CN102395955B - 数据中心控制 - Google Patents
数据中心控制 Download PDFInfo
- Publication number
- CN102395955B CN102395955B CN201080016515.0A CN201080016515A CN102395955B CN 102395955 B CN102395955 B CN 102395955B CN 201080016515 A CN201080016515 A CN 201080016515A CN 102395955 B CN102395955 B CN 102395955B
- Authority
- CN
- China
- Prior art keywords
- data center
- server
- application
- controller
- parameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5005—Allocation of resources, e.g. of the central processing unit [CPU] to service a request
- G06F9/5027—Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/10—Protocols in which an application is distributed across nodes in the network
- H04L67/1001—Protocols in which an application is distributed across nodes in the network for accessing one among a plurality of replicated servers
- H04L67/1004—Server selection for load balancing
- H04L67/1008—Server selection for load balancing based on parameters of servers, e.g. available memory or workload
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/07—Responding to the occurrence of a fault, e.g. fault tolerance
- G06F11/16—Error detection or correction of the data by redundancy in hardware
- G06F11/20—Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements
- G06F11/202—Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements where processing functionality is redundant
- G06F11/2023—Failover techniques
- G06F11/203—Failover techniques using migration
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/48—Program initiating; Program switching, e.g. by interrupt
- G06F9/4806—Task transfer initiation or dispatching
- G06F9/4843—Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
- G06F9/485—Task life-cycle, e.g. stopping, restarting, resuming execution
- G06F9/4856—Task life-cycle, e.g. stopping, restarting, resuming execution resumption being on a different machine, e.g. task migration, virtual machine migration
Landscapes
- Engineering & Computer Science (AREA)
- Software Systems (AREA)
- Theoretical Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Power Sources (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Debugging And Monitoring (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
提供了用于数据中心控制的系统和方法,其识别一个或者多个数据中心的参数,其中每一个数据中心包括多个设备。所述系统和方法接收执行应用的命令,并且至少部分地基于参数的评估来识别来自一个或者多个数据中心的所选择的数据中心作为运行应用的位置。
Description
相关申请的交叉引用
本申请在这里通过引用将题目为“Power Supply and Data CenterControl”、在2009年2月13日递交的并且转让给本申请的受让人的美国专利申请号12/370,969全部并入。所引用的申请一般公开用于控制数据中心的系统和方法。
发明背景
1.发明领域
本发明的至少一种实施方案一般涉及控制设施活动,并且更具体地,涉及管理数据中心。
2.发明背景
作为对日益增加的工业需求、发展需求和基于信息的经济的需求的响应,数据中心和信息技术网络在全球持续激增。这种扩展呈现各种各样的形式,包括将在地理上无联系的计算资源联接在一起的广泛分布的计算机网络、以及向多种应用提供电力、冷却和计算基础设施的数据中心。
典型的数据中心包含需要电力、冷却和与外部通信设施的连接的许多装置机架。在现代数据中心和网络室内,在这些设施中使用的计算装置的日益增加的密度对它们相关的电力系统加了负担。因为这种计算装置在操作中产生热,这些设备的冷却系统也被加了负担。
当数据中心的类型、大小和复杂度增长时,与它们的操作关联的成本也增长。这些成本包括与电力利用率关联的能量成本、取得电子设备和基础设施的成本、相关的冷却或热消散系统的成本、以及维护和管理人员的工资。
发明概述
本发明的至少一些方面和实施方案目的在于用于数据中心控制的系统和方法。一个或者多个网络可将多个数据中心联接在一起。相关的控制器可监控数据中心以及它们的部件和设备的活动和参数。这些参数可被评估以识别适于执行应用的数据中心或者其设备。
至少一个方面目的在于用于数据中心控制的计算机实现的方法。计算机实现的方法识别多个数据中心的参数,其中每一个数据中心包括多个设备。该计算机实现的方法接收执行应用的命令,并且至少部分地基于参数的评估来识别来自上述多个数据中心的所选择的数据中心作为运行应用的位置。
在一种实施方案中,计算机实现的方法可识别应用的要求,并且可至少部分地基于要求的评估来识别数据中心。该方法可检测在数据中心处的应用的故障,并且作为响应,可以识别另一个数据中心作为运行应用的位置。该方法可至少部分地基于第一数据中心冷却或者电力特征的评估来确定第一数据中心能力,向与第二数据中心关联的设备提供指示第一数据中心能力的信息,并且可接收在第一数据中心内的设备上执行由第二数据中心或者相关的设备提供的应用的请求。
在多种实施方案中,多个数据中心中的至少两个可由网络连接,并且该方法可监控形成网络的至少部分的网络基础设施装置的参数。该方法还可向数据中心的一组虚拟服务器添加物理服务器,并且可将应用的至少一部分分配到该组虚拟服务器。应用可被提供到数据中心的虚拟服务器,并且该方法可禁用不间断电源、服务器、网络装置或者冷却单元中的至少一个,其中每一个可与至少一个数据中心参数关联。该方法可从第一数据中心或者其子系统接收报警消息,并且可将应用从第一数据中心转移到第二数据中心。
在多种实施方案中,基于数据中心参数和系统要求的评估,该方法识别执行应用的系统要求,并且使应用的执行时移。该方法可将在数据中心内的服务器识别为具有足以执行应用、将应用提供给服务器并且指示服务器执行该应用的能力。在一种实施方案中,该方法生成向数据中心添加硬件的请求。该方法可指示数据中心具有额外的能力,并且该方法可将应用的全部或者部分分配到至少一个数据中心。
至少一个其他方面目的在于数据中心活动控制系统。该系统包括与网络关联的数据中心控制器。该数据中心控制器被配置成识别与网络关联的多个数据中心的参数,其中每一个数据中心包括多个设备。数据中心控制器配置成评估参数以识别来自多个数据中心的所选择的数据中心作为运行应用的位置。
在多种实施方案中,数据中心控制器配置成识别应用的要求,并且还配置成至少部分基于应用的要求的评估来识别数据中心作为运行应用的位置。应用的要求可以包括应用电力消耗、应用冗余度、应用运行时间、或者应用被安排运行的时间段,并且该应用可以是容错的或者冗余的。在一些实施方案中,数据中心控制器被配置成接收执行应用的命令,并且数据中心控制器可响应于在不同的数据中心执行应用的故障来识别数据中心作为运行应用的位置。数据中心控制器可基于第一数据中心冷却或者电力特征的评估来确定第一数据中心能力。数据中心控制器可向与第二数据中心关联的设备提供指示第一数据中心能力的信息,并且数据中心控制器可接收在数据中心内的设备上执行由与另一个数据中心关联的设备提供的应用的请求。
在多种实施方案中,系统包括具有与一个或者多个数据中心关联的网络基础设施装置的网络,并且数据中心控制器可监控网络基础设施装置的参数。在一些实施方案中,数据中心控制器配置成将应用的至少一部分分配到数据中心的一组虚拟服务器,并且可向位于数据中心内的一组虚拟服务器提供应用。数据中心控制器可禁用数据中心装置,例如不间断电源、服务器、网络装置、计算机或者冷却单元。
在多种实施方案中,数据中心控制器被配置成从第一数据中心或者其子系统接收报警消息,并且将第一应用从第一数据中心转移到第二数据中心。数据中心控制器可识别系统要求以执行应用,并且可至少部分地基于系统要求来使应用的执行时移。数据中心控制器可向数据中心内的服务器提供应用,以由服务器执行,并且数据中心控制器可生成向一个或者多个数据中心添加硬件的请求。数据中心控制器可基于数据中心参数的评估来指示数据中心具有额外的能力,并且数据中心控制器可至少部分地基于通过数据中心控制器的数据中心参数的评估来将应用的至少一部分分配到至少一个数据中心。
至少一个其他方面目的在于具有存储有指令序列的计算机可读介质。指令序列包括指令,当指令由处理器执行时使处理器识别多个数据中心的参数,其中每一个数据中心包括多个设备。指令使处理器接收执行应用的命令,并且至少部分地基于参数的评估来识别来自多个数据中心的所选择的数据中心作为运行应用的位置。
在多种实施方案中,指令使处理器识别应用的要求,并且至少部分地基于要求的评估来识别数据中心作为运行应用的位置。指令可使处理器检测在数据中心处的应用故障。在一种实施方案中,指令可使处理器基于第一数据中心冷却或者电力特征来确定第一数据中心能力,向第二数据中心或者相关的设备提供指示第一数据中心能力的信息,并且接收在第一数据中心内的设备上执行由与第二数据中心关联的设备提供的应用的请求。
指令可使处理器监控形成网络的至少部分的网络基础设施装置的参数,并且可使处理器向数据中心的虚拟服务器添加物理服务器,并且将应用的至少一部分分配到一个或者多个虚拟服务器。指令可使处理器向位于数据中心内的虚拟服务器提供应用,并且指令可使处理器响应于数据中心参数的评估来禁用不间断电源、服务器、网络装置和冷却单元中的一个或者多个。
在多种实施方案中,指令可使处理器从第一数据中心接收报警消息,并且将应用从第一数据中心转移到第二数据中心。指令可使处理器识别执行应用的系统要求,并且基于系统要求的评估来使应用的执行时移。指令可使处理器将在数据中心内的装置识别为具有足以执行应用、向装置提供应用并且指示装置执行应用的能力。指令可使处理器生成向数据中心添加硬件的请求,基于数据中心参数的评估来指示数据中心具有额外的能力,或者至少部分地基于数据中心参数的评估来将应用的至少一部分分配到至少一个数据中心。
从结合附图理解的下面的详细描述中,这些示例性方面和实施方案的其他方面、实施方案和优点将变得明显,附图仅作为例子说明本发明的原理。应当理解,上述信息和下面的详细描述包括各种方面和实施方案的例证性的例子,并且旨在提供用于理解所主张的方面和实施方案的性质和特征的概述或者框架。附图与说明书的其余部分一起用于解释所描述的和主张的方面和实施方案的原理和操作。
附图的简要说明
附图并没有被规定为按比例绘制。在附图中,在各个图中所示的每一个相同的或几乎相同的部件由相似的数字表示。为了清楚的目的,可能不是每一个部件都被标注在附图中。当结合附图阅读时,在此公开的系统和方法的上述和其他目的、特征和优点将从下面的多种实施方案的描述中被更加完整地理解,其中:
图1是描绘根据一种实施方案的数据中心的例子的俯视图;
图2是描绘根据一种实施方案的数据中心控制系统的例子的框图;
图3是描绘根据一种实施方案的数据中心控制系统的例子的框图;
图4是描绘根据一种实施方案的在一个或者多个数据中心内的服务器配置的例子的框图;
图5是描绘根据一种实施方案的在数据中心内的服务器配置的例子的框图;
图6是说明根据一种实施方案的数据中心控制的示例性方法的流程图;
图7是根据一种实施方案的计算机系统的功能框图;
图8是根据一种实施方案的存储系统的功能框图。
详细描述
这里描述的系统和方法在其应用中不限于在描述中阐述的或在附图中说明的部件的结构和布置的细节。本发明能够有其他的实施方案,并且能够以多种方式被实践或执行。另外,这里使用的措辞和术语是为了描述的目的,并且不应当被视为限制性的。在这里,“包含”、“包括”、“具有”、“含有”、“涉及”和其变形的使用意指包括其后所列的项和其等效物以及另外的项。
多种方面和实施方案目的在于数据中心控制。一个或多个数据中心的特征可经由网络由一个或多个数据中心控制器识别、监控和控制。数据中心可以是地理上无联系的,并且可具有不同的特征和部件。数据中心控制器可评估数据中心和可由数据中心部件执行的应用的特征。这些评估可包括例如数据中心供应(例如可利用的数据中心处理能力)或者要求(例如可以由数据中心提供的用于执行的应用的参数)的评估。至少部分地基于这些评估,数据中心控制器可将应用指引到一个或多个数据中心用于执行。
这里描述的实施方案可以用于设计、管理和改进数据中心,例如数据中心100,其在图1中示出。数据中心100可以包括支持或确保数据中心装置功能的多种资源、装置或设备。数据中心100的资源的例子包括电力、冷却、物理空间、重力支持、远程装置控制能力、物理和逻辑安全以及物理和逻辑网络连接。电力数据中心资源可以包括电力分配资源,例如变压器、电力分配单元、电源插座、和可用于分配的电力,例如提供到数据中心100的公用电力、现场发电机产生的电力、和电力分配单元提供的电力。在数据中心100中的物理空间资源可以包括数据中心占地空间和机架U空间。在数据中心100内的冷却资源可以包括冷却分配能力和冷却产生能力。在数据中心100内的物理安全资源可包括安全摄像机和门锁。在数据中心100内的逻辑网络连接资源可以包括虚拟局域网、域名服务和动态主机配置协议服务。物理网络连接资源可以包括网络布线和插线面板。在数据中心100内的远程装置控制能力资源可以包括键盘视频鼠标服务。
应当认识到,数据中心100是代表性的数据中心,并且在这里描述的多种实施方案不限于诸如数据中心100的数据中心。可以使用例如不包括活地板的多种其他数据中心和设施。数据中心100或其他数据中心可以与容纳更多、更少或不同的装置或者除了计算装置以外的装置的设施——包括电信设施和其他的设施——一起使用。在一种实施方案中,数据中心100包括由子系统支持的计算机。数据中心100可以但不需要是专用空间或房间。另外,数据中心装置布局不需要被整洁地布置为如图1所示的。
数据中心100可包括行102、冷却单元104和至少一个活地板106。行102可包括至少一个机架108,机架108在操作中可从机架108的前部抽取冷空气并且将暖空气返回到机架108的后部或顶部。在一种实施方案中,机架108可以包含U空间位置,其被设计成容纳安装在机架上的数据中心装置,例如服务器、计算机、冷却装置、或者网络连接装置。
在一种实施方案中,数据中心100的行102可定位为产生交替的冷通道和热通道。如在图1的实施方案所示的,通道110是热通道而通道112是冷通道。为了向机架108提供冷却,在冷通道112中的每一个机架108的前部,穿孔的地砖114可被用于提供来自活地板106的下面的冷空气。在数据中心100中,除了穿孔的地砖114以外,活地板106还可以包括实心地砖。冷却单元104可向活地板106下面的区域提供冷空气,并且可从临近数据中心的天花板的空间接收热空气。
在一种实施方案中,除了或者代替冷却单元104,还可使用行内冷却单元,例如从罗德艾兰州West Kingston的美国电力转换(APC)公司可得到的那些冷却单元。在一种实施方案中,可使用例如具有12英寸的宽度的半机架行内冷却单元,其宽度是标准数据中心高架的宽度的大约一半。
数据中心100可以包括多个不同类型的服务器。例如,服务器可以是物理服务器、专用服务器或者虚拟服务器。物理服务器一般包括硬件,操作系统在硬件上运行。专用服务器一般包括在物理服务器上运行的服务应用。例如,专用服务器可以包括在操作系统上的web服务或文件传输协议(FTP)服务,其中服务应用可耦合到物理服务器。虚拟服务器可包括独立于物理服务器硬件的服务。例如,虚拟服务器可以包括将物理服务器划分成多个服务器,每一个服务器具有好像它们在它们自己的专用服务器上运行的外观和能力。在一种实施方案中,每一个物理服务器可以有一个专用服务器操作系统,并且每一个物理服务器可以有多个虚拟服务器。虚拟服务器可与专用服务器并行地(例如紧接着)运行。
图2是根据一种实施方案的数据中心控制系统200的框图。在一种实施方案中,系统200包括至少一个数据中心100。多个数据中心100可经由至少一个网络205和至少一个数据中心控制器210彼此关联。网络205可包括至少一个计算机互连网络,例如因特网、任何广域、局域、地下铁道、无线、电话、蜂窝、卫星、或者其他区域网络、或者其组合。网络205可以包括网络基础设施装置,例如服务器、路由器、节点或交换机。在一种实施方案中,数据中心100的部件经由至少一个网络205彼此互连或者与数据中心控制器210互连。在数据中心100内的服务器和网络205的网络基础设施设备可以被分组成网络区域或集群,以便网络205的安全在服务器添加或改变期间或以后保持完好。
在多种实施方案中,数据中心控制器210可位于一个或多个数据中心100内,或者被远程地定位在数据中心100外部。例如,数据中心控制器210可以位于数据中心100外部,并且经由网络205与数据中心100连接。在一种实施方案中,数据中心控制器210包括诸如处理器、微芯片或者电路的设备,以识别、管理和控制数据中心特征。在一种实施方案中,数据中心控制器210可接收与至少一个数据中心100有关的数据。例如,数据中心控制器210可以接收、测量或监控指示数据中心100的温度、容量、电力或电流消耗的数据,或者指示数据中心100或其部件的操作状态的其他数据。在一种实施方案中,数据中心控制器210可模拟数据中心100的操作。在这种实施方案中,数据中心特征可以基于模拟的或估计的——而不是测量的——数据中心条件,例如温度、容量或者能量数据。这个模拟的数据可以由数据中心控制器210产生或者接收。
数据中心控制器210还可以包含指示数据中心100的最大容限或能力的数据。在一种实施方案中,至少一个数据库215存储指示数据中心100的容限或最大能力的数据。数据库215可以是数据中心控制器210的部分,或者可以位于其他地方,并且经由例如网络205由数据中心控制器210可访问。数据库215可以包括来自一个以上的数据中心100的数据。在一种实施方案中,每一个数据中心100包括至少一个数据库215,其存储指示数据中心100的信息例如容限或者能力范围的数据。数据中心控制器210在一种实施方案中可以包括从罗德艾兰州West Kingston的美国电力转换公司得到的管理平台。
在一种实施方案中,数据中心控制器210评估来自一个或多个数据中心100的实时或者近实时数据。例如,数据中心控制器210可确定数据中心100是否以全部能力操作。数据中心控制器210还可确定或接收指示数据中心100的各个设备、部件或者子系统的操作状态的信息。例如,数据中心100可以包括多个服务器。通过网络205,数据中心100可以向数据中心控制器210提供指示在数据中心100内的特定的服务器没有以全部能力操作的数据,并且因此能够执行额外的应用。
在一种实施方案中,数据中心100包括一个或多个子系统。子系统的例子包括一个或多个装置子系统220、电力生成子系统225、不间断电源子系统230、冷却子系统235、安全子系统240、能量存储子系统245和通信子系统250。子系统一般包括数据中心100的以功能为任务的一个或多个设备。例如,如在图1和2的实施方案中所示的,冷却子系统235可以包括以调节数据中心100的温度为任务的一个或多个冷却单元104。在另一个例子中,装置子系统220可以包括执行计算功能的服务器或者其他的逻辑设备。
在一种实施方案中,通信子系统250包括通过网络205向至少一个数据中心控制器提供数据的计算机硬件。例如,通信子系统250可以至少部分地基于例如在数据中心100上执行的冷却能力分析来指示数据中心100正以其能力的80%操作。在另一个例子中,通信子系统250可以指示特定的设备例如来自装置子系统200的服务器正以其处理能力的45%操作。在这个例子中,该服务器可以用于另外的处理操作。在一种实施方案中,通信子系统250可向数据中心控制器210提供数据中心100、其相关的子系统、或者各个数据中心部件或者设备的最大值、最小值、或者容限和操作数据。通信子系统250还可以指示数据中心100具有或没有用于插入额外的部件的足够的物理空间。在一种实施方案中,通信子系统250包括至少一个数据库215。
通信子系统250通常来说还可以指示数据中心100或者其关联的子系统的状态。例如,通信子系统250可以指示发生了电力故障。电力故障可以由于例如本地电网的故障或者数据中心100的设备或子系统的故障。通信子系统250然后可以向数据中心控制器210提供指示发生了电力故障的信息。
在一种实施方案中,数据中心控制器210持续地或者周期性地接收或者监控关于一个或者多个数据中心100的信息。从这个信息中,数据中心控制器210可确定数据中心100作为整体、以及它们的各个设备(例如服务器)或者子系统的操作状态、范围和容限。至少部分地基于接收到的或者监控的信息,数据中心控制器210然后可以重新分配在一个或多个数据中心100之间的应用,将一个或者多个数据中心100识别为运行应用的位置,或者将一个或者多个数据中心100识别为增加可用于运行应用的新的硬件或者虚拟服务器的位置。在一种实施方案中,接收到的信息包括模拟的或者估计的数据中心信息。
例如,第一数据中心100能以大于其最大冷却能力的90%操作。这个信息可以从通信子系统250提供给数据中心控制器210。第二数据中心100能以其最大冷却能力的30%操作,并且这个信息也可以提供给数据中心控制器210。在这个例子中,已经识别出第一和第二数据中心100的冷却能力参数的数据中心控制器210可以确定第二数据中心100可运行当前由第一数据中心100运行的应用。数据中心控制器210然后可以指示应用从第一数据中心100到第二数据中心100的转移。在这个例子中,将应用从第一数据中心100转移到第二数据中心减少了第一数据中心的活动,这可以降低第一数据中心100的温度,并且增加可利用的冷却能力和可利用的电力能力。
在一种实施方案中,数据中心控制器210可将一个数据中心100识别为执行新应用的位置。例如,一个或多个数据中心100能以关于温度、电力或者其他参数的多种能力操作。数据中心控制器210可评估一个或多个数据中心100的操作条件以确定适合于执行新应用的数据中心100。在多种实施方案中,该确定可基于温度、电力、电流、冷却、能量、安全或者数据中心100的其他参数例如位置的任何组合。例如,两个数据中心100可以消耗实质上相同数量的电力,但是可以位于不同的地理位置上。数据中心控制器210可以将这两个数据中心100的一个识别为执行新应用的位置,因为例如数据中心控制器210评估指示在第二个位置处的能量成本比在第一个位置处的能量成本少的信息。在这个例子中,这两个数据中心100都可以执行新应用,但是在这个例子中能量成本使在第二个位置处的数据中心100成为更加适合的位置。
