CN108411731A CN201810394022.9A CN201810394022A CN108411731A CN 108411731 A CN108411731 A CN 108411731A CN 201810394022 A CN201810394022 A CN 201810394022A CN 108411731 A CN108411731 A CN 108411731A
Authority
CN
China
Prior art keywords
casing
sleeve
power transmission
prefabricated
heavy mail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810394022.9A
Other languages
Chinese (zh)
Inventor
颜彦
叶苏疏
陈鹏
陈一鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Nuclear Engineering Research and Design Institute Co Ltd
Original Assignee
Shanghai Nuclear Engineering Research and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Nuclear Engineering Research and Design Institute Co Ltd filed Critical Shanghai Nuclear Engineering Research and Design Institute Co Ltd
Priority to CN201810394022.9A priority Critical patent/CN108411731A/en
Publication of CN108411731A publication Critical patent/CN108411731A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/02Arrangement or construction of joints; Methods of making joints; Packing for joints
    • E01C11/04Arrangement or construction of joints; Methods of making joints; Packing for joints for cement concrete paving
    • E01C11/14Dowel assembly ; Design or construction of reinforcements in the area of joints

Abstract

The invention discloses a kind of power transmission bar assemblies of prefabricated heavy mail road deck, including transmission rod and casing;Transmission rod is shaped form, and one end has end plate;Casing includes first sleeve and the second casing, and transmission rod is arranged to be arranged in first sleeve and the second casing;End plate is more than the opening of casing.First sleeve can be prefabricated in two adjacent prefabricated heavy mail road decks respectively with the second casing so that first sleeve is opposite with the lateral openings forward direction of the second casing., will be in transmission rod threading after the completion of the lifting of prefabricated heavy mail road deck so that between road deck mutually can abundant power transmission, heavy vehicle is not easy to cause the faulting of slab ends of seam crossing when passing through road deck, and the pulling force between panel and shearing are effectively transmitted by transmission rod.It is convenient to mount and dismount moreover, the power transmission bar assembly of the present invention also has, repeats the advantages of utilizing.

Description

A kind of power transmission bar assembly of prefabricated heavy mail road deck
Technical field
The present invention relates to prefabricated heavy mail road deck fields, more particularly to a kind of transmission rod group of prefabricated heavy mail road deck Part can effectively transmit pulling force and shearing for ensureing between prefabricated heavy mail road deck.
Background technology
Conventional carriage way is equipped with expansion joint and applies substantially using cast-in-situ steel reinforced concrete road surface along road surface at present Work is stitched.In order to transmit the stress that traffic load generates between adjacent road deck, the faulting of slab ends of seaming position is reduced, is generally required The pre-buried a certain number of transmission rods in pavement joint position.This cast-in-place pavement construction period is long, curing requirements are high, and later stage repairing is difficult Degree is big, and road surface integral strength can also be declined after repairing.
In addition, in industrial working, only interim transport needs heavy mail road sometimes, such as builds and complete in nuclear power plant Afterwards, the road surface of high-bearing capacity is in fact in permanent idle state, instead can be in some cases even due to being difficult to remove The burden recycled for plant area's transformation and place.Prefabricated road deck system can preferably solve the above problems.Therefore this field Technical staff wishes to develop a kind of prefabricated road deck so that it has each other fully power transmission, dress convenient disassembly and can repeat The function of utilizing.
Invention content
Technical problem to be solved by the invention is to provide a kind of prefabricated heavy mail road deck actuating systems so that between road deck Mutual abundant power transmission, and fill convenient disassembly, can reuse.
To achieve the above object, the present invention proposes a kind of power transmission bar assembly of prefabricated heavy mail road deck, have it is detachable and The function of recycling can not need to restore place after solving the problems, such as conventional cast-in-place pavement construction according to function.Tool Body, technical solution provided by the invention is as follows:
A kind of power transmission bar assembly of prefabricated heavy mail road deck, the power transmission bar assembly includes transmission rod and casing;The biography Power bar is shaped form, and one end has end plate;Described sleeve pipe includes first sleeve and the second casing, and the transmission rod is arranged to can It is arranged in the first sleeve and second casing;The end plate is more than the opening of described sleeve pipe.
Preferably, the transmission rod is U-shaped or arc.
Preferably, the transmission rod is integrally formed with the end plate.
Preferably, the first sleeve and second casing are symmetrical structure.
Preferably, the section of the transmission rod is round or round rectangle.
Preferably, the transmission rod and described sleeve pipe are made of metal material or polymer composite.
Preferably, be arranged to second casing can be prefabricated prefabricated heavy in adjacent two respectively for the first sleeve In part road deck, the first sleeve is opposite with the lateral openings forward direction of the second casing.
Further, the vertical openings of the first sleeve and second casing are straight up.
A kind of installation method of the power transmission bar assembly of prefabricated heavy mail road deck, uses the transmission rod group of above-mentioned any one Part includes the following steps:
A. respectively that first sleeve and the second casing is prefabricated in two adjacent prefabricated heavy mail road decks, the first set The lateral openings of pipe and second casing are located substantially at the half height of prefabricated heavy mail road surface plate thickness;
B. in place by two adjacent prefabricated heavy mail road deck liftings so that the first sleeve and second casing Lateral openings forward direction is opposite;
C. transmission rod is penetrated into the first sleeve and second casing so that the end plate of transmission rod end with it is prefabricated heavy Part road deck is bonded.
The power transmission bar assembly of the prefabricated heavy mail road deck of the present invention make between road deck mutually can abundant power transmission, heavy goods vehicles It is not easy to cause the faulting of slab ends of seam crossing when passing through road deck, the pulling force between panel and shearing are effectively transmitted by transmission rod. In addition, the power transmission bar assembly of the present invention is convenient to mount and dismount, and can reuse.
The method of the present invention and the technique effect of generation are described further below with reference to attached drawing, to be fully understood from The purpose of the present invention, feature and effect.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis The attached drawing of offer obtains other attached drawings.
Fig. 1 is the explosive view of the preferred embodiment of the power transmission bar assembly of the present invention;
Fig. 2 is the overall schematic of the preferred embodiment of the power transmission bar assembly of the present invention.
The prefabricated heavy mail road decks of 1-;2- casings;3- transmission rods;31- end plates
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1 is the explosive view of the preferred embodiment of the power transmission bar assembly of the present invention.Wherein, power transmission bar assembly includes transmission rod 3 and casing 2;Transmission rod 3 is shaped form, and one end has end plate 31;Casing 2 includes first sleeve and the second casing, 3 quilt of transmission rod It is set as to be arranged in first sleeve and the second casing;End plate 31 is more than the opening of casing.
First sleeve is arranged to the second casing can be prefabricated in two adjacent prefabricated heavy mail road decks 1 respectively, the Sleeve is opposite with the lateral openings forward direction of the second casing, as shown in Figure 2.First sleeve and the vertical openings of the second casing are vertical Upwards.
In the present embodiment, transmission rod is preferably U-shaped or arc, and its purpose is to make two adjacent prefabricated heavy mails Road deck 1 mutually can fully transmit pulling force and shearing so that heavy vehicle is not easy to cause the mistake of seam crossing when passing through road deck Platform.In other examples, transmission rod may be set to be other curved configurations, as long as can be so that adjacent is two prefabricated heavy Part road deck 1 can transmit pulling force.
In addition, in the present embodiment, transmission rod is preferably integrally formed with end plate;The section of transmission rod it is preferably circular or Round rectangle;Transmission rod 3 and casing 2 are preferably made of the metal material or polymer composite of high intensity.In other realities It applies in example, transmission rod can also be connect with end plate by modes such as welding or screw threads.
For the ease of the manufacture and replacement of casing, first sleeve is preferably arranged to symmetrical structure with the second casing, that is, is tying It is consistent on structure.
The connection method of the power transmission bar assembly of the prefabricated heavy mail road deck of the present invention is as follows:
The service sleeve 2 in the process of prefabricated heavy mail road deck 1, the height that casing 2 is open in the ozzle of seam crossing Preferably 1/2 plate thickness, the ozzle opening of 2 other end of casing is straight up.Construction is transported to after prefabricated 1 completion of processing of heavy mail road deck Place is mated formation by crane.The casing 2 in adjacent two pieces of prefabricated heavy mail road decks 1 should be made lateral in process of deployment as possible Register can allow certain deviation in place in the horizontal direction due to the slotted hole that 2 cross section of casing is horizontal direction. After the completion of laying, by transmission rod 3 from vertical direction on ozzle opening penetrate, until 3 end of transmission rod end plate completely in advance The upper surface of heavy mail road deck 1 processed is bonded.
It is two neighboring when heavy vehicle passes through road surface after installation is complete for the power transmission bar assembly of prefabricated heavy mail road deck Pulling force and shearing suffered by prefabricated heavy mail road deck 1 can be transmitted by transmission rod 3, and road deck seam crossing is reduced to play The phenomenon that faulting of slab ends, tensioning.When prefabricated heavy mail road deck needs removed from place when, it is only necessary to extract transmission rod 3 can be realized by The function that prefabricated road deck is split.

