CN108797253A - A kind of U-shaped detachable dowel bar structure for prefabricated heavy mail road deck - Google Patents
A kind of U-shaped detachable dowel bar structure for prefabricated heavy mail road deck Download PDFInfo
- Publication number
- CN108797253A CN108797253A CN201810962797.1A CN201810962797A CN108797253A CN 108797253 A CN108797253 A CN 108797253A CN 201810962797 A CN201810962797 A CN 201810962797A CN 108797253 A CN108797253 A CN 108797253A
- Authority
- CN
- China
- Prior art keywords
- shaped
- heavy mail
- prefabricated heavy
- road deck
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C5/00—Pavings made of prefabricated single units
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/02—Arrangement or construction of joints; Methods of making joints; Packing for joints
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The present invention provides a kind of U-shaped detachable dowel bar structure for prefabricated heavy mail road deck, including:Special-shaped casing;The abnormal shape casing, which is configured, to be embedded in prefabricated heavy mail road deck, another adjacent face is through to from one of prefabricated heavy mail road deck face;Pre-buried special-shaped casing is spliced into U-shaped in two adjacent prefabricated heavy mail road decks;U-shaped transmission rod;The U-shaped transmission rod and special-shaped casing pre-buried in adjacent two prefabricated heavy mail road decks be spliced into it is U-shaped match, the U-shaped transmission rod is configured pre-buried special-shaped casing in two adjacent prefabricated heavy mail road decks.Provided by the present invention for the U-shaped detachable dowel bar structure of prefabricated heavy mail road deck, has detachable and recycling function, can not be needed to restore place according to function after solving the problems, such as conventional cast-in-place pavement construction.
Description
Technical field
The design of a kind of U-shaped detachable transmission rod suitable for prefabricated heavy mail road deck of the invention, and in particular to a kind of
Ensure effectively to transmit between prefabricated heavy mail road deck the novel dowel bar structure of pulling force and shearing.
Background technology
Conventional carriage way is equipped with expansion joint and applies substantially using cast-in-situ steel reinforced concrete road surface along road surface at present
Work is stitched.In order to transmit the stress that traffic load generates between adjacent road deck, the faulting of slab ends of seaming position is reduced, is generally required
The pre-buried a certain number of transmission rods in pavement joint position.
This cast-in-place pavement construction period is long, curing requirements are high, and later stage repairing difficulty is big, and road surface is integrally strong after repairing
Degree is also declined.In addition, only interim transport needs the heavy mail road in industrial working sometimes, builds and complete in nuclear power plant
Afterwards, the road surface of high-bearing capacity is in fact in permanent idle state, in some cases even due to being difficult to remove, becomes instead
The burden that plant area is transformed and place recycles.Prefabricated road deck system can preferably solve the above problems.For prefabricated road surface
Transmission rod between plate should have the function of abundant power transmission, dress convenient disassembly and can reuse.
Invention content
In view of the deficiencies of the prior art, the present invention proposes a kind of U-shaped detachable power transmissions for prefabricated heavy mail road deck
Rod structure.
Provided by the present invention for the U-shaped detachable dowel bar structure of prefabricated heavy mail road deck, including:
Special-shaped casing;The abnormal shape casing, which is configured, to be embedded in prefabricated heavy mail road deck, from prefabricated heavy mail road deck
One of face is through to another adjacent face;Pre-buried special-shaped casing is spliced into two adjacent prefabricated heavy mail road decks
It is U-shaped;
U-shaped transmission rod;The U-shaped transmission rod splices with special-shaped casing pre-buried in adjacent two prefabricated heavy mail road decks
At it is U-shaped match, the U-shaped transmission rod is configured the pre-buried special-shaped set in two adjacent prefabricated heavy mail road decks
Pipe.
Preferably, the special-shaped casing, which is configured from the top surface of prefabricated heavy mail road deck, is through to prefabricated heavy mail road deck
One side is aligned through the side for having special-shaped casing on adjacent two prefabricated heavy mail road decks.