应当认识到,当数据中心控制器210识别运行新应用的位置时,能量成本和其他的外部因素不需要是决定性的。数据中心控制器210可以评估一个或者多个数据中心100的操作数据(例如实时数据)、数据中心参数(例如数据中心100、它们的子系统或者各个部件的电力消耗、冷却能力、效率、可靠性、冗余、备份运行时间、容限)、以及外部因素(例如本地能量、安全或者劳动成本)的组合,以将一个或者多个数据中心100识别为运行应用的位置。数据中心控制器210可以评估模拟的数据例如一个或者多个数据中心100、它们的子系统或者各个部件的模拟的电力消耗、模拟的冷却能力、模拟的效率、模拟的冗余和模拟的备份运行时间的组合。
在图3中示出了示例性数据中心控制系统200。在一种实施方案中,数据中心控制器210提供了实时的并且在计划的事件例如例行维护或者非计划的事件例如停电或者其他非计划的干扰期间的数据中心100的操作的概观。在一种实施方案中,数据中心控制器210包括变化和能力管理器305,其可以确定数据中心100的电力和冷却特征,如在通过引用被全部并入本文的在2006年1月27日递交的题目为“Methods and Systems for ManagingFacility Power and Cooling”的美国专利申请序列号11/342,300中所描述的。变化和能力管理器305可以确定数据中心100的能力。例如,变化和能力管理器305可以包括例如识别数据中心能力的处理器或者逻辑设备,例如电路或者微控制器。在一种实施方案中,通信子系统250向变化和能力管理器305提供关于数据中心100的能力的信息。例如,变化和能力管理器305可以指示数据中心100的实时能力。显示器可以向负责数据中心100的管理的技术人员或者人提供这个信息。
至少一个装置能力和状态管理器310在确定数据中心100的装置例如服务器的操作状态(例如多个状态)和操作范围(例如容量)时可采样或者监控数据中心100的装置。例如,装置能力和状态管理器310可以指示在数据中心100的特定机架内的虚拟服务器以95%的能力操作。在另一个例子中,参考图1和3,装置能力和状态管理器310可以确定冷却单元104以100%的能力操作,或者例如,冷却单元104在确定量的时间内以大于90%的能力操作。在一种实施方案中,装置和能力管理器310向变化和能力管理器305提供信息用于进一步的评估。
数据中心控制器210还可以包括至少一个服务器和网络管理器315,其为方便起见被称为服务器管理器315。在一种实施方案中,服务器管理器315管理和监控位于数据中心100内的物理、专用、或者虚拟服务器的性能标准。例如,服务器管理器315可以监控服务器性能并且确定服务器以它的处理能力的某个百分比操作。在一种实施方案中,服务器管理器315维护并配置网络装置,以便服务器位于特定的网络、群集或者区域内。服务器管理器315还可以指示服务器将被添加到一个或者多个数据中心100,从一个或者多个数据中心100移除,或者从一个数据中心100移动到另一个数据中心100。
在一种实施方案中,服务器管理器315可包括在多个虚拟服务器上运行的冗余应用。例如,应用可以具有用于备份目的的冗余要求。这样的应用的例子包括工资单、账目、安全、投资、银行业务、或者应用故障通常被避免的其他应用。在这个例子中,服务器管理器315可以识别并且管理一个或者多个服务器的冗余能力。在一种实施方案中,服务器管理器315可以在一个或者多个物理位置上运行。服务器管理器315还可以通过例如在不同的服务器上操作来在物理位置之间移动。
在另一个例子中,服务器管理器315可以在位于数据中心控制器210或者在数据中心100内的专用硬件上实现。另外,例如,响应于来自技术人员的输入或者在特定的时间,服务器管理器315可以指示应用被提供给特定的服务器用于执行。在一种实施方案中,服务器管理器315可指示应用的全部或者部分从第一服务器移动到第二服务器。在这个例证性的实施方案中,第一和第二服务器可以位于相同或者不同的数据中心100中。例如,服务器管理器315可以指示应用分布在位于一个以上的数据中心100中的多个虚拟服务器之间。
数据中心控制器210还可以包括至少一个硬件管理器320。硬件管理器320通常通过监控装置参数、能量效率、总所有权成本、维护和灾难事件以在数据中心100内和之间分配资源来优化数据中心100的性能。在一种实施方案中,硬件管理器320联合变化和能力管理器305以及服务器管理器315的功能。例如,硬件管理器320可以评估来自变化和能力管理器305以及服务器管理器315的信息以提供关于在哪里定位服务器的指示。硬件管理器320在识别在一个或者多个数据中心100内的服务器位置时考虑的因素包括电网停电、维护、环境改变、本地时间、现场工作人员的空闲性、数据中心100的增加或者减少的利用。其他因素可以例如由变化和能力管理器305、装置能力和状态管理器310、或者服务器管理器315提供。
在一种实施方案中,技术人员可以提供执行应用的指示、或者数据中心100的操作要求。例如,技术人员可以向硬件管理器320输入指示没有新的物理服务器将被添加到一个或者多个数据中心100的参数。在这个例子中,硬件管理器320可以识别执行应用的虚拟服务器位置。在另一个例子中,由于向数据中心100供电的不可靠的本地电网,技术人员可以为数据中心100提供最大的电力消耗。在这个例子中,硬件管理器320可以使应用时移或者分配到其他的数据中心100,以将数据中心100的电力消耗保持在规定的最大的电力消耗之下。
在一种实施方案中,硬件管理器320提供将服务器从第一数据中心100内的第一位置移动到第一或者第二数据中心100内的第二位置的指示。例如,硬件管理器320可以自动地将诸如虚拟服务器的服务器从第一数据中心100内的第一位置移动到第一或者第二数据中心100内的第二位置。在一种实施方案内,至少部分地基于数据中心100的信息,硬件管理器320可以移动或者提供将服务器移动到数据中心100内的位置的指示。数据中心100的信息可以包括数据中心部件的状态和参数信息、诸如劳动成本和能量成本的总所有权成本的因素、安全、可用性要求、和动态要求例如电力、冷却、延长的运行时间和冗余要求。硬件管理器320还可以识别服务器、网络装置、或者在数据中心100内的其他设备的可靠性或者其他要求。这些要求的例子包括冗余、运行时间、电力使用、处理速度或者能力、热生成、安全、电力供应、电力要求、和与数据中心设备或者应用关联的网络区域。在一种实施方案中,硬件管理器320可评估当识别在一个或者多个数据中心100内执行应用的位置时执行的应用的性质。
在一种实施方案中,硬件管理器320包括与变化和能力管理器305、装置能力和状态管理器310以及服务器和网络管理器315的一个或者多个通信的客户端平台上的应用。例如,硬件管理器应用可以与管理器305和310的一个或者多个相互作用以识别数据中心100的状态和位于数据中心100内的服务器的配置信息。硬件管理器应用还可以识别形成网络205的部分的网络装置、总所有权成本、和数据中心100的电力生成、存储或者冷却信息。
在一种实施方案中,数据中心控制器210包括至少一个共享数据中心网络管理器325。共享数据中心网络管理器325可以监控一个或者多个网络205的要求和操作。例如,网络205的基础设施或者装置可以具有操作限制或者功能要求。网络基础设施限制例如容量、可靠性或者带宽可由网络管理器325确定,并且被提供给硬件管理器320或者数据中心控制器210的其他部件作为当识别执行应用的位置时可以被考虑的因素。
应当认识到,数据中心控制器210不需要包括变化管理器305、装置能力和状态管理器310、服务器管理器315、硬件管理器320、和共享数据中心网络管理器325的分离的元件。数据中心控制器210可以包括其他元件,例如可监控数据中心100和其部件——包括服务器——的参数、要求和使用的一个或者多个处理器或者电路。在一种实施方案中,响应于从数据中心接收到的信息,数据中心控制器210将至少一个数据中心100识别为执行应用的位置。应用可在现有装置上执行,或者诸如虚拟服务器的新装置可添加到数据中心100以执行应用。
在一种实施方案中,数据中心控制器210——包括它的子系统和管理器305-325的任何组合——可识别并且跟踪服务器的物理位置。例如,数据中心控制器210可以被提供有指示特定的服务器位于特定的数据中心100内的信息。数据中心控制器210可以通过评估服务器、数据中心100和网络205的信息例如参数、要求和操作状态信息来优化在数据中心内的服务器的位置。在一种实施方案中,数据中心控制器210请求虚拟、专用、或者物理服务器的移动、放置、添加或者重新分配。这可以例如响应于应用要求、数据中心100的操作条件例如计划的或者非计划的服务或者维护、或者网络205的操作条件例如电网停电。服务器移动的请求可以响应于数据中心100的电力、冷却、或者容量操作条件。由数据中心控制器210请求的服务器移动可增加数据中心100的效率、可靠性和性能,并且可降低操作成本。
在一种实施方案中,关于图1到3,数据中心控制器210可以识别服务器将被插入的特定的数据中心100或者特定的机架108。例如,数据中心控制器210可以识别在数据中心100内的现有的物理服务器,并且指示现有的物理服务器被修改为包括虚拟或专用服务器。在一种实施方案中,数据中心控制器210评估来自多个数据中心100的信息,并且识别可用于执行一个或者多个应用或者执行一个或者多个操作的最小数量的虚拟服务器。这可以包括一组虚拟服务器。在这个例证性的实施方案中,数据中心100的剩余的物理硬件可被关闭或者置于较低的功率待机模式中。这保存能量并且降低数据中心100的冷却要求。
在一种实施方案中,数据中心控制器210提供电网停电、数据中心100的故障或者其他中断的指示。例如,数据中心控制器210可以识别数据中心100或者网络210的电池关闭、报警或者其他问题。数据中心控制器120可以向技术人员提供数据中心100的维护请求的指示。
在一个例子中,关于图1到3,数据中心100可以布置成使得冷却单元104是无效的或者效率差的。在这个例子中,基于从数据中心100接收的信息,例如温度数据或者冷却信息,数据中心控制器210可以识别产生过量的热的一个或者多个服务器(或者其他的设备)。继续这个例子,数据中心控制器210可以识别更接近冷却单元104的用于再分配的服务器。数据中心控制器210还可以将物理服务器识别为产生过量的热,并且作为响应,可以将与该物理服务器关联的一个或者多个虚拟服务器转移到在相同的或者不同的数据中心100内的不同的位置。
应当认识到,数据中心部件可以被评估以增加数据中心性能或者操作。例如,数据中心控制器210可以识别低效操作的服务器。在这个例子中,数据中心控制器210可以识别硬件或者软件升级。数据中心控制器210然后可以继续安装或者请求服务器的升级。
在一种实施方案中,数据中心控制器210可以评估数据中心信息以识别或者确定可利用的数据中心能力。例如,数据中心控制器210可以识别数据中心100作为整体的可利用的能力,或者诸如服务器的单独数据中心部件的可利用的能力。在这个例子中,数据中心控制器210可以指示可利用的数据中心能力可用于租借、出租或者出售。在一种实施方案中,多余的数据中心能力的租借通过可识别和指示在一个或者多个数据中心100内的能力的可用性的集中式数据中心能力租借系统而发生。在一种实施方案中,多余的数据中心能力可以分布到一个或者多个数据中心100以增加数据中心100的性能或者降低成本。数据中心控制器210还可以指示对运行应用的另外的能力的需求,并且可以从一个或者多个数据中心100引入或者引出数据中心能力。应当认识到,这个另外的能力可以作为商品起作用。例如,像电和其他的能量资源一样,数据中心能力可被销售、租借或者储备。
数据中心100可以使用三相电源,其中不间断电源子系统230包括三相不间断电源(UPS)。在这个例子中,三相UPS可将三相电力分配到数据中心100的电力分配单元(PDU)或者断路器面板。从PDU,电力可通过一个或者多个单相或者三相分支电路传递到机架108。在这个例子中,通过数据中心设备(例如子系统、服务器或者装置)的电力利用可以是单相或者是三相,并且服务器或者其他装置可以不知道它正在使用的相。在一种实施方案中,数据中心控制器210可以监控来自数据中心100的服务器的服务器报告的电力消耗值。在另一种实施方案中,数据中心控制器210监控在数据中心100的三相电力系统内的相负荷。在利用三相电力系统的这个实施方案中,除了指示电力消耗而没有指定相的任何服务器报告的电力消耗信息之外,数据中心控制器210还可以被提供有相特定的信息(例如服务器所连接到的相)。
在一种实施方案中,机架108的可利用的未使用的UPS能力可以被确定。在例如三相UPS的可利用的未使用的能力不提供数据中心100的电力特征的足够准确的指示的另一实施方案中,在UPS处、在PDU输入处、和在分支电路处的单独的相的负载可以被确定。例如,在三相电力分配系统中,最有效地确定数据中心的可利用的能力的电力能力测量可以是分支电路的电力能力(例如IT设备或者其他数据中心装置连接到电源的点)。在这个例子中,数据中心装置可以是单相的并且连接到三相UPS电力系统的三相的一个。
在一个实施方案中,除了在分支电路处的可利用的电力能力以外,数据中心控制器210还可以确定或者被提供有在与该分支电路关联的UPS处的对应相的可利用的电力能力数据,和与该分支电路关联的PDU的对应相的可利用的电力能力数据。在一种实施方案中,当能力在分支电路本身和在与该分支电路关联的PDU和UPS处的对应的相处是可利用的时,在分支电路处的能力是可利用的。
应当认识到,能力可以在PDU、UPS和分支电路之间变得搁浅。换句话说,数据中心100的一些设备可以具有可利用的能力,但是这个可利用的能力可以不能被其他的数据中心设备访问来使用。例如,机柜例如一个装置机架108可以没有IT负载,并且可以具有被三相UPS的相A提供的单相分支电路,其中UPS被加载至33%,这个负载全部在相A上。在这个例子中,没有对相A的剩余的UPS电力,并且因此将没有对那个机架108的可利用的能力。在这个例子中,机架108可以被重接布线以从不同的相给相关的分支电路供电。
在另一个例子中,没有IT负载的机架108可以具有由相A供电的单相分支电路,其中相关的PDU被加载至33%,负载全部在相A上。在这个例子中,没有对相A的剩余的PDU电力,并且因此没有对机架108的可利用的能力。在这个例子中,机架108可以被重接布线以从不同的相给相关的分支电路供电。
在另一个例子中,具有功率设定在15KW的到机架108的三相电力分配的机架108可以被装有在所有三个相中相等地分配的9KW能力的装置。在这个例子中,当电力分配在三个相之间均衡时,每一相将具有2KW的可利用的能力。在这个例子中,虽然可能看起来6KW的能力是可利用的(也就是15KW-9KW),由于均衡的分配,每一相具有2KW的能力,并且在这个例子中大于2KW的设备不能安装在机架108中。
应当认识到,在世界各地的许多电网上,数据中心装置连接到230V分支电路,以及在北美,三相电力分配可连接具有120V或者208V的负载,例如数据中心装置。在一种实施方案中,120V和208V负载可在数据中心100的分支电路上混合。120V和230V负载都可与特定的相关联,并且208V负载可连接在二个相之间,并且可消耗在两个相上的电流能力。因此,在数据中心100消耗来自北美电网的电力的一种实施方案中,可基于在分支电路处的能力的可用性和连接到负载的两个相关相上的其关联的UPS和PDU来确定在分支电路处的能力。
在多种实施方案中,数据中心100控制包括与数据中心100的电力供应和数据中心100的电力要求相关的信息。例如,数据中心控制器210可以管理关于数据中心100的结构例如它的电力分配系统、它与IT负载例如数据中心装置的连接、和连接的相关相的信息。
在一种实施方案中,数据中心装置例如服务器可以包括允许服务器电流和服务器电力消耗信息的报告的仪器。另外,数据中心装置的物理位置可以存储在与该装置关联的数据库、或者另一个数据库例如数据库215中。
在一种实施方案中,机架108的电力消耗可以基于报告的装置和该装置的电力消耗信息来确定,数据库指示该装置位于机架108内。例如,数据中心控制器210可以使用来自服务器的服务器仪器的这个报告的电力消耗来确定数据中心100的全部或者部分的冷却能力,服务器已知位于数据中心100的机架108内。
内置于一些服务器内的服务器仪器可以提供不充分的信息来向数据中心控制器210指示它连接到哪个分支电路或相。在这个例子中,在没有这个信息的情况下,由于例如这里讨论的搁浅的电力能力情况,数据中心控制器210可能不能够识别服务器或者机架108可利用的电力能力。在这个例子中,仪器可以被引入到数据中心100以向数据中心服务器210提供信息。
在一种实施方案中,机架108或者其他数据中心装置的电力消耗可以至少部分地基于装置制造商数据来确定。例如,当装置的相连接是已知的时,分支电路、UPS、和PDU能力可以至少部分地基于制造商提供的装置参数来确定。为了简化这些确定,在一种实施方案中,分支电路可以专用于单个数据中心设备或者一件装置,并且分支电路电流负载也可以被测量。应当认识到,由于例如大量的相连接和分支电路配置,这样的基于制造商数据的电力能力确定对一些较高密度的数据中心可能是不够的,其中分支电路可以专用于单个设备。
在一种实施方案中,仪器可以在整个电力分配系统中实现。例如,仪器可以被引入到具有新设备的数据中心100内,或者现有的数据中心装置可以被改进。在一种实施方案中,电流可以在数据中心100的电力分配系统的一个或者多个分支电路、PDU输入和UPS输出处被测量,并且这个信息可以提供给数据中心控制器210,其可至少部分地基于这个信息来量化数据中心100的电力要求。例如,当数据中心控制器210包括在数据中心100的机架108、PDU和UPS之间的相互作用的逻辑表示时,可对数据中心100的所有分支电路确定考虑相负荷效应的可利用的电力能力。
如所讨论的,数据中心控制器210可以帮助新数据中心装置、设备、或者IT装置的部署。在一种实施方案中,数据中心控制器210可以识别数据中心100内的位置用于以一种平衡在三相电源的相之间的负载的方式来放置设备。当数据中心装置被添加到数据中心或者移进数据中心内时,数据中心控制器210可以指示装置将被耦合到服务于数据中心100的电力系统的未充分利用的相。例如,以在平均数据中心设计密度之上的电力密度操作的装置负载可被数据中心控制器210指示来耦合到未充分利用的相。类似地,以在平均数据中心设计密度之下的电力密度操作的装置负载可被数据中心控制器210指示来耦合到过度使用的相。在一种实施方案中,对添加到数据中心100或者移进数据中心100内的设备重复这个基于相利用的方法可优化相平衡和机架108的空间利用。
应当认识到,未能以平衡的方式部署数据中心装置可导致搁浅的电力能力,其看起来存在于诸如PDU、分支电路或者UPS的一些数据中心装置内,但是,由于数据中心装置或者电力系统的配置而不能被使用,因而降低了数据中心100的效率和可部署的装置的数量。
平衡三相电源的相利用可影响机架108的电力分配和数据中心100的电力密度。在一种实施方案中,数据中心控制器210可识别在数据中心100内的装置外壳的区域。例如,关于图1,行102可以是数据中心100的区域。在这个例子中,数据中心控制器210可以为每一个区域确定或者指定平均机架电力或者峰均机架比。继续这个例子,峰均比可以影响可能存在的搁浅的电力能力的量。在一种实施方案中,数据中心控制器210可以将峰均比增加到比从典型的机架108的变化所预期的值大20%的值。这可降低由于在分支电路之间的不平衡而搁浅的电力能力的量。
在一种实施方案中,对机架108的三相电力分配使数据中心控制器210能够对那个机架108的不同的相分配装置,导致电力相的平衡的应用。在具有对机架108的单相电力分配的实施方案中,数据中心控制器210可以指示分支电路在机架108之间的重新分配。
转向图4,其示出了在数据中心100内的示例性服务器配置。在图4的例子中描绘的每一个服务器可以包括至少一个物理、专用或者虚拟服务器,并且如在图4中描绘的服务器可以物理地位于一个或者一个以上的数据中心100内。在一种实施方案中,数据中心服务器可以包括FTP服务器405、文件和备份服务器410、web服务器415、次序服务器420、数据库服务器425、电子邮件服务器430、和流式服务器435。应当认识到,这个服务器配置是例子并且不是限制性的。其他服务器功能、应用和配置是可能的。虽然在图4中被描绘为位于一个数据中心100内,图4的服务器配置和其他的服务器配置可以位于一个以上的数据中心100内。
在一种实施方案中,在图4中示出的服务器405到435的一个或者多个上执行的不同的应用可具有不同的可靠性参数。另外,服务器插入服务器配置内可能需要不同的可靠性参数,并且可改变现有的可靠性参数。如在图4中描绘的,FTP服务器405以及文件和备份服务器410可以具有低级别的可靠性,电子邮件服务器430和流式服务器435可以具有中级别的可靠性,而web服务器415、次序服务器420和数据库服务器425可以具有高级别的可靠性。应当认识到,其他的配置和可靠性参数是可能的。
在一种实施方案中,连接在一个或者多个数据中心100内的服务器的信息技术(IT)或者网络基础设施装置可包括足以支持必要级别的可靠性的连接。例如,FTP服务器405可以具有低可靠性参数。因此,对于FTP服务器405,与在这个例子中也具有低可靠性要求的文件和备份服务器410关联可能是足够的。在一种实施方案中,例如具有中可靠性参数的流式服务器435可添加到图4的服务器配置。在这个例子中,所添加的流式服务器435可以包括可执行流式应用的服务器。但是,插入的流式服务器435将依赖于文件和备份服务器410,其在这个例子中具有在这个例子中不足以执行中可靠性流式应用的低可靠性参数。
关于图3和图4,数据中心控制器210的部件例如服务器和网络管理器315可识别在服务器之间的网络或者IT连接。在这个例子中,服务器和网络管理器315可以指示文件和备份服务器410或者在添加的流式服务器435与文件和备份服务器410之间的连接将具有执行流式应用的不够的可靠性级别。响应于这个确定,服务器和网络管理器315可以指示文件和备份服务器410的可靠性增加到足以允许流式服务器435的插入的级别,用于流式应用的执行。在一种实施方案中,在数据中心100或者网络205的服务器或者其他元件之间的相关性可被数据中心控制器210或者相关的部件识别以识别执行应用的位置,并且识别可以对数据中心100进行的修改,以有效地以低成本执行应用。
在图5中示出了在数据中心100内的服务器配置的例子。在一种实施方案中,图5包括第一服务器505和第二服务器510,其参考图1可以位于一个或者多个机架108内。第一服务器505和第二服务器510可以每个包括一个或者多个虚拟、物理或者专用服务器。在一种实施方案中,第一服务器505和第二服务器510可以是形成网络205的部分的物理基础设施部件。
如在图5中所示的,第二服务器510包括被实现为在第二服务器510内的专用硬件的服务器和网络管理器315。在没有在图5中清楚地示出的一种实施方案中,服务器和网络管理器315可以在包括在第一服务器505、第二服务器510或者两者内的虚拟或者物理服务器上运行的应用中实现。数据中心100可以包括超过一个的服务器和网络管理器315以提供足够级别的冗余和可靠性。例如,如在图5中所示的,第一服务器505位于不间断电源(UPS)区域1内,并且第二服务器510位于UPS区域2内。在一种实施方案中,第一和第二服务器505和510都包括以虚拟或者物理服务器应用的形式的服务器管理器315。例如,在第一和第二区域的一个中的电力故障的情况下,第一和第二服务器505和510的一个与服务器管理器315可保持在操作中。因此,服务器管理器315可以在停电、服务或者维护中断的情况下跟踪或者优化服务器的物理位置以识别或者请求服务器移动。
服务器和网络管理器315可以被提供有第二服务器510的参数、要求、或者操作信息,以及第一服务器505或者其他服务器的信息。在一种实施方案中,至少部分地基于服务器或者数据中心参数,服务器和网络管理器315可以指示第一和第二服务器505和510的一个或者多个执行应用。
图6是说明用于数据中心控制的示例性计算机实现的方法600的流程图。在一种实施方案中,方法600包括识别数据中心的参数的行动(ACT605),其中每一个数据中心包括至少一个设备。例如,识别数据中心参数(ACT 605)可以包括识别数据中心的电力消耗、能量利用、冷却能力、处理能力、操作能力、容限、要求或者操作范围。识别数据中心参数(ACT605)可以包括识别数据中心作为整体的参数以及识别诸如服务器或者冷却单元的数据中心部件的参数。识别数据中心参数(ACT 605)可以包括识别与数据中心关联的一个或者多个网络的参数。例如,多个数据中心可以由一个或者多个网络相互连接,并且由控制器控制。识别数据中心参数(ACT 605)可以包括识别网络的参数,在该网络中网络参数可以限制数据中心操作。
在一种实施方案中,识别数据中心参数(ACT 605)包括识别选择的数据中心设备的参数或者特征。数据中心设备的例子包括冷却子系统、电力子系统、电力生成子系统、安全子系统、不间断电源、服务器、处理器和计算机。应当认识到,这个列表不是排他的,并且例如数据中心设备包括其他的部件和逻辑设备。识别数据中心参数(ACT 605)可以包括识别或者确定数据中心、它们的子系统、和各个部件的各个状态、要求、相关性和操作信息。在一种实施方案中,识别数据中心参数(ACT 605)包括识别电网的电网参数,数据中心从该电网消耗电力。其他这样的外部参数也可以被识别。例如,识别数据中心参数(ACT 605)可以包括识别劳动条件、政治或者经济骚动、或者可影响数据中心操作的其他外部因素。数据中心参数的另外的例子包括数据中心环境数据、数据中心内部的温度、数据中心外部的温度、电力成本、冷却成本、数据中心设施租借、出租、或者所有权成本、服务成本、维护成本、和劳动成本中的任何一个。应当认识到,这些列表是例子并且不是排他的。在多种实施方案中,数据中心参数可以包括当前或者历史数据。在一种实施方案中,识别数据中心参数(ACT 605)可以实时地或者以周期性间隔出现。
