CN102367699A - Construction method of large-area concrete terrace - Google Patents

Construction method of large-area concrete terrace Download PDF

Info

Publication number
CN102367699A
CN102367699A CN2011101746468A CN201110174646A CN102367699A CN 102367699 A CN102367699 A CN 102367699A CN 2011101746468 A CN2011101746468 A CN 2011101746468A CN 201110174646 A CN201110174646 A CN 201110174646A CN 102367699 A CN102367699 A CN 102367699A
Authority
CN
China
Prior art keywords
terrace
little
casings
rod member
sleeve pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101746468A
Other languages
Chinese (zh)
Inventor
张宗建
朱雪峰
强化
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU JIANGDU CONSTRUCTION GROUP CO Ltd
Original Assignee
JIANGSU JIANGDU CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU JIANGDU CONSTRUCTION GROUP CO Ltd filed Critical JIANGSU JIANGDU CONSTRUCTION GROUP CO Ltd
Priority to CN2011101746468A priority Critical patent/CN102367699A/en
Publication of CN102367699A publication Critical patent/CN102367699A/en
Pending legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention relates to the technical field of building construction, in particular to a construction method of a large-area concrete terrace. The method comprises the following steps of: transversely pre-burying casings on the periphery with the openings of the casings facing outwards during construction of a previous small terrace; after the previous small terrace is molded by pouring, inserting straight rigid rod pieces into the casings, and fixedly connecting the outer ends of the rod pieces projecting out of the openings of the casings with steel bars of a next small terrace; and after the next small terrace is molded by pouring, cutting the rod pieces from the joint between the two small terraces. Due to the adoption of the method, slotted ground can be prevented, and the engineering quality can be improved.

Description

A kind of job practices of large tracts of land coagulation terrace
Technical field
The present invention relates to technical field of building construction, particularly the job practices of large tracts of land coagulation terrace.
Background technology
In large tracts of land coagulation floor construction process; Often take the method for block construction; The sequence construction method of promptly constructing again in the fritter terrace outside of having constructed, because block construction, surface settlement is uneven; Be prone to cause between two plots of adjacent terraces parting seam occurs, directly influence the globality of large tracts of land coagulation terrace.
The method of existing control concrete building plate thickness is on the wall column reinforcing bar, is ferreted out the line of 50cm, and diagonal wiring is measured control downwards with invar tape, and this method workload is big, error is many, consuming time, consumption power, causes careless omission easily.And, as when weight or people step down on the reinforcing bar that has tied up, also can make being shifted of fixing originally, so only rely on the traditional concrete method for controlling thickness can't guarantee the accurate construction of thickness of slab control.
Summary of the invention
The object of the invention is to propose a kind of job practices that improves large tracts of land coagulation terrace globality.
The present invention adopts the block construction method, and in the horizontal service sleeve of periphery, the opening that makes sleeve pipe outwardly when last little floor construction; After treating that last plot of little terrace built moulding, in said sleeve pipe, insert straight shape rigidity rod member, and the outer end that will stretch out in the outer said rod member of the opening of sleeve pipe is fixedly connected with the reinforcing bar of a back little terrace; After treating that a back little terrace is built moulding, cut off said rod member from the seam crossing between two plots of little terraces.
The present invention has adopted the practical dowel bar of straight shape rigidity rod member, jumps in the method construction of beating in minute storehouse, and reinforcing bar is by building the colligation of order piecemeal, and is uneven for the surface settlement of avoiding the reinforcing bar disconnection to cause, and straight shape rigidity rod member is set in the parting seam position.Construct by close joint when concrete is built, more straight shape rigidity rod member is cut off after two to three days, guarantee that uniformity falls in the layer of large area concrete terrace, no parting seam is to improve workmanship.
Description of drawings
Fig. 1 is a kind of construction sketch map of the present invention.
The specific embodiment
As shown in Figure 1, the present invention adopts the block construction method.
In the horizontal service sleeve 2 of periphery, the opening that makes sleeve pipe 2 outwardly when 1 construction of last plot of little terrace.
After treating that last plot of little terrace 1 built moulding, in sleeve pipe 2, insert straight shape rigidity rod member 3, and outer rod member 3 outer ends of opening that will stretch out in sleeve pipe 2 are fixedly connected with the reinforcing bar 5 of a back little terrace 4.
After treating that a back little terrace 4 is built moulding, cut off rod member 3 from the seam crossing between two plots of little terraces 1 and 4.

Claims (1)

1. the job practices of a large tracts of land coagulation terrace adopts the block construction method, it is characterized in that when last little floor construction in the horizontal service sleeve of periphery, and the opening that makes sleeve pipe outwardly; After treating that last plot of little terrace built moulding, in said sleeve pipe, insert straight shape rigidity rod member, and the outer end that will stretch out in the outer said rod member of the opening of sleeve pipe is fixedly connected with the reinforcing bar of a back little terrace; After treating that a back little terrace is built moulding, cut off said rod member from the seam crossing between two plots of little terraces.
CN2011101746468A 2011-06-27 2011-06-27 Construction method of large-area concrete terrace Pending CN102367699A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101746468A CN102367699A (en) 2011-06-27 2011-06-27 Construction method of large-area concrete terrace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101746468A CN102367699A (en) 2011-06-27 2011-06-27 Construction method of large-area concrete terrace

Publications (1)

Publication Number Publication Date
CN102367699A true CN102367699A (en) 2012-03-07

Family

ID=45760287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101746468A Pending CN102367699A (en) 2011-06-27 2011-06-27 Construction method of large-area concrete terrace

Country Status (1)

Country Link
CN (1) CN102367699A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108411731A (en) * 2018-04-27 2018-08-17 上海核工程研究设计院有限公司 A kind of power transmission bar assembly of prefabricated heavy mail road deck
CN108691262A (en) * 2017-04-06 2018-10-23 五冶集团上海有限公司 A method of steel form is fixed and adjusted for floor construction
CN111206746A (en) * 2020-01-09 2020-05-29 海达建设集团有限公司 Construction method of large-area terrace
CN111441215A (en) * 2020-03-31 2020-07-24 上海宝冶集团有限公司 Steel plate type force transmission rod assembly for concrete terrace and construction method thereof
CN114135077A (en) * 2021-11-08 2022-03-04 中建四局第六建设有限公司 Concrete super-building reset cutting floor construction method free of warehouse dividing strip structure
CN116289376A (en) * 2023-03-20 2023-06-23 山东交通学院 Connection structure and construction method of assembled concrete pavement base plate

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108691262A (en) * 2017-04-06 2018-10-23 五冶集团上海有限公司 A method of steel form is fixed and adjusted for floor construction
CN108411731A (en) * 2018-04-27 2018-08-17 上海核工程研究设计院有限公司 A kind of power transmission bar assembly of prefabricated heavy mail road deck
CN111206746A (en) * 2020-01-09 2020-05-29 海达建设集团有限公司 Construction method of large-area terrace
CN111441215A (en) * 2020-03-31 2020-07-24 上海宝冶集团有限公司 Steel plate type force transmission rod assembly for concrete terrace and construction method thereof
CN114135077A (en) * 2021-11-08 2022-03-04 中建四局第六建设有限公司 Concrete super-building reset cutting floor construction method free of warehouse dividing strip structure
CN116289376A (en) * 2023-03-20 2023-06-23 山东交通学院 Connection structure and construction method of assembled concrete pavement base plate

Similar Documents

Publication Publication Date Title
CN102367699A (en) Construction method of large-area concrete terrace
CN203961284U (en) A kind of concrete cylindrical regularization constructing structure
CN105064555A (en) Structural wallboard for superimposed decorative layer and insulating layer and construction method
CN103556819B (en) A kind of construction method of reserved constructional column hole on beam slab
CN104060781A (en) Cast-in-situ cranked slab stair without seams at stair sections and construction method
CN102535495B (en) U-shaped groove base for prefabricated building and construction method thereof
US8650830B2 (en) Method of basement construction
CN108005286A (en) A kind of construction method of the unidirectional overlapping floorboard of assembled architecture
CN203947498U (en) Poured band of outer wall of basement wall Side Template
CN107761759A (en) A kind of L-type concrete guard wall
WO2012173935A2 (en) Building block, system and method
CN204456671U (en) Cast-in-place concrete structure floor bar thickness of slab Comprehensive Control part
CN206957042U (en) Light composite heat insulation outer wall plate and particular manufacturing craft
CN104947853A (en) Built-in stand type cast-in-place reinforced concrete pillar and construction method
CN112411798A (en) Synchronous construction method for prefabricated guide wall and main structure of toilet
CN103352568A (en) Method for building constructional column on foundation pad
CN103161311A (en) Construction method for transverse penetration of long-diameter reinforced concrete pipeline through bridge abutment
WO2012123964A3 (en) Casting designer walls for building by using moulds
CN203878718U (en) Joint structure of cover plate of trench and pipe trench
JP2017227052A (en) Mold hanger
CN102535842A (en) Construction process of prefabricated column construction component
CN204876210U (en) Structure wallboard of coincide decorative layer and heat preservation
CN103206084A (en) Material-saving construction method of cast-in-place floor
US9194122B2 (en) Dome enclosure
CN207700206U (en) A kind of concrete self-balancing side mould of building construction cushion cap

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120307