并减少提供给所述多个服务器中的第二服务器的电力。
18.如权利要求17所述的系统,其中所述数据中心控制器被配置成将所述虚拟服务器添加至所述第一服务器包括所述数据中心控制器进一步被配置成将所述虚拟服务器从所述第二服务器重定位至所述第一服务器。
19.如权利要求17所述的系统,其中所述数据中心控制器配置成关闭与所述第二服务器关联的所述冷却单元的一部分。
20.如权利要求13所述的系统,其中所述数据中心控制器配置成调整所述冷却单元的参数以调整所述多个服务器中的至少一个服务器的温度。
21.如权利要求13所述的系统,其中所述数据中心控制器配置成调整所述冷却单元的参数以保持所述多个服务器中的至少一个服务器的温度。
22.如权利要求13所述的系统,所述数据中心控制器被配置成将所述虚拟服务器添加至所述第一服务器包括所述数据中心控制器进一步被配置成将所述虚拟服务器从第二数据中心的服务器重定位至所述第一服务器。
23.如权利要求13所述的系统,其中所述参数、所述估计参数和所述估计电力分配中的至少一个包括模拟参数;以及
其中所述数据中心控制器配置成至少部分地根据所述模拟参数将所述虚拟服务器添加至所述第一服务器。
24.如权利要求13所述的系统,其中所述数据中心控制器评估所述参数、所述估计参数和所述估计电力分配中的至少一个以确定至少一个数据中心组件的估计寿命;以及其中所述数据中心控制器至少部分地根据所述估计寿命提供数据中心维护计划表。
25.如权利要求13所述的系统,其中所述参数包括所述多个服务器中的至少一个服务器的测量参数和所述多个服务器中的至少一个服务器的估计未来参数中的至少一个。
26.如权利要求25所述的系统,其中所述估计未来参数包括所述多个服务器中的至少一个服务器在一时间段内的估计的未来电力需求,所述时间段为小于一秒、介于一秒和十秒之间、以及大于10秒的时间段中的至少一个。
27.一种计算机实现的系统,其配置成控制数据中心电源,包括:
用于识别多个服务器中的至少一个服务器的参数的模块,所述多个服务器形成数据中心的至少一部分;
用于识别虚拟服务器的估计参数的模块,所述估计参数包括所述虚拟服务器的估计电力消耗和所述虚拟服务器的估计冷却需求;
用于确定从电源到所述多个服务器的估计电力分配的模块;
用于至少部分地根据所述参数、所述估计参数和所述估计电力分配来选择所述多个服务器中的一个服务器的模块;
用于至少部分地根据所述估计参数生成电力请求的模块;
用于向所选择的服务器提供所述虚拟服务器的模块;
用于至少部分地根据所述估计参数调整冷却单元以调整所述冷却单元到所述第一服务器的输出的模块;以及
用于响应于所述电力请求调整所述电源以调整提供给所述多个服务器中的至少一个服务器的电力的模块。
28.一种数据中心控制系统,包括:
第一数据中心和第二数据中心,所述第一数据中心包括第一电源,所述第二数据中心包括第二电源,每个数据中心与网络关联,并且每个数据中心包括多个服务器;
数据中心控制器,其与所述网络关联并配置成识别所述第一数据中心的参数和所述第二数据中心的参数;
所述数据中心控制器配置成估计所述第一电源和所述第二电源的电力分配;
所述数据中心控制器配置成识别用于在虚拟服务器上执行应用的估计参数,所述估计参数包括所述虚拟服务器的估计电力消耗和所述虚拟服务器的估计冷却需求;
所述数据中心控制器配置成至少部分地根据所述估计参数生成电力请求;
所述数据中心控制器配置成评估所述第一数据中心和所述第二数据中心的参数、所述第一电源和所述第二电源的估计电力分配、以及所述虚拟服务器的估计参数,并配置成至少部分地根据所述评估将所述虚拟服务器从所述第一数据中心的服务器转移至所述第二数据中心的服务器,
其中与所述第一服务器关联的所述第一电源的至少一部分响应于所述虚拟服务器的转移而可逆地关闭,耦合到所述第二服务器的第二电源响应于所述电力请求被调整,并且冷却单元至少部分地根据所述估计参数被调整,以调整所述冷却单元到所述第二服务器的输出。
29.一种用于数据中心控制的计算机实现的方法,包括:
识别第一数据中心服务器的服务器参数和第二数据中心服务器的服务器参数;
确定从电源到所述第一数据中心服务器和到所述第二数据中心服务器的估计电力分配;
识别用于在虚拟服务器上执行应用的估计参数,所述估计参数包括所述虚拟服务器的估计电力消耗和所述虚拟服务器的估计冷却需求;
至少部分地根据所述估计参数生成电力请求;
至少部分地根据对所述第一数据中心服务器的服务器参数、所述第二数据中心服务器的服务器参数和所述估计参数的评估来将所述虚拟服务器从所述第一数据中心的服务器转移至所述第二数据中心的服务器;
可逆地关闭与所述第一数据中心的服务器关联的电源的至少一部分;以及
至少部分地根据所述估计参数调整冷却单元以调整所述冷却单元到所述第二数据中心的服务器的输出。
CN201080016514.6A 2009-02-13 2010-02-04 电源和数据中心控制 Active CN102395938B (zh)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US12/370,969 US9778718B2 (en) 2009-02-13 2009-02-13 Power supply and data center control
US12/370,969 2009-02-13
PCT/US2010/023142 WO2010093549A1 (en) 2009-02-13 2010-02-04 Power supply and data center control

Publications (2)

Publication Number Publication Date
CN102395938A CN102395938A (zh) 2012-03-28
CN102395938B true CN102395938B (zh) 2015-04-01

Family

ID=42110922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201080016514.6A Active CN102395938B (zh) 2009-02-13 2010-02-04 电源和数据中心控制

Country Status (5)

Country Link
US (1) US9778718B2 (zh)
EP (1) EP2396709A1 (zh)
CN (1) CN102395938B (zh)
AU (1) AU2010213978A1 (zh)
WO (1) WO2010093549A1 (zh)

