CN102373668A - 桥梁钢锚箱组装方法 - Google Patents

桥梁钢锚箱组装方法 Download PDF

Info

Publication number
CN102373668A
CN102373668A CN2011103712767A CN201110371276A CN102373668A CN 102373668 A CN102373668 A CN 102373668A CN 2011103712767 A CN2011103712767 A CN 2011103712767A CN 201110371276 A CN201110371276 A CN 201110371276A CN 102373668 A CN102373668 A CN 102373668A
Authority
CN
China
Prior art keywords
plate
steel plate
steel
plates
junction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103712767A
Other languages
English (en)
Other versions
CN102373668B (zh
Inventor
敬承钱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN2011103712767A priority Critical patent/CN102373668B/zh
Publication of CN102373668A publication Critical patent/CN102373668A/zh
Application granted granted Critical
Publication of CN102373668B publication Critical patent/CN102373668B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种桥梁钢锚箱组装方法,步骤如下:A、下料制作钢板板块和连接板;B、将两块钢板板块重合铣端面;将其中的一块钢板板块的另一端与第三块钢板板块重合铣端面;又将第三块钢板板块的另一端与第四块钢板板块重合铣端面;如此反复循环,将所有的钢板板块的端面铣完;C、对钢板板块的连接端钻孔;D、组装单元箱体;E、组装钢锚箱。本发明采用钢板板块重合铣端面,并采用连接板与连接端配钻,连接时按编号和标记连接,既提高了钢板板块端面的顶紧率和高强度螺栓穿孔率,使组装后的整个桥梁钢锚箱的结构更牢固,使用寿命更长。

Description

桥梁钢锚箱组装方法
技术领域
本发明涉及一种桥梁钢结构施工方法,尤其涉及一种桥梁钢锚箱组装方法。
背景技术
目前,斜拉桥钢锚箱端面顶紧在结构组装后整体端面铣,并在端面铣后配钻高强螺栓孔;该种加工方式,对于结构构件端面过大时,需要大型镗床才能加工,使用镗床加工不但加工费用高,并且精度不高,无法保证结构件端面垂直,从而影响结构加工质量,导致整个桥梁钢锚箱的结构不牢固,使用寿命不长。
发明内容
针对现有技术中存在的上述不足之处,本发明提供了一种安装过程中钢板板块顶紧精度高、高强度螺栓穿孔率高、方便加工、降低施工成本的桥梁钢锚箱组装方法,该组装方法组装的桥梁钢锚箱结构更牢固,使用寿命更长。
为了解决上述技术问题,本发明采用了如下技术方案:桥梁钢锚箱组装方法,包括如下步骤:
A、下料:选用合适的钢板,按照尺寸要求下料,切割成一块一块长度合适的钢板板块;同时选择合适的钢板,按照尺寸要求下料,切割成一块一块长度适合的连接板,并在该连接板上钻数个连接孔;
B、对钢板板块进行精加工:先将两块钢板板块重合并放置在铣床上,铣该两个重合钢板板块的端面;再将该两块钢板板块中的一块钢板板块的另一端与第三块钢板板块重合,在铣床上铣端面;又将第三块钢板板块的另一端与第四块钢板板块重合,在铣床上铣端面;如此反复循环,将所有的钢板板块的端面铣完;在对钢板板块进行精加工的同时,按照加工顺序对钢板板块进行相应的编号,并对相邻编号的两个钢板板块在铣床上同步铣出的端面作相应的标记;
C、对钢板板块的连接端钻孔:先在平台上将钢板板块按照加工顺序的编号平放,使标有相应标记的同步铣出的两个端面中的一个钢板板块翻转180°,并使该相邻两个钢板板块的端面顶紧;再将钻有连接孔的连接板夹紧在两个钢板板块的连接端头上,配钻两个钢板板块的连接端头,使该两个连接端头上具有数个连接孔,并在该连接板上作出与该连接端头相同的标记;采用不同的连接板对不同的相邻两个钢板板块的连接端头进行配钻连接孔,并在该连接板上作出与该配钻的连接端头相同的标记;
D、组装单元箱体:钢锚箱的总高度由各段单元箱体的高度组成,每段单元箱体由同一高度的钢板板块组装成横截面呈矩形结构的箱体;同一段单元箱体上的相邻钢板板块的侧面之间焊接固定;
E、组装钢锚箱:先将底部的单元箱体焊接在桥梁的基墩的连接板上;再将其余的各段单元箱体从下向上对接,使对接后各段单元箱体上钢板板块在竖直方向上按照加工顺序的编号依次排列,且在竖直方向上的相邻钢板板块之间的连接端面为相同标记的同步铣出的端面;最后在相邻单元箱体上的对接钢板板块的内外侧安装与该钢板板块配钻的连接板,通过在连接孔内穿入高强度螺栓并紧固从而使上下相邻的单元箱体固定连接。 
与现有技术相比,本发明的桥梁钢锚箱组装方法,具有如下优点:
1、保证了钢板板块端面顶紧率,采用两个钢板板块反向对称端面铣后再组装成单元箱体,既有效地保证钢板板块端面铣加工精度,又降低了加工成本,避免了组装后再用镗床加工而导致的加工精度不高和加工成本高的缺陷。
2、保证了高强螺栓顶紧率,在端面铣后整体装配后配装螺栓孔,可保证高强螺栓穿孔率,同时实现了端面顶紧率满足要求。
3、该组装方法方便施工、降低施工成本;克服了对于结构构件端面过大时,现有技术中需要大型镗床才能加工而导致的精度不高,不能保证结构件端面垂直,从而影响结构加工质量的缺陷;使组装后的桥梁钢锚箱结构更牢固,使用寿命更长。
附图说明
图1为两个钢板板块顶紧后配钻的结构示意图;
图2为单个单元箱体的结构示意图;
图3为桥梁钢锚箱组装方法组装的钢锚箱的结构示意图。
具体实施方式
    下面结合附图和具体实施方式对本发明作进一步详细地说明。  
桥梁钢锚箱组装方法,该方法包括如下步骤:
A、下料:选用合适的钢板,按照尺寸要求下料,切割成一块一块长度合适的钢板板块1;同时选择合适的钢板,按照尺寸要求下料,切割成一块一块长度适合的连接板2,并在该连接板2上钻数个连接孔;钢板板块1和连接板2作为备用。
B、对钢板板块1进行精加工:先将两块钢板板块1重合并放置在铣床上,铣该两个重合钢板板块1的端面;再将该两块钢板板块1中的一块钢板板块的另一端与第三块钢板板块重合,在铣床上铣端面;又将第三块钢板板块的另一端与第四块钢板板块重合,在铣床上铣端面;如此反复循环,将所有的钢板板块的端面铣完;在对钢板板块进行精加工的同时,按照加工顺序对钢板板块1进行相应的编号,并对相邻编号的两个钢板板块在铣床上同步铣出的端面作相应的标记。
C、对钢板板块1的连接端钻孔:先在平台上将钢板板块按照加工顺序的编号平放,使标有相应标记的同步铣出的两个端面中的一个钢板板块翻转180°,并使该相邻两个钢板板块的端面顶紧;再将钻有连接孔的连接板夹紧在两个钢板板块的连接端头上,配钻两个钢板板块的连接端头,使该两个连接端头上具有数个连接孔3(如图1所示),并在该连接板上作出与该连接端头相同的标记;采用不同的连接板对不同的相邻两个钢板板块的连接端头进行配钻连接孔,并在该连接板上作出与该配钻的连接端头相同的标记。
D、组装单元箱体:钢锚箱的总高度由各段单元箱体的高度组成,每段单元箱体由同一高度的钢板板块组装成横截面呈矩形结构的箱体(如图2所示);同一段单元箱体上的相邻钢板板块的侧面5之间焊接固定。
E、组装钢锚箱:先将底部的单元箱体焊接在桥梁的基墩的连接板上;再将其余的各段单元箱体从下向上对接,使对接后各段单元箱体上钢板板块在竖直方向上按照加工顺序的编号依次排列,且在竖直方向上的相邻钢板板块之间的连接端面为相同标记的同步铣出的端面;最后在相邻单元箱体上的对接钢板板块的内外侧安装与该钢板板块1配钻的连接板2,通过在连接孔3内穿入高强度螺栓4并紧固,从而使上下相邻的单元箱体固定连接,组装后的钢锚箱的结构如图3所示。
最后说明的是,以上实施例仅用以说明本发明的技术方案而非限制,尽管参照较佳实施例对本发明进行了详细说明,本领域的普通技术人员应当理解,可以对本发明的技术方案进行修改或者等同替换,而不脱离本技术方案的宗旨和范围,其均应涵盖在本发明的权利要求范围当中。

Claims (1)

1.桥梁钢锚箱组装方法,其特征在于,该方法包括如下步骤:
A、下料:选用合适的钢板,按照尺寸要求下料,切割成一块一块长度合适的钢板板块;同时选择合适的钢板,按照尺寸要求下料,切割成一块一块长度适合的连接板,并在该连接板上钻数个连接孔;
B、对钢板板块进行精加工:先将两块钢板板块重合并放置在铣床上,铣该两个重合钢板板块的端面;再将该两块钢板板块中的一块钢板板块的另一端与第三块钢板板块重合,在铣床上铣端面;又将第三块钢板板块的另一端与第四块钢板板块重合,在铣床上铣端面;如此反复循环,将所有的钢板板块的端面铣完;在对钢板板块进行精加工的同时,按照加工顺序对钢板板块进行相应的编号,并对相邻编号的两个钢板板块在铣床上同步铣出的端面作相应的标记;
C、对钢板板块的连接端钻孔:先在平台上将钢板板块按照加工顺序的编号平放,使标有相应标记的同步铣出的两个端面中的一个钢板板块翻转180°,并使该相邻两个钢板板块的端面顶紧;再将钻有连接孔的连接板夹紧在两个钢板板块的连接端头上,配钻两个钢板板块的连接端头,使该两个连接端头上具有数个连接孔,并在该连接板上作出与该连接端头相同的标记;采用不同的连接板对不同的相邻两个钢板板块的连接端头进行配钻连接孔,并在该连接板上作出与该配钻的连接端头相同的标记;
D、组装单元箱体:钢锚箱的总高度由各段单元箱体的高度组成,每段单元箱体由同一高度的钢板板块组装成横截面呈矩形结构的箱体;同一段单元箱体上的相邻钢板板块的侧面之间焊接固定;
E、组装钢锚箱:先将底部的单元箱体焊接在桥梁的基墩的连接板上;再将其余的各段单元箱体从下向上对接,使对接后各段单元箱体上钢板板块在竖直方向上按照加工顺序的编号依次排列,且在竖直方向上的相邻钢板板块之间的连接端面为相同标记的同步铣出的端面;最后在相邻单元箱体上的对接钢板板块的内外侧安装与该钢板板块配钻的连接板,通过在连接孔内穿入高强度螺栓并紧固,从而使上下相邻的单元箱体固定连接。
CN2011103712767A 2011-11-21 2011-11-21 桥梁钢锚箱组装方法 Active CN102373668B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103712767A CN102373668B (zh) 2011-11-21 2011-11-21 桥梁钢锚箱组装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103712767A CN102373668B (zh) 2011-11-21 2011-11-21 桥梁钢锚箱组装方法

Publications (2)

Publication Number Publication Date
CN102373668A true CN102373668A (zh) 2012-03-14
CN102373668B CN102373668B (zh) 2013-12-04

Family

ID=45792845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103712767A Active CN102373668B (zh) 2011-11-21 2011-11-21 桥梁钢锚箱组装方法

Country Status (1)

Country Link
CN (1) CN102373668B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103934631A (zh) * 2013-12-31 2014-07-23 中铁四局集团钢结构有限公司 一种大型索塔钢锚箱加工方法
CN105002830A (zh) * 2015-08-05 2015-10-28 武船重型工程股份有限公司 一种钢塔小节段的制造方法
CN106400675A (zh) * 2016-08-31 2017-02-15 中交公局第三工程有限公司 一种钢锚箱及其安装方法
CN108213805A (zh) * 2016-12-21 2018-06-29 重庆重齿机械有限公司 一种箱型结构反装法
CN109290739A (zh) * 2018-08-15 2019-02-01 中铁宝桥集团有限公司 一种空间曲线钢塔节段制造工艺
CN110722327A (zh) * 2019-10-28 2020-01-24 中铁山桥集团有限公司 一种整体插入式锚箱制作方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6219989B1 (en) * 1997-09-29 2001-04-24 Shinichi Tumura Construction method of joining column and beam in building structure based on heavy-weight steel frame construction
CN101240524A (zh) * 2007-12-27 2008-08-13 中交第二航务工程局有限公司 索塔钢锚箱安装倾斜度调整方法及具有倾斜度调整垫块的钢锚箱

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6219989B1 (en) * 1997-09-29 2001-04-24 Shinichi Tumura Construction method of joining column and beam in building structure based on heavy-weight steel frame construction
CN101240524A (zh) * 2007-12-27 2008-08-13 中交第二航务工程局有限公司 索塔钢锚箱安装倾斜度调整方法及具有倾斜度调整垫块的钢锚箱

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张喜刚,刘玉挚: "《组合索塔锚固结构》", 28 February 2010, article "《组合索塔锚固结构》", pages: 8 - 9 *
秦晓锋,朱晓凯,夏明建: "《重庆嘉悦大桥钢锚箱施工技术》", 《市政技术》, no. 6, 10 November 2010 (2010-11-10), pages 71 - 74 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103934631A (zh) * 2013-12-31 2014-07-23 中铁四局集团钢结构有限公司 一种大型索塔钢锚箱加工方法
CN103934631B (zh) * 2013-12-31 2016-09-28 中铁四局集团钢结构有限公司 一种大型索塔钢锚箱加工方法
CN105002830A (zh) * 2015-08-05 2015-10-28 武船重型工程股份有限公司 一种钢塔小节段的制造方法
CN105002830B (zh) * 2015-08-05 2017-08-04 武船重型工程股份有限公司 一种钢塔小节段的制造方法
CN106400675A (zh) * 2016-08-31 2017-02-15 中交公局第三工程有限公司 一种钢锚箱及其安装方法
CN106400675B (zh) * 2016-08-31 2018-08-03 中交一公局第三工程有限公司 一种钢锚箱及其安装方法
CN108213805A (zh) * 2016-12-21 2018-06-29 重庆重齿机械有限公司 一种箱型结构反装法
CN108213805B (zh) * 2016-12-21 2019-09-27 重庆重齿机械有限公司 一种箱型结构反装法
CN109290739A (zh) * 2018-08-15 2019-02-01 中铁宝桥集团有限公司 一种空间曲线钢塔节段制造工艺
CN110722327A (zh) * 2019-10-28 2020-01-24 中铁山桥集团有限公司 一种整体插入式锚箱制作方法
CN110722327B (zh) * 2019-10-28 2021-09-21 中铁山桥集团有限公司 一种整体插入式锚箱制作方法

Also Published As

Publication number Publication date
CN102373668B (zh) 2013-12-04

Similar Documents

Publication Publication Date Title
CN102373668B (zh) 桥梁钢锚箱组装方法
CN101664847B (zh) 一种钢结构箱形梁/柱的制作方法
CN103015537B (zh) 一种装配式钢结构体系的梁柱节点连接装置
CN110593431A (zh) 一种可更换耗能梁段的π型钢-端板连接结构及方法
CN107199437B (zh) 一种钢锚梁节段制备方法
CN101745748B (zh) 钻井平台的桩腿与桩靴的焊接方法
CN109629677B (zh) 一种采用外套筒连接的模块化钢结构建筑的连接节点
CN102966033A (zh) 全焊铁路连续钢桁梁多节点弦杆及制造方法
CN112144408A (zh) 一种装配式栈桥搭建施工方法
JP2017002559A (ja) コンクリート床版接合工法、コンクリート床版取り替え工法、コンクリート床版接合構造、プレキャストコンクリート床版
CN102900166B (zh) 屈曲约束支撑及其节点连接板和安装方法
CN102069215B (zh) 一种钢结构连接板钻孔夹具
CN104863266A (zh) 箱形柱-工形梁预制装配式高延性梁柱节点
CN101497151B (zh) 加热炉平移框架的组焊工艺
CN104652616A (zh) 一种装配式钢结构体系的半焊半螺栓梁柱节点连接装置
CN207727803U (zh) 一种预制装配式防屈曲钢板剪力墙
CN102069208B (zh) 一种钢结构连接板的钻孔方法
CN101082266B (zh) 一种石油钻机井架的对接方法
CN103758280B (zh) H型钢及其制造方法、钢结构及其组装方法
CN206987058U (zh) 一种生活楼模块单元装配拼接节点组合
CN207806978U (zh) 一种隧道拱架法兰盘固定工装
CN214117073U (zh) 一种跨越隔震支座的接地结构及建筑隔震结构
KR100804046B1 (ko) 연결부 강성이 증대된 아이빔 세그멘트 가설교량 연결방법
CN217873626U (zh) 一种立库堆垛机地轨现场安装结构
JP4713291B2 (ja) 大型鉄骨h型梁の分割構造と組み立て方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant