CN102340178A - Data acquisition and monitoring control system for power system - Google Patents
Data acquisition and monitoring control system for power system Download PDFInfo
- Publication number
- CN102340178A CN102340178A CN2010102390263A CN201010239026A CN102340178A CN 102340178 A CN102340178 A CN 102340178A CN 2010102390263 A CN2010102390263 A CN 2010102390263A CN 201010239026 A CN201010239026 A CN 201010239026A CN 102340178 A CN102340178 A CN 102340178A
- Authority
- CN
- China
- Prior art keywords
- remote control
- submodule
- electric
- draws
- data acquisition
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The invention discloses a data acquisition and monitoring control system for a power system. The data acquisition and monitoring control system comprises a data acquisition and monitoring control system body, and further comprises a batch power grid connection module connected with the data acquisition and monitoring control system body, wherein the batch power grid connection module comprises a viewing sub-module, a calculation and processing sub-module, a password verification sub-module and an automatic remote control power grid connection processing sub-module which are sequentially connected; the viewing sub-module is connected with a preset sub-module; and the automatic remote control power grid connection processing sub-module is connected with a remote control feedback correction sub-module. The data acquisition and monitoring control system for the power system can increase remote control processing speed on the premise of ensuring accuracy and security.
Description
Technical field
The present invention relates to field of power, relate in particular to a kind of data acquisition and supervisor control that is used for electric power system.
Background technology
Remote control is a critical function of dispatch automated system.Rely on straighforward operation; The dispatcher can realize the Long-distance Control to factory's station each switch of end; Operate on the spot with respect to rushing towards the factory station, saved great amount of manpower and time, and can recognize that the execution result of operation and other electric network datas change through system.
Yet along with the continuous expansion of scale of power, various emergencies possibly take place at any time.Build stronger electrical network, the execution speed of each item scheduling operation is had higher requirement, such as, carry out under the situation of promptly drawing the electricity operation in enormous quantities at needs, finish like how the fastest velocity process.Since straighforward operation widespread has been arrived in the scheduling production process, the processing speed that so how to improve straighforward operation becomes key wherein.
At present, when the dispatcher carries out straighforward operation on the traffic control station, at first to open factory's station primary connection figure list, in more than 100 factory stations, click to choose and to carry out the factory station that remote control is handled.
After getting into factory's station primary connection picture, clicking operation behind the input password, is carried out single remote control, selects corresponding switch.Confirm and check, return to school then, reaffirm after the cross-check information.Need wait for refresh switch information at last, can confirm after the show state of treating related switch changes that this remote control finishes dealing with.
With 10 switches of remote control is example, and on average 30 seconds of time spent are handled in each remote control, handles 10 remote controls and amounts to 5 minutes times spent, and the processing time is longer.In order to ensure the uninterrupted power supply of responsible consumer, under the excessive situation of network load, need to carry out fast the electric task of drawing of a collection of circuit usually, if rely on the dispatcher to carry out straighforward operation one by one, then waste time and energy.
According to analysis, cause slow-footed two reasons to be respectively:
1. system operation inconvenience according to the practical operation statistics, is whenever carried out a remote control and is handled; The dispatcher need carry out 8 step operations, and intermediate steps can not be omitted, and need carry out repeatedly remote control continuously and handle the time; Can't take the mode of batch process; Had a strong impact on treatment effeciency, single remote control treatment step is many, and can't carry out batch process;
2. the personnel operation mode is not good, at present, and when the remote control task of process mass; The mode that we adopt is to handle one by one according to the step of single remote control; Task can't be carried out batch process more for a long time, influences efficient, if can be under the prerequisite that ensures correctness and fail safe; Adopt the mode of batch operation to handle, then will improve the remote control processing speed greatly.
Summary of the invention
The objective of the invention is to overcome the defective of prior art and a kind of data acquisition and supervisor control that is used for electric power system be provided, it can be under the prerequisite that ensures correctness and fail safe raising remote control processing speed.