Families Citing this family (124)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7881910B2 (en) 2005-05-02 2011-02-01 American Power Conversion Corporation Methods and systems for managing facility power and cooling
US7885795B2 (en) 2005-05-02 2011-02-08 American Power Conversion Corporation Methods and systems for managing facility power and cooling
US9568206B2 (en) 2006-08-15 2017-02-14 Schneider Electric It Corporation Method and apparatus for cooling
US8327656B2 (en) 2006-08-15 2012-12-11 American Power Conversion Corporation Method and apparatus for cooling
US8322155B2 (en) 2006-08-15 2012-12-04 American Power Conversion Corporation Method and apparatus for cooling
US7681404B2 (en) 2006-12-18 2010-03-23 American Power Conversion Corporation Modular ice storage for uninterruptible chilled water
US8425287B2 (en) 2007-01-23 2013-04-23 Schneider Electric It Corporation In-row air containment and cooling system and method
AU2008255030B2 (en) 2007-05-15 2014-02-20 Schneider Electric It Corporation Methods and systems for managing facility power and cooling
US8560677B2 (en) * 2009-02-13 2013-10-15 Schneider Electric It Corporation Data center control
US9519517B2 (en) * 2009-02-13 2016-12-13 Schneider Electtic It Corporation Data center control
US9778718B2 (en) 2009-02-13 2017-10-03 Schneider Electric It Corporation Power supply and data center control
US9239994B2 (en) * 2009-02-25 2016-01-19 Empire Technology Development Llc Data centers task mapping
EP2415129B1 (en) * 2009-03-31 2016-09-07 Hewlett-Packard Enterprise Development LP Determining power topology of a plurality of computer systems
US8249825B2 (en) 2009-05-08 2012-08-21 American Power Conversion Corporation System and method for predicting cooling performance of arrangements of equipment in a data center
US8355890B2 (en) * 2009-05-08 2013-01-15 American Power Conversion Corporation System and method for predicting maximum cooler and rack capacities in a data center
WO2011011408A1 (en) * 2009-07-20 2011-01-27 Viridity Software, Inc. Techniques for power analysis
US20110062939A1 (en) * 2009-09-15 2011-03-17 Christopher Edward Hoover Controlling power usage by at least one electronic apparatus
US8443220B2 (en) * 2009-09-17 2013-05-14 International Business Machines Corporation Automated voltage control for scheduled server outage in server cluster by determining future workload increase for remaining servers based upon service level objectives and determining associated voltage adjustments
US8261118B2 (en) 2009-09-25 2012-09-04 International Business Machines Corporation Energy-efficient server location determination
US8140652B2 (en) * 2009-09-25 2012-03-20 International Business Machines Corporation Energy-efficient server location determination for configuration changes
US8478451B2 (en) * 2009-12-14 2013-07-02 Intel Corporation Method and apparatus for dynamically allocating power in a data center
US8457805B2 (en) * 2010-04-16 2013-06-04 International Business Machines Corporation Power distribution considering cooling nodes
US8588989B1 (en) 2010-04-29 2013-11-19 Google Inc. Power-consuming facilities as a source of reserve power
US20110283119A1 (en) * 2010-05-13 2011-11-17 GCCA Inc. System and Method for Providing Energy Efficient Cloud Computing
US8805998B2 (en) 2010-06-11 2014-08-12 Eaton Corporation Automatic matching of sources to loads
US10205319B2 (en) 2010-06-11 2019-02-12 Eaton Intelligent Power Limited Automatic matching of sources to loads
US8560291B2 (en) * 2010-06-22 2013-10-15 International Business Machines Corporation Data center physical infrastructure threshold analysis
US20120030686A1 (en) * 2010-07-29 2012-02-02 International Business Machines Corporation Thermal load management in a partitioned virtual computer system environment through monitoring of ambient temperatures of envirnoment surrounding the systems
US8600575B2 (en) * 2010-09-24 2013-12-03 Synapsense Corporation Apparatus and method for collecting and distributing power usage data from rack power distribution units (RPDUs) using a wireless sensor network
US8811377B1 (en) 2010-08-30 2014-08-19 Synapsense Corporation Apparatus and method for instrumenting devices to measure power usage using a multi-tier wireless network
US20120053925A1 (en) * 2010-08-31 2012-03-01 Steven Geffin Method and System for Computer Power and Resource Consumption Modeling
WO2012048014A2 (en) * 2010-10-05 2012-04-12 Unisys Corporation Automatic selection of secondary backend computing devices for virtual machine image replication
US20120084445A1 (en) * 2010-10-05 2012-04-05 Brock Scott L Automatic replication and migration of live virtual machines
US8587929B2 (en) * 2010-10-22 2013-11-19 Eaton Corporation High density uninterruptible power supplies and related systems and power distribution units
US20120109619A1 (en) * 2010-10-29 2012-05-03 Daniel Juergen Gmach Generating a resource management plan for an infrastructure
US8676397B2 (en) * 2010-12-20 2014-03-18 International Business Machines Corporation Regulating the temperature of a datacenter
US8688413B2 (en) 2010-12-30 2014-04-01 Christopher M. Healey System and method for sequential placement of cooling resources within data center layouts
US8762522B2 (en) * 2011-04-19 2014-06-24 Cisco Technology Coordinating data center compute and thermal load based on environmental data forecasts
US8533514B2 (en) 2011-06-26 2013-09-10 Microsoft Corporation Power-capping based on UPS capacity
US8924781B2 (en) 2011-06-30 2014-12-30 Microsoft Corporation Power capping based on generator capacity
NL2007098C2 (en) * 2011-07-13 2013-01-15 Deerns Raadgevende Ingenieurs B V Method of distributing a data processing load.
US8707095B2 (en) 2011-07-14 2014-04-22 Beacon Property Group Llc Datacenter utilizing modular infrastructure systems and redundancy protection from failure
US20130054993A1 (en) * 2011-08-25 2013-02-28 International Business Machines Corporation Branch circuit determination with synchronous correlation
US9207002B2 (en) 2011-10-12 2015-12-08 International Business Machines Corporation Contaminant separator for a vapor-compression refrigeration apparatus
US8824143B2 (en) 2011-10-12 2014-09-02 International Business Machines Corporation Combined power and cooling rack supporting an electronics rack(S)
CN102508541A (zh) * 2011-11-17 2012-06-20 浪潮电子信息产业股份有限公司 一种可以实现smartrack节能的方法
JP2013144099A (ja) * 2011-12-12 2013-07-25 Toshiba Corp 磁気共鳴イメージング装置
EP2796025A4 (en) 2011-12-22 2016-06-29 Schneider Electric It Corp SYSTEM AND METHOD FOR PREDICTING TEMPERATURE VALUES IN AN ELECTRONIC SYSTEM
AU2011384046A1 (en) 2011-12-22 2014-07-17 Schneider Electric It Corporation Analysis of effect of transient events on temperature in a data center
EP2795424A4 (en) 2011-12-22 2016-06-01 Schneider Electric It Corp SYSTEMS AND METHOD FOR REDUCING THE ENERGY STORAGE REQUIREMENTS IN A DATA CENTER
CN102893229B (zh) 2011-12-29 2013-12-04 华为技术有限公司 一种节能监控方法以及设备
US9825767B2 (en) * 2012-05-01 2017-11-21 Avago Technologies General Ip (Singapore) Pte. Ltd Service based power management in a network
WO2014021864A1 (en) * 2012-07-31 2014-02-06 Hewlett-Packard Development Company, L.P. Receiving input power measurements to manage a rectifier
US9673632B1 (en) 2012-09-27 2017-06-06 Google Inc. Fluid plane in computer data center
US10211630B1 (en) 2012-09-27 2019-02-19 Google Llc Data center with large medium voltage domain
US9135577B2 (en) 2012-10-10 2015-09-15 International Business Machines Corporation Statistical determination of power-circuit connectivity
EP2939176A4 (en) 2012-12-27 2016-07-27 Schneider Electric It Corp SYSTEMS AND METHOD FOR VISUALIZING AN AIRFLOW
US9997995B2 (en) 2013-02-28 2018-06-12 Hewlett-Packard Enterprise Development LP Three-phase parallel power converter load adjustment
US9973429B2 (en) 2013-04-05 2018-05-15 Futurewei Technologies, Inc. Software defined networking (SDN) controller orchestration and network virtualization for data center interconnection
US9373957B2 (en) * 2013-10-16 2016-06-21 Lenovo Enterprise Solutions (Singapore) Pte. Ltd. Power balancing in power distribution networks