Preferably, the cross section that the special-shaped casing is applied in the side of prefabricated heavy mail road deck is length in the horizontal direction
Circular hole.
Preferably, the slotted hole alignment on the side of adjacent two prefabricated heavy mail road decks or section aligned, and be aligned
Part is not less than the cross-sectional area of U-shaped transmission rod.
Preferably, the height for the side that the special-shaped casing is applied in prefabricated heavy mail road deck is prefabricated heavy mail road surface plate thickness
The 1/2 of degree.
Preferably, the special-shaped casing is metal abnormal shape casing or macromolecule abnormal shape casing.
Preferably, the U-shaped transmission rod is the U-shaped transmission rod of metal or the U-shaped transmission rod of macromolecule.
Compared with prior art, the invention has the advantages that:
1, provided by the present invention for the U-shaped detachable dowel bar structure of prefabricated heavy mail road deck, have it is detachable and
The function of recycling can not need to restore place after solving the problems, such as conventional cast-in-place pavement construction according to function.
2, provided by the present invention for the U-shaped detachable dowel bar structure of prefabricated heavy mail road deck, it is ensured that heavy vehicle
It will not cause the faulting of slab ends of seam crossing when passing through road deck, the pulling force between panel and shearing are effectively transmitted by transmission rod.
Description of the drawings
Fig. 1 is the U-shaped detachable dowel bar structure for prefabricated heavy mail road deck for meeting the preferred embodiment of the present invention
Schematic diagram.
Specific implementation mode
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, below in conjunction with the accompanying drawings and specific real
Applying mode, the present invention is described in further detail.
As shown in Figure 1, the U-shaped detachable transmission rod knot for prefabricated heavy mail road deck that one embodiment of the invention provides
Structure includes:Special-shaped casing 2 and U-shaped transmission rod 3.Special-shaped casing 2 is embedded in prefabricated heavy mail road deck 1, from prefabricated heavy mail road surface
One of plate 1 face is through to another adjacent face, pre-buried special-shaped casing in adjacent two prefabricated heavy mail road decks 1
2 be spliced into it is U-shaped.U-shaped transmission rod 3 is spliced into U-shaped with special-shaped casing 2 pre-buried in adjacent two prefabricated heavy mail road decks 1
Match, U-shaped transmission rod 3 runs through special-shaped casing 2 pre-buried in two adjacent prefabricated heavy mail road decks 1.
Special-shaped casing 2 is through to the one side of prefabricated heavy mail road deck 1 from the top surface of prefabricated heavy mail road deck 1, adjacent
It is aligned through the side for having special-shaped casing on two prefabricated heavy mail road decks 1.
The service sleeve 2 in 1 process of road deck, seam crossing ozzle height are 1/2 plate thickness, and other end ozzle opening is perpendicular
It is straight upward.Construction site is transported to after 1 completion of processing of road deck, is then mated formation by crane.It should make as possible in process of deployment
Casing 2 in adjacent two block roads plate 1 is aligned, since cross section of the service sleeve 2 on side is the slotted hole of horizontal direction,
Certain deviation in place can be allowed in the horizontal direction.After the completion of in place, transmission rod 3 is inserted into from ozzle straight up, directly
End plate to 3 root of transmission rod is bonded with road deck completely.
The abnormal shape casing 2 and transmission rod 3 are Prefabricated, and high intensity, corrosion resistant metal material or height can be used
Molecular composite material, a transmission rod 3 correspond to two special-shaped casings 2.
After installation is complete for patent of the present invention, when heavy vehicle passes through road surface, the pulling force and shearing of road deck 1
It is transmitted by transmission rod 3, to play the phenomenon that reducing seam crossing faulting of slab ends, tensioning.When prefabricated road deck needs to move from place
Except when, it is only necessary to extract transmission rod 3 and the function of splitting prefabricated road deck can be realized.
