CN102340177A - Method for increasing remote-control processing speed in automatic dispatching system - Google Patents

Method for increasing remote-control processing speed in automatic dispatching system Download PDF

Info

Publication number
CN102340177A
CN102340177A CN2010102372458A CN201010237245A CN102340177A CN 102340177 A CN102340177 A CN 102340177A CN 2010102372458 A CN2010102372458 A CN 2010102372458A CN 201010237245 A CN201010237245 A CN 201010237245A CN 102340177 A CN102340177 A CN 102340177A
Authority
CN
China
Prior art keywords
remote control
remote
processing speed
cut
batches
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010102372458A
Other languages
Chinese (zh)
Inventor
刘颉
徐卫锋
汪瑞佳
彭一宏
周明雅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Electric Power Co filed Critical Shanghai Municipal Electric Power Co
Priority to CN2010102372458A priority Critical patent/CN102340177A/en
Publication of CN102340177A publication Critical patent/CN102340177A/en
Pending legal-status Critical Current

Links

Landscapes

  • Selective Calling Equipment (AREA)

Abstract

The invention discloses a method for increasing remote-control processing speed in an automatic dispatching system. The method comprises the following steps: a batch power-cut step when a power-cut process is carried out, i.e. when the batch power-cut process is needed to be carried out, one scheme is selected from a plurality of preset batch power-cut schemes, and line load is calculated and lines which are not temporarily subjected to the power-cut process are individually removed; and the remote-control batch power-cut is started, i.e. passwords are needed to be inputted prior to executing the remote-control batch power-cut, the remote-control batch power-cut is started after the passwords are confirmed, the remote-control power-cut process is automatically carried out on the selected lines according the sequence in a list, in the meantime, the confirmation for remote-control feedback sent by plant stations is needed to be automatically carried out, and the processing process is displayed on a display screen in real time. The method for increasing the remote-control processing speed in the automatic dispatching system disclosed by the invention can increase the remote-control processing speed under the premise of guaranteeing the correctness and the security.