WO2015066048A1 (en) * 2013-10-28 2015-05-07 Virtual Power Systems, Inc. Energy control via power requirement analysis and power source enablement
US11126242B2 (en) 2013-10-28 2021-09-21 Virtual Power Systems, Inc. Time varying power management within datacenters
US10429914B2 (en) 2013-10-28 2019-10-01 Virtual Power Systems, Inc. Multi-level data center using consolidated power control
US10747289B2 (en) 2013-10-28 2020-08-18 Virtual Power Systems, Inc. Data center power manipulation
IN2013CH05013A (zh) 2013-11-07 2015-05-08 Schneider Electric It Corp
WO2015088569A1 (en) 2013-12-14 2015-06-18 Hewlett-Packard Development Company, L.P. Powering loads with a power supply and an uninterruptible power supply
US10114431B2 (en) 2013-12-31 2018-10-30 Microsoft Technology Licensing, Llc Nonhomogeneous server arrangement
US10209692B2 (en) 2014-01-20 2019-02-19 Emerson Electric Co. Selectively connecting a climate control system controller with more than one destination server
US9568205B2 (en) * 2014-01-20 2017-02-14 Emerson Electric Co. Selectively connecting a climate control system controller with more than one destination server
US9483094B2 (en) * 2014-02-11 2016-11-01 Microsoft Technology Licensing, Llc Backup power management for computing systems
US9958178B2 (en) * 2014-03-06 2018-05-01 Dell Products, Lp System and method for providing a server rack management controller
US10466758B2 (en) 2014-04-25 2019-11-05 International Business Machines Corporation Managing power consumption in a computing system
US10465492B2 (en) 2014-05-20 2019-11-05 KATA Systems LLC System and method for oil and condensate processing
US9694281B2 (en) 2014-06-30 2017-07-04 Microsoft Technology Licensing, Llc Data center management of multimode servers
US10379558B2 (en) * 2014-08-13 2019-08-13 Facebook, Inc. Dynamically responding to demand for server computing resources
JP2017187813A (ja) * 2015-02-24 2017-10-12 株式会社野村総合研究所 稼働状況表示システム
US10305320B2 (en) 2015-03-30 2019-05-28 Vertiv S.R.L. Method of controlling an uninterruptible power supply system to optimize component life
JP6824630B2 (ja) 2015-04-30 2021-02-03 アーベーベー・シュバイツ・アーゲーABB Schweiz AG 無停電電源システムを制御する方法、ソフトウェアパッケージおよび無停電電源システム
WO2016196775A1 (en) * 2015-06-04 2016-12-08 Fischer Block, Inc. Remaining-life and time-to-failure predictions of power assets
US9703340B1 (en) 2015-12-18 2017-07-11 International Business Machines Corporation Intermittently redistributing energy from multiple power grids in a data center context
CN108353034B (zh) 2016-01-11 2020-08-11 环球互连及数据中心公司 用于数据中心基础设施监测的方法、系统和存储介质
US10554519B2 (en) 2016-02-08 2020-02-04 Cray Inc. System and method for dampening power swings in distributed computer environments
US10126804B2 (en) 2016-02-19 2018-11-13 Microsoft Technology Licensing, Llc Balancing input phases across server rack power supplies
CN105975047B (zh) * 2016-04-29 2019-03-01 北京百度网讯科技有限公司 云数据中心功耗调节方法和系统
US11461513B2 (en) 2016-08-18 2022-10-04 Cato Data center power scenario simulation
US11455021B2 (en) 2016-08-18 2022-09-27 Cato Datacenter power management using AC and DC power sources
US10585468B2 (en) 2016-08-18 2020-03-10 Virtual Power Systems, Inc. Datacenter power management using dynamic redundancy
US11107016B2 (en) 2016-08-18 2021-08-31 Virtual Power Systems, Inc. Augmented power control within a datacenter using predictive modeling
US10545560B2 (en) 2016-10-10 2020-01-28 International Business Machines Corporation Power management and utilization detection of computing components
US10401940B2 (en) 2016-10-10 2019-09-03 International Business Machines Corporation Power management in disaggregated computing systems
US10819599B2 (en) * 2016-10-10 2020-10-27 International Business Machines Corporation Energy consumption as a measure of utilization and work characterization in a system
US11169592B2 (en) 2016-10-10 2021-11-09 International Business Machines Corporation SLA-based backup power management during utility power interruption in disaggregated datacenters
US10360077B2 (en) 2016-10-10 2019-07-23 International Business Machines Corporation Measuring utilization of resources in datacenters
US10838482B2 (en) 2016-10-10 2020-11-17 International Business Machines Corporation SLA-based power management in disaggregated computing systems
US10261874B2 (en) 2016-12-01 2019-04-16 International Business Machines Corporation Enabling a cloud controller to communicate with power systems
US11076509B2 (en) 2017-01-24 2021-07-27 The Research Foundation for the State University Control systems and prediction methods for it cooling performance in containment
CA3090944A1 (en) 2017-02-08 2018-08-16 Upstream Data Inc. Blockchain mine at oil or gas facility
US10969846B2 (en) 2017-05-25 2021-04-06 Virtual Power Systems, Inc. Secure communication initiation and execution for datacenter power control
CN107423133B (zh) * 2017-06-29 2020-08-14 国网江苏省电力公司电力科学研究院 一种降低电网网损的数据中心间数据网络负载分配方法
US10528115B2 (en) 2017-09-19 2020-01-07 Facebook, Inc. Obtaining smoother power profile and improved peak-time throughput in datacenters
US10719120B2 (en) 2017-12-05 2020-07-21 Facebook, Inc. Efficient utilization of spare datacenter capacity
US11678615B2 (en) * 2018-01-11 2023-06-20 Lancium Llc Method and system for dynamic power delivery to a flexible growcenter using unutilized energy sources
US11216059B2 (en) * 2018-03-05 2022-01-04 Virtual Power Systems, Inc. Dynamic tiering of datacenter power for workloads
US20200081504A1 (en) * 2018-09-12 2020-03-12 Quanta Computer Inc. Method and system for current sharing balance in three-phase input source system
US11031787B2 (en) 2018-09-14 2021-06-08 Lancium Llc System of critical datacenters and behind-the-meter flexible datacenters
US11016553B2 (en) 2018-09-14 2021-05-25 Lancium Llc Methods and systems for distributed power control of flexible datacenters
US10873211B2 (en) 2018-09-14 2020-12-22 Lancium Llc Systems and methods for dynamic power routing with behind-the-meter energy storage
US11025060B2 (en) * 2018-09-14 2021-06-01 Lancium Llc Providing computational resource availability based on power-generation signals
US11031813B2 (en) 2018-10-30 2021-06-08 Lancium Llc Systems and methods for auxiliary power management of behind-the-meter power loads
US10367353B1 (en) 2018-10-30 2019-07-30 Lancium Llc Managing queue distribution between critical datacenter and flexible datacenter
US10452127B1 (en) 2019-01-11 2019-10-22 Lancium Llc Redundant flexible datacenter workload scheduling
US11128165B2 (en) 2019-02-25 2021-09-21 Lancium Llc Behind-the-meter charging station with availability notification
US10847994B2 (en) 2019-03-15 2020-11-24 Seagate Technology Llc Data center power distribution system
WO2020227811A1 (en) 2019-05-15 2020-11-19 Upstream Data Inc. Portable blockchain mining system and methods of use
US11397999B2 (en) 2019-08-01 2022-07-26 Lancium Llc Modifying computing system operations based on cost and power conditions
US11868106B2 (en) 2019-08-01 2024-01-09 Lancium Llc Granular power ramping
CN110518604A (zh) * 2019-08-27 2019-11-29 深圳市共济科技股份有限公司 基于平衡度控制的设备部署方法、智能终端及存储介质
US10618427B1 (en) 2019-10-08 2020-04-14 Lancium Llc Behind-the-meter branch loads for electrical vehicle charging
US10608433B1 (en) 2019-10-28 2020-03-31 Lancium Llc Methods and systems for adjusting power consumption based on a fixed-duration power option agreement
US11042948B1 (en) * 2020-02-27 2021-06-22 Lancium Llc Computing component arrangement based on ramping capabilities
WO2022021240A1 (en) * 2020-07-30 2022-02-03 Alibaba Cloud Computing Ltd. Thermal-aware scheduling method and system
CN113268130A (zh) * 2021-04-02 2021-08-17 北京比格大数据有限公司 服务器供电方法、存储介质、计算机设备
US11723178B2 (en) * 2021-06-22 2023-08-08 State Grid Jiangsu Electric Power Co., Ltd. Information & Telecommunication Branch Power grid-friendly control method and system for data center cooling system
US11747782B1 (en) * 2023-01-20 2023-09-05 Citibank, N.A. Systems and methods for providing power consumption predictions for selected applications within network arrangements featuring devices with non-homogenous or unknown specifications

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1779600A (zh) * 2004-11-23 2006-05-31 国际商业机器公司 在计算机中心动态重新安排应用及其它服务器资源的方法

Family Cites Families (209)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4747041A (en) 1983-06-27 1988-05-24 Unisys Corporation Automatic power control system which automatically activates and deactivates power to selected peripheral devices based upon system requirement
US4823290A (en) 1987-07-21 1989-04-18 Honeywell Bull Inc. Method and apparatus for monitoring the operating environment of a computer system
AU622215B2 (en) 1988-08-23 1992-04-02 Derek Robert Marsden Utility metering
US5019717A (en) 1988-11-14 1991-05-28 Elegant Design Solutions Inc. Computer-controlled uninterruptable power supply
US5396635A (en) 1990-06-01 1995-03-07 Vadem Corporation Power conservation apparatus having multiple power reduction levels dependent upon the activity of the computer system
US5216623A (en) 1990-06-06 1993-06-01 M. T. Mcbrian, Inc. System and method for monitoring and analyzing energy characteristics
US6105061A (en) 1990-07-26 2000-08-15 Nec Corporation Hierarchically distributed network management system using open system interconnection (OSI) protocols
US5153837A (en) 1990-10-09 1992-10-06 Sleuth Inc. Utility consumption monitoring and control system
US5097328A (en) 1990-10-16 1992-03-17 Boyette Robert B Apparatus and a method for sensing events from a remote location
US5382943A (en) 1991-07-31 1995-01-17 Tanaka; Mutuo Remote monitoring unit
CA2071804A1 (en) 1991-06-24 1992-12-25 Ronald G. Ward Computer system manager
CA2069273A1 (en) 1992-05-22 1993-11-23 Edward L. Ratcliffe Energy management systems
US5319571A (en) 1992-11-24 1994-06-07 Exide Electronics UPS system with improved network communications
US5528507A (en) 1993-08-11 1996-06-18 First Pacific Networks System for utility demand monitoring and control using a distribution network
US5860012A (en) 1993-09-30 1999-01-12 Intel Corporation Installation of application software through a network from a source computer system on to a target computer system
US5462225A (en) 1994-02-04 1995-10-31 Scientific-Atlanta, Inc. Apparatus and method for controlling distribution of electrical energy to a space conditioning load
US5845090A (en) 1994-02-14 1998-12-01 Platinium Technology, Inc. System for software distribution in a digital computer network
US5963457A (en) 1994-03-18 1999-10-05 Hitachi, Ltd. Electrical power distribution monitoring system and method
US5995729A (en) 1994-07-22 1999-11-30 Hitachi, Ltd. Method and apparatus for aiding configurating management of a computer system
US5978594A (en) 1994-09-30 1999-11-02 Bmc Software, Inc. System for managing computer resources across a distributed computing environment by first reading discovery information about how to determine system resources presence
US5581478A (en) 1995-04-13 1996-12-03 Cruse; Michael Facility environmental control system
US6112235A (en) 1995-06-07 2000-08-29 Spofford; Jason J. Method and apparatus for remotely managing a network hardware device having an embedded server with a client computer across a network
US6317775B1 (en) 1995-11-03 2001-11-13 Cisco Technology, Inc. System for distributing load over multiple servers at an internet site
US6104868A (en) 1996-04-30 2000-08-15 Peters; Daniel G. Extendible and portable network protocol based system management architecture
US6151643A (en) 1996-06-07 2000-11-21 Networks Associates, Inc. Automatic updating of diverse software products on multiple client computer systems by downloading scanning application to client computer and generating software list on client computer
US5949974A (en) 1996-07-23 1999-09-07 Ewing; Carrell W. System for reading the status and for controlling the power supplies of appliances connected to computer networks
US5960204A (en) 1996-10-28 1999-09-28 J.D. Edwards World Source Company System and method for installing applications on a computer on an as needed basis
US6108782A (en) 1996-12-13 2000-08-22 3Com Corporation Distributed remote monitoring (dRMON) for networks
US6085243A (en) 1996-12-13 2000-07-04 3Com Corporation Distributed remote management (dRMON) for networks
US5974237A (en) 1996-12-18 1999-10-26 Northern Telecom Limited Communications network monitoring
US7216043B2 (en) 1997-02-12 2007-05-08 Power Measurement Ltd. Push communications architecture for intelligent electronic devices
US5978912A (en) 1997-03-20 1999-11-02 Phoenix Technologies Limited Network enhanced BIOS enabling remote management of a computer without a functioning operating system
US6266721B1 (en) 1997-05-13 2001-07-24 Micron Electronics, Inc. System architecture for remote access and control of environmental management
US5987614A (en) 1997-06-17 1999-11-16 Vadem Distributed power management system and method for computer
US6389464B1 (en) 1997-06-27 2002-05-14 Cornet Technology, Inc. Device management system for managing standards-compliant and non-compliant network elements using standard management protocols and a universal site server which is configurable from remote locations via internet browser technology
JP3306651B2 (ja) 1997-07-07 2002-07-24 吉田 富貴子 リモート電源スイッチング装置
US5924486A (en) 1997-10-29 1999-07-20 Tecom, Inc. Environmental condition control and energy management system and method
US6055480A (en) 1997-11-12 2000-04-25 Albert Einstein Healthcare Network Environmental monitoring system
GB2333864B (en) 1998-01-28 2003-05-07 Ibm Distribution of software updates via a computer network
US7047300B1 (en) 1998-02-10 2006-05-16 Sprint Communications Company L.P. Survivable and scalable data system and method for computer networks
US6922558B2 (en) 1998-03-06 2005-07-26 Don Delp Integrated building control and information system with wireless networking
US6134511A (en) 1998-04-15 2000-10-17 Subbarao; Krishnappa Method and apparatus for improving building energy simulations
US6347627B1 (en) 1998-04-23 2002-02-19 Pioneer Inventions, Inc. Nitrous oxide based oxygen supply system
US6363421B2 (en) 1998-05-31 2002-03-26 Lucent Technologies, Inc. Method for computer internet remote management of a telecommunication network element
US6141762A (en) 1998-08-03 2000-10-31 Nicol; Christopher J. Power reduction in a multiprocessor digital signal processor based on processor load
US6631134B1 (en) 1999-01-15 2003-10-07 Cisco Technology, Inc. Method for allocating bandwidth in an optical network
US6281790B1 (en) 1999-09-01 2001-08-28 Net Talon Security Systems, Inc. Method and apparatus for remotely monitoring a site
US7159022B2 (en) 2001-01-26 2007-01-02 American Power Conversion Corporation Method and system for a set of network appliances which can be connected to provide enhanced collaboration, scalability, and reliability
US7392309B2 (en) 1999-10-27 2008-06-24 American Power Conversion Corporation Network appliance management
US6714977B1 (en) 1999-10-27 2004-03-30 Netbotz, Inc. Method and system for monitoring computer networks and equipment
JP2001184145A (ja) * 1999-12-27 2001-07-06 Id Gate Co Ltd 情報処理装置等のリモート電源管理システム
US6574970B2 (en) 2000-02-18 2003-06-10 Toc Technology, Llc Computer room air flow method and apparatus
TW550477B (en) 2000-03-01 2003-09-01 Passgate Corp Method, system and computer readable medium for Web site account and e-commerce management from a central location
US6792321B2 (en) 2000-03-02 2004-09-14 Electro Standards Laboratories Remote web-based control
AU2001249286A1 (en) 2000-03-21 2001-10-03 Liebert Corporation Method and apparatus for cooling electronic enclosures
US20010047387A1 (en) 2000-03-27 2001-11-29 Exoplex, Inc. Systems and methods for providing distributed cross-enterprise portals
US20010032109A1 (en) * 2000-04-13 2001-10-18 Gonyea Richard Jeremiah System and method for predicting a maintenance schedule and costs for performing future service events of a product
US6670810B2 (en) 2000-04-25 2003-12-30 Airak, Inc. System and method for distributed monitoring of surroundings using telemetry of data from remote sensors
WO2001082260A2 (en) 2000-04-26 2001-11-01 American Power Conversion System and method for managing uninterruptible power supply systems
US7010594B2 (en) 2000-05-26 2006-03-07 Isochron, Llc System using environmental sensor and intelligent management and control transceiver for monitoring and controlling remote computing resources
US20020023258A1 (en) 2000-06-27 2002-02-21 Elwahab Amgad Mazen System and method for managing telecommunications devices
US7693976B2 (en) 2000-07-11 2010-04-06 Ciena Corporation Granular management of network resources
US6633823B2 (en) 2000-07-13 2003-10-14 Nxegen, Inc. System and method for monitoring and controlling energy usage
US7457785B1 (en) * 2000-08-25 2008-11-25 Battelle Memorial Institute Method and apparatus to predict the remaining service life of an operating system
US7292898B2 (en) 2000-09-18 2007-11-06 Balboa Instruments, Inc. Method and apparatus for remotely monitoring and controlling a pool or spa
US20040003266A1 (en) 2000-09-22 2004-01-01 Patchlink Corporation Non-invasive automatic offsite patch fingerprinting and updating system and method
US7058826B2 (en) * 2000-09-27 2006-06-06 Amphus, Inc. System, architecture, and method for logical server and other network devices in a dynamically configurable multi-server network environment
US7032119B2 (en) 2000-09-27 2006-04-18 Amphus, Inc. Dynamic power and workload management for multi-server system
US7228441B2 (en) 2000-09-27 2007-06-05 Huron Ip Llc Multi-server and multi-CPU power management system and method
US6628009B1 (en) * 2000-10-06 2003-09-30 The Root Group, Inc. Load balanced polyphase power distributing system
US6829630B1 (en) 2000-11-24 2004-12-07 Xerox Corporation Mechanisms for web-object event/state-driven communication between networked devices
US20020071031A1 (en) 2000-12-07 2002-06-13 Philips Electronics North America Corporation Remote monitoring via a consumer electronic appliance
US7493391B2 (en) 2001-02-12 2009-02-17 International Business Machines Corporation System for automated session resource clean-up by determining whether server resources have been held by client longer than preset thresholds
US20020129355A1 (en) 2001-03-01 2002-09-12 Mike Velten Method and system for monitoring an apparatus for a computer
US20030196126A1 (en) 2002-04-11 2003-10-16 Fung Henry T. System, method, and architecture for dynamic server power management and dynamic workload management for multi-server environment
US7519909B2 (en) 2001-08-10 2009-04-14 American Power Conversion Corporation Uninterruptible power supply (UPS) devices monitoring system
US6672955B2 (en) 2001-09-07 2004-01-06 International Business Machines Corporation Air flow management system for an internet data center
US7337333B2 (en) * 2001-09-19 2008-02-26 Dell Products L.P. System and method for strategic power supply sequencing in a computer system with multiple processing resources and multiple power supplies
US6574104B2 (en) 2001-10-05 2003-06-03 Hewlett-Packard Development Company L.P. Smart cooling of data centers
JPWO2003034523A1 (ja) 2001-10-11 2005-02-03 株式会社日立製作所 家庭用燃料電池システム
US6957353B2 (en) 2001-10-31 2005-10-18 Hewlett-Packard Development Company, L.P. System and method for providing minimal power-consuming redundant computing hardware for distributed services
US7043650B2 (en) 2001-10-31 2006-05-09 Hewlett-Packard Development Company, L.P. System and method for intelligent control of power consumption of distributed services during periods when power consumption must be reduced
US7203846B2 (en) 2001-10-31 2007-04-10 Hewlett-Packard Development Company, Lp. System and method for intelligent control of power consumption of distributed services during periods of reduced load
US6804616B2 (en) * 2001-12-13 2004-10-12 Intel Corporation Method to estimate power and cooling requirements of systems
US7020586B2 (en) 2001-12-17 2006-03-28 Sun Microsystems, Inc. Designing a data center
US7310673B2 (en) 2001-12-21 2007-12-18 Hewlett-Packard Development Company, L.P. Network resource assignment system and method
US6721672B2 (en) 2002-01-02 2004-04-13 American Power Conversion Method and apparatus for preventing overloads of power distribution networks
US7519000B2 (en) 2002-01-30 2009-04-14 Panduit Corp. Systems and methods for managing a network
US20030149608A1 (en) 2002-02-06 2003-08-07 Kall Jonathan J. Suite of configurable supply chain infrastructure modules for deploying collaborative e-manufacturing solutions
US6628520B2 (en) 2002-02-06 2003-09-30 Hewlett-Packard Development Company, L.P. Method, apparatus, and system for cooling electronic components
US20030154285A1 (en) 2002-02-13 2003-08-14 International Business Machines Corporation Method and system for assigning network addreses
US7313503B2 (en) 2002-02-19 2007-12-25 Hewlett-Packard Development Company, L.P. Designing layout for internet datacenter cooling
US6964539B2 (en) 2002-03-18 2005-11-15 International Business Machines Corporation Method for managing power consumption of multiple computer servers
US6795928B2 (en) 2002-03-18 2004-09-21 International Business Machines Corporation Method for managing power consumption of multiple computer servers
KR100387358B1 (en) 2002-03-22 2003-06-12 Ec Tech Co Ltd System for cooling computer component using thermoelectric element
GB0207382D0 (en) 2002-03-28 2002-05-08 Holland Heating Uk Ltd Computer cabinet
US20030193777A1 (en) 2002-04-16 2003-10-16 Friedrich Richard J. Data center energy management system
US6718277B2 (en) 2002-04-17 2004-04-06 Hewlett-Packard Development Company, L.P. Atmospheric control within a building
US7197553B2 (en) 2002-04-19 2007-03-27 Nortel Networks Limited Network system having a virtual-service-module
US20040078708A1 (en) 2002-05-17 2004-04-22 Chuang Li Methods for facilitating the installation of computer devices
US7072960B2 (en) 2002-06-10 2006-07-04 Hewlett-Packard Development Company, L.P. Generating automated mappings of service demands to server capacities in a distributed computer system
US7152100B2 (en) 2002-07-09 2006-12-19 Adtran, Inc. System and method for provisioning network access devices
US6786056B2 (en) 2002-08-02 2004-09-07 Hewlett-Packard Development Company, L.P. Cooling system with evaporators distributed in parallel
US20040020225A1 (en) 2002-08-02 2004-02-05 Patel Chandrakant D. Cooling system
US20040075343A1 (en) 2002-09-05 2004-04-22 Paul Wareham System and method for power load management
US6775997B2 (en) 2002-10-03 2004-08-17 Hewlett-Packard Development Company, L.P. Cooling of data centers
US6862179B2 (en) 2002-11-26 2005-03-01 Hewlett-Packard Development Company, L.P. Partition for varying the supply of cooling fluid
US7120689B2 (en) 2003-01-23 2006-10-10 Sbc Properties, L.P. Receiving network metrics data from disparate devices and displaying in a host format
US6694759B1 (en) 2003-01-27 2004-02-24 Hewlett-Packard Development Company, L.P. Pressure control of cooling fluid within a plenum using automatically adjustable vents
US7210048B2 (en) 2003-02-14 2007-04-24 Intel Corporation Enterprise power and thermal management
US6859366B2 (en) 2003-03-19 2005-02-22 American Power Conversion Data center cooling system
US20040186905A1 (en) 2003-03-20 2004-09-23 Young Donald E. System and method for provisioning resources
US7546475B2 (en) 2003-05-13 2009-06-09 Hewlett-Packard Development Company, L.P. Power-aware adaptation in a data center
US20050023363A1 (en) 2003-05-29 2005-02-03 Sharma Ratnesh K. CRAC unit control based on re-circulation index
US7051946B2 (en) 2003-05-29 2006-05-30 Hewlett-Packard Development Company, L.P. Air re-circulation index
US7146353B2 (en) 2003-07-22 2006-12-05 Hewlett-Packard Development Company, L.P. Resource allocation for multiple applications
US7127625B2 (en) 2003-09-04 2006-10-24 Hewlett-Packard Development Company, L.P. Application management based on power consumption
WO2005036367A2 (en) * 2003-10-08 2005-04-21 Unisys Corporation Virtual data center that allocates and manages system resources across multiple nodes
US7451336B2 (en) 2003-10-16 2008-11-11 International Business Machines Corporation Automated load shedding of powered devices in a computer complex in the event of utility interruption
US7414329B2 (en) * 2003-10-30 2008-08-19 Server Technology, Inc. Polyphase power distribution and monitoring apparatus
JP4351517B2 (ja) 2003-11-14 2009-10-28 株式会社日立製作所 データセンタの装置管理方法、装置管理サーバ、データセンタの装置管理システム並びにプログラム
US8108496B2 (en) 2004-04-07 2012-01-31 American Power Conversion Corporation Method and apparatus for selecting forwarding modes
US7197433B2 (en) 2004-04-09 2007-03-27 Hewlett-Packard Development Company, L.P. Workload placement among data centers based on thermal efficiency
US8156490B2 (en) 2004-05-08 2012-04-10 International Business Machines Corporation Dynamic migration of virtual machine computer programs upon satisfaction of conditions
US7031870B2 (en) 2004-05-28 2006-04-18 Hewlett-Packard Development Company, L.P. Data center evaluation using an air re-circulation index
US7447920B2 (en) 2004-08-31 2008-11-04 Hewlett-Packard Development Company, L.P. Workload placement based on thermal considerations
US7514815B2 (en) 2004-09-28 2009-04-07 American Power Conversion Corporation System and method for allocating power to loads
US7251547B2 (en) 2004-10-08 2007-07-31 Hewlett-Packard Development Company, L.P. Correlation of vent tile settings and rack temperatures
US20060121421A1 (en) 2004-10-15 2006-06-08 Spitaels James S IT equipment simulation
US7426453B2 (en) 2005-01-14 2008-09-16 Hewlett-Packard Development Company, L.P. Workload placement based upon CRAC unit capacity utilizations
US7472043B1 (en) 2005-02-18 2008-12-30 Tellabs Bedford, Inc. Mass customization configurator
JP2006236532A (ja) * 2005-02-28 2006-09-07 Toshiba Corp 電子装置及びその消費電力制御方法
US7522626B2 (en) 2005-03-14 2009-04-21 American Power Conversion Corporation Communications system and method
US7640760B2 (en) 2005-03-25 2010-01-05 Hewlett-Packard Development Company, L.P. Temperature control using a sensor network
US7881910B2 (en) 2005-05-02 2011-02-01 American Power Conversion Corporation Methods and systems for managing facility power and cooling
WO2006119248A2 (en) 2005-05-02 2006-11-09 American Power Conversion Corporation Methods and systems for managing facility power and cooling
US7596476B2 (en) * 2005-05-02 2009-09-29 American Power Conversion Corporation Methods and systems for managing facility power and cooling
US7885795B2 (en) 2005-05-02 2011-02-08 American Power Conversion Corporation Methods and systems for managing facility power and cooling
US7841199B2 (en) 2005-05-17 2010-11-30 American Power Conversion Corporation Cold aisle isolation
JP4101251B2 (ja) 2005-05-24 2008-06-18 富士通株式会社 負荷分散プログラム、負荷分散方法、及び負荷分散装置
US7315448B1 (en) 2005-06-01 2008-01-01 Hewlett-Packard Development Company, L.P. Air-cooled heat generating device airflow control system
US7389403B1 (en) 2005-08-10 2008-06-17 Sun Microsystems, Inc. Adaptive computing ensemble microprocessor architecture
US20070067296A1 (en) 2005-08-19 2007-03-22 Malloy Patrick J Network capacity planning
US8429630B2 (en) 2005-09-15 2013-04-23 Ca, Inc. Globally distributed utility computing cloud
JP4717579B2 (ja) * 2005-09-30 2011-07-06 株式会社小松製作所 作業機械のメンテナンス作業管理システム
US7726144B2 (en) 2005-10-25 2010-06-01 Hewlett-Packard Development Company, L.P. Thermal management using stored field replaceable unit thermal information
US7620480B2 (en) 2005-11-01 2009-11-17 Hewlett-Packard Development Company, L.P. Cooling components across a continuum
US20070150584A1 (en) 2005-12-28 2007-06-28 Deepa Srinivasan Apparatus, system, and method for determining server utilization in hosted computing infrastructure
CN101401498A (zh) 2006-02-10 2009-04-01 美国能量变换公司 储藏机架管理系统和方法
US20070234077A1 (en) 2006-03-31 2007-10-04 Rothman Michael A Reducing power consumption by load imbalancing
US7558649B1 (en) 2006-05-03 2009-07-07 Hewlett-Packard Development Company, L.P. Method for predicting airflow rates
JP4800837B2 (ja) 2006-05-22 2011-10-26 株式会社日立製作所 計算機システム、その消費電力低減方法、及びそのプログラム
DK2036189T3 (da) * 2006-06-01 2019-05-27 Google Llc Kontinuerlig strømdistributionsarkitektur til et datacenter