Compared with prior art, the present embodiment has the advantages that:
1, the U-shaped detachable dowel bar structure provided in this embodiment for prefabricated heavy mail road deck has detachable
With the function of recycling, can not be needed to restore place according to function after solving the problems, such as conventional cast-in-place pavement construction.
2, the U-shaped detachable dowel bar structure provided in this embodiment for prefabricated heavy mail road deck, it is ensured that heavy goods vehicles
It will not cause the faulting of slab ends of seam crossing when passing through road deck, the pulling force and shearing between panel are effectively transmitted by transmission rod.
Those skilled in the art can use different methods to achieve the described function each specific application, but
It is that such implementation should not be considered as beyond the scope of the present invention.
Obviously, those skilled in the art can carry out invention spirit of the various modification and variations without departing from the present invention
And range.If in this way, these modifications and changes of the present invention belong to the claims in the present invention and its equivalent technologies range it
Interior, then the present invention is also intended to including these modification and variations.
Claims (7)
1. a kind of U-shaped detachable dowel bar structure for prefabricated heavy mail road deck, which is characterized in that including:
Special-shaped casing;The abnormal shape casing, which is configured, to be embedded in prefabricated heavy mail road deck, wherein from prefabricated heavy mail road deck
One face is through to another adjacent face;Pre-buried special-shaped casing is spliced into U-shaped in two adjacent prefabricated heavy mail road decks;
U-shaped transmission rod;The U-shaped transmission rod is spliced into special-shaped casing pre-buried in adjacent two prefabricated heavy mail road decks
U-shaped to match, the U-shaped transmission rod is configured pre-buried special-shaped casing in two adjacent prefabricated heavy mail road decks.
2. being used for the U-shaped detachable dowel bar structure of prefabricated heavy mail road deck as described in claim 1, which is characterized in that
The abnormal shape casing is configured the one side that prefabricated heavy mail road deck is through to from the top surface of prefabricated heavy mail road deck, and adjacent two
It is aligned through the side for having special-shaped casing on a prefabricated heavy mail road deck.
3. being used for the U-shaped detachable dowel bar structure of prefabricated heavy mail road deck as claimed in claim 2, which is characterized in that
The cross section that the abnormal shape casing is applied in the side of prefabricated heavy mail road deck is slotted hole in the horizontal direction.
4. being used for the U-shaped detachable dowel bar structure of prefabricated heavy mail road deck as claimed in claim 3, which is characterized in that
Slotted hole alignment on the side of two adjacent prefabricated heavy mail road decks or section aligned, and aligned portions are not less than U-shaped biography
The cross-sectional area of power bar.
5. being used for the U-shaped detachable dowel bar structure of prefabricated heavy mail road deck as claimed in claim 2, which is characterized in that
The height for the side that the abnormal shape casing is applied in prefabricated heavy mail road deck is the 1/2 of prefabricated heavy mail road surface plate thickness.
6. being used for the U-shaped detachable dowel bar structure of prefabricated heavy mail road deck as described in claim 1, which is characterized in that
The abnormal shape casing is metal abnormal shape casing or macromolecule abnormal shape casing.
7. being used for the U-shaped detachable dowel bar structure of prefabricated heavy mail road deck as described in claim 1, which is characterized in that
The U-shaped transmission rod is the U-shaped transmission rod of metal or the U-shaped transmission rod of macromolecule.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810962797.1A CN108797253A (en) | 2018-08-22 | 2018-08-22 | A kind of U-shaped detachable dowel bar structure for prefabricated heavy mail road deck |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810962797.1A CN108797253A (en) | 2018-08-22 | 2018-08-22 | A kind of U-shaped detachable dowel bar structure for prefabricated heavy mail road deck |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108797253A true CN108797253A (en) | 2018-11-13 |
Family
ID=64080709
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810962797.1A Pending CN108797253A (en) | 2018-08-22 | 2018-08-22 | A kind of U-shaped detachable dowel bar structure for prefabricated heavy mail road deck |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108797253A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090183429A1 (en) * | 2006-04-10 | 2009-07-23 | Jung-Hoi Kim | Prefabrication type flowerpot block |
CN205775685U (en) * | 2016-05-27 | 2016-12-07 | 中国路桥工程有限责任公司 | A kind of laterite pellet pavement structure as basic unit mixing rubble |
CN108411731A (en) * | 2018-04-27 | 2018-08-17 | 上海核工程研究设计院有限公司 | A kind of power transmission bar assembly of prefabricated heavy mail road deck |
-
2018
- 2018-08-22 CN CN201810962797.1A patent/CN108797253A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090183429A1 (en) * | 2006-04-10 | 2009-07-23 | Jung-Hoi Kim | Prefabrication type flowerpot block |
CN205775685U (en) * | 2016-05-27 | 2016-12-07 | 中国路桥工程有限责任公司 | A kind of laterite pellet pavement structure as basic unit mixing rubble |
CN108411731A (en) * | 2018-04-27 | 2018-08-17 | 上海核工程研究设计院有限公司 | A kind of power transmission bar assembly of prefabricated heavy mail road deck |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5266291B2 (en) | Construction method of bridge deck and joint structure of precast deck | |
US20150167260A1 (en) | Method and apparatus for lifting and securing a concrete panel in place above a road bed | |
JP6180376B2 (en) | Main girder provision method in composite girder floor slab replacement method, composite girder floor slab replacement method, and main girder provision structure in composite girder floor slab replacement method | |
JP6375195B2 (en) | Widened PC slab structure and widening method of existing PC slab | |
CN111778864A (en) | Bridge with small box girders prefabricated in longitudinal sections and construction method | |
CN209854553U (en) | Assembled concrete anticollision barrier based on ultrahigh performance concrete is connected | |
CN110331675B (en) | Construction method for rebuilding and expanding bridge | |
CN109403201A (en) | A kind of new and old bridge jointing seam new structural systen and implementation method | |
CN102926504A (en) | Connecting steel construction member for steel and concrete overlapped beam combined part and construction method thereof | |
JP2010037802A (en) | Box girder joining structure and method of joining box girder | |
JP2007327255A (en) | Fatigue-resistant steel floor slab | |
CN112281663B (en) | Construction method for widening connection of upper structures of new and old bridges | |
CN106758857B (en) | The construction method of precast block formula secondary prestress Wavelike steel webplate combination beam | |
CN105821908A (en) | Multiple water stop belt, waterproof structure and construction method of waterproof structure | |
CN108797253A (en) | A kind of U-shaped detachable dowel bar structure for prefabricated heavy mail road deck | |
KR200431821Y1 (en) | The Method of Construction for Continuous Bridge made by Prestressed Concrete I-Shape Girder | |
CN103850162B (en) | Bridge-type combining structure pavement system and construction method thereof | |
CN208219336U (en) | A kind of power transmission bar assembly of prefabricated heavy mail road deck | |
CN108411731A (en) | A kind of power transmission bar assembly of prefabricated heavy mail road deck | |
CN203768753U (en) | Bridge type steel plate pavement system | |
CN113700153A (en) | Connecting structure of assembled laminated slab and combination beam and construction method thereof | |
JPS6059209A (en) | Replacing method of bridge reinforced concrete floor panel | |
WO2016001997A1 (en) | Bridge construction method and bridge structure | |
JP6740846B2 (en) | Floor slab replacement structure and floor slab replacement construction method | |
CN110541369A (en) | Device and method for additionally arranging prestressed steel strand in hollow plate hinge joint space |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: No. 29 Rainbow Road, Shanghai, Xuhui District Applicant after: Shanghai Nuclear Engineering Research and Design Institute Co.,Ltd. Address before: No. 29 Hong Cao Road, Xuhui District, Shanghai Applicant before: SHANGHAI NUCLEAR ENGINEERING RESEARCH & DESIGN INSTITUTE Co.,Ltd. |
|
CB02 | Change of applicant information | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181113 |
|
WD01 | Invention patent application deemed withdrawn after publication |