Description

A kind of method that improves remote control processing speed in the dispatch automated system
Technical field
The present invention relates to the electrical network field of remote control, relate in particular to a kind of method that improves remote control processing speed in the dispatch automated system.
Background technology
Remote control is a critical function of dispatch automated system.Rely on straighforward operation; The dispatcher can realize the Long-distance Control to factory's station each switch of end; Operate on the spot with respect to rushing towards the factory station, saved great amount of manpower and time, and can recognize that the execution result of operation and other electric network datas change through system.
Yet along with the continuous expansion of scale of power, various emergencies possibly take place at any time.Build stronger electrical network, the execution speed of each item scheduling operation is had higher requirement, such as, carry out under the situation of promptly drawing the electricity operation in enormous quantities at needs, finish like how the fastest velocity process.Since straighforward operation widespread has been arrived in the scheduling production process, the processing speed that so how to improve straighforward operation becomes key wherein.
At present, when the dispatcher carries out straighforward operation on the traffic control station, at first to open factory's station primary connection figure list, in more than 100 factory stations, click to choose and to carry out the factory station that remote control is handled.
After getting into factory's station primary connection picture, clicking operation behind the input password, is carried out single remote control, selects corresponding switch.Confirm and check, return to school then, reaffirm after the cross-check information.Need wait for refresh switch information at last, can confirm after the show state of treating related switch changes that this remote control finishes dealing with.
With 10 switches of remote control is example, and on average 30 seconds of time spent are handled in each remote control, handles 10 remote controls and amounts to 5 minutes times spent, and the processing time is longer.In order to ensure the uninterrupted power supply of responsible consumer, under the excessive situation of network load, need to carry out fast the electric task of drawing of a collection of circuit usually, if rely on the dispatcher to carry out straighforward operation one by one, then waste time and energy.
According to analysis, cause slow-footed two reasons to be respectively:
1. system operation inconvenience according to the practical operation statistics, is whenever carried out a remote control and is handled; The dispatcher need carry out 8 step operations, and intermediate steps can not be omitted, and need carry out repeatedly remote control continuously and handle the time; Can't take the mode of batch process; Had a strong impact on treatment effeciency, single remote control treatment step is many, and can't carry out batch process;
2. the personnel operation mode is not good, at present, and when the remote control task of process mass; The mode that we adopt is to handle one by one according to the step of single remote control; Task can't be carried out batch process more for a long time, influences efficient, if can be under the prerequisite that ensures correctness and fail safe; Adopt the mode of batch operation to handle, then will improve the remote control processing speed greatly.
Summary of the invention
The objective of the invention is to overcome the defective of prior art and a kind of method that improves remote control processing speed in the dispatch automated system be provided, it can be under the prerequisite that ensures correctness and fail safe raising remote control processing speed.
The technical scheme that realizes above-mentioned purpose is: a kind of method that improves remote control processing speed in the dispatch automated system wherein, when drawing electric treatment, comprises that also one draws electric step in batches, that is:
When needs carry out batch when drawing electric treatment; From some the batches of establishing in advance draw the electric scheme select to get into a scheme after; Can check some preset circuits; These some link testers are crossed a tabulation and are shown, computational scheme load and to temporarily not drawing the circuit of electric treatment to reject individually;
Begin remote control then and draw electricity in batches, before the execution remote control is drawn electricity in batches, need the input password; Beginning remote control after password obtains confirming draws in batches; Promptly carry out remote control for selected circuit automatically and draw electric treatment, during this period, need the automatic remote control that the factory station is sent to return to school and confirm according to the order in the tabulation; Processing procedure is presented on the screen in real time
If the wait timeout of returning to school then automatically performs next bar straighforward operation, treat that first round remote control disposes after, again to the circuit of the wait timeout of returning to school executable operations once more, if failure once more, think that then this circuit handles failure.
The method of remote control processing speed in the above-mentioned raising dispatch automated system, wherein, every is drawn electric scheme to comprise several can to supply remote control to draw the circuit of electric treatment.
The method of remote control processing speed in the above-mentioned raising dispatch automated system, wherein, the described stand-by period of returning to school is 20 seconds.
The method of remote control processing speed in the above-mentioned raising dispatch automated system, wherein, when the input password, display password input frame on two traffic control stations promptly needs two dispatchers after confirming the remote control contents processing and inputing password simultaneously, can executable operations.
The invention has the beneficial effects as follows: owing to adopted straighforward operation in batches, shortened the time of personnel operation greatly, improved treatment effeciency; Draw electricity from selecting to draw electric scheme to begin to carry out to system in batches, about 30 seconds personnel operation times spent, 10 remote controls total times spent of batch process only need about 1 minute and 30 seconds; It is thus clear that, carrying out in the process of straighforward operation in batches, on average each switch time spent only needs about 6 seconds; Count 30 seconds personnel operation time in, on average each remote control processing time spent also only needs about 9 seconds.And handle the increase of number along with every batch of remote control; The personnel operation time spent is constant basically; Adopt the jump of drawing electric mode to handle hot job in batches further to promote, with respect to original employing 5 minutes consuming time of method of operation one by one, the efficient of batch operation has improved more than 3 times; And, adopt the further lifting of efficient of drawing electric mode in batches along with the increase of every batch of remote control processing number; Owing to adopted double two-shipper to confirm the remote control contents processing, the operation correctness has obtained guaranteeing preferably; Owing to adopt double two-shipper to confirm the remote control contents processing, two dispatchers input password ability executable operations respectively, have guaranteed the fail safe of operation preferably.
Embodiment
Below in conjunction with an embodiment the present invention is described further.
A kind of method that improves remote control processing speed in the dispatch automated system of the present invention when drawing electric treatment, comprises that also one draws electric step in batches, that is:
When needs carry out batch when drawing electric treatment; From some the batches of establishing in advance draw the electric scheme select to get into a scheme after; Can check some preset circuits; These some link testers are crossed a tabulation and are shown, computational scheme load and to temporarily not drawing the circuit of electric treatment to reject individually;
Begin remote control then and draw electricity in batches, before the execution remote control is drawn electricity in batches, need the input password; Begin remote control after password obtains confirming and draw electricity in batches, promptly carry out remote control for selected circuit automatically and draw electric treatment, during this period according to the order in the tabulation; Needing the automatic remote control that the factory station is sent to return to school confirms; Need not manual intervention, processing procedure is presented on the screen in real time
If the wait timeout of returning to school then automatically performs next bar straighforward operation, treat that first round remote control disposes after, again to the circuit of the wait timeout of returning to school executable operations once more, if failure once more, think that then this circuit handles failure, do not influence the processing of All other routes.
Every is drawn electric scheme to comprise several can to supply remote control to draw the circuit of electric treatment, scheme for example: select the capacitor switch at 12 factories stations, be set to one and draw electric scheme; Through repeatedly drawing electrical testing in batches, drawing a more typical test result is that 10 remote controls are handled, and comprises selecting to draw electric scheme, two of rejectings not to draw the switches of electricity; The input password is confirmed remote control contents processing step, about 2 minutes consuming time altogether; Through the setting to the stand-by period of returning to school, the time that makes further shortens.
According to the on-the-spot test result, because the communication port transmission delay, the remote control of individual switches is returned to school overtime, has not only expended the time of reprocessing, and does not operate successfully.Therefore, among the present invention, the setting of the time of the stand-by period of returning to school extended to 20 seconds from original 15 seconds.
The method that double two-shipper is confirmed the straighforward operation content is proposed among the present invention; Promptly before carrying out straighforward operation; When the input password, display password input frame on two traffic control stations promptly needs two dispatchers after confirming the remote control contents processing and inputing password simultaneously; Can executable operations, greatly reduce the possibility that causes the misoperation incident because of reasons such as operating personnel's carelessness.
Above embodiment only supplies to explain the present invention's usefulness; But not limitation of the present invention; The technical staff in relevant technologies field under the situation that does not break away from the spirit and scope of the present invention, can also make various conversion or modification; Therefore all technical schemes that are equal to also should belong to category of the present invention, should be limited each claim.