识别数据中心参数(ACT 605)还可以包括识别工厂提供或者嵌入设备的容限数据。识别数据中心参数(ACT 605)可以包括监控或者采样数据中心或者它们的装置以确定参数。在一种实施方案中,识别数据中心参数(ACT 605)包括接收识别参数的信息。在一种实施方案中,被识别的(ACT 605)数据中心参数可以为了随后的取回而存储在一个或者多个数据库或者记忆存储设备中。在一种实施方案中,识别数据中心参数(ACT605)包括识别哪些数据中心或者数据中心部件可用于执行另外的应用。例如,一列可利用的数据中心可以被提供并且按照可用能力的顺序或者按照操作费用的顺序排列。这样的列表可以存储在数据库中并且当数据中心参数改变时实时地或者周期性地更新。
在一种实施方案中,识别数据中心参数(ACT 605)包括确定诸如子系统、硬件、或者虚拟服务器的任何增加的部件对数据中心的影响。例如,识别数据中心参数(ACT 605)可以包括确定任何增加的数据中心部件对数据中心冷却能力、电力消耗或者性能的影响。
在一种实施方案中,方法600包括指示一个或者多个数据中心的额外的数据中心能力的行动(ACT 610)。例如,指示额外的数据中心能力(ACT610)可以包括向技术人员或者与可以具有更少或者没有额外能力的不同的数据中心关联的逻辑设备提供额外的数据中心能力的指示。在一种实施方案中,指示额外的数据中心能力(ACT 610)包括数据中心操作能力或者额外的能力的实时图形显示。例如,指示额外的数据中心能力(ACT 610)可以包括提供指示数据中心正以例如80%的能力操作并且因此具有20%的额外数据能力的信息。通过重新分配数据中心应用或者关闭数据中心设备,额外的数据能力可被提供给其他的数据中心、被减小、或者被消除。
方法600还可以包括检测应用故障的行动(ACT 615)。在一种实施方案中,检测应用故障(ACT 615)包括检测由于缺乏可利用的数据中心而引起的应用故障、数据中心操作问题、维护、网络问题或者电力供应问题。在一种实施方案中,在数据中心处的应用故障的指示可以在发生应用故障的数据中心内部或远离该数据中心的位置处被检测到(ACT 615)。
在一种实施方案中,检测应用故障(ACT 615)包括定位与故障关联的或者被故障影响的数据中心或者网络装置。例如,当在服务器上运行时应用可能不能如预期的执行。在这个例子中,服务器可以被识别,并且识别信息可以被提供给技术人员、控制器、或者与相同或不同的数据中心关联的逻辑。在应用不能适当地在物理服务器上执行的一种实施方案中,紧接着虚拟服务器运行的一个或者多个虚拟服务器也可以被识别。虚拟服务器可以然后被转移到同一数据中心内的不同位置、或者不同的数据中心。在一种实施方案中,响应于检测到应用故障(ACT 615),可以为应用转移找到临时位置。这个临时位置可以不是长期应用执行的最合适的位置。例如,在临时位置处运行应用可以将在数据中心部件上的负担增加到不可支持的水平。在这个例子中,应用可以在临时位置处运行,直到更合适的位置可被识别出。
在一种实施方案中,检测应用故障(ACT 615)包括向技术人员提供与故障相关的信息。例如,这个信息可以识别有故障的数据中心或者网络装置、转移的虚拟服务器、新的硬件、维护操作以及关闭信号。
方法600可以包括产生将硬件添加到数据中心的请求的行动(ACT620)。在一种实施方案中,响应于检测到应用故障(ACT 615),方法600包括产生添加硬件的请求的行动(ACT 621)。例如,应用可能由于缺乏在数据中心中的服务器处理能力而出故障。响应于这个故障的检测(ACT615),方法600可以产生向应用出故障的数据中心添加硬件的请求(ACT620)。然后可以试图响应于该请求而使用被添加到数据中心的新硬件(ACT620)来执行出故障的应用。产生向数据中心添加硬件的请求(ACT 620)还可以包括向数据中心技术人员提供请求。在一种实施方案中,所产生的(ACT 620)请求可以在图形界面上显示。产生请求(ACT 620)可以包括产生向数据中心添加虚拟服务器的请求。
方法600可以包括禁用一个或者多个数据中心设备的行动(ACT 625)。在一种实施方案中,诸如服务器或者其他部件的数据中心设备可以不在使用中、或者能以它的能力的一小部分来使用。禁用数据中心设备(ACT 625)可增加数据中心的效率,降低电力消耗,并且减少热生成,所有这些可降低数据中心操作的成本。禁用数据中心设备(ACT 625)可以包括关闭设备,从数据中心移除诸如物理或者虚拟服务器的设备,或者将设备置于降低该设备的电力消耗的睡眠模式中。在一种实施方案中,禁用数据中心设备(ACT 625)包括在禁用设备之前将在该数据中心设备上运行的应用转移到可以位于相同或者不同的数据中心中的不同的设备。
在一种实施方案中,方法600包括监控网络装置参数的行动(ACT630)。例如,网络限制可限制数据中心操作。这可以包括至少形成网络的至少部分的网络基础设施装置的限制。监控网络装置(ACT 630)可以包括接收网络装置要求、相关性、能力、速度、功能或者带宽的指示的任一行动。例子的这个列表不是排他的。监控网络参数(ACT 630)可以包括检测网络故障或者中断,而且可以包括检测可以向数据中心提供电力的电网的电网中断。在一种实施方案中,监控网络装置(ACT 630)包括监控单独的网络元件、设备或者部件例如服务器、交换机或者路由器的状态。
方法600可以包括接收报警消息的行动(ACT 635)。例如,接收报警消息(ACT 635)可以包括接收计划的或者非计划的数据中心维护、或者在包括数据中心的位置中的电力中断的消息。在一种实施方案中,接收报警消息(ACT 635)可以包括识别数据中心的问题。例如,接收报警消息(ACT 635)可以包括接收数据中心部件或者子系统正以全部能力或者接近全部能力操作的消息。
在一种实施方案中,接收报警消息(ACT 635)可以包括接收指示数据中心、它的子系统(例如冷却单元)或者部件(例如服务器)未被充分利用的信息。例如,数据中心或者其部件(例如设备)当前正使用它的可利用的处理能力的5%的报警消息可以被接收(ACT 635)。响应于这个报警消息,数据中心可以至少暂时地关闭。在那个数据中心运行的任何应用可以被停止,并且技术人员可以被警告。这样的行动可以在多个数据中心一致地操作时增加总的效率并且降低成本。
在一种实施方案中,方法600包括接收执行应用的命令的行动(ACT645)。接收执行应用的命令(ACT 645)可以包括接收执行应用的请求。例如,请求或者命令可以从数据中心、与数据中心关联的网络、或者技术人员接收(ACT 645)。在一种实施方案中,接收执行应用的命令(ACT 645)包括接收在数据中心之间或者在一个或者多个数据中心的数据中心部件之间转移应用的请求。在一种实施方案中,接收执行应用的请求(ACT 645)可以响应于在一个或者多个数据中心检测应用故障(ACT 615)的行动。在一种实施方案中,接收执行应用的请求(ACT 645)包括产生请求的控制器。在一种实施方案中,接收执行应用(ACT 645)的命令包括接收在数据中心执行应用的命令,其中该应用由不同的数据中心提供。
在一种实施方案中,方法600包括识别应用的要求的行动(ACT 650)。例如,识别应用的要求(ACT 650)可以包括识别在其执行过程中由应用使用的系统资源。例如,系统资源可以包括所使用的存储器或者处理器能力、以及所产生的热、控制所产生的热所需要的冷却能力、或者用于运行、存储或者执行应用的装置的电力消耗。在一种实施方案中,应用的要求响应于或连同执行应用的所接收的(ACT 645)命令被识别(ACT 650)。识别应用的要求可以包括识别应用将被执行的时间段。在一种实施方案中,识别应用(ACT 650)的要求包括识别应用的冗余、准确度、可靠性或者故障容忍要求。
在一种实施方案中,方法600包括将数据中心识别为运行应用的位置的行动(ACT 655)。这可以包括至少部分地基于多个数据中心的参数的评估来识别来自多个数据中心的数据中心(ACT 655)。例如,这些参数可以包括数据中心作为整体、数据中心装置、和将控制器连接到一个或者多个数据中心的网络的网络装置的电力、电流、能量、冷却和设备特征。识别数据中心(ACT 655)可以包括识别数据中心或者其单独的部件或者子系统,例如服务器。在一种实施方案中,识别数据中心(ACT 655)包括至少部分地基于可以在数据中心内执行的应用的要求来识别数据中心。
在一个例子中,多个数据中心可以通过至少一个网络彼此连接,并且还连接到至少一个控制器。这些数据中心可以在地理上是无联系的。例如,第一数据中心能以它的处理能力的35%操作,但是可以使用它的冷却能力的98%,并且因此可能消耗大量的电力。例如,第二数据中心能以它的能力的90%操作,但是可以仅使用它的冷却能力的60%,并且在这个例子中可以比第一数据中心消耗更少的电力。继续这个例子,控制器可以评估这两个数据中心的能力和电力消耗数据,并且识别(ACT 655)第二数据中心作为执行应用的位置。在这个例子中,应用可以是新的应用,或者可以从第一数据中心转移到第二数据中心。应当认识到,识别数据中心(ACT655)可包括不仅仅数据中心处理、冷却和电力能力的评估。例如,网络装置以及单独的数据中心子系统和设备可以在识别执行应用(ACT 655)的一个或者多个数据中心时被评估。
上面的例子是非限制性的,并且其他的因素、参数和要求可以在识别数据中心(ACT 655)时被考虑。例如,两个或者多个数据中心可以消耗相等的电力,但是一个数据中心可能位于具有更便宜的电力的国家或地区中。在这个例子中,识别数据中心(ACT 655)可以包括识别消耗来自更便宜的源的电力的数据中心,因为这降低了数据中心操作的总成本。在另一个例子中,从环境上更安全的(例如太阳的、风、水力发电的、或者原子核的)源产生的电力可以影响识别数据中心(ACT 655)的行动。地理的和政治的关注以及劳动成本是可以在识别数据中心(ACT 655)时考虑的因素的另外的例子。
在一种实施方案中,识别数据中心(ACT 655)可以包括在在包括数据中心的区域中评估气候或者当地天气条件。例如,在寒冷气候中,数据中心可以以最小化冷却数据中心所必需的冷却装置的数量的方式来设计。在另一个例子中,极端天气条件例如飓风或者暴风雪的潜力可以导致电网中断,并且可以在识别数据中心(ACT 655)时被考虑。
在一种实施方案中,识别数据中心(ACT 655)可以包括识别特定的数据中心子系统或者设备作为执行应用的至少部分的位置。例如,识别数据中心(ACT 655)可以包括识别第一数据中心或者其部件以运行应用的部分,以及识别第一数据中心的不同部件以运行应用的另一部分。另外,应用的另一部分可以在第二数据中心或者其部件处运行。在一种实施方案中,识别数据中心(ACT 655)包括识别在一个或者多个数据中心执行应用的时间。例如,由于例如运行应用所需的数据中心使用条件或者资源,在半夜时在特定的数据中心执行应用可能是最有成本效益的。
在一种实施方案中,将数据中心识别为执行应用(ACT 655)的位置包括识别应用对数据中心的影响,假定数据中心部件执行应用。例如,数据中心能以它的能力的77%操作。将数据中心识别为执行应用(ACT 655)的位置可以包括在所识别的数据中心执行应用将使该数据中心以它的能力的不同百分比操作的确定。在另一个例子中,识别数据中心(ACT 655)可以包括确定如果应用在业务时间期间被执行则在数据中心上执行应用将导致数据中心电力消耗的0.5%的增加。应当认识到,在这里使用的这些百分比和其他的示例性百分比是任意的。可以使用指示数据中心或者网络功能的其他百分比或者值。
在一种实施方案中,应用可以对数据中心产生的影响的指示可以被显示或者提供给技术人员。在这个例子中,识别数据中心(ACT 655)可以响应于来自技术人员的指示应用对数据中心的影响是可接受的指示而发生。在另一个例子中,识别数据中心(ACT 655)可以响应于来自任何数据中心的控制器或者数据中心部件的指示应用对数据中心的影响是可接受的指示而发生。
在一种实施方案中,识别数据中心(ACT 655)包括识别具有执行应用的足够的能力的多个数据中心。例如,所识别的数据中心参数可以被评估以产生在一个或者多个数据中心内执行应用的一列合适的位置。在这个例子中,该列表可以被排序,以便至少一个位置被识别为主要位置。继续这个例子,在一个或者多个数据中心内的多个服务器可以从具有最低操作费用的那些数据中心到具有最高操作费用的那些数据中心被识别。数据中心本身或者它们的各个部件或者子系统可以被识别(ACT 655)。在一种实施方案中,在一个或者多个数据中心内的一组虚拟服务器可被识别(ACT655)。
识别数据中心(ACT 655)可以包括识别数据中心的虚拟服务器的位置,其中该虚拟服务器具有执行应用的足够的能力。在一种实施方案中,识别数据中心(ACT 655)包括识别在数据中心内的虚拟服务器,以及识别该虚拟服务器的合适的备用的位置。这样的备用位置可以在具有比另一个数据中心更低的操作费用或者更低的总所有权成本的数据中心内。例如,能够执行应用的虚拟服务器可以在具有不可靠的电网的数据中心内、或者该虚拟服务器可以依赖于不充足的或者不可靠的其他数据中心部件。在这个例子中,识别数据中心(ACT 655)可以包括识别虚拟服务器的备用位置。备用位置可以在相同的或者不同的数据中心中。一个虚拟服务器或者一组虚拟服务器然后可以转移到备用位置以执行应用。
在一种实施方案中,识别数据中心(ACT 655)可以包括将数据中心识别为正需要维护。在这个例证性的实施方案中,技术人员可以批准在数据中心、它的部件、或者它的相关网络或者控制器上升级或者执行维护的请求。例如,如果下层物理服务器的硬件被升级,则虚拟服务器性能可以增加。在这个例子中,识别数据中心(ACT 655)可以包括或者响应于升级服务器硬件的请求。在一种实施方案中,当识别数据中心(ACT 655)时,可以考虑在升级装置或者增加硬件时硬件、维护或者安装活动的成本。例如,这可以响应于将硬件添加到数据中心(ACT 620)的请求而发生。
不需要在识别数据中心(ACT 655)的行动之前提供特定的应用用于执行。例如,识别数据中心(ACT 655)可以包括识别例如具有可利用的服务器处理能力的多个数据中心。一列这些数据中心可以按照例如处理能力的量、操作成本、位置或者其他因素来排列。这个列表可以周期性地或者实时地更新。这个列表可以从它被存储的存储器存储单元或者数据库被取回。
在一种实施方案中,方法600可以包括转移数据中心应用的行动(ACT658)。数据中心应用可以在一个数据服务器内的设备之间、或者从第一数据中心到第二数据中心转移(ACT 658)。在一种实施方案中,转移数据中心应用可响应于从数据中心接收报警消息的行动(ACT 635)。在一种实施方案中,诸如虚拟、物理或者专用服务器的部件可以为了接收所转移的(ACT 658)应用的目的而添加到数据中心。转移应用(ACT 658)可以包括将应用转移到两个或者多个物理或者虚拟位置或者一组虚拟服务器。在一种实施方案中,转移应用(ACT 658)包括转移应用的一部分,而应用的另一部分保持在现有的物理或者虚拟位置处。
在一种实施方案中,转移数据中心应用(ACT 658)包括将数据中心识别为能够执行当前被分配到或者指派到不同的数据中心的设备的应用。例如,多个数据中心可以同时操作。多个数据中心的一个可以在能量成本比在其他数据中心的位置处的能量成本更低的位置上操作。在这个例子中,转移数据中心应用(ACT 658)可以包括识别具有较低的能量成本的数据中心作为执行当前由具有较高的能量成本的不同的数据中心执行的应用的位置。在这个例子中,应用可以从具有较高能量成本的数据中心转移(ACT 658)到具有较低能量成本的数据中心。这降低了多个数据中心的总的操作成本。应当认识到,能量成本的例子不是限制性的。其他因素例如劳动成本、维护、处理能力、可靠性或者电网耐久性可以在将数据中心转移到执行应用(ACT 658)的位置时被评估。
在一种实施方案中,方法600包括向数据中心提供应用的行动(ACT660)。例如,向数据中心提供应用(ACT 660)可以包括通过网络将应用传送到数据中心或者其部件,例如具有执行应用的足够的能力的服务器。应用可以通过网络、另一个数据中心、技术人员或者控制器来提供(ACT660)给数据中心。在一种实施方案中,向数据中心(ACT 660)提供应用包括响应于生成添加硬件的请求(ACT 620)的行动来将应用提供到被添加到数据中心的硬件。应当认识到,向数据中心提供应用(ACT 660)可以改变数据中心操作特征和其他参数。
在一种实施方案中,方法600包括指示服务器或者其他的数据中心部件执行应用(ACT 665)的行动。例如,应用可以被提供给数据中心(ACT660)用于通过服务器或者其他的数据中心部件立即执行。指示服务器执行应用(ACT 665)还可以包括关于如何执行应用的指令。例如,指令可以包括可靠性或者容错规范。在多种实施方案中,指示数据中心执行应用(ACT 665)可以响应于例如转移应用(ACT 658)、向数据中心提供应用(ACT 660)、向第二数据中心提供应用(ACT 680)或者识别数据中心(ACT655)。
在一种实施方案中,方法600包括使应用的执行时移(ACT 670)的行动。应用的时移执行(ACT 670)可以包括延迟应用的执行。例如,当识别应用的要求(ACT 650)时,可以确定应用的执行不是时间敏感的。另外,在某些日子,例如假期或者周末,或者在一天的某些时间,例如在股票市场关闭后或者在工作时间以后,数据中心可以具有另外的能力。在例如这些情况下,应用可以被时移(ACT 670)以在减少的数据中心活动的时期期间使用数据中心。在一种实施方案中,执行应用(ACT 665)的指令包括使应用的执行时移(ACT 670)的指令。在一种实施方案中,使应用的执行时移(ACT 670)可以响应于数据中心参数的识别(ACT 605)。另外,使应用的执行时移(ACT 670)可以响应于报警消息的接收(ACT635)。例如,报警消息可以指示数据中心或者其部件在全部能力或者接近全部能力,数据中心维护被排定,与数据中心关联的电网被中断,存在劳动或者安全关注或者其他因素。
方法600可以包括确定第一数据中心能力(ACT 675)的行动。例如,确定第一数据中心能力(ACT 675)可以包括确定正在被使用的数据中心能力的量或者可利用的数据中心能力的量。被确定的数据中心能力(ACT675)可以包括数据中心作为整体的或者其中的各个子系统或者元件的处理能力、电力能力或者冷却能力。例如,识别第一数据中心能力(ACT 675)可以包括将在数据中心内的服务器识别为具有执行应用的足够的能力。可以基于由第一数据中心或者它的装置提供的信息、或者通过基于与第一数据中心可能正在执行的许多应用关联的已知的装置容限和信息的推断来确定第一数据中心能力(ACT 675)。
确定第一数据中心能力(ACT 675)可以包括识别具有额外或者可利用的能力的数据中心。确定第一数据中心能力(ACT 675)还可以包括确定数据中心以全部能力操作。例如,数据中心可以消耗它的100%的可利用的电力,或者数据中心冷却单元能以全部能力操作。另外,服务器或者其他的部件能以它们的最大处理能力操作,或者存储设备可以是满的。在一种实施方案中,识别数据中心参数(ACT 605)包括确定第一数据中心能力(ACT 675)的行动。
在一种实施方案中,确定第一数据中心能力(ACT 675)可以通过参考数据中心模型来完成。例如,在数据中心外部的数据中心控制器可以模拟数据中心操作。在这个例子中,确定第一数据中心能力(ACT 675)可以包括基于模拟的而不是测量的数据中心数据来确定数据中心能力。
在一种实施方案中,方法600包括向第二数据中心提供应用的行动(ACT 680)。例如,向第二数据中心提供应用(ACT 680)可以响应于确定第一数据中心能力(ACT 675)、接收报警消息(ACT 635)、检测应用故障(ACT 615)、监控网络装置参数(ACT 630)、指示额外的数据中心能力(ACT 610)、和识别数据中心参数(ACT 605)中的至少一个行动而发生。在一种实施方案中,向第二数据中心提供应用(ACT 680)包括向第二数据中心部件例如服务器提供应用用于执行。在一种实施方案中,向第二数据中心提供应用(ACT 680)包括向第二数据中心提供应用的一部分。
此处描述的各种方面和实施方案可以在如上面讨论的一个或者多个计算机系统上实现。例如,系统200可以在单个计算机系统中或者在多个计算机系统中实现。例如,这些计算机系统可以是例如通用计算机,例如基于Intel PENTIUM型处理器、Motorola PowerPC、Sun UltraSPARC、Hewlett-Packard PA-RISC处理器、或者任何其他类型的处理器的那些计算机。
例如,各种方面可以被实现为在例如在图7中示出的通用计算机系统700中执行的专用软件。计算机系统700可以包括连接到一个或者多个存储设备710例如磁盘驱动器、存储器、或者用于存储数据的其他设备的处理器705。存储器710通常用于在计算机系统700的操作过程中存储程序和数据。计算机系统700还可以包括提供另外的存储能力的存储系统715。计算机系统700的部件可以由互连机构720耦合,互连机构720可以包括一个或者多个总线(例如集成在同一机器内的部件之间)和/或网络(例如在位于单独的分立的机器上的部件之间)。互连机构720使通信(例如数据、指令)能够在系统700的系统部件之间交换。
计算机系统700还包括一个或者多个输入设备725例如键盘、鼠标、跟踪球、麦克风、触摸屏和一个或者多个输出设备730例如打印设备、显示屏、扬声器。另外,计算机系统700可以包括一个或者多个接口(没有示出),其将计算机系统700连接到通信网络(除了互连机构720以外或者作为互连机构720的替代物)。
在图8中更详细地示出的存储系统715通常包括存储有信号的计算机可读和可写的非易失性记录介质805,所述信号定义由处理器执行的程序或者在介质805上或内存储的由程序处理以执行与这里描述的实施方案相关的一种或者多种功能的信息。例如,介质可以是磁盘或者闪存。通常地,在操作中,处理器使数据从非易失性记录介质805被读到另一个存储器810,与介质805相比,存储器810允许通过处理器对信息的更快的存取。这个存储器810通常是易失性随机存取存储器,例如动态随机存取存储器(DRAM)或者静态存储器(SRAM)。它可以如所示位于储存系统715内或者在存储系统710内。处理器705一般操纵在集成电路存储器710、810内的数据,并且然后在处理结束以后将数据复制到介质805。多种机构可以管理在介质805和集成电路存储元件710、810之间的数据移动,并且这里提供的例子——包括示例性存储系统710和储存系统715——是非限制性的。
这里实现的计算机系统可以包括特别编程的专用硬件,例如专用集成电路(ASIC)。这里描述的各种方面可以在软件、硬件或者固件或者其任何组合中实现。另外,这样的方法、行为、系统、其系统元件和部件可以作为上面描述的计算机系统的一部分或者作为独立的部件来实现。
虽然计算机系统700作为例子被显示为在其上可实践这里描述的各种方面的一种类型的计算机系统,但是应当认识到,方面和实施方案不限于在如图7所示的计算机系统上实现。各种方面可以在具有与图7中所示的架构或者部件不同的一个或者多个计算机上被实践。另外,在这里(或者在权利要求中)描述的实施方案的功能或者过程在处理器或者控制器上被执行的场合,这样的描述旨在包括使用超过一个的处理器或者控制器来执行功能的系统。
计算机系统700可以是通用计算机系统,其是可以使用高级计算机编程语言编程的。计算机系统700还可以使用特别编程的专用硬件来实现。在计算机系统700中,处理器705可以是市场上可买到的处理器,例如可从Intel公司得到的著名的Pentium类处理器。其他处理器是可以利用的,例如可执行操作系统的那些处理器,该操作系统可以是例如可以从微软公司得到的Windows 95、Windows 98、Windows NT、Windows 2000(WindowsME)、Windows XP或者Windows Vista操作系统,可以从苹果计算机公司得到的MAC OS System X操作系统,可以从Sun微系统公司得到的Solaris操作系统,或者可以从多种资源得到的UNIX操作系统。许多其他的操作系统可以被使用。
处理器和操作系统共同定义计算机平台,对该计算机平台使用高级编程语言编写应用程序。应当理解,这里描述的系统和方法的实施方案不限于特定的计算机系统平台、处理器、操作系统或者网络。另外,应当认识到,这些系统和方法不限于特定的编程语言或者计算机系统。其他合适的编程语言和其他合适的计算机系统可被使用。
计算机系统的一个或者多个部分可以分布在耦合到通信网络的一个或者多个计算机系统中。例如,如上面讨论的,网络管理器315可以定位成远离变化和能力管理器305。这些计算机系统还可以是通用计算机系统。例如,系统200的元件可分布在配置成向一个或者多个客户端计算机提供服务(例如服务器)或者作为分布式系统的部分执行总任务的一个或者多个计算机系统中。例如,可以在包括分布在一个或者多个服务器系统之间的部件的客户端-服务器或者多层系统上执行操作,这些部件根据这里描述的各种实施方案执行各种功能。这些部件可以是使用通信协议(例如,TCP/IP)在通信网络(例如,英特网)上进行通信的可执行的、中间的(例如IL)或者解释的(例如Java)代码。例如,一个或者多个数据库服务器可以用于存储在设计布局中使用的设备数据,并且一个或者多个服务器可以用于有效地执行与这里描述的实施方案关联的冷却计算。
应当认识到,这里描述的方面和实施方案不限于在任何特定的系统或者系统组上执行。另外,应当认识到,这里描述的方面和实施方案不限于任何特定的分布式架构、网络或者通信协议。
各种方面和实施方案可以使用诸如SmallTalk、Java、C++、Ada、或者C#(C-Sharp)的面向对象的编程语言来编程。其他面向对象的编程语言也可以被使用。可选地,可以使用功能、脚本、和/或逻辑编程语言。各种方面和实施方案可以在非编程环境(例如以HTML、XML或者其他形式创建的文件,当在浏览器程序的窗口被查看时,这些文件再现图形化用户界面(GUI)的方面或者执行其他的功能)中实现。各种方面和实施方案可以作为编程的或者未编程的元件或者其任何组合来实现。
这里描述了提供装置外壳的剩余冷却能力的指示的系统和方法。剩余冷却能力的指示可以是例如以每小时千瓦或者BTU为单位的剩余冷却的直接指示,或者指示可以是间接的,例如提供例如以百分比为单位的外壳可用的总冷却能力和正在使用多少冷却的指示。另外,计算值——包括捕获系数和再循环系数——可以用于确定特定设计的充分性,并在报警或者错误情况将产生之前确定另外的冷却能力。
在这里讨论的方面和实施方案中,分析结果被描述为实时地提供。应当认识到,术语“实时”的使用可以但不需要表明结果是立即可用的。例如,结果可以迅速地变成过时的,假定设计者有在较短的一段时间例如大约几分钟内尝试许多不同设计的能力。
注意在图1到图8中,所列举的项作为单独的元件示出。然而,在这里描述的系统和方法的实际实现中,它们可以是其他电子设备例如数字计算机的不可分离的部件。因此,上面描述的行动可以至少部分地在可以体现在包括程序存储介质的制造物品中的软件内实现。程序存储介质包括在载波、计算机磁盘(磁性的、或者光学的(例如CD或者DVD或者两者)、非易失性存储器、磁带、系统存储器和计算机硬驱动器的一个或者多个中体现的数据信号。
从前述内容中,应当认识到,这里描述的方面和实施方案提供有效的数据中心控制。这些方面和实施方案能够识别来自地理上无联系的数据中心和其关联的设备和网络的多个特征。通过评估这些特征,方面和实施方案可识别执行新的或者现有的应用的数据中心位置。用于执行的应用的这个重新分配和布置增加了数据中心效率和兼容性,节省了能量,并且降低了操作成本。
这里描述的实施方案和方面适合于在具有大量的装置机架的相对大的数据中心、以及较小的和非正式的数据中心中使用,并可用在数据中心以外的设备上。分支电路能力的估计和相平衡在高密度数据中心内可能变得复杂。内部服务器电力仪器可以向数据中心控制器提供识别冷却子系统能力的信息。在多种实施方案例如使用三相电源或者服务器仪器缺少的那些实施方案中,电力分配系统仪器可提供用于确定负载消耗、可利用的能力和相平衡的信息。这个信息可由数据中心控制器使用以将数据中心设备、子系统或者装置分配或者重新分配到一个或者多个数据中心上或内。这改进了数据中心操作和效率,并且降低了操作成本。
对前面和后面、左侧和右侧、顶部和底部、和上部和下部的任何提及旨在为了描述的方便,而不是将本系统和方法或者它们的部件限制到任何一个位置或者空间方位。
在这里以单数形式提到的系统和方法的实施方案或者元件或者行动的任何提及还可以包括包含多个这些元件的实施方案,并且对这里的任何实施方案或者元件或者行动的复数形式的任何提及也可以包括只包含单个元件的实施方案。以单数或者复数形式的提及并不用于限制当前公开的系统或者方法、它们的部件、行动或者元件。
这里公开的任何实施方案可以与任何其他的实施方案组合,并且对“实施方案”、“一些实施方案”、“可选的实施方案”、“多种实施方案”、“一种实施方案”或者类似的提及不一定是相互排他的,并且旨在指示结合实施方案所描述的特定的特征、结构或者特性可以包括在至少一种实施方案中。如在这里使用的这样的术语不一定都指的是同一实施方案。任何实施方案可以用与这里公开的目标一致的任何方式与任何其他实施方案组合。对“或者”的提及可以被解释为包括的,以便使用“或者”描述的任何术语可以指示所描述的项的单个、一个以上、和全部的任何一种情况。
在附图、详细描述或者任何权利要求中的技术特征跟随有参考标记的场合,参考标记为了增加附图、详细描述和权利要求的可理解性的目的而被包括。因此,有或没有参考标记对任何权利要求元件的范围没有任何限制影响。
本领域技术人员将认识到,在这里描述的系统和方法可以体现在其他特定的形式中,而不偏离其精神或者本质特征。例如,在地理上无联系的区域内的物理上分离的数据中心可以被考虑为一个分布式数据中心。在另一个例子中,资源可以在单个数据中心的一个或者多个设备或者子系统之间被分配或者调节。上述的实施方案因此在所有方面被认为是例证性的,而不是所描述的系统和方法的限制。这里描述的系统和方法的范围因此由所附的权利要求而不是上述的描述指示,并且因此在权利要求的等效形式的含义和范围内的所有变化被规定为包括在其中。
Claims (27)
1.一种用于数据中心控制的计算机实现的方法,包括:
识别多个数据中心的参数,每一个数据中心包括多个设备;
接收执行应用的命令;
至少部分地基于对所述参数的评估来识别来自所述多个数据中心的所选择的数据中心作为运行所述应用的位置;
评估所述参数以识别所述多个数据中心的一个的设备的未充分利用条件,所述参数包括模拟冗余;以及
基于所述未充分利用条件禁用所述多个数据中心的一个的所述设备。
2.如权利要求1所述的计算机实现的方法,包括:
识别所述应用的要求;以及
至少部分地基于对所述要求的评估来识别所述选择的数据中心。
3.如权利要求1所述的计算机实现的方法,包括:
检测在所述多个数据中心的一个处的所述应用的故障;以及
响应于检测到所述故障来识别所述选择的数据中心。
4.如权利要求1所述的计算机实现的方法,包括:
基于对模拟的第一数据中心冷却特征和模拟的第一数据中心电力特征的至少一个的评估来确定第一数据中心的第一数据中心能力;
向与第二数据中心关联的设备提供指示所述第一数据中心能力的信息;以及
接收在所述第一数据中心中的设备上执行由与第二数据中心关联的所述设备提供的应用的请求。
5.如权利要求1所述的计算机实现的方法,包括:
至少部分地基于所述选择的数据中心的模拟特征来识别在所述选择的数据中心中的不足的数据中心能力;以及
启动所述选择的数据中心的不间断电源、服务器、网络装置和冷却单元的至少一个。
6.如权利要求1所述的计算机实现的方法,其中所述多个数据中心的至少两个由网络连接,所述方法包括:
监控形成所述网络的至少部分的网络基础设施装置的模拟参数。
7.如权利要求1所述的计算机实现的方法,包括:
向所述选择的数据中心的一组虚拟服务器添加物理服务器;以及
将所述应用的至少一部分分配到该组虚拟服务器。
8.如权利要求1所述的计算机实现的方法,包括:
向所述选择的数据中心的虚拟服务器提供所述应用。
9.如权利要求1所述的计算机实现的方法,包括:
禁用与所述多个数据中心的所述参数的至少一个关联的不间断电源、服务器、网络装置和冷却单元中的至少一个。
10.如权利要求1所述的计算机实现的方法,包括:
启动与所述多个数据中心的所述参数的至少一个关联的不间断电源、服务器、网络装置和冷却单元中的至少一个。
11.如权利要求1所述的计算机实现的方法,包括:
识别执行所述应用的系统要求;以及
基于对所述参数的评估和对所述系统要求的评估来使所述应用的执行时移。
12.如权利要求1所述的计算机实现的方法,包括:
识别所述选择的数据中心中具有足以执行所述应用的能力的服务器;
向所述服务器提供所述应用;以及
指示所述服务器执行所述应用。
13.如权利要求1所述的计算机实现的方法,包括:
将所述应用的至少一部分分配到两个或者更多个数据中心。
14.一种用于数据中心活动控制的系统,包括:
数据中心控制器,其与网络关联,所述数据中心控制器包括:
用于识别与所述网络关联的多个数据中心的参数的模块,每一个数据中心包括多个设备;
用于评估所述参数以识别来自所述多个数据中心的所选择的数据中心作为运行应用的位置的模块,所述参数包括模拟冗余;
用于评估所述参数以识别所述多个数据中心的一个的设备的未充分利用条件的模块;以及
用于基于所述未充分利用条件禁用所述多个数据中心的一个的所述设备的模块。
15.如权利要求14所述的系统,其中所述数据中心控制器还包括:
用于识别所述应用的要求的模块;以及
用于至少部分地基于对所述要求的评估来识别所述选择的数据中心的模块。
16.如权利要求14所述的系统,其中用于评估所述参数以识别所选择的数据中心的所述模块包括用于响应于在所述多个数据中心的一个处执行所述应用的故障来识别所述选择的数据中心的模块。
17.如权利要求14所述的系统,其中所述参数包括位于所述数据中心的一个中的设备的模拟电力消耗、模拟冷却能力、模拟效率、模拟可靠性和模拟备份运行时间中的至少一个。
18.如权利要求14所述的系统,其中:
用于评估所述参数以识别未充分利用条件的所述模块包括用于基于对模拟的第一数据中心冷却特征和模拟的第一数据中心电力特征的至少一个的评估来确定第一数据中心的第一数据中心能力的模块;以及其中
所述数据中心控制器还包括:
用于向与第二数据中心关联的设备提供指示所述第一数据中心能力的信息的模块;以及
用于接收在所述第一数据中心中的设备上执行由与第二数据中心关联的所述设备提供的应用的请求的模块。
19.如权利要求14所述的系统,其中所述数据中心控制器还包括用于监控形成所述网络的至少部分的网络基础设施装置的参数的模块。
20.如权利要求14所述的系统,其中所述数据中心控制器还包括用于将所述应用的至少一部分分配到所述选择的数据中心的一组虚拟服务器的模块。
21.如权利要求14所述的系统,其中所述数据中心控制器还包括用于向位于所述选择的数据中心中的虚拟服务器提供所述应用的模块。
22.如权利要求14所述的系统,其中所述数据中心控制器还包括:
用于接收来自第一数据中心的子系统的报警消息的模块;以及
用于通过所述网络将第一应用从位于所述第一数据中心中的服务器转移到位于第二数据中心中的服务器的模块。
23.如权利要求14所述的系统,其中所述数据中心控制器还包括:
用于识别执行所述应用的系统要求的模块;以及
用于部分地基于所述系统要求来使所述应用的执行时移的模块。
24.如权利要求14所述的系统,其中:
在所述选择的数据中心中的一服务器包括足以执行所述应用的能力;以及其中
所述数据中心控制器还包括用于向所述服务器提供所述应用以由所述服务器执行的模块。
25.如权利要求14所述的系统,其中所述数据中心控制器还包括用于生成向所述多个数据中心的至少一个添加硬件的请求的模块。
26.如权利要求14所述的系统,其中所述数据中心控制器还包括用于至少部分地基于对所述参数的评估来指示所述选择的数据中心具有额外的能力的模块。
27.如权利要求14所述的系统,其中所述数据中心控制器还包括用于至少部分地基于对所述参数的评估来将所述应用的至少一部分分配到两个或者更多个数据中心的模块。
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/371,355 | 2009-02-13 | ||
US12/371,355 US9519517B2 (en) | 2009-02-13 | 2009-02-13 | Data center control |
PCT/US2010/022074 WO2010093515A1 (en) | 2009-02-13 | 2010-01-26 | Data center control |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102395955A CN102395955A (zh) | 2012-03-28 |
CN102395955B true CN102395955B (zh) | 2014-08-06 |
Family
ID=42194687
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201080016515.0A Active CN102395955B (zh) | 2009-02-13 | 2010-01-26 | 数据中心控制 |
Country Status (6)
Country | Link |
---|---|
US (1) | US9519517B2 (zh) |
EP (1) | EP2396726A1 (zh) |
CN (1) | CN102395955B (zh) |
AU (1) | AU2010214029B2 (zh) |
CA (1) | CA2752613A1 (zh) |
WO (1) | WO2010093515A1 (zh) |
Families Citing this family (114)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7881910B2 (en) | 2005-05-02 | 2011-02-01 | American Power Conversion Corporation | Methods and systems for managing facility power and cooling |
US7885795B2 (en) | 2005-05-02 | 2011-02-08 | American Power Conversion Corporation | Methods and systems for managing facility power and cooling |
US9568206B2 (en) | 2006-08-15 | 2017-02-14 | Schneider Electric It Corporation | Method and apparatus for cooling |
US8327656B2 (en) | 2006-08-15 | 2012-12-11 | American Power Conversion Corporation | Method and apparatus for cooling |
US8322155B2 (en) | 2006-08-15 | 2012-12-04 | American Power Conversion Corporation | Method and apparatus for cooling |
US7681404B2 (en) | 2006-12-18 | 2010-03-23 | American Power Conversion Corporation | Modular ice storage for uninterruptible chilled water |
US8425287B2 (en) | 2007-01-23 | 2013-04-23 | Schneider Electric It Corporation | In-row air containment and cooling system and method |
ES2612328T3 (es) | 2007-05-15 | 2017-05-16 | Schneider Electric It Corporation | Métodos y sistemas para gestionar potencia y enfriamiento de una instalación |
US9496200B2 (en) | 2011-07-27 | 2016-11-15 | Coolit Systems, Inc. | Modular heat-transfer systems |
US9943014B2 (en) | 2013-03-15 | 2018-04-10 | Coolit Systems, Inc. | Manifolded heat exchangers and related systems |
US9405348B2 (en) | 2008-04-21 | 2016-08-02 | Adaptive Computing Enterprises, Inc | System and method for managing energy consumption in a compute environment |
WO2009131592A1 (en) * | 2008-04-21 | 2009-10-29 | Cluster Resources, Inc. | System and method for managing energy consumption in a compute environment |
US8209056B2 (en) | 2008-11-25 | 2012-06-26 | American Power Conversion Corporation | System and method for assessing and managing data center airflow and energy usage |
US8560677B2 (en) * | 2009-02-13 | 2013-10-15 | Schneider Electric It Corporation | Data center control |
US9778718B2 (en) | 2009-02-13 | 2017-10-03 | Schneider Electric It Corporation | Power supply and data center control |
GB2480020B (en) * | 2009-02-23 | 2015-07-08 | Commscope Inc | Methods and systems for monitoring changes made to a network that alter the services provided to a server |
US8249825B2 (en) | 2009-05-08 | 2012-08-21 | American Power Conversion Corporation | System and method for predicting cooling performance of arrangements of equipment in a data center |
US8355890B2 (en) * | 2009-05-08 | 2013-01-15 | American Power Conversion Corporation | System and method for predicting maximum cooler and rack capacities in a data center |
JP5218276B2 (ja) * | 2009-05-19 | 2013-06-26 | 富士通株式会社 | 空調制御システム、空調制御方法および空調制御プログラム |
US11386371B2 (en) * | 2009-06-26 | 2022-07-12 | Turbonomic, Inc. | Systems, apparatus and methods for cost and performance-based movement of applications and workloads in a multiple-provider system |
US10346775B1 (en) | 2015-11-16 | 2019-07-09 | Turbonomic, Inc. | Systems, apparatus and methods for cost and performance-based movement of applications and workloads in a multiple-provider system |
JP2011018167A (ja) * | 2009-07-08 | 2011-01-27 | Fujitsu Ltd | 負荷分散プログラム、負荷分散装置及び負荷分散方法 |
WO2011011408A1 (en) * | 2009-07-20 | 2011-01-27 | Viridity Software, Inc. | Techniques for power analysis |
US8468380B2 (en) * | 2009-07-31 | 2013-06-18 | Dell Products, Lp | Power consumption monitor and method therefor |
US8566619B2 (en) * | 2009-12-30 | 2013-10-22 | International Business Machines Corporation | Cooling appliance rating aware data placement |
US9207993B2 (en) * | 2010-05-13 | 2015-12-08 | Microsoft Technology Licensing, Llc | Dynamic application placement based on cost and availability of energy in datacenters |
US10205319B2 (en) | 2010-06-11 | 2019-02-12 | Eaton Intelligent Power Limited | Automatic matching of sources to loads |
US8805998B2 (en) | 2010-06-11 | 2014-08-12 | Eaton Corporation | Automatic matching of sources to loads |
US8560291B2 (en) * | 2010-06-22 | 2013-10-15 | International Business Machines Corporation | Data center physical infrastructure threshold analysis |
US9729464B1 (en) * | 2010-06-23 | 2017-08-08 | Brocade Communications Systems, Inc. | Method and apparatus for provisioning of resources to support applications and their varying demands |
US8811377B1 (en) | 2010-08-30 | 2014-08-19 | Synapsense Corporation | Apparatus and method for instrumenting devices to measure power usage using a multi-tier wireless network |
US8600575B2 (en) * | 2010-09-24 | 2013-12-03 | Synapsense Corporation | Apparatus and method for collecting and distributing power usage data from rack power distribution units (RPDUs) using a wireless sensor network |
US20120060167A1 (en) * | 2010-09-08 | 2012-03-08 | Salsburg Michael A | Method and system of simulating a data center |
US9274849B1 (en) | 2010-09-08 | 2016-03-01 | Disney Enterprises, Inc. | Systems and methods for configuring and managing computing resources to provide highly-scalable services |
US9348394B2 (en) * | 2010-09-14 | 2016-05-24 | Microsoft Technology Licensing, Llc | Managing computational workloads of computing apparatuses powered by renewable resources |
US10061371B2 (en) * | 2010-10-04 | 2018-08-28 | Avocent Huntsville, Llc | System and method for monitoring and managing data center resources in real time incorporating manageability subsystem |
US9762578B2 (en) | 2010-10-25 | 2017-09-12 | Schneider Electric It Corporation | Methods and systems for establishing secure authenticated bidirectional server communication using automated credential reservation |
US10642849B2 (en) * | 2010-10-25 | 2020-05-05 | Schneider Electric It Corporation | Methods and systems for providing improved access to data and measurements in a management system |
US8849469B2 (en) * | 2010-10-28 | 2014-09-30 | Microsoft Corporation | Data center system that accommodates episodic computation |
US8499066B1 (en) * | 2010-11-19 | 2013-07-30 | Amazon Technologies, Inc. | Predicting long-term computing resource usage |
US9063738B2 (en) | 2010-11-22 | 2015-06-23 | Microsoft Technology Licensing, Llc | Dynamically placing computing jobs |
US9442771B2 (en) * | 2010-11-24 | 2016-09-13 | Red Hat, Inc. | Generating configurable subscription parameters |
US9563479B2 (en) | 2010-11-30 | 2017-02-07 | Red Hat, Inc. | Brokering optimized resource supply costs in host cloud-based network using predictive workloads |
US8825451B2 (en) | 2010-12-16 | 2014-09-02 | Schneider Electric It Corporation | System and methods for rack cooling analysis |
US8688413B2 (en) | 2010-12-30 | 2014-04-01 | Christopher M. Healey | System and method for sequential placement of cooling resources within data center layouts |
US9128778B2 (en) * | 2010-12-30 | 2015-09-08 | Panduit Corp. | System and method for assignment of virtual machines based on physical information |
US8762522B2 (en) * | 2011-04-19 | 2014-06-24 | Cisco Technology | Coordinating data center compute and thermal load based on environmental data forecasts |
US8533514B2 (en) | 2011-06-26 | 2013-09-10 | Microsoft Corporation | Power-capping based on UPS capacity |
US9450838B2 (en) | 2011-06-27 | 2016-09-20 | Microsoft Technology Licensing, Llc | Resource management for cloud computing platforms |
US9595054B2 (en) | 2011-06-27 | 2017-03-14 | Microsoft Technology Licensing, Llc | Resource management for cloud computing platforms |
US8924781B2 (en) | 2011-06-30 | 2014-12-30 | Microsoft Corporation | Power capping based on generator capacity |
EP2555141A1 (en) * | 2011-08-03 | 2013-02-06 | Alcatel Lucent | A method, a system, a server, a control element, a computer program and a computer program product for operating a power grid having decentralized control elements |
US10365667B2 (en) | 2011-08-11 | 2019-07-30 | Coolit Systems, Inc. | Flow-path controllers and related systems |
US9229786B2 (en) * | 2011-10-25 | 2016-01-05 | International Business Machines Corporation | Provisioning aggregate computational workloads and air conditioning unit configurations to optimize utility of air conditioning units and processing resources within a data center |
FR2982386B1 (fr) * | 2011-11-08 | 2016-05-27 | Bull Sas | Procede, programme d'ordinateur et dispositif d'allocation de ressources informatiques d'un cluster pour l'execution d'un travail soumis audit cluster |
CN103138999A (zh) * | 2011-11-28 | 2013-06-05 | 英业达科技有限公司 | 多个机架系统的监控方法 |
US10380515B1 (en) * | 2011-12-21 | 2019-08-13 | EMC IP Holding Company LLC | Geolocation for customer support mobile application |
CN104137105B (zh) | 2011-12-22 | 2017-07-11 | 施耐德电气It公司 | 关于瞬时事件对数据中心中的温度的影响分析 |
US9830410B2 (en) | 2011-12-22 | 2017-11-28 | Schneider Electric It Corporation | System and method for prediction of temperature values in an electronics system |
AU2011384034A1 (en) | 2011-12-22 | 2014-07-10 | Schneider Electric It Corporation | Systems and methods for reducing energy storage requirements in a data center |
US9411655B2 (en) * | 2011-12-30 | 2016-08-09 | Dell Products, Lp | System and method for detection and deployment of virtualization capable assets in a managed datacenter |
US9703342B2 (en) | 2012-02-10 | 2017-07-11 | Server Technology, Inc. | System and method for configuring plurality of linked power distribution units in which configuration data of the linked power distribution units are accessible by the remote system |
US20130219043A1 (en) * | 2012-02-20 | 2013-08-22 | Moritz M. Steiner | Method and apparatus for automatic migration of application service |
US20130275552A1 (en) * | 2012-04-16 | 2013-10-17 | Cisco Technology, Inc. | Virtual desktop system |
US8990639B1 (en) | 2012-05-31 | 2015-03-24 | Amazon Technologies, Inc. | Automatic testing and remediation based on confidence indicators |
US9043658B1 (en) | 2012-05-31 | 2015-05-26 | Amazon Technologies, Inc. | Automatic testing and remediation based on confidence indicators |
US9009542B1 (en) | 2012-05-31 | 2015-04-14 | Amazon Technologies, Inc. | Automatic testing and remediation based on confidence indicators |
US11521139B2 (en) | 2012-09-24 | 2022-12-06 | Amazon Technologies, Inc. | Providing system resources with secure containment units |
US9843484B2 (en) | 2012-09-25 | 2017-12-12 | A10 Networks, Inc. | Graceful scaling in software driven networks |
US10002141B2 (en) * | 2012-09-25 | 2018-06-19 | A10 Networks, Inc. | Distributed database in software driven networks |
EP2901308B1 (en) | 2012-09-25 | 2021-11-03 | A10 Networks, Inc. | Load distribution in data networks |
US10021174B2 (en) | 2012-09-25 | 2018-07-10 | A10 Networks, Inc. | Distributing service sessions |
US9342981B1 (en) | 2012-10-16 | 2016-05-17 | Google Inc. | Instantiating an application based on connection with a device via a universal serial bus |
US10408712B2 (en) | 2013-03-15 | 2019-09-10 | Vertiv Corporation | System and method for energy analysis and predictive modeling of components of a cooling system |
US9052252B2 (en) | 2013-03-15 | 2015-06-09 | Coolit Systems, Inc. | Sensors, communication techniques, and related systems |
TWI531795B (zh) | 2013-03-15 | 2016-05-01 | 水冷系統公司 | 感測器、多工通信技術及相關系統 |
US9335932B2 (en) * | 2013-03-15 | 2016-05-10 | Bracket Computing, Inc. | Storage unit selection for virtualized storage units |
US9860303B1 (en) * | 2013-09-27 | 2018-01-02 | Amazon Technologies, Inc. | Data center growth control |
US9912570B2 (en) | 2013-10-25 | 2018-03-06 | Brocade Communications Systems LLC | Dynamic cloning of application infrastructures |
IN2013CH05013A (zh) | 2013-11-07 | 2015-05-08 | Schneider Electric It Corp | |
US9348380B2 (en) | 2013-12-28 | 2016-05-24 | Samsung Electronics Co., Ltd. | Dynamic thermal budget allocation for memory array |
US9958178B2 (en) * | 2014-03-06 | 2018-05-01 | Dell Products, Lp | System and method for providing a server rack management controller |
US20150262094A1 (en) * | 2014-03-12 | 2015-09-17 | International Business Machines Corporation | Automatically instantiating an organizational workflow across different geographical locations |
US9933804B2 (en) | 2014-07-11 | 2018-04-03 | Microsoft Technology Licensing, Llc | Server installation as a grid condition sensor |
US10234835B2 (en) | 2014-07-11 | 2019-03-19 | Microsoft Technology Licensing, Llc | Management of computing devices using modulated electricity |
US10001761B2 (en) | 2014-12-30 | 2018-06-19 | Schneider Electric It Corporation | Power consumption model for cooling equipment |
US20170026305A1 (en) * | 2015-07-23 | 2017-01-26 | Schneider Electric It Corporation | System to place virtual machines onto servers based upon backup runtime constraints |
CN106487834B (zh) * | 2015-08-27 | 2020-09-08 | 香港中文大学深圳研究院 | 一种在云平台上部署服务器提供服务的方法 |
JP6463660B2 (ja) * | 2015-09-17 | 2019-02-06 | 富士通株式会社 | 移動管理装置、移動管理方法及び移動管理プログラム |
CN106933868B (zh) * | 2015-12-30 | 2020-04-24 | 阿里巴巴集团控股有限公司 | 一种调整数据分片分布的方法及数据服务器 |
US9866637B2 (en) | 2016-01-11 | 2018-01-09 | Equinix, Inc. | Distributed edge processing of internet of things device data in co-location facilities |
US9948522B2 (en) | 2016-01-11 | 2018-04-17 | Equinix, Inc. | Associating infrastructure assets in a data center |
US11175966B2 (en) * | 2016-02-26 | 2021-11-16 | Arista Networks, Inc. | System and method of a managing multiple data centers |
US10222849B2 (en) * | 2016-08-29 | 2019-03-05 | International Business Machines Corporation | Power phase energy level monitoring and management in a data center |
US11080632B2 (en) * | 2016-11-29 | 2021-08-03 | International Business Machines Corporation | Optimization of steady state cost for multi-site high availability application deployment of management and managed intrastructure |
US10261874B2 (en) | 2016-12-01 | 2019-04-16 | International Business Machines Corporation | Enabling a cloud controller to communicate with power systems |
US10568231B1 (en) | 2016-12-30 | 2020-02-18 | Equinix, Inc. | Power supply and distribution skid frames for data centers |
US11076509B2 (en) | 2017-01-24 | 2021-07-27 | The Research Foundation for the State University | Control systems and prediction methods for it cooling performance in containment |
TWI756202B (zh) * | 2017-01-24 | 2022-03-01 | 香港商阿里巴巴集團服務有限公司 | 調整資料片段分布的方法及資料伺服器 |
US10425353B1 (en) | 2017-01-27 | 2019-09-24 | Triangle Ip, Inc. | Machine learning temporal allocator |
US20180336579A1 (en) * | 2017-05-18 | 2018-11-22 | Microsoft Technology Licensing, Llc | Systems and methods for scheduling datacenter buildouts |
EP3635915A1 (en) | 2017-06-09 | 2020-04-15 | Equinix, Inc. | Near real-time messaging service for data center infrastructure monitoring data |
US11452243B2 (en) | 2017-10-12 | 2022-09-20 | Coolit Systems, Inc. | Cooling system, controllers and methods |
US10819556B1 (en) | 2017-10-16 | 2020-10-27 | Equinix, Inc. | Data center agent for data center infrastructure monitoring data access and translation |
US11662037B2 (en) | 2019-01-18 | 2023-05-30 | Coolit Systems, Inc. | Fluid flow control valve for fluid flow systems, and methods |
US11729952B2 (en) | 2019-02-07 | 2023-08-15 | Data Shelter, LLC | Systems and methods for redundant data centers |
US11473860B2 (en) | 2019-04-25 | 2022-10-18 | Coolit Systems, Inc. | Cooling module with leak detector and related systems |
CN112752327B (zh) * | 2019-10-29 | 2023-10-20 | 上海华为技术有限公司 | 功率调节方法和接入网设备 |
US11507433B2 (en) * | 2019-12-18 | 2022-11-22 | Hewlett Packard Enterprise Development Lp | Infrastructure load balancing using software-defined networking controllers |
US11395443B2 (en) | 2020-05-11 | 2022-07-19 | Coolit Systems, Inc. | Liquid pumping units, and related systems and methods |
US20230246908A1 (en) * | 2020-05-22 | 2023-08-03 | Sony Group Corporation | Information processing apparatus, information processing method, program, and information processing system |
US11675518B2 (en) * | 2021-05-04 | 2023-06-13 | EMC IP Holding Company LLC | Determining migrations between geographically distributed data centers |
US11949637B2 (en) * | 2022-04-01 | 2024-04-02 | Zoom Video Communications, Inc. | Addressing conditions impacting communication services |
CN115510272B (zh) * | 2022-09-20 | 2023-07-14 | 广州金狐智能科技有限公司 | 一种基于大数据分析的计算机数据处理系统 |
Family Cites Families (213)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4747041A (en) | 1983-06-27 | 1988-05-24 | Unisys Corporation | Automatic power control system which automatically activates and deactivates power to selected peripheral devices based upon system requirement |
CN1012244B (zh) | 1987-02-20 | 1991-03-27 | 株式会社东芝 | 不间断电源装置 |
FR2614748A1 (fr) | 1987-04-29 | 1988-11-04 | Omega Electronics Sa | Dispositif d'alimentation d'une lampe a decharge |
JPH0813171B2 (ja) | 1987-06-26 | 1996-02-07 | 株式会社ユタカ電機製作所 | 安定化電源装置 |
US4823290A (en) | 1987-07-21 | 1989-04-18 | Honeywell Bull Inc. | Method and apparatus for monitoring the operating environment of a computer system |
US4831508A (en) | 1987-10-20 | 1989-05-16 | Computer Products Inc. | Power supply system having improved input power factor |
US5404136A (en) | 1988-08-23 | 1995-04-04 | Marsden; Derek R. | Method and apparatus for monitoring the consumption of utilities in business premises |
US5019717A (en) | 1988-11-14 | 1991-05-28 | Elegant Design Solutions Inc. | Computer-controlled uninterruptable power supply |
US5017800A (en) | 1989-09-29 | 1991-05-21 | Wisconsin Alumni Research Foundation | AC to DC to AC power conversion apparatus with few active switches and input and output control |
US4980812A (en) | 1989-11-09 | 1990-12-25 | Exide Electronics | Uninterrupted power supply system having improved power factor correction circuit |
US4962734A (en) | 1990-03-14 | 1990-10-16 | Paccar Inc. | Electrically driven, circumferentially supported fan |
US5396635A (en) | 1990-06-01 | 1995-03-07 | Vadem Corporation | Power conservation apparatus having multiple power reduction levels dependent upon the activity of the computer system |
US5216623A (en) | 1990-06-06 | 1993-06-01 | M. T. Mcbrian, Inc. | System and method for monitoring and analyzing energy characteristics |
US5126585A (en) | 1990-06-19 | 1992-06-30 | Auckland Uniservices Limited | Uninterruptible power supplies |
US6105061A (en) | 1990-07-26 | 2000-08-15 | Nec Corporation | Hierarchically distributed network management system using open system interconnection (OSI) protocols |
US5153837A (en) | 1990-10-09 | 1992-10-06 | Sleuth Inc. | Utility consumption monitoring and control system |
US5097328A (en) | 1990-10-16 | 1992-03-17 | Boyette Robert B | Apparatus and a method for sensing events from a remote location |
US5382943A (en) | 1991-07-31 | 1995-01-17 | Tanaka; Mutuo | Remote monitoring unit |
CA2071804A1 (en) | 1991-06-24 | 1992-12-25 | Ronald G. Ward | Computer system manager |
CA2069273A1 (en) | 1992-05-22 | 1993-11-23 | Edward L. Ratcliffe | Energy management systems |
US5319571A (en) | 1992-11-24 | 1994-06-07 | Exide Electronics | UPS system with improved network communications |
US6069412A (en) | 1993-03-29 | 2000-05-30 | Powerware Corporation | Power factor corrected UPS with improved connection of battery to neutral |
US5528507A (en) | 1993-08-11 | 1996-06-18 | First Pacific Networks | System for utility demand monitoring and control using a distribution network |
US5860012A (en) | 1993-09-30 | 1999-01-12 | Intel Corporation | Installation of application software through a network from a source computer system on to a target computer system |
FR2713030B1 (fr) | 1993-11-24 | 1996-01-12 | Merlin Gerin | Alimentation sans coupure à neutre traversant, comportant un hacheur-élévateur double. |
US5684686A (en) | 1994-01-12 | 1997-11-04 | Deltec Electronics Corporation | Boost-input backed-up uninterruptible power supply |
US5462225A (en) | 1994-02-04 | 1995-10-31 | Scientific-Atlanta, Inc. | Apparatus and method for controlling distribution of electrical energy to a space conditioning load |
US5845090A (en) | 1994-02-14 | 1998-12-01 | Platinium Technology, Inc. | System for software distribution in a digital computer network |
JPH07245955A (ja) | 1994-03-02 | 1995-09-19 | Yutaka Denki Seisakusho:Kk | 力率改善型安定化電源回路および無停電電源回路 |
US5963457A (en) | 1994-03-18 | 1999-10-05 | Hitachi, Ltd. | Electrical power distribution monitoring system and method |
US5995729A (en) | 1994-07-22 | 1999-11-30 | Hitachi, Ltd. | Method and apparatus for aiding configurating management of a computer system |
US5978594A (en) | 1994-09-30 | 1999-11-02 | Bmc Software, Inc. | System for managing computer resources across a distributed computing environment by first reading discovery information about how to determine system resources presence |
US5581478A (en) | 1995-04-13 | 1996-12-03 | Cruse; Michael | Facility environmental control system |
GB2301206A (en) | 1995-05-23 | 1996-11-27 | Compaq Computer Corp | A system for facilitating creation of a computer |
US6112235A (en) | 1995-06-07 | 2000-08-29 | Spofford; Jason J. | Method and apparatus for remotely managing a network hardware device having an embedded server with a client computer across a network |
US5657641A (en) | 1995-09-13 | 1997-08-19 | Kooltronic, Inc. | Panel mounted cooling system |
US6317775B1 (en) * | 1995-11-03 | 2001-11-13 | Cisco Technology, Inc. | System for distributing load over multiple servers at an internet site |
US6104868A (en) | 1996-04-30 | 2000-08-15 | Peters; Daniel G. | Extendible and portable network protocol based system management architecture |
US6151643A (en) | 1996-06-07 | 2000-11-21 | Networks Associates, Inc. | Automatic updating of diverse software products on multiple client computer systems by downloading scanning application to client computer and generating software list on client computer |
US5949974A (en) | 1996-07-23 | 1999-09-07 | Ewing; Carrell W. | System for reading the status and for controlling the power supplies of appliances connected to computer networks |
US5960204A (en) | 1996-10-28 | 1999-09-28 | J.D. Edwards World Source Company | System and method for installing applications on a computer on an as needed basis |
US6085243A (en) | 1996-12-13 | 2000-07-04 | 3Com Corporation | Distributed remote management (dRMON) for networks |
US6108782A (en) | 1996-12-13 | 2000-08-22 | 3Com Corporation | Distributed remote monitoring (dRMON) for networks |
US5974237A (en) | 1996-12-18 | 1999-10-26 | Northern Telecom Limited | Communications network monitoring |
US7216043B2 (en) | 1997-02-12 | 2007-05-08 | Power Measurement Ltd. | Push communications architecture for intelligent electronic devices |
US5978912A (en) | 1997-03-20 | 1999-11-02 | Phoenix Technologies Limited | Network enhanced BIOS enabling remote management of a computer without a functioning operating system |
US6266721B1 (en) | 1997-05-13 | 2001-07-24 | Micron Electronics, Inc. | System architecture for remote access and control of environmental management |
US5987614A (en) | 1997-06-17 | 1999-11-16 | Vadem | Distributed power management system and method for computer |
US6389464B1 (en) | 1997-06-27 | 2002-05-14 | Cornet Technology, Inc. | Device management system for managing standards-compliant and non-compliant network elements using standard management protocols and a universal site server which is configurable from remote locations via internet browser technology |
JP3306651B2 (ja) | 1997-07-07 | 2002-07-24 | 吉田 富貴子 | リモート電源スイッチング装置 |
US5924486A (en) | 1997-10-29 | 1999-07-20 | Tecom, Inc. | Environmental condition control and energy management system and method |
US6055480A (en) | 1997-11-12 | 2000-04-25 | Albert Einstein Healthcare Network | Environmental monitoring system |
GB2333864B (en) | 1998-01-28 | 2003-05-07 | Ibm | Distribution of software updates via a computer network |
US7047300B1 (en) * | 1998-02-10 | 2006-05-16 | Sprint Communications Company L.P. | Survivable and scalable data system and method for computer networks |
US6922558B2 (en) | 1998-03-06 | 2005-07-26 | Don Delp | Integrated building control and information system with wireless networking |
US6134511A (en) | 1998-04-15 | 2000-10-17 | Subbarao; Krishnappa | Method and apparatus for improving building energy simulations |
US6347627B1 (en) | 1998-04-23 | 2002-02-19 | Pioneer Inventions, Inc. | Nitrous oxide based oxygen supply system |
US6363421B2 (en) | 1998-05-31 | 2002-03-26 | Lucent Technologies, Inc. | Method for computer internet remote management of a telecommunication network element |
US6141762A (en) | 1998-08-03 | 2000-10-31 | Nicol; Christopher J. | Power reduction in a multiprocessor digital signal processor based on processor load |
US6246969B1 (en) | 1998-09-08 | 2001-06-12 | International Business Machines Corporation | Method and apparatus for testing computer cooling systems |
US6631134B1 (en) | 1999-01-15 | 2003-10-07 | Cisco Technology, Inc. | Method for allocating bandwidth in an optical network |
US6483730B2 (en) | 1999-08-13 | 2002-11-19 | Powerware Corporation | Power converters with AC and DC operating modes and methods of operation thereof |
US6281790B1 (en) | 1999-09-01 | 2001-08-28 | Net Talon Security Systems, Inc. | Method and apparatus for remotely monitoring a site |
US6714977B1 (en) | 1999-10-27 | 2004-03-30 | Netbotz, Inc. | Method and system for monitoring computer networks and equipment |
US7392309B2 (en) | 1999-10-27 | 2008-06-24 | American Power Conversion Corporation | Network appliance management |
JP2001184145A (ja) | 1999-12-27 | 2001-07-06 | Id Gate Co Ltd | 情報処理装置等のリモート電源管理システム |
US6574970B2 (en) | 2000-02-18 | 2003-06-10 | Toc Technology, Llc | Computer room air flow method and apparatus |
TW550477B (en) | 2000-03-01 | 2003-09-01 | Passgate Corp | Method, system and computer readable medium for Web site account and e-commerce management from a central location |
US6792321B2 (en) | 2000-03-02 | 2004-09-14 | Electro Standards Laboratories | Remote web-based control |
EP1266548B2 (en) | 2000-03-21 | 2015-07-29 | Liebert Corporation | Method and apparatus for cooling electronic enclosures |
US20010047387A1 (en) * | 2000-03-27 | 2001-11-29 | Exoplex, Inc. | Systems and methods for providing distributed cross-enterprise portals |
US20010032109A1 (en) | 2000-04-13 | 2001-10-18 | Gonyea Richard Jeremiah | System and method for predicting a maintenance schedule and costs for performing future service events of a product |
US6670810B2 (en) | 2000-04-25 | 2003-12-30 | Airak, Inc. | System and method for distributed monitoring of surroundings using telemetry of data from remote sensors |
AU2001257119A1 (en) | 2000-04-26 | 2001-11-07 | American Power Conversion | System and method for managing uninterruptible power supply systems |
US7010594B2 (en) | 2000-05-26 | 2006-03-07 | Isochron, Llc | System using environmental sensor and intelligent management and control transceiver for monitoring and controlling remote computing resources |
US20020023258A1 (en) | 2000-06-27 | 2002-02-21 | Elwahab Amgad Mazen | System and method for managing telecommunications devices |
US7693976B2 (en) * | 2000-07-11 | 2010-04-06 | Ciena Corporation | Granular management of network resources |
US6633823B2 (en) | 2000-07-13 | 2003-10-14 | Nxegen, Inc. | System and method for monitoring and controlling energy usage |
US7292898B2 (en) | 2000-09-18 | 2007-11-06 | Balboa Instruments, Inc. | Method and apparatus for remotely monitoring and controlling a pool or spa |
US20040003266A1 (en) | 2000-09-22 | 2004-01-01 | Patchlink Corporation | Non-invasive automatic offsite patch fingerprinting and updating system and method |
US7032119B2 (en) | 2000-09-27 | 2006-04-18 | Amphus, Inc. | Dynamic power and workload management for multi-server system |
US7228441B2 (en) | 2000-09-27 | 2007-06-05 | Huron Ip Llc | Multi-server and multi-CPU power management system and method |
US7058826B2 (en) | 2000-09-27 | 2006-06-06 | Amphus, Inc. | System, architecture, and method for logical server and other network devices in a dynamically configurable multi-server network environment |
US6829630B1 (en) | 2000-11-24 | 2004-12-07 | Xerox Corporation | Mechanisms for web-object event/state-driven communication between networked devices |
US20020071031A1 (en) | 2000-12-07 | 2002-06-13 | Philips Electronics North America Corporation | Remote monitoring via a consumer electronic appliance |
US6374627B1 (en) | 2001-01-09 | 2002-04-23 | Donald J. Schumacher | Data center cooling system |
DK1360796T3 (da) | 2001-01-26 | 2010-05-10 | American Power Conv Corp | Fremgangsmåde og system til at indstille et sæt netværksapparater som kan forbindes for at tilvejebringe forbedret samarbejde, skalerbarhed og pålidelighed |
DK174494B1 (da) | 2001-01-26 | 2003-04-22 | American Power Conversion Denm | Kombineret AC-DC til DC konverter |
US7493391B2 (en) | 2001-02-12 | 2009-02-17 | International Business Machines Corporation | System for automated session resource clean-up by determining whether server resources have been held by client longer than preset thresholds |
US20020129355A1 (en) | 2001-03-01 | 2002-09-12 | Mike Velten | Method and system for monitoring an apparatus for a computer |
US6967283B2 (en) | 2001-03-20 | 2005-11-22 | American Power Conversion Corporation | Adjustable scalable rack power system and method |
US20030196126A1 (en) | 2002-04-11 | 2003-10-16 | Fung Henry T. | System, method, and architecture for dynamic server power management and dynamic workload management for multi-server environment |
US7519909B2 (en) | 2001-08-10 | 2009-04-14 | American Power Conversion Corporation | Uninterruptible power supply (UPS) devices monitoring system |
US6672955B2 (en) | 2001-09-07 | 2004-01-06 | International Business Machines Corporation | Air flow management system for an internet data center |
US7337333B2 (en) | 2001-09-19 | 2008-02-26 | Dell Products L.P. | System and method for strategic power supply sequencing in a computer system with multiple processing resources and multiple power supplies |
US6574104B2 (en) | 2001-10-05 | 2003-06-03 | Hewlett-Packard Development Company L.P. | Smart cooling of data centers |
JPWO2003034523A1 (ja) | 2001-10-11 | 2005-02-03 | 株式会社日立製作所 | 家庭用燃料電池システム |
US7043650B2 (en) * | 2001-10-31 | 2006-05-09 | Hewlett-Packard Development Company, L.P. | System and method for intelligent control of power consumption of distributed services during periods when power consumption must be reduced |
US6957353B2 (en) | 2001-10-31 | 2005-10-18 | Hewlett-Packard Development Company, L.P. | System and method for providing minimal power-consuming redundant computing hardware for distributed services |
US7203846B2 (en) | 2001-10-31 | 2007-04-10 | Hewlett-Packard Development Company, Lp. | System and method for intelligent control of power consumption of distributed services during periods of reduced load |
US6804616B2 (en) | 2001-12-13 | 2004-10-12 | Intel Corporation | Method to estimate power and cooling requirements of systems |
US7020586B2 (en) | 2001-12-17 | 2006-03-28 | Sun Microsystems, Inc. | Designing a data center |
US7310673B2 (en) * | 2001-12-21 | 2007-12-18 | Hewlett-Packard Development Company, L.P. | Network resource assignment system and method |
US6721672B2 (en) | 2002-01-02 | 2004-04-13 | American Power Conversion | Method and apparatus for preventing overloads of power distribution networks |
US7519000B2 (en) | 2002-01-30 | 2009-04-14 | Panduit Corp. | Systems and methods for managing a network |
US6628520B2 (en) | 2002-02-06 | 2003-09-30 | Hewlett-Packard Development Company, L.P. | Method, apparatus, and system for cooling electronic components |
US20030149608A1 (en) | 2002-02-06 | 2003-08-07 | Kall Jonathan J. | Suite of configurable supply chain infrastructure modules for deploying collaborative e-manufacturing solutions |
US20030154285A1 (en) | 2002-02-13 | 2003-08-14 | International Business Machines Corporation | Method and system for assigning network addreses |
US7313503B2 (en) | 2002-02-19 | 2007-12-25 | Hewlett-Packard Development Company, L.P. | Designing layout for internet datacenter cooling |
US6964539B2 (en) | 2002-03-18 | 2005-11-15 | International Business Machines Corporation | Method for managing power consumption of multiple computer servers |
US6795928B2 (en) | 2002-03-18 | 2004-09-21 | International Business Machines Corporation | Method for managing power consumption of multiple computer servers |
KR100387358B1 (en) | 2002-03-22 | 2003-06-12 | Ec Tech Co Ltd | System for cooling computer component using thermoelectric element |
GB0207382D0 (en) | 2002-03-28 | 2002-05-08 | Holland Heating Uk Ltd | Computer cabinet |
US20030193777A1 (en) * | 2002-04-16 | 2003-10-16 | Friedrich Richard J. | Data center energy management system |
US6718277B2 (en) | 2002-04-17 | 2004-04-06 | Hewlett-Packard Development Company, L.P. | Atmospheric control within a building |
US7197553B2 (en) | 2002-04-19 | 2007-03-27 | Nortel Networks Limited | Network system having a virtual-service-module |
US20040078708A1 (en) | 2002-05-17 | 2004-04-22 | Chuang Li | Methods for facilitating the installation of computer devices |
US7072960B2 (en) * | 2002-06-10 | 2006-07-04 | Hewlett-Packard Development Company, L.P. | Generating automated mappings of service demands to server capacities in a distributed computer system |
US7152100B2 (en) | 2002-07-09 | 2006-12-19 | Adtran, Inc. | System and method for provisioning network access devices |
US20040020225A1 (en) | 2002-08-02 | 2004-02-05 | Patel Chandrakant D. | Cooling system |
US6786056B2 (en) | 2002-08-02 | 2004-09-07 | Hewlett-Packard Development Company, L.P. | Cooling system with evaporators distributed in parallel |
US20040075343A1 (en) | 2002-09-05 | 2004-04-22 | Paul Wareham | System and method for power load management |
US6775997B2 (en) | 2002-10-03 | 2004-08-17 | Hewlett-Packard Development Company, L.P. | Cooling of data centers |
US6862179B2 (en) | 2002-11-26 | 2005-03-01 | Hewlett-Packard Development Company, L.P. | Partition for varying the supply of cooling fluid |
US7120689B2 (en) | 2003-01-23 | 2006-10-10 | Sbc Properties, L.P. | Receiving network metrics data from disparate devices and displaying in a host format |
US6694759B1 (en) | 2003-01-27 | 2004-02-24 | Hewlett-Packard Development Company, L.P. | Pressure control of cooling fluid within a plenum using automatically adjustable vents |
US7786616B2 (en) | 2003-02-07 | 2010-08-31 | Cummins Power Generation Inc. | Generator with DC boost and split bus bidirectional DC-to-DC converter for uninterruptible power supply system or for enhanced load pickup |
US7210048B2 (en) | 2003-02-14 | 2007-04-24 | Intel Corporation | Enterprise power and thermal management |
US6859366B2 (en) | 2003-03-19 | 2005-02-22 | American Power Conversion | Data center cooling system |
US20040186905A1 (en) | 2003-03-20 | 2004-09-23 | Young Donald E. | System and method for provisioning resources |
US20040189161A1 (en) | 2003-03-28 | 2004-09-30 | Davis Brooks I. | Zero rack unit space utilization |
US7546475B2 (en) | 2003-05-13 | 2009-06-09 | Hewlett-Packard Development Company, L.P. | Power-aware adaptation in a data center |
US7051946B2 (en) | 2003-05-29 | 2006-05-30 | Hewlett-Packard Development Company, L.P. | Air re-circulation index |
US20050023363A1 (en) | 2003-05-29 | 2005-02-03 | Sharma Ratnesh K. | CRAC unit control based on re-circulation index |
US6819563B1 (en) | 2003-07-02 | 2004-11-16 | International Business Machines Corporation | Method and system for cooling electronics racks using pre-cooled air |
US7085133B2 (en) | 2003-07-09 | 2006-08-01 | International Business Machines Corporation | Cooling using complimentary tapered plenums |
US7146353B2 (en) * | 2003-07-22 | 2006-12-05 | Hewlett-Packard Development Company, L.P. | Resource allocation for multiple applications |
US7127625B2 (en) * | 2003-09-04 | 2006-10-24 | Hewlett-Packard Development Company, L.P. | Application management based on power consumption |
US7725559B2 (en) | 2003-10-08 | 2010-05-25 | Unisys Corporation | Virtual data center that allocates and manages system resources across multiple nodes |
JP4351517B2 (ja) * | 2003-11-14 | 2009-10-28 | 株式会社日立製作所 | データセンタの装置管理方法、装置管理サーバ、データセンタの装置管理システム並びにプログラム |
US20050186905A1 (en) * | 2004-02-24 | 2005-08-25 | Tracy James L. | Independently actuating electronic components and method of operating therefor |
US8108496B2 (en) | 2004-04-07 | 2012-01-31 | American Power Conversion Corporation | Method and apparatus for selecting forwarding modes |
US7197433B2 (en) * | 2004-04-09 | 2007-03-27 | Hewlett-Packard Development Company, L.P. | Workload placement among data centers based on thermal efficiency |
US8156490B2 (en) | 2004-05-08 | 2012-04-10 | International Business Machines Corporation | Dynamic migration of virtual machine computer programs upon satisfaction of conditions |
US7031870B2 (en) | 2004-05-28 | 2006-04-18 | Hewlett-Packard Development Company, L.P. | Data center evaluation using an air re-circulation index |
US7447920B2 (en) * | 2004-08-31 | 2008-11-04 | Hewlett-Packard Development Company, L.P. | Workload placement based on thermal considerations |
US7514815B2 (en) | 2004-09-28 | 2009-04-07 | American Power Conversion Corporation | System and method for allocating power to loads |
US7251547B2 (en) | 2004-10-08 | 2007-07-31 | Hewlett-Packard Development Company, L.P. | Correlation of vent tile settings and rack temperatures |
US20060121421A1 (en) | 2004-10-15 | 2006-06-08 | Spitaels James S | IT equipment simulation |
US7155318B2 (en) | 2004-11-05 | 2006-12-26 | Hewlett-Packard Development Company, Lp. | Air conditioning unit control to reduce moisture varying operations |
US20060112286A1 (en) | 2004-11-23 | 2006-05-25 | Whalley Ian N | Method for dynamically reprovisioning applications and other server resources in a computer center in response to power and heat dissipation requirements |
US7259963B2 (en) | 2004-12-29 | 2007-08-21 | American Power Conversion Corp. | Rack height cooling |
US7426453B2 (en) | 2005-01-14 | 2008-09-16 | Hewlett-Packard Development Company, L.P. | Workload placement based upon CRAC unit capacity utilizations |
US7472043B1 (en) | 2005-02-18 | 2008-12-30 | Tellabs Bedford, Inc. | Mass customization configurator |
US7522626B2 (en) | 2005-03-14 | 2009-04-21 | American Power Conversion Corporation | Communications system and method |
US7640760B2 (en) | 2005-03-25 | 2010-01-05 | Hewlett-Packard Development Company, L.P. | Temperature control using a sensor network |
US7402921B2 (en) | 2005-04-21 | 2008-07-22 | American Power Conversion Corporation | Method and apparatus for providing uninterruptible power |
US7885795B2 (en) | 2005-05-02 | 2011-02-08 | American Power Conversion Corporation | Methods and systems for managing facility power and cooling |
US7881910B2 (en) | 2005-05-02 | 2011-02-01 | American Power Conversion Corporation | Methods and systems for managing facility power and cooling |
WO2006119248A2 (en) | 2005-05-02 | 2006-11-09 | American Power Conversion Corporation | Methods and systems for managing facility power and cooling |
US7596476B2 (en) * | 2005-05-02 | 2009-09-29 | American Power Conversion Corporation | Methods and systems for managing facility power and cooling |
US7841199B2 (en) | 2005-05-17 | 2010-11-30 | American Power Conversion Corporation | Cold aisle isolation |
JP4101251B2 (ja) * | 2005-05-24 | 2008-06-18 | 富士通株式会社 | 負荷分散プログラム、負荷分散方法、及び負荷分散装置 |
US7315448B1 (en) | 2005-06-01 | 2008-01-01 | Hewlett-Packard Development Company, L.P. | Air-cooled heat generating device airflow control system |
US20070067296A1 (en) * | 2005-08-19 | 2007-03-22 | Malloy Patrick J | Network capacity planning |
US8429630B2 (en) * | 2005-09-15 | 2013-04-23 | Ca, Inc. | Globally distributed utility computing cloud |
US7726144B2 (en) | 2005-10-25 | 2010-06-01 | Hewlett-Packard Development Company, L.P. | Thermal management using stored field replaceable unit thermal information |
US7620480B2 (en) | 2005-11-01 | 2009-11-17 | Hewlett-Packard Development Company, L.P. | Cooling components across a continuum |
US7568360B1 (en) | 2005-11-01 | 2009-08-04 | Hewlett-Packard Development Company, L.P. | Air re-circulation effect reduction system |
US20070150584A1 (en) * | 2005-12-28 | 2007-06-28 | Deepa Srinivasan | Apparatus, system, and method for determining server utilization in hosted computing infrastructure |
ATE528978T1 (de) | 2006-02-10 | 2011-10-15 | American Power Conv Corp | Aufbewahrungsregal-verwaltungssystem und verfahren |
US7558649B1 (en) | 2006-05-03 | 2009-07-07 | Hewlett-Packard Development Company, L.P. | Method for predicting airflow rates |
JP4800837B2 (ja) * | 2006-05-22 | 2011-10-26 | 株式会社日立製作所 | 計算機システム、その消費電力低減方法、及びそのプログラム |
CA2653778C (en) | 2006-06-01 | 2013-03-26 | Exaflop Llc | Data center uninterruptible power distribution architecture |
US7549070B2 (en) | 2006-06-30 | 2009-06-16 | Sun Microsystems, Inc. | Method and apparatus for generating a dynamic power-flux map for a set of computer systems |
US7705489B2 (en) | 2006-09-08 | 2010-04-27 | American Power Conversion Corporation | Method and apparatus for providing uninterruptible power |
US8335703B1 (en) * | 2006-10-20 | 2012-12-18 | Desktone, Inc. | Virtual computing services deployment network |
US8185893B2 (en) * | 2006-10-27 | 2012-05-22 | Hewlett-Packard Development Company, L.P. | Starting up at least one virtual machine in a physical machine by a load balancer |
US8296760B2 (en) | 2006-10-27 | 2012-10-23 | Hewlett-Packard Development Company, L.P. | Migrating a virtual machine from a first physical machine in response to receiving a command to lower a power mode of the first physical machine |
US8195340B1 (en) * | 2006-12-18 | 2012-06-05 | Sprint Communications Company L.P. | Data center emergency power management |
US8275642B2 (en) | 2007-01-19 | 2012-09-25 | International Business Machines Corporation | System to improve predictive maintenance and warranty cost/price estimation |
EP2123140B1 (en) | 2007-01-24 | 2016-09-07 | Schneider Electric IT Corporation | System and method for evaluating equipment rack cooling performance |
US7856549B2 (en) * | 2007-01-24 | 2010-12-21 | Hewlett-Packard Development Company, L.P. | Regulating power consumption |
US7676280B1 (en) | 2007-01-29 | 2010-03-09 | Hewlett-Packard Development Company, L.P. | Dynamic environmental management |
EP2132514B1 (en) | 2007-03-14 | 2018-12-19 | Zonit Structured Solutions, LLC | Air-based cooling for data center rack |
US8205205B2 (en) * | 2007-03-16 | 2012-06-19 | Sap Ag | Multi-objective allocation of computational jobs in client-server or hosting environments |
WO2008132924A1 (ja) | 2007-04-13 | 2008-11-06 | Nec Corporation | 仮想計算機システムおよびその最適化方法 |
ES2612328T3 (es) | 2007-05-15 | 2017-05-16 | Schneider Electric It Corporation | Métodos y sistemas para gestionar potencia y enfriamiento de una instalación |
US10339227B1 (en) | 2007-06-08 | 2019-07-02 | Google Llc | Data center design |
US8880907B2 (en) | 2007-06-21 | 2014-11-04 | Schneider Electric It Corporation | Method and system for determining physical location of equipment |
US7970903B2 (en) * | 2007-08-20 | 2011-06-28 | Hitachi, Ltd. | Storage and server provisioning for virtualized and geographically dispersed data centers |
US8468230B2 (en) | 2007-10-18 | 2013-06-18 | Fujitsu Limited | Method, apparatus and recording medium for migrating a virtual machine |
WO2009061432A1 (en) * | 2007-11-06 | 2009-05-14 | Credit Suisse Securities (Usa) Llc | Predicting and managing resource allocation according to service level agreements |
JP4902501B2 (ja) | 2007-11-12 | 2012-03-21 | 株式会社日立製作所 | 電力制御方法、計算機システム、及びプログラム |
US8732706B2 (en) | 2007-11-27 | 2014-05-20 | Hewlett-Packard Development Company, L.P. | Generating governing metrics for resource provisioning |
US7801994B2 (en) * | 2007-11-29 | 2010-09-21 | Hitachi, Ltd. | Method and apparatus for locating candidate data centers for application migration |
US7979250B2 (en) | 2007-12-05 | 2011-07-12 | International Business Machines Corporation | Method of laying out a data center using a plurality of thermal simulators |
US8447993B2 (en) * | 2008-01-23 | 2013-05-21 | Palo Alto Research Center Incorporated | Integrated energy savings and business operations in data centers |
US8996890B2 (en) | 2008-02-07 | 2015-03-31 | Dell Products L.P. | Method for power conservation in virtualized environments |
US7878007B2 (en) | 2008-02-15 | 2011-02-01 | International Business Machines Corporation | Monitoring method and system for determining airflow rate through and heat removal rate of an air-conditioning unit |
US8140276B2 (en) | 2008-02-27 | 2012-03-20 | Abl Ip Holding Llc | System and method for streetlight monitoring diagnostics |
US8381221B2 (en) | 2008-03-04 | 2013-02-19 | International Business Machines Corporation | Dynamic heat and power optimization of resource pools |
JP4724730B2 (ja) | 2008-04-09 | 2011-07-13 | 株式会社日立製作所 | 情報処理システムの運用管理方法、運用管理プログラム、および運用管理装置、ならびに情報処理システム |
WO2009126154A1 (en) * | 2008-04-10 | 2009-10-15 | Hewlett-Packard Development Company, L.P. | Virtual machine migration according to environmental data |
US9008844B2 (en) * | 2008-06-09 | 2015-04-14 | International Business Machines Corporation | System and method to route airflow using dynamically changing ducts |
JP5288899B2 (ja) | 2008-06-20 | 2013-09-11 | 株式会社日立製作所 | 消費電力推定を行うストレージ装置及びストレージ装置の電力推定方法 |
US8849987B2 (en) * | 2008-07-29 | 2014-09-30 | International Business Machines Corporation | Automated discovery of a topology of a distributed computing environment |
US8046468B2 (en) | 2009-01-26 | 2011-10-25 | Vmware, Inc. | Process demand prediction for distributed power and resource management |
US8560677B2 (en) * | 2009-02-13 | 2013-10-15 | Schneider Electric It Corporation | Data center control |
US9778718B2 (en) * | 2009-02-13 | 2017-10-03 | Schneider Electric It Corporation | Power supply and data center control |
JP5378946B2 (ja) | 2009-10-26 | 2013-12-25 | 株式会社日立製作所 | サーバ管理装置およびサーバ管理方法 |
US8768742B2 (en) * | 2012-02-09 | 2014-07-01 | International Business Machines Corporation | Assessment and rationalization of resiliency of data center strategies |
US9329888B2 (en) | 2013-01-28 | 2016-05-03 | International Business Machines Corporation | Computing optimized virtual machine allocations using equivalence combinations |
-
2009
- 2009-02-13 US US12/371,355 patent/US9519517B2/en active Active
-
2010
- 2010-01-26 WO PCT/US2010/022074 patent/WO2010093515A1/en active Application Filing
- 2010-01-26 CN CN201080016515.0A patent/CN102395955B/zh active Active
- 2010-01-26 CA CA2752613A patent/CA2752613A1/en not_active Abandoned
- 2010-01-26 AU AU2010214029A patent/AU2010214029B2/en active Active
- 2010-01-26 EP EP10703552A patent/EP2396726A1/en not_active Ceased
Also Published As
Publication number | Publication date |
---|---|
EP2396726A1 (en) | 2011-12-21 |
CN102395955A (zh) | 2012-03-28 |
AU2010214029B2 (en) | 2015-07-09 |
AU2010214029A1 (en) | 2011-09-01 |
US9519517B2 (en) | 2016-12-13 |
WO2010093515A1 (en) | 2010-08-19 |
US20100211669A1 (en) | 2010-08-19 |
CA2752613A1 (en) | 2010-08-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102395955B (zh) | 数据中心控制 | |
AU2011305487B2 (en) | Data center control | |
CN102395938B (zh) | 电源和数据中心控制 | |
US10429914B2 (en) | Multi-level data center using consolidated power control | |
US9800087B2 (en) | Multi-level data center consolidated power control | |
US8433547B2 (en) | System and method for analyzing nonstandard facility operations within a data center | |
US11216059B2 (en) | Dynamic tiering of datacenter power for workloads | |
US9891682B1 (en) | Power management for devices | |
US9891685B1 (en) | Reconfigurable backup battery unit | |
US11061458B2 (en) | Variable redundancy data center power topology | |
US9910471B1 (en) | Reconfigurable array of backup battery units | |
CN106371528A (zh) | 一种服务器 | |
Talapko et al. | Comparison of Electrical Architectures for Support of the Software Defined Data Centers | |
Govindan et al. | Modeling and analysis of availability of datacenter power infrastructure | |
Brocanelli et al. | Reducing the expenses of geo-distributed data centers with portable containerized modules | |
CN118210221A (zh) | 基于iec61850的水电站冗余控制设备接入方法 | |
US8745189B2 (en) | Method and power-saving control device for controlling operations of computing units |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
C53 | Correction of patent for invention or patent application | ||
CB02 | Change of applicant information |
Address after: rhode island Applicant after: American Power Conversion Corporation Address before: rhode island Applicant before: American Power Conversion Corp. |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: AMERICAN POWER CONVERSION CORP. TO: SCHNEIDER ELECTRIC IT CORP. |
|
GR01 | Patent grant |