CN101098075A (zh) 2006-06-30 2008-01-02 佛山市顺德区顺达电脑厂有限公司 保护系统以及方法
US7549070B2 (en) 2006-06-30 2009-06-16 Sun Microsystems, Inc. Method and apparatus for generating a dynamic power-flux map for a set of computer systems
US8725886B1 (en) 2006-10-20 2014-05-13 Desktone, Inc. Provisioned virtual computing
US8296760B2 (en) * 2006-10-27 2012-10-23 Hewlett-Packard Development Company, L.P. Migrating a virtual machine from a first physical machine in response to receiving a command to lower a power mode of the first physical machine
US8185893B2 (en) 2006-10-27 2012-05-22 Hewlett-Packard Development Company, L.P. Starting up at least one virtual machine in a physical machine by a load balancer
US7702485B2 (en) * 2006-12-06 2010-04-20 Oracle America, Inc. Method and apparatus for predicting remaining useful life for a computer system
US8195340B1 (en) 2006-12-18 2012-06-05 Sprint Communications Company L.P. Data center emergency power management
CA2573941A1 (en) * 2007-01-15 2008-07-15 Coolit Systems Inc. Computer cooling system
US8275642B2 (en) * 2007-01-19 2012-09-25 International Business Machines Corporation System to improve predictive maintenance and warranty cost/price estimation
CN101589656B (zh) 2007-01-24 2013-05-01 美国能量变换公司 设备支架冷却性能的评估系统和方法
US7856549B2 (en) 2007-01-24 2010-12-21 Hewlett-Packard Development Company, L.P. Regulating power consumption
US7676280B1 (en) 2007-01-29 2010-03-09 Hewlett-Packard Development Company, L.P. Dynamic environmental management
CN101680718A (zh) 2007-03-14 2010-03-24 佐尼特结构解决方案有限责任公司 用于数据中心机架的基于空气的冷却
US8205205B2 (en) 2007-03-16 2012-06-19 Sap Ag Multi-objective allocation of computational jobs in client-server or hosting environments
JP5596343B2 (ja) * 2007-04-13 2014-09-24 日本電気株式会社 仮想計算機システムおよびその最適化方法
JP4739271B2 (ja) * 2007-04-19 2011-08-03 株式会社富士通アドバンストエンジニアリング 電源制御装置、仮想サーバ管理システム、電源制御方法および電源制御プログラム
AU2008255030B2 (en) 2007-05-15 2014-02-20 Schneider Electric It Corporation Methods and systems for managing facility power and cooling
US10339227B1 (en) * 2007-06-08 2019-07-02 Google Llc Data center design
US8880907B2 (en) 2007-06-21 2014-11-04 Schneider Electric It Corporation Method and system for determining physical location of equipment
US7970903B2 (en) 2007-08-20 2011-06-28 Hitachi, Ltd. Storage and server provisioning for virtualized and geographically dispersed data centers
US8468230B2 (en) * 2007-10-18 2013-06-18 Fujitsu Limited Method, apparatus and recording medium for migrating a virtual machine
CN101911047A (zh) 2007-11-06 2010-12-08 瑞士信贷证券(美国)有限责任公司 根据服务水平协议预测并管理资源分配
JP4902501B2 (ja) * 2007-11-12 2012-03-21 株式会社日立製作所 電力制御方法、計算機システム、及びプログラム
US8732706B2 (en) 2007-11-27 2014-05-20 Hewlett-Packard Development Company, L.P. Generating governing metrics for resource provisioning
US7801994B2 (en) 2007-11-29 2010-09-21 Hitachi, Ltd. Method and apparatus for locating candidate data centers for application migration
US7979250B2 (en) * 2007-12-05 2011-07-12 International Business Machines Corporation Method of laying out a data center using a plurality of thermal simulators
US8447993B2 (en) 2008-01-23 2013-05-21 Palo Alto Research Center Incorporated Integrated energy savings and business operations in data centers
US8996890B2 (en) * 2008-02-07 2015-03-31 Dell Products L.P. Method for power conservation in virtualized environments
US8140276B2 (en) * 2008-02-27 2012-03-20 Abl Ip Holding Llc System and method for streetlight monitoring diagnostics
US8381221B2 (en) 2008-03-04 2013-02-19 International Business Machines Corporation Dynamic heat and power optimization of resource pools
JP4924514B2 (ja) 2008-03-31 2012-04-25 富士通株式会社 仮想マシン管理プログラム、管理サーバ装置及び仮想マシン管理方法
JP4724730B2 (ja) 2008-04-09 2011-07-13 株式会社日立製作所 情報処理システムの運用管理方法、運用管理プログラム、および運用管理装置、ならびに情報処理システム
WO2009126154A1 (en) 2008-04-10 2009-10-15 Hewlett-Packard Development Company, L.P. Virtual machine migration according to environmental data
US8140195B2 (en) * 2008-05-30 2012-03-20 International Business Machines Corporation Reducing maximum power consumption using environmental control settings
US9008844B2 (en) 2008-06-09 2015-04-14 International Business Machines Corporation System and method to route airflow using dynamically changing ducts
JP5288899B2 (ja) * 2008-06-20 2013-09-11 株式会社日立製作所 消費電力推定を行うストレージ装置及びストレージ装置の電力推定方法
JP5157717B2 (ja) 2008-07-28 2013-03-06 富士通株式会社 仮想バッテリを備えた仮想マシンシステムおよび仮想バッテリを備えた仮想マシンシステム用プログラム
US8849987B2 (en) 2008-07-29 2014-09-30 International Business Machines Corporation Automated discovery of a topology of a distributed computing environment
GB0818174D0 (en) 2008-10-03 2008-11-12 Leaneco Aps Emergency power supply apparatus
US8467985B2 (en) 2008-10-31 2013-06-18 Schneider Electric Usa Inc. Automated synchronization of data between electrical grids
US8046468B2 (en) * 2009-01-26 2011-10-25 Vmware, Inc. Process demand prediction for distributed power and resource management
US9778718B2 (en) 2009-02-13 2017-10-03 Schneider Electric It Corporation Power supply and data center control
US8560677B2 (en) 2009-02-13 2013-10-15 Schneider Electric It Corporation Data center control
US9519517B2 (en) 2009-02-13 2016-12-13 Schneider Electtic It Corporation Data center control
US8117613B2 (en) 2009-04-08 2012-02-14 Microsoft Corporation Optimized virtual machine migration mechanism
US8769535B2 (en) 2009-09-24 2014-07-01 Avaya Inc. Providing virtual machine high-availability and fault tolerance via solid-state backup drives
JP5378946B2 (ja) * 2009-10-26 2013-12-25 株式会社日立製作所 サーバ管理装置およびサーバ管理方法
US20110202728A1 (en) 2010-02-17 2011-08-18 Lsi Corporation Methods and apparatus for managing cache persistence in a storage system using multiple virtual machines
US8627123B2 (en) 2010-03-25 2014-01-07 Microsoft Corporation Managing power provisioning in distributed computing
EP2458501A1 (en) 2010-11-30 2012-05-30 France Telecom Method of operating a communication device and related communication device
US20120137289A1 (en) 2010-11-30 2012-05-31 International Business Machines Corporation Protecting high priority workloads in a virtualized datacenter
US8612801B2 (en) 2011-01-25 2013-12-17 Dell Products, Lp System and method for extending system uptime while running on backup power
CN102163874B (zh) 2011-04-26 2013-04-17 广东康菱动力科技有限公司 大型数据存储中心大马力高压柴油发电机组电力系统的供电方法
US8768742B2 (en) 2012-02-09 2014-07-01 International Business Machines Corporation Assessment and rationalization of resiliency of data center strategies
US9329888B2 (en) 2013-01-28 2016-05-03 International Business Machines Corporation Computing optimized virtual machine allocations using equivalence combinations
IN2013CH05013A (zh) 2013-11-07 2015-05-08 Schneider Electric It Corp

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1779600A (zh) * 2004-11-23 2006-05-31 国际商业机器公司 在计算机中心动态重新安排应用及其它服务器资源的方法

Also Published As

Publication number Publication date
US20100211810A1 (en) 2010-08-19
EP2396709A1 (en) 2011-12-21
CN102395938A (zh) 2012-03-28
WO2010093549A1 (en) 2010-08-19
WO2010093549A8 (en) 2010-10-21
US9778718B2 (en) 2017-10-03
AU2010213978A1 (en) 2011-09-01

Similar Documents

Publication Publication Date Title
CN102395938B (zh) 电源和数据中心控制
CN102395955B (zh) 数据中心控制
CN103221898B (zh) 数据中心控制
US10558768B1 (en) Computer and data center load determination
Koutitas et al. Challenges for energy efficiency in local and regional data centers
Addabbo et al. Availability and reliability modeling of multicore controlled UPS for datacenter applications
Ahmed et al. Electrical energy consumption model of internal components in data centers
Cui et al. An optimal energy co-scheduling framework for smart buildings
Malla et al. Coordinated priority-aware charging of distributed batteries in oversubscribed data centers
Pahlevan et al. Joint computing and electric systems optimization for green datacenters
Mehta et al. Smart edge power management to improve availability and cost-efficiency of edge cloud
Kontorinis et al. Battery provisioning and associated costs for data center power capping
Zhabelova et al. Data center power dynamics within the settings of regional power grid
US20230187936A1 (en) Control apparatus, control method and program
Cardoza et al. Active Power Nodes for Increased Energy Resources Availability in Distribution Networks
Milad UPS system: how current and future technologies can improve energy efficiency in data centres
Chen et al. A joint optimization framework for request scheduling and energy storage management in a data center
Talapko et al. Comparison of Electrical Architectures for Support of the Software Defined Data Centers
Pahlevan et al. and David Atienza
Paivarinta Design and operation of energy-efficient data centers
Esch Prolog to:" Estimating the Energy Use and Efficiency Potential of US Data Centers"
Nagazono Fujitsu’s Approach to Energy-Saving Data Centers
Tamilarasi et al. Professor, Dr. MGR Educational and Research Institute, Maduravoyal, Chennai-95
Okafor et al. Smart Grids: A New Framework for Efficient Power Management in Datacenter Networks

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: rhode island

Applicant after: American Power Conversion Corporation

Address before: rhode island

Applicant before: American Power Conversion Corp.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: AMERICAN POWER CONVERSION CORP. TO: SCHNEIDER ELECTRIC IT CORP.

C14 Grant of patent or utility model
GR01 Patent grant