Claims (4)

1. a method that improves remote control processing speed in the dispatch automated system is characterized in that, when drawing electric treatment, comprises that also one draws electric step in batches, that is:
When needs carry out batch when drawing electric treatment; From some the batches of establishing in advance draw the electric scheme select to get into a scheme after; Can check some preset circuits; These some link testers are crossed a tabulation and are shown, computational scheme load and to temporarily not drawing the circuit of electric treatment to reject individually;
Begin remote control then and draw electricity in batches, before the execution remote control is drawn electricity in batches, need the input password; Beginning remote control after password obtains confirming draws in batches; Promptly carry out remote control for selected circuit automatically and draw electric treatment, during this period, need the automatic remote control that the factory station is sent to return to school and confirm according to the order in the tabulation; Processing procedure is presented on the screen in real time
If the wait timeout of returning to school then automatically performs next bar straighforward operation, treat that first round remote control disposes after, again to the circuit of the wait timeout of returning to school executable operations once more, if failure once more, think that then this circuit handles failure.
2. the method for remote control processing speed is characterized in that in the raising dispatch automated system according to claim 1, and every is drawn electric scheme to comprise several can to supply remote control to draw the circuit of electric treatment.
3. the method for remote control processing speed is characterized in that in the raising dispatch automated system according to claim 1, and the described stand-by period of returning to school is 20 seconds.
4. the method for remote control processing speed in the raising dispatch automated system according to claim 1; It is characterized in that; When the input password; Display password input frame on two traffic control stations promptly needs two dispatchers after confirming the remote control contents processing and inputing password simultaneously, can executable operations.
CN2010102372458A 2010-07-28 2010-07-28 Method for increasing remote-control processing speed in automatic dispatching system Pending CN102340177A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102372458A CN102340177A (en) 2010-07-28 2010-07-28 Method for increasing remote-control processing speed in automatic dispatching system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102372458A CN102340177A (en) 2010-07-28 2010-07-28 Method for increasing remote-control processing speed in automatic dispatching system

Publications (1)

Publication Number Publication Date
CN102340177A true CN102340177A (en) 2012-02-01

Family

ID=45515748

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102372458A Pending CN102340177A (en) 2010-07-28 2010-07-28 Method for increasing remote-control processing speed in automatic dispatching system

Country Status (1)

Country Link
CN (1) CN102340177A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103825362A (en) * 2014-02-18 2014-05-28 国网安徽省电力公司马鞍山供电公司 Safety remote control method based on virtual remote signaling technology
CN104079813A (en) * 2013-03-29 2014-10-01 安科智慧城市技术(中国)有限公司 Device and method for remotely setting internet protocol camera

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003209928A (en) * 2002-01-11 2003-07-25 Kansai Electric Power Co Inc:The Method for recognizing transmission/stoppage of electric power system
CN101594004A (en) * 2009-06-29 2009-12-02 江苏金智科技股份有限公司 The intelligence control method of electric substation automation system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003209928A (en) * 2002-01-11 2003-07-25 Kansai Electric Power Co Inc:The Method for recognizing transmission/stoppage of electric power system
CN101594004A (en) * 2009-06-29 2009-12-02 江苏金智科技股份有限公司 The intelligence control method of electric substation automation system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张健等: "遥控技术在保障上海电网安全稳定运行中的应用", 《上海电力》 *
王海燕: "调度自动化主站系统批量遥控中的智能防误处理", 《电力建设》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104079813A (en) * 2013-03-29 2014-10-01 安科智慧城市技术(中国)有限公司 Device and method for remotely setting internet protocol camera
CN103825362A (en) * 2014-02-18 2014-05-28 国网安徽省电力公司马鞍山供电公司 Safety remote control method based on virtual remote signaling technology

Similar Documents

Publication Publication Date Title
CN103269130B (en) Method for remotely confirming remote-control operation of transformer station
CN106160219B (en) The monitoring method of remote forced monitoring system for transformer station switching operation
CN102447305B (en) Topological anti-misoperation system for power grid
CN104895547B (en) Electric control system for drilling machine intelligent mobile monitors and automatic maintenance method and device
CN108233536A (en) A kind of intelligent program remote handling system
CN101776910A (en) Integrated five-prevention operation ticket system-based substation programmed control system
CN102937789B (en) A kind of power scheduling programmed control system and method
CN115693951A (en) Second-level intelligent operation sequence control method based on power grid OCS (online charging system)
CN102340177A (en) Method for increasing remote-control processing speed in automatic dispatching system
CN102064602A (en) Operating method of B/S framework networked electronic simulation drawing board system
CN102111508A (en) Fault processing method and system as well as fault scheduling equipment
CN108879663B (en) One-key sequence control method and system for electric power system with exception handling
CN105281429A (en) Method for preventing maloperation in scheduling remote control
CN102594910B (en) Method adopting data service bus to realize single-instance transformer station programmed processing
CN102111017B (en) Automatic remote maintenance system of transforming plant
CN111130116B (en) Scheduling operation power flow checking method based on key topology change item identification
CN106655520A (en) Method for ensuring safe and reliable execution of relay protection remote operation
CN107944570B (en) Automatic processing method and device for intelligent substation sequential control atypical state
CN106936217A (en) Throw and move back soft platen method, regulation and control main website, stability control device and system in an a kind of distant place
CN102340178B (en) Data acquisition and monitoring control system for power system
CN101615012A (en) Remote operation intelligent and safe checking method
CN105449857A (en) Ground control for preventing electric blocking and method
CN106549423A (en) Electric network fault multi-stage scheduling cooperative processing method and device
CN205725158U (en) A kind of system of automatic collection Substation Station end index
CN104092307A (en) Smart substation secondary device operation state monitoring method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20121026

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121026

Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Applicant after: Shanghai Electric Power Corporation

Applicant after: State Grid Corporation of China

Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Applicant before: Shanghai Electric Power Corporation

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120201