The technical scheme that realizes above-mentioned purpose is: a kind of data acquisition and supervisor control that is used for electric power system; Comprise a data acquisition and supervisor control body; Wherein, Comprise that also one draws electric module with batch that described data acquisition links to each other with the supervisor control body, this draws electric module to comprise that check submodule, calculating and processing sub, password authentification submodule, the automatic remote control that link to each other successively draws the electric treatment submodule in batches, and the described submodule of checking also links to each other with a preset submodule; Described automatic remote control draws an electric treatment submodule and the remote control submodule of returning to school to link to each other, wherein:
Described preset submodule pre-sets some batches and draws electric scheme, and preserves, and every batch draws electric scheme to comprise some the circuits that can supply remote control to draw electric treatment;
The described submodule of checking checks that through the form of tabulation the batch of storing in the described preset submodule draws electric scheme; And from some the batches of establishing in advance draw the electric scheme select to get into a scheme after, can check further that this batch draws some involved circuits of electric scheme;
Described calculating and processing sub are calculated the line load in this scheme based on the scheme of selecting, and to temporarily not drawing the circuit of electric treatment to reject individually, output affirmation remote control draws the signal of electricity to give described password authentification submodule in batches then;
After described password authentification submodule receives that the signal of electricity is drawn in the affirmation remote control of said calculating and processing sub output in batches; Eject the password input window mouth, can begin remote control after the password of dispatcher's input obtains confirming and draw the signal of electricity to export to described automatic remote control in batches to draw the electric treatment submodule;
Described automatic remote control draws the electric treatment submodule to carry out remote control for selected circuit automatically and draw electric treatment according to the order in the tabulation, during its executable operations, also receives the remote control signal that submodule sends of returning to school;
Described remote control remote control that submodule sends the factory station signal of returning to school of returning to school sends to described automatic remote control and draws the electric treatment submodule confirming, and real-time being presented at on the screen of processing procedure of electric treatment submodule drawn in automatic remote control.
Above-mentioned data acquisition that is used for electric power system and supervisor control, wherein, described automatic remote control draws the electric treatment submodule when waiting for that the signal of submodule is returned to school in remote control; If return to school wait timeout; Then automatically perform next bar straighforward operation, treat that first round remote control disposes after, again to the circuit of the wait timeout of returning to school executable operations once more; If failure once more, think that then this circuit handles failure.
Above-mentioned data acquisition that is used for electric power system and supervisor control, wherein, the described stand-by period of returning to school is 20 seconds.
Above-mentioned data acquisition that is used for electric power system and supervisor control; Wherein, Described password authentification submodule is when password input window mouth input password; Display password input frame on two traffic control stations promptly needs two dispatchers after confirming the remote control contents processing and inputing password simultaneously, can executable operations.
The invention has the beneficial effects as follows: the present invention draws electric module in batches owing to having set up, and has realized straighforward operation in batches, has shortened the time of personnel operation greatly; Improved treatment effeciency, drawn electricity from selecting to draw electric scheme to begin to carry out in batches, about 30 seconds personnel operation times spent to system; 10 remote controls total times spent of batch process only need about 1 minute and 30 seconds; It is thus clear that, carrying out in the process of straighforward operation in batches, on average each switch time spent only needs about 6 seconds; Count 30 seconds personnel operation time in, on average each remote control processing time spent also only needs about 9 seconds.And handle the increase of number along with every batch of remote control; The personnel operation time spent is constant basically; Adopt the jump of drawing electric mode to handle hot job in batches further to promote, with respect to original employing 5 minutes consuming time of method of operation one by one, the efficient of batch operation has improved more than 3 times; And, adopt the further lifting of efficient of drawing electric mode in batches along with the increase of every batch of remote control processing number; Owing to adopted double two-shipper to confirm the remote control contents processing, the operation correctness has obtained guaranteeing preferably; Owing to adopt double two-shipper to confirm the remote control contents processing, two dispatchers input password ability executable operations respectively, have guaranteed the fail safe of operation preferably.
Description of drawings
Fig. 1 is the data acquisition of electric power system and the structural representation of supervisor control of being used for of the present invention;
Fig. 2 is the structural representation that batch of the present invention draws electric module.
Embodiment
Below in conjunction with an embodiment the present invention is described further.See also Fig. 1 and Fig. 2; A kind of data acquisition and supervisor control that is used for electric power system of the present invention has been shown among the figure; Comprise a data acquisition and supervisor control body 100; Comprise that also one draws electric module 200 with batch that data acquisition links to each other with supervisor control body 100, this draws electric module 200 to comprise that check submodule 21, calculating and processing sub 22, password authentification submodule 23, the automatic remote control that link to each other successively draws electric treatment submodule 24 in batches, checks that submodule 21 also links to each other with a preset submodule 25; Automatic remote control draws an electric treatment submodule 24 and the remote control submodule 26 of returning to school to link to each other, wherein:
Preset submodule 25 pre-sets some batches and draws electric scheme, and preserves, and every batch draws electric scheme to comprise some the circuits that can supply remote control to draw electric treatment;
Check that submodule 21 checks that through the form of tabulation the batch of storage in the preset submodule 25 draws electric scheme; And from some the batches of establishing in advance draw the electric scheme select to get into a scheme after, can check further that this batch draws some involved circuits of electric scheme;
Calculating and processing sub 22 are calculated the line load in this scheme based on the scheme of selecting, and to temporarily not drawing the circuit of electric treatment to reject individually, output affirmation remote control draws electric signal to password authentification submodule 23 in batches then;
After password authentification submodule 23 receives that the signal of electricity is drawn in the affirmation remote control of calculating and processing sub 22 outputs in batches; Eject the password input window mouth; Can begin remote control after the password of dispatcher input obtains confirming draws the signal of electricity to export to automatic remote control to draw electric treatment submodule 24 in batches; Password authentification submodule 23 is when password input window mouth input password; Simultaneously display password input frame on two traffic control stations promptly needs two dispatchers after confirming the remote control contents processing and inputing password, can executable operations;
Automatic remote control draws electric treatment submodule 24 to carry out remote control for selected circuit automatically and draw electric treatment according to the order in the tabulation, during its executable operations, also receives the remote control signal that submodule 26 sends of returning to school;
Remote control remote control that submodule 26 sends the factory station signal of returning to school of returning to school sends to automatic remote control and draws electric treatment submodule 24 confirming, need not manual intervention, and real-time being presented at on the screen of processing procedure of automatic remote control being drawn electric treatment submodule 24.
