CN102390286A - 一种接触网立柱调节装置 - Google Patents
一种接触网立柱调节装置 Download PDFInfo
- Publication number
- CN102390286A CN102390286A CN2011102349013A CN201110234901A CN102390286A CN 102390286 A CN102390286 A CN 102390286A CN 2011102349013 A CN2011102349013 A CN 2011102349013A CN 201110234901 A CN201110234901 A CN 201110234901A CN 102390286 A CN102390286 A CN 102390286A
- Authority
- CN
- China
- Prior art keywords
- base plate
- fixed base
- strength bolt
- nut
- upright post
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 235000020637 scallop Nutrition 0.000 claims description 15
- 241000237509 Patinopecten sp. Species 0.000 claims description 9
- 241000237503 Pectinidae Species 0.000 claims description 6
- 238000010276 construction Methods 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 2
- 230000001105 regulatory effect Effects 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 201000010099 disease Diseases 0.000 description 1
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 description 1
- 230000008014 freezing Effects 0.000 description 1
- 238000007710 freezing Methods 0.000 description 1
- 230000003137 locomotive effect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000010257 thawing Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Train Traffic Observation, Control, And Security (AREA)
Abstract
一种接触网立柱调节装置,涉及一种电气化铁路接触网立柱调节装置。克服了现有接触网立柱需要特殊设备上道进行调试、人员配置多、几何调整范围小、调整速度慢。该调节装置包括:可动式底座板(1)、第一至第四高强螺栓(5-1、5-2、5-3、5-4)、第一至第四螺母(6-1、6-2、6-3、6-4)、固定底板(4)、预埋钢筋(7);所述的可动式底座板(1)和固定底板通过第一至第四高强螺栓和第一至第四螺母连接;预埋钢筋焊接在固定底板的下表面。该装置不需要特殊设备上道进行调试、校正速度快、校正范围广、同时需要较少配置施工人员、不受天气影响、尤其适合冻土高原铁路操作环境恶劣、劳动强度大、接触网立柱冻融病害严重等工程条件。
Description
技术领域
本发明涉及一种电气化铁路接触网立柱调节装置。
背景技术
电气化铁路是中国高速铁路和城市轨道交通重要组成部分,其中的接触网立柱是重要的结构。现有接触网立柱悬挂与供电线路接触主要依靠调整立柱悬挂系统,需要特殊设备上道进行调试(车辆上下道占用轨道线路,影响行车)、人员配置多、调整速度慢同时受到天气影响等等。
高原铁路,如中国的青藏铁路等冻土路基,由于路基冻土的冷冻与融化,导致接触网立柱基础发生偏移、扭转、上浮下沉,严重阻碍青藏铁路电气化改造,为目前青藏铁路依然采用内燃机车的主要顾虑。
发明内容
本发明所要解决的技术问题是,克服现有接触网立柱需要特殊设备上道进行调试、人员配置多、几何调整范围小、调整速度慢提供一种适用于高原冻土铁路电气化可调试接触网底座方法与装置。
本发明解决其技术问题的技术方案:
一种接触网立柱调节装置,该调节装置包括:可动式底座板、第一至第四高强螺栓、第一至第四螺母、固定底板、预埋钢筋。所述的可动式底座板和固定底板通过第一至第四高强螺栓和第一至第四螺母连接。预埋钢筋焊接在固定底板的下表面。
所述的可动式底座板为一圆形板,在其上设第一扇形孔、第二扇形孔、第三扇形孔、第四扇形孔;四个扇形孔的中心为过可动式底座板中心的夹角为40°~45°的射线与半径为90mm~130mm的圆周的交点;四个扇形孔的长度均为80mm~90mm,宽度均为30mm~40mm。
在上述半径为90mm~130mm的圆周与上述夹角的平分线垂线的交点上设第一凸台和第二凸台。
所述的固定底板为一圆形板,与可动式底座板直径相等。
所述的固定底板上设四个通孔,四个通孔的中心为过固定底板中心的夹角为40°~45°的射线与半径为90mm~130mm的圆周的交点设四个通孔。
第一至第四高强螺栓分别穿过这四个通孔,与固定底板焊接。
所述的固定底板与第一至第四高强螺栓焊接面的中心,焊接一根直的预埋钢筋,在同一面上,半径为70mm~110mm的圆周上,均布六至十根预埋钢筋,其形状为L形。
本发明和已有技术相比所具有的有益效果是:
该接触网立柱调节装置不需要特殊设备上道进行调试、校正速度快、校正范围广、同时需要较少配置施工人员、不受天气影响、尤其适合冻土高原铁路操作环境恶劣、劳动强度大、接触网立柱冻融病害严重等工程条件。
附图说明
图1为接触网立柱调节装置主视图。
图2为接触网立柱调节装置俯视图。
图3为图1的a的局部放大图。
图4为可动式底座板的主视图。
图5为可动式底座板的左视图。
图6为可动式底座板的俯视图。
图7为图6的B-B剖面图。
图8为预埋钢筋焊接在固定底板的下表面的布置图。
具体实施方式
结合附图对本发明作进一步说明。
一种接触网立柱调节装置,如图1所示,该调节装置包括:可动式底座板1、第一至第四高强螺栓5-1、5-2、5-3、5-4、第一至第四螺母6-1、6-2、6-3、6-4、固定底板4、预埋钢筋7。所述的可动式底座板1和固定底板4通过第一至第四高强螺栓5-1、5-2、5-3、5-4和第一至第四螺母6-1、6-2、6-3、6-4连接,如图3所示。预埋钢筋7焊接在固定底板4的下表面。
所述的可动式底座板1如图4、5、6、7所示,为一圆形板,半径为120mm~180mm,厚度为10-20mm。在其上设第一扇形孔2-1、第二扇形孔2-2、第三扇形孔2-3、第四扇形孔2-4;四个扇形孔的中心为过可动式底座板1中心的夹角为40°~45°的射线与半径为90mm~130mm的圆周的交点;四个扇形孔的长度均为80mm~90mm,宽度均为30mm~40mm。
在上述半径为90mm~130mm的圆周与上述夹角的平分线垂线的交点上设第一凸台3-1和第二凸台3-2,宽20mm~30mm,长30mm~50mm,高为15mm~30mm。
所给的可动式底座板1的数值范围的端值及其中间的任意数值均可。
所述的固定底板4为一圆形板,与可动式底座板1直径相等,厚度为20~25mm。所述的固定底板4上设四个通孔,四个通孔的中心为过固定底板4中心的夹角为40°~45°的射线与半径为90mm~130mm的圆周的交点设四个通孔。
第一至第四高强螺栓5-1、5-2、5-3、5-4分别穿过这四个通孔,与固定底板4焊接。所述的固定底板4与第一至第四高强螺栓焊接面的中心,焊接一根直的预埋钢筋,在同一面上,半径为70mm~110mm的圆周上,均布六至十根预埋钢筋7,其形状为L形,如图1、8所示。
所给的固定底板4的数值范围的端值及其中间的任意数值均可。
使用接触网立柱调节装置时,将该装置的固定底板4和预埋钢筋埋在混凝土基础8中,待混凝土凝固后,可动式底座板1通过第一至第四高强螺栓5-1、5-2、5-3、5-4用第一至第四螺母6-1、6-2、6-3、6-4固定。将接触网立柱焊接在可动式底座板1的中心。
在可动式底座板1上设第一凸台3-1和第二凸台3-2,是为了通过扳手施加水平转动力,调整接触网立柱的角度,从而使接触网立柱达到理想位置。
Claims (3)
1.一种接触网立柱调节装置,其特征在于,该调节装置包括:可动式底座板(1)、第一至第四高强螺栓(5-1、5-2、5-3、5-4)、第一至第四螺母(6-1、6-2、6-3、6-4)、固定底板(4)、预埋钢筋(7);
所述的可动式底座板(1)和固定底板(4)通过第一至第四高强螺栓(5-1、5-2、5-3、5-4)和第一至第四螺母(6-1、6-2、6-3、6-4)连接;
预埋钢筋(7)焊接在固定底板(4)的下表面。
2.根据权利要求1所述的一种接触网立柱调节装置,其特征在于:
所述的可动式底座板(1)为一圆形板,在其上设第一扇形孔(2-1)、第二扇形孔(2-2)、第三扇形孔(2-3)、第四扇形孔(2-4);四个扇形孔的中心为过可动式底座板(1)中心的夹角为40°~45°的射线与半径为90mm~130mm的圆周的交点;四个扇形孔的长度均为80mm~90mm,宽度均为30mm~40mm;
在上述半径为90mm~130mm的圆周与上述夹角的平分线垂线的交点上设第一凸台(3-1)和第二凸台(3-2);
所述的固定底板(4)为一圆形板,与可动式底座板(1)直径相等;
所述的固定底板(4)上设四个通孔,四个通孔的中心为过固定底板(4)中心的夹角为40°~45°的射线与半径为90mm~130mm的圆周的交点设四个通孔;
第一至第四高强螺栓(5-1、5-2、5-3、5-4)分别穿过这四个通孔,与固定底板(4)焊接。
3.根据权利要求1所述的一种接触网立柱调节装置,其特征在于:
所述的固定底板(4)与第一至第四高强螺栓焊接面的中心,焊接一根直的预埋钢筋,在同一面上,半径为70mm~110mm的圆周上,均布六至十根预埋钢筋(7),其形状为L形。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102349013A CN102390286A (zh) | 2011-08-17 | 2011-08-17 | 一种接触网立柱调节装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102349013A CN102390286A (zh) | 2011-08-17 | 2011-08-17 | 一种接触网立柱调节装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102390286A true CN102390286A (zh) | 2012-03-28 |
Family
ID=45857718
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011102349013A Pending CN102390286A (zh) | 2011-08-17 | 2011-08-17 | 一种接触网立柱调节装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102390286A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106740277A (zh) * | 2017-02-22 | 2017-05-31 | 中铁电气化局集团宝鸡器材有限公司 | 一种轨道交通接触网支撑装置 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2313525A1 (fr) * | 1975-01-30 | 1976-12-31 | Sigoure Gerard | Dispositif pour la fixation de poteaux |
CN2893071Y (zh) * | 2006-04-29 | 2007-04-25 | 中铁电气化局集团德阳制品厂 | 电气化铁道接触网支柱基础 |
CN2928940Y (zh) * | 2006-07-17 | 2007-08-01 | 交通部公路科学研究所 | 一种可解体消能交通标志 |
KR20090092499A (ko) * | 2008-02-27 | 2009-09-01 | 백성호 | 지주용 보호커버의 설치구조 |
KR20100126916A (ko) * | 2009-05-25 | 2010-12-03 | 주식회사 계영아이엔 | 도로용 스탠드 |
-
2011
- 2011-08-17 CN CN2011102349013A patent/CN102390286A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2313525A1 (fr) * | 1975-01-30 | 1976-12-31 | Sigoure Gerard | Dispositif pour la fixation de poteaux |
CN2893071Y (zh) * | 2006-04-29 | 2007-04-25 | 中铁电气化局集团德阳制品厂 | 电气化铁道接触网支柱基础 |
CN2928940Y (zh) * | 2006-07-17 | 2007-08-01 | 交通部公路科学研究所 | 一种可解体消能交通标志 |
KR20090092499A (ko) * | 2008-02-27 | 2009-09-01 | 백성호 | 지주용 보호커버의 설치구조 |
KR20100126916A (ko) * | 2009-05-25 | 2010-12-03 | 주식회사 계영아이엔 | 도로용 스탠드 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106740277A (zh) * | 2017-02-22 | 2017-05-31 | 中铁电气化局集团宝鸡器材有限公司 | 一种轨道交通接触网支撑装置 |
CN106740277B (zh) * | 2017-02-22 | 2023-02-28 | 中铁高铁电气装备股份有限公司 | 一种轨道交通接触网支撑装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102979041B (zh) | 下穿铁路道岔群顶进大跨度箱桥施工的软架空加固顶进法 | |
CN103437254B (zh) | 框架桥顶进铁路岔区线路加固装置 | |
CN102787534A (zh) | 岩溶区轻型框架路基桩板结构构造 | |
CN210134353U (zh) | 一种用于盖梁施工的牛腿式抱箍托架 | |
CN203729173U (zh) | 一种有关调整轨排高度的调轨支架结构 | |
CN206768578U (zh) | 一种减小桥台跳车的搭板结构 | |
CN205224075U (zh) | 高速铁路路基接触网立柱基础预埋螺栓定位盘 | |
CN102390286A (zh) | 一种接触网立柱调节装置 | |
CN203866711U (zh) | 一种大跨斜拉桥塔梁三向临时固结结构 | |
CN109235289A (zh) | 一种连续t梁桥无支架维修加固施工平台与安装方法 | |
CN204174481U (zh) | 软土地区现代有轨电车桥台过渡板结构 | |
CN203200639U (zh) | 车载移动式公路路面裂纹机器视觉检测系统 | |
CN207091921U (zh) | 一种少钢管支架的平联连接装置 | |
CN202881854U (zh) | 桥梁施工支撑托架 | |
CN203684102U (zh) | 匝道桥与主线桥交接跨架设预制梁支撑系统 | |
CN207277171U (zh) | 一种跨座式单轨交通轨道梁防落梁伸缩装置 | |
CN209162662U (zh) | 一种连续t梁桥无支架维修加固施工平台 | |
CN202509500U (zh) | 一种钢围檩支撑结构 | |
CN210134352U (zh) | 一种用于独柱墩盖梁施工的抱箍式支架 | |
CN113481871A (zh) | 一种小曲线半径、大跨度连续工型钢混组合桥梁架桥机逐跨过孔方法 | |
CN102602305A (zh) | 一种接触网立柱竖向调节装置 | |
CN201552401U (zh) | 吊车拼装用胎架 | |
CN104229638A (zh) | 既有线施工用承载梁移动吊架 | |
CN108755418A (zh) | 一种桥梁顶推组合装置及其施工方法 | |
CN206904540U (zh) | 一种高架桥信号设备安装支架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: 100044, No. 2, building 59, No. 305 sorghum street, Haidian District, Beijing Applicant after: BEIJING SHEENLINE TECHNOLOGY Co.,Ltd. Address before: 100044, No. 2, building 59, No. 305 sorghum street, Haidian District, Beijing Applicant before: Beijing Sheenline Technology Co.,Ltd. |
|
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120328 |