Claims (9)

1. a kind of power transmission bar assembly of prefabricated heavy mail road deck, which is characterized in that the power transmission bar assembly includes transmission rod and set Pipe;
The transmission rod is shaped form, and one end has end plate;
Described sleeve pipe includes first sleeve and the second casing, and the transmission rod is arranged to that the first sleeve and institute can be arranged in It states in the second casing;
The end plate is more than the opening of described sleeve pipe.
2. the power transmission bar assembly of prefabricated heavy mail road deck as described in claim 1, which is characterized in that the transmission rod is U-shaped Or arc.
3. the power transmission bar assembly of prefabricated heavy mail road deck as described in claim 1, which is characterized in that the transmission rod with it is described End plate is integrally formed.
4. the power transmission bar assembly of prefabricated heavy mail road deck as described in claim 1, which is characterized in that the first sleeve and institute It is symmetrical structure to state the second casing.
5. the power transmission bar assembly of prefabricated heavy mail road deck as described in claim 1, which is characterized in that the section of the transmission rod For round or round rectangle.
6. the power transmission bar assembly of prefabricated heavy mail road deck as described in claim 1, which is characterized in that the transmission rod and described Casing is made of metal material or polymer composite.
7. the power transmission bar assembly of prefabricated heavy mail road deck as described in claim 1, which is characterized in that the first sleeve and institute Stating that the second casing is arranged to can be prefabricated in two adjacent prefabricated heavy mail road decks respectively, the first sleeve and described the The lateral openings forward direction of two casings is opposite.
8. the power transmission bar assembly of prefabricated heavy mail road deck as claimed in claim 7, which is characterized in that the first sleeve and institute State the vertical openings of the second casing straight up.
9. a kind of installation method of the power transmission bar assembly of prefabricated heavy mail road deck, which is characterized in that using as in claim 1-8 The power transmission bar assembly of any one, includes the following steps:
A. respectively that first sleeve and the second casing is prefabricated in two adjacent prefabricated heavy mail road decks, the first sleeve with The lateral openings of second casing are located substantially at the half height of prefabricated heavy mail road surface plate thickness;
B. in place by two adjacent prefabricated heavy mail road deck liftings so that the first sleeve is lateral with second casing Opening is positive opposite;
C. transmission rod is penetrated into the first sleeve and second casing so that the end plate of transmission rod end and prefabricated heavy mail road Panel attachment.
CN201810394022.9A 2018-04-27 2018-04-27 A kind of power transmission bar assembly of prefabricated heavy mail road deck Pending CN108411731A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810394022.9A CN108411731A (en) 2018-04-27 2018-04-27 A kind of power transmission bar assembly of prefabricated heavy mail road deck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810394022.9A CN108411731A (en) 2018-04-27 2018-04-27 A kind of power transmission bar assembly of prefabricated heavy mail road deck

Publications (1)

Publication Number Publication Date
CN108411731A true CN108411731A (en) 2018-08-17

Family

ID=63136912

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810394022.9A Pending CN108411731A (en) 2018-04-27 2018-04-27 A kind of power transmission bar assembly of prefabricated heavy mail road deck

Country Status (1)

Country Link
CN (1) CN108411731A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797253A (en) * 2018-08-22 2018-11-13 上海核工程研究设计院有限公司 A kind of U-shaped detachable dowel bar structure for prefabricated heavy mail road deck

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006016881A (en) * 2004-07-02 2006-01-19 Kcon Kk Load transmitting bar and construction method of the load transmitting bar
CN201924254U (en) * 2010-11-02 2011-08-10 湖南省交通科学研究院 Novel expansion joint structure for continuously reinforced concrete composite road surface
CN102367699A (en) * 2011-06-27 2012-03-07 江苏江都建设集团有限公司 Construction method of large-area concrete terrace
KR20150017812A (en) * 2013-08-07 2015-02-23 현대엔지니어링 주식회사 Precast concrete slabs pavement using arc tie­bar connection and its construction method
CN208219336U (en) * 2018-04-27 2018-12-11 上海核工程研究设计院有限公司 A kind of power transmission bar assembly of prefabricated heavy mail road deck

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006016881A (en) * 2004-07-02 2006-01-19 Kcon Kk Load transmitting bar and construction method of the load transmitting bar
CN201924254U (en) * 2010-11-02 2011-08-10 湖南省交通科学研究院 Novel expansion joint structure for continuously reinforced concrete composite road surface
CN102367699A (en) * 2011-06-27 2012-03-07 江苏江都建设集团有限公司 Construction method of large-area concrete terrace
KR20150017812A (en) * 2013-08-07 2015-02-23 현대엔지니어링 주식회사 Precast concrete slabs pavement using arc tie­bar connection and its construction method
CN208219336U (en) * 2018-04-27 2018-12-11 上海核工程研究设计院有限公司 A kind of power transmission bar assembly of prefabricated heavy mail road deck

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797253A (en) * 2018-08-22 2018-11-13 上海核工程研究设计院有限公司 A kind of U-shaped detachable dowel bar structure for prefabricated heavy mail road deck

Similar Documents

Publication Publication Date Title
US10794053B2 (en) Reinforced compound concrete beam-column joint containing demolished concrete lumps and a construction method
CN105863050B (en) A kind of assembled wave webs beam column combined joint attachment device of recoverable function
CN103924505B (en) Use prefabricated steel-concrete combination T beam and the construction method of Wavelike steel webplate
KR101066838B1 (en) Double composite box girder and construction method using the same
CN101613990B (en) Construction method of railway steel truss girder T-shaped stiffening rib orthotropic slab bridge deck
CN102587689B (en) Repairing and strengthening method for existing reinforced concrete beam-column joints
CN106638943A (en) Connecting node for steel pipe constrained steel recycled concrete column and steel beam and construction method thereof
JP2007132077A (en) Construction method of rigid-frame bridge with angle brace member, and rigid-frame bridge with angle brace member
CN107268787A (en) A kind of end plate assembled corrugated web occlusion beam column node connection device for recovering function
CN102493553B (en) Construction method of member for connection node of reinforced beam and steel beam
CN105064202A (en) Profile steel and reinforced concrete slab assembled light composite beam bridge and construction method thereof
CN208219336U (en) A kind of power transmission bar assembly of prefabricated heavy mail road deck
CN110453588A (en) A kind of lattice bent cap and its construction method
CN108411731A (en) A kind of power transmission bar assembly of prefabricated heavy mail road deck
CN105442404A (en) Steel plate pavement road and construction method thereof
CN204753575U (en) A pile extension mechanism for concrete pile
CN105752864A (en) Tower crane attachment joint and construction method thereof
KR101673287B1 (en) Methods of increasing the sectional resisting force for negative moment acting at the end part of beam in case of repair or remodeling
CN109629685A (en) A kind of assembled Self-resetting center pillar attachment device of recoverable function
CN106758857B (en) The construction method of precast block formula secondary prestress Wavelike steel webplate combination beam
CN206554483U (en) A kind of full fabricated scaffold is encorbelmented component
CN101881030A (en) Split-mounting type foundation for tower crane
CN104099849B (en) A kind of pressure reductor of fast assembling disassembling structure
CN203947382U (en) A kind of decompression plate of fast assembling disassembling structure
CN210507105U (en) Lattice type bent cap

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: No. 29 Hong Cao Road, Xuhui District, Shanghai

Applicant after: Shanghai Nuclear Engineering Research and Design Institute Co.,Ltd.

Address before: No. 29 Hong Cao Road, Xuhui District, Shanghai

Applicant before: SHANGHAI NUCLEAR ENGINEERING RESEARCH & DESIGN INSTITUTE Co.,Ltd.