Automatic remote control draws electric treatment submodule 24 when waiting for that the signal of submodule 26 is returned to school in remote control, if return to school wait timeout, then automatically performs next bar straighforward operation; After treating that first round remote control disposes; Again to the circuit of the wait timeout of returning to school executable operations once more, if failure once more, think that then this circuit handles failure; Do not influence the processing of All other routes, the stand-by period of returning to school is 20 seconds.
Every is drawn electric scheme to comprise several can to supply remote control to draw the circuit of electric treatment, scheme for example: select the capacitor switch at 12 factories stations, be set to one and draw electric scheme; Through repeatedly drawing electrical testing in batches, drawing a more typical test result is that 10 remote controls are handled, and comprises selecting to draw electric scheme, two of rejectings not to draw the switches of electricity; The input password is confirmed remote control contents processing step, about 2 minutes consuming time altogether; Through the setting to the stand-by period of returning to school, the time that makes further shortens; According to the on-the-spot test result, because the communication port transmission delay, the remote control of individual switches is returned to school overtime, has not only expended the time of reprocessing, and does not operate successfully.Therefore, among the present invention, the setting of the time of the stand-by period of returning to school extended to 20 seconds from original 15 seconds.
The method that double two-shipper is confirmed the straighforward operation content is proposed among the present invention; Promptly before carrying out straighforward operation; When the input password, display password input frame on two traffic control stations promptly needs two dispatchers after confirming the remote control contents processing and inputing password simultaneously; Can executable operations, greatly reduce the possibility that causes the misoperation incident because of reasons such as operating personnel's carelessness.
Above embodiment only supplies to explain the present invention's usefulness; But not limitation of the present invention; The technical staff in relevant technologies field under the situation that does not break away from the spirit and scope of the present invention, can also make various conversion or modification; Therefore all technical schemes that are equal to also should belong to category of the present invention, should be limited each claim.
Claims (4)
1. a data acquisition and supervisor control that is used for electric power system; Comprise a data acquisition and supervisor control body; It is characterized in that; Comprise that also one draws electric module with batch that described data acquisition links to each other with the supervisor control body, this draws electric module to comprise that check submodule, calculating and processing sub, password authentification submodule, the automatic remote control that link to each other successively draws the electric treatment submodule in batches, and the described submodule of checking also links to each other with a preset submodule; Described automatic remote control draws an electric treatment submodule and the remote control submodule of returning to school to link to each other, wherein:
Described preset submodule pre-sets some batches and draws electric scheme, and preserves, and every batch draws electric scheme to comprise some the circuits that can supply remote control to draw electric treatment;
The described submodule of checking checks that through the form of tabulation the batch of storing in the described preset submodule draws electric scheme; And from some the batches of establishing in advance draw the electric scheme select to get into a scheme after, can check further that this batch draws some involved circuits of electric scheme;
Described calculating and processing sub are calculated the line load in this scheme based on the scheme of selecting, and to temporarily not drawing the circuit of electric treatment to reject individually, output affirmation remote control draws the signal of electricity to give described password authentification submodule in batches then;
After described password authentification submodule receives that the signal of electricity is drawn in the affirmation remote control of said calculating and processing sub output in batches; Eject the password input window mouth, can begin remote control after the password of dispatcher's input obtains confirming and draw the signal of electricity to export to described automatic remote control in batches to draw the electric treatment submodule;
Described automatic remote control draws the electric treatment submodule to carry out remote control for selected circuit automatically and draw electric treatment according to the order in the tabulation, during its executable operations, also receives the remote control signal that submodule sends of returning to school;
Described remote control remote control that submodule sends the factory station signal of returning to school of returning to school sends to described automatic remote control and draws the electric treatment submodule confirming, and real-time being presented at on the screen of processing procedure of electric treatment submodule drawn in automatic remote control.
2. data acquisition and the supervisor control that is used for electric power system according to claim 1 is characterized in that, described automatic remote control draws the electric treatment submodule when waiting for that the signal of submodule is returned to school in remote control; If return to school wait timeout; Then automatically perform next bar straighforward operation, treat that first round remote control disposes after, again to the circuit of the wait timeout of returning to school executable operations once more; If failure once more, think that then this circuit handles failure.
3. data acquisition and the supervisor control that is used for electric power system according to claim 2 is characterized in that, the described stand-by period of returning to school is 20 seconds.
4. data acquisition and the supervisor control that is used for electric power system according to claim 1; It is characterized in that; Described password authentification submodule is when password input window mouth input password; Display password input frame on two traffic control stations promptly needs two dispatchers after confirming the remote control contents processing and inputing password simultaneously, can executable operations.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102390263A CN102340178B (en) | 2010-07-28 | 2010-07-28 | Data acquisition and monitoring control system for power system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102390263A CN102340178B (en) | 2010-07-28 | 2010-07-28 | Data acquisition and monitoring control system for power system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102340178A true CN102340178A (en) | 2012-02-01 |
CN102340178B CN102340178B (en) | 2013-08-21 |
Family
ID=45515749
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010102390263A Active CN102340178B (en) | 2010-07-28 | 2010-07-28 | Data acquisition and monitoring control system for power system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102340178B (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5179376A (en) * | 1991-02-28 | 1993-01-12 | Systems Analysis And Integration, Inc. | Substation load distribution monitor system |
US5406495A (en) * | 1993-02-01 | 1995-04-11 | Systems Analysis And Integration, Inc. | Substation load distribution monitor system |
CN1222779A (en) * | 1997-03-17 | 1999-07-14 | 辜寄眉 | Electric power system dispatching method and digital power dispatching system |
-
2010
- 2010-07-28 CN CN2010102390263A patent/CN102340178B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5179376A (en) * | 1991-02-28 | 1993-01-12 | Systems Analysis And Integration, Inc. | Substation load distribution monitor system |
US5406495A (en) * | 1993-02-01 | 1995-04-11 | Systems Analysis And Integration, Inc. | Substation load distribution monitor system |
CN1222779A (en) * | 1997-03-17 | 1999-07-14 | 辜寄眉 | Electric power system dispatching method and digital power dispatching system |
Also Published As
Publication number | Publication date |
---|---|
CN102340178B (en) | 2013-08-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103269130B (en) | Method for remotely confirming remote-control operation of transformer station | |
CN109787356B (en) | Transformer substation remote control anti-misoperation method and system based on IEC61850 protocol | |
CN108233536A (en) | A kind of intelligent program remote handling system | |
CN110020967A (en) | The information processing method and device of a kind of dispatching of power netwoks end substation intelligent alarm | |
CN103941240B (en) | A kind of detection method of the extension set detecting device that communicates based on radar system | |
CN105049223A (en) | Electric power communication network defect and fault processing decision-aided analysis method | |
CN101776910A (en) | Integrated five-prevention operation ticket system-based substation programmed control system | |
CN109782724B (en) | Control method for preventing misoperation-locking and terminal equipment | |
CN110633901A (en) | Intelligent substation relay protection device operation situation perception and remote maintenance system | |
CN105680441B (en) | Simulation based on stimulated replacement technology is to a device | |
CN102111508A (en) | Fault processing method and system as well as fault scheduling equipment | |
CN106059090B (en) | A kind of working method based on dispatch automated system prompt system | |
CN102064602A (en) | Operating method of B/S framework networked electronic simulation drawing board system | |
CN105279588A (en) | Power grid dispatching operation associated monitoring system | |
CN111130116B (en) | Scheduling operation power flow checking method based on key topology change item identification | |
CN102340178B (en) | Data acquisition and monitoring control system for power system | |
CN102340177A (en) | Method for increasing remote-control processing speed in automatic dispatching system | |
CN106936217A (en) | Throw and move back soft platen method, regulation and control main website, stability control device and system in an a kind of distant place | |
CN207851599U (en) | A kind of photovoltaic module manufacturing monitoring system | |
CN105224729A (en) | Based on the information access method of inspection of substation secondary device panoramic information simulation | |
CN113673903B (en) | Task management system for off-site nuclear emergency and control method thereof | |
CN106549423A (en) | Electric network fault multi-stage scheduling cooperative processing method and device | |
CN104539045A (en) | Intelligent fault-analysis-prevention system and working method thereof | |
CN104092307A (en) | Smart substation secondary device operation state monitoring method | |
CN104009543B (en) | The supervision method of transformer station's secondary equipment running status |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: STATE ELECTRIC NET CROP. Effective date: 20121016 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20121016 Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122 Applicant after: Shanghai Electric Power Corporation Applicant after: State Grid Corporation of China Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122 Applicant before: Shanghai Electric Power Corporation |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |