CN102390785A - 排土机受料臂的吊装方法 - Google Patents

排土机受料臂的吊装方法 Download PDF

Info

Publication number
CN102390785A
CN102390785A CN2011103386965A CN201110338696A CN102390785A CN 102390785 A CN102390785 A CN 102390785A CN 2011103386965 A CN2011103386965 A CN 2011103386965A CN 201110338696 A CN201110338696 A CN 201110338696A CN 102390785 A CN102390785 A CN 102390785A
Authority
CN
China
Prior art keywords
cranes
material feeding
tons
feeding arm
hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103386965A
Other languages
English (en)
Inventor
吕树爱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN2011103386965A priority Critical patent/CN102390785A/zh
Publication of CN102390785A publication Critical patent/CN102390785A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

一种排土机受料臂的吊装方法,利用排土机设备安装原有的两台70吨吊车和一台25吨吊车,新增加一台90吨吊车,形成四机抬吊的吊装技术,其中25吨吊车仅配合受料臂平移,平移到位后提前摘钩,由三台吊车就位安装。此技术解决了受料臂斜角度安装、又长又重、且头重脚轻、同时受料臂头部吊装过程中需平移等吊装难题,很好的保证了施工质量和安全,既经济又合理,整个吊装过程时间短(不超过8小时)。

Description

排土机受料臂的吊装方法
技术领域:
本发明属于一种设备的吊装方法,特别涉及一种排土机受料臂的吊装方法。
背景技术:
矿山、冶金等行业使用的排土机受料臂头部通过回转轴承固定在排土机塔架15米处,尾部直接放在5米高的走行台车的万向轴承架上。受料臂分四节到货,第一节长11米,重30吨,其他三节均长17米,重20吨。由于受料臂安装位置带斜角度,分节在就位位置组装既不安全、又很难控制中心和水平、所需临时设施费用多,要保证施工质量很困难。若组装成整体吊装施工质量就很好保证,但组对成整体后受料臂外形尺寸为长62.4米,宽4.6米,高3米,头部圆弧直径为7.8米,总重90吨,既长又重,且呈现头重脚轻的特点,同时受料臂头部从组装点到就位点还最少需平移10米的距离,这给吊装留下了极大难题。
发明内容:
本发明的目的就在于克服上述现有技术中存在的不足,而提供一种排土机受料臂的吊装方法,该方法可实现排土机受料臂安全、快速的吊装。
如上构思,本发明的技术方案是:一种排土机受料臂的吊装方法,其特征在于:依照下列步骤完成:
a在排土机受料臂上的中下部安装原有的两台70吨吊车,在受料臂的顶部安装一台25吨吊车,在受料臂的上中部安装一台90吨吊车,形成四机抬吊的吊装方式,然后根据各台吊车的吊装点挂好吊索、吊具;
b四台吊车同时起钩,离地面100mm后回钩,往复几次后将四台吊车同时起钩,保证受料臂水平上升越过排土机塔架主体的平台的位置;
c将90吨吊车开始缓慢起杆、回钩的同时25吨吊车缓慢落杆、起钩,保证受料臂水平的情况下实现平移5米,两台70吨吊车主杆保持不动,在起重的指挥下配合旋转;此时25吨吊车提前摘钩;
d将三台吊车同时缓慢旋转至受料臂安装位置,将卸料车行走平台推至受料臂尾部正下方,90吨吊车起钩、两台70吨吊车缓慢回钩,受料臂到达安装就位位置,尾部直接放在卸料车行走平台上,卸料车行走平台用连杆与原有的卸料车连接,在排土机塔架上挂两个五吨手拉葫芦进行微调,保证受料臂头部回转轴承与塔架底部连接,穿高强螺栓,拧到设计扭矩力;
e受料臂头部和尾部都连接完成后,三台吊车同时回钩,拆除吊索、吊具,整个吊装过程结束。
本发明利用排土机设备安装原有的两台70吨吊车和一台25吨吊车,新增加一台90吨吊车,形成四机抬吊的吊装技术,其中25吨吊车仅配合受料臂平移,平移到位后提前摘钩,由三台吊车就位安装。此技术解决了受料臂斜角度安装、又长又重、且头重脚轻、同时受料臂头部吊装过程中需平移等吊装难题,很好的保证了施工质量和安全,即经济又合理,整个吊装过程时间短(不超过8小时)。
附图说明:
图1是本发明吊装方法布置图。
图2是图1的A向视图。
具体实施方式:
一种排土机受料臂的吊装方法,依照下列步骤完成:
1、在排土机受料臂上的中下部安装原有的两台70吨吊车4、5,在受料臂的顶部安装一台25吨吊车6,在受料臂的上中部安装一台90吨吊车3,形成四机抬吊的吊装方式,然后根据各台吊车的吊装点9挂好吊索、吊具;
2、四台吊车同时起钩,离地面100mm后回钩,往复三次,没问题后开始正式吊装。四台吊车同时起钩,保证受料臂水平上升到标高8米位置(越过排土机塔架1主体的平台)。
3、90吨吊车开始缓慢起杆、回钩的同时25吨吊车缓慢落杆、起钩,保证受料臂水平的情况下实现平移5米,两台70吨吊车主杆保持不动,在起重的指挥下配合旋转。此时25吨吊车已经可以不承受重量了,在安全的情况下去受料臂头部摘钩,防止吊索、吊具影响受料臂就位。
4、三台吊车同时缓慢旋转至受料臂安装位置2处,将卸料车行走台车7推至受料臂尾部正下方,90吨吊车起钩、两台70吨吊车缓慢回钩,受料臂到达安装就位位置,尾部直接放在卸料车行走台车7上,卸料车行走台车7用连杆与原有的卸料车连接,在排土机塔架1上挂两个五吨手拉葫芦进行微调,保证受料臂头部回转轴承与塔架底部连接,穿高强螺栓,拧到设计扭矩力。
5、受料臂头部和尾部都连接完成后,将受料臂从组装位置8吊装到安装位置2处,此时三台吊车同时回钩,拆除吊索、吊具,整个吊装过程结束。

Claims (1)

1.一种排土机受料臂的吊装方法,其特征在于:依照下列步骤完成:
a在排土机受料臂上的中下部安装原有的两台70吨吊车,在受料臂的顶部安装一台25吨吊车,在受料臂的上中部安装一台90吨吊车,形成四机抬吊的吊装方式,然后根据各台吊车的吊装点挂好吊索、吊具;
b四台吊车同时起钩,离地面100mm后回钩,往复几次后将四台吊车同时起钩,保证受料臂水平上升越过排土机塔架主体的平台的位置;
c将90吨吊车开始缓慢起杆、回钩的同时25吨吊车缓慢落杆、起钩,保证受料臂水平的情况下实现平移5米,两台70吨吊车主杆保持不动,在起重的指挥下配合旋转;此时25吨吊车提前摘钩;
d将三台吊车同时缓慢旋转至受料臂安装位置,将卸料车行走平台推至受料臂尾部正下方,90吨吊车起钩、两台70吨吊车缓慢回钩,受料臂到达安装就位位置,尾部直接放在卸料车行走平台上,卸料车行走平台用连杆与原有的卸料车连接,在排土机塔架上挂两个五吨手拉葫芦进行微调,保证受料臂头部回转轴承与塔架底部连接,穿高强螺栓,拧到设计扭矩力;
e受料臂头部和尾部都连接完成后,三台吊车同时回钩,拆除吊索、吊具,整个吊装过程结束。
CN2011103386965A 2011-11-01 2011-11-01 排土机受料臂的吊装方法 Pending CN102390785A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103386965A CN102390785A (zh) 2011-11-01 2011-11-01 排土机受料臂的吊装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103386965A CN102390785A (zh) 2011-11-01 2011-11-01 排土机受料臂的吊装方法

Publications (1)

Publication Number Publication Date
CN102390785A true CN102390785A (zh) 2012-03-28

Family

ID=45858197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103386965A Pending CN102390785A (zh) 2011-11-01 2011-11-01 排土机受料臂的吊装方法

Country Status (1)

Country Link
CN (1) CN102390785A (zh)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2160665B1 (de) * 1971-12-07 1973-06-14 Schreck, Philipp, Dipl Ing , 8000 München Verfahren zum versetzen von frei tragenden schalungen und vorrichtung zur durchfuehrung des verfahrens
FR2760736A1 (fr) * 1997-03-11 1998-09-18 Philippe Devianne Engin de manutention d'une charge tel un plateau de coffrage de pont
CN101435180A (zh) * 2008-12-22 2009-05-20 中铁二局股份有限公司 一种钢帽定位方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2160665B1 (de) * 1971-12-07 1973-06-14 Schreck, Philipp, Dipl Ing , 8000 München Verfahren zum versetzen von frei tragenden schalungen und vorrichtung zur durchfuehrung des verfahrens
FR2760736A1 (fr) * 1997-03-11 1998-09-18 Philippe Devianne Engin de manutention d'une charge tel un plateau de coffrage de pont
CN101435180A (zh) * 2008-12-22 2009-05-20 中铁二局股份有限公司 一种钢帽定位方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
孙青山: "空间钢桁架三机整体抬吊", 《科技情报开发与经济》, vol. 11, no. 1, 31 January 2001 (2001-01-31), pages 73 - 1 *
王子军: "大跨度悬臂通廊的制造与安装", 《钢结构》, no. 2, 28 February 1995 (1995-02-28) *
马杰: "大型空间桁架四机整体抬吊", 《施工技术》, no. 6, 30 June 1996 (1996-06-30) *

Similar Documents

Publication Publication Date Title
CN202988612U (zh) 平臂式塔式起重机
CN201943007U (zh) 活动支架不变幅架梁吊机
CN101434366B (zh) 立柱构件的吊装机具及吊装方法
CN206624553U (zh) 构件吊装系统
CN102010927B (zh) 大型转炉整体液压顶升倒装施工方法
CN203922540U (zh) 液压换装架及其成套设备
CN104003320B (zh) 液压换装架及其快速组装方法
CN100417586C (zh) 大型桥式起重机整体提升方法及其设备
CN103058069B (zh) 平臂式塔式起重机
CN204474193U (zh) 一种定柱式旋臂起重机
CN203475323U (zh) 半幅开合式移动工作台车
CN202390116U (zh) 一种高强度小吨位起吊机
CN201873499U (zh) 移动转臂式主梁翻转机
CN102390785A (zh) 排土机受料臂的吊装方法
CN103979442B (zh) 6400吨液压复式起重机吊装费托反应器的方法
CN201605110U (zh) 悬臂施工桁车前端吊装波形钢腹板装置
CN103058059B (zh) 双平臂塔式起重机及其起重小车同步控制装置
CN103362080A (zh) 声屏障螺栓紧固设备
CN103922232B (zh) 一种自升式塔机降塔工艺
CN109607384A (zh) 超大直径盾构机刀盘的翻身方法
CN105129327A (zh) 一种门形连接梁及其半门式刮板取料机
CN105060134A (zh) 新型配重平衡机构起重大高安全性塔吊和塔吊改造升级
CN204778268U (zh) 一种用于大吨位预制箱梁吊装的专用吊具
CN105317031B (zh) 一种升船机主机房桥机主梁吊装方法
CN103738852A (zh) 起重机试重装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120328