CN102322063B - 一种深基坑二次开挖及支护施工方法 - Google Patents
一种深基坑二次开挖及支护施工方法 Download PDFInfo
- Publication number
- CN102322063B CN102322063B CN 201110176483 CN201110176483A CN102322063B CN 102322063 B CN102322063 B CN 102322063B CN 201110176483 CN201110176483 CN 201110176483 CN 201110176483 A CN201110176483 A CN 201110176483A CN 102322063 B CN102322063 B CN 102322063B
- Authority
- CN
- China
- Prior art keywords
- deep foundation
- foundation ditch
- foundation pit
- cap
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
本发明公开了一种深基坑二次开挖及支护施工方法,它包括以下步骤:(1)在一次深基坑和二次深基坑的周边打支护桩,然后在一次和二次深基坑周边的支护桩顶端进行帽板和帽梁施工,在与二次深基坑相对应的位置并且紧邻重要建筑物的一侧的帽梁内安放多个帽梁预埋件;(2)进行一次深基坑土方开挖;(3)进行一次深基坑底板基础的施工,在与多个帽梁预埋件一一对应的位置安放多个底板预埋件;(4)连接多个钢斜撑;(5)进行二次深基坑的上半部分土方开挖,然后连接中间钢斜撑;(6)进行二次深基坑的下半部分土方开挖并进行二次深基坑的基础结构施工。采用本发明方法可以有效的解决紧邻重要建筑物易倒塌和倾斜的问题。
Description
技术领域
本发明涉及一种深基坑开挖施工方法,尤其涉及一种更深的深基坑二次开挖及支护施工方法。
背景技术
在建筑基坑施工时,为确保施工安全,防止塌方事故发生,必须对开挖的建筑基坑采取支护措施。建筑基坑支护设计与施工应综合考虑工程地质与水文地质条件、基坑类型、基坑开挖掘深度、降排水条件、周边环境对基坑侧壁位移的要求,基坑周边荷载、施工季节、支护结构使用期限等因素,做到合理设计、精心施工、经济安全。
随着大量高层建筑的建造及地下空间的开发,同时也为了满足高层建筑抗震和抗风等结构要求,地下室由一层发展到多层,相应的基坑开挖深度也越来越深,支护结构失稳的几率也越来越大,目前,我国基坑工程成功率低的问题异常突出,各大城市均有已建成基坑出现工程事故的例子。当深基坑临边一侧有更深的深基坑时,而且更深的深基坑周边又紧邻重要建筑物,所以对此临边一侧的土方开挖及支护应采取合理的施工方法,又不影响其它深基坑大面积基础施工,目前没有有效的施工方法。
发明内容
本发明的目的在于克服现有技术的不足,提供一种操作方便、成本低、强度高,适用性强,可以防止建筑物倒塌和倾斜的一种深基坑二次开挖及支护施工方法。
本发明的一种深基坑二次开挖及支护施工方法,它包括以下步骤:
(1)在一次深基坑和二次深基坑的周边打支护桩,然后在一次和二次深基坑周边的支护桩顶端进行帽板和帽梁施工,在与二次深基坑相对应的位置并且紧邻重要建筑物的一侧的帽梁内安放多个帽梁预埋件;所述的二次深基坑的开挖深度深于所述的一次深基坑的深度;
(2)进行一次深基坑土方开挖直至达到预定深度;
(3)进行一次深基坑底板基础的施工,在进行深基坑底板基础施工时,在与多个帽梁预埋件一一对应的位置安放多个底板预埋件;
(4)将多个侧边钢斜撑的一端与位于两侧的帽梁预埋件焊接连接并且其另一端分别与底板预埋件焊接连接;
(5)进行二次深基坑的上半部分土方开挖直至达到预定深度,然后将一根中间钢斜撑一端与位于中间的帽梁预埋件焊接连接并且其另一端与位于中间的底板预埋件焊接连接;
(6)进行二次深基坑的下半部分土方开挖直至达到预定深度;
(7)进行二次深基坑的基础结构施工。
采用本发明方法操作方便、成本低、强度高,适用性强,可以有效的解决当深基坑临边一侧有比此深基坑更深的深基坑时,而且更深的深基坑临边一侧又紧邻重要建筑物时,建筑物易倒塌和倾斜的问题。
附图说明
图1为本发明的一种深基坑二次开挖及支护施工方法的施工平面示意图;
图2为本发明的一种深基坑二次开挖及支护施工方法的二次深基坑处的施工立面图。
具体实施方式
下面结合具体的实施例,并参照附图,对本发明做进一步的说明:
如图所示本发明的本发明的一种深基坑二次开挖及支护施工方法,它包括以下步骤:(1)在一次深基坑1周边打支护桩3并且在二次深基坑2周边打支护桩4,然后在一次和二次深基坑周边的支护桩顶端进行帽板和帽梁5施工,在与二次深基坑相对应的位置并且紧邻重要建筑物的一侧的帽梁内安放多个帽梁预埋件;所述的二次深基坑位于一次深基坑内紧邻重要建筑物的一侧,所述的二次深基坑的开挖深度深于所述的一次深基坑的深度;(2)进行一次深基坑土方开挖直至达到预定深度;(3)进行一次深基坑底板基础6的施工,在进行深基坑底板基础施工时,在与多个帽梁预埋件一一对应的位置安放多个底板预埋件9;如图1所示作为本发明的一种实施方式安放了三个底板预埋件9。(4)将多个侧边钢斜撑7的一端与位于两侧的帽梁预埋件焊接连接并且其另一端分别与底板预埋件9焊接连接;(5)进行二次深基坑的上半部分土方开挖直至达到预定深度,然后将一根中间钢斜撑8一端与位于中间的帽梁预埋件焊接连接并且其另一端与位于中间的底板预埋件焊接连接;(6)进行二次深基坑的下半部分土方开挖直至达到预定深度;(7)进行二次深基坑的基础结构施工。在步骤(5)和(6)的二次深基坑开挖过程中如果二次深基坑2周边支护桩4的打入深度低于设计深度则截桩。
二次深基坑开挖一半进行中间钢斜撑支撑安装是为了进一步保证基坑周边的安全。
实施例1
(1)在一次深基坑和二次深基坑的周边打支护桩,然后在一次深基坑周边的支护桩顶端进行帽板和帽梁施工,在与二次深基坑相对应的位置并且紧邻重要建筑物的一侧的帽梁内安放多个帽梁预埋件;所述的二次深基坑的开挖深度深于所述的一次深基坑的深度;
(2)进行一次深基坑土方开挖直至达到预定深度;
(3)进行一次深基坑底板基础的施工,在进行深基坑底板基础施工时,在与帽梁预埋件一一对应的位置安放多个底板预埋件;
(4)将多个侧边钢斜撑的一端与位于两侧的帽梁预埋件焊接连接并且其另一端分别与底板预埋件焊接连接;
(5)进行二次深基坑的上半部分土方开挖直至达到预定深度,然后将一根中间钢斜撑一端与位于中间的帽梁预埋件焊接连接并且其另一端与位于中间的底板预埋件焊接连接;
(6)进行二次深基坑的下半部分土方开挖直至达到预定深度;
(7)进行二次深基坑的基础结构施工。
采用本方法有效的解决了当深基坑临边一侧有比此深基坑更深的深基坑时,而且更深的深基坑临边一侧又紧邻重要建筑物时建筑物易倒塌和倾斜的问题。
Claims (1)
1.一种深基坑二次开挖及支护施工方法,其特征在于它包括以下步骤:
(1)在一次深基坑和二次深基坑的周边打支护桩,然后在一次和二次深基坑周边的支护桩顶端进行帽板和帽梁施工,在与二次深基坑相对应的位置并且紧邻重要建筑物的一侧的帽梁内安放多个帽梁预埋件;所述的二次深基坑的开挖深度深于所述的一次深基坑的深度;
(2)进行一次深基坑土方开挖直至达到预定深度;
(3)进行一次深基坑底板基础的施工,在进行深基坑底板基础施工时,在与多个帽梁预埋件一一对应的位置安放多个底板预埋件;
(4)将多个侧边钢斜撑的一端与位于两侧的帽梁预埋件焊接连接并且其另一端分别与底板预埋件焊接连接;
(5)进行二次深基坑的上半部分土方开挖直至达到预定深度,然后将一根中间钢斜撑一端与位于中间的帽梁预埋件焊接连接并且其另一端与位于中间的底板预埋件焊接连接;
(6)进行二次深基坑的下半部分土方开挖直至达到预定深度;
(7)进行二次深基坑的基础结构施工。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110176483 CN102322063B (zh) | 2011-06-28 | 2011-06-28 | 一种深基坑二次开挖及支护施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110176483 CN102322063B (zh) | 2011-06-28 | 2011-06-28 | 一种深基坑二次开挖及支护施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102322063A CN102322063A (zh) | 2012-01-18 |
CN102322063B true CN102322063B (zh) | 2013-04-17 |
Family
ID=45449889
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110176483 Expired - Fee Related CN102322063B (zh) | 2011-06-28 | 2011-06-28 | 一种深基坑二次开挖及支护施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102322063B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103243720A (zh) * | 2013-05-20 | 2013-08-14 | 中冶天工集团有限公司 | 软土地基超深基坑支护方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101294390A (zh) * | 2007-04-27 | 2008-10-29 | 上海市第五建筑有限公司 | 一平一抛局部中心岛基坑支撑系统及施工方法 |
CN101967829A (zh) * | 2010-10-29 | 2011-02-09 | 中国神华能源股份有限公司 | 一种基坑的施工方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5919204B2 (ja) * | 1981-05-23 | 1984-05-04 | 株式会社竹中工務店 | 地下掘削工法 |
-
2011
- 2011-06-28 CN CN 201110176483 patent/CN102322063B/zh not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101294390A (zh) * | 2007-04-27 | 2008-10-29 | 上海市第五建筑有限公司 | 一平一抛局部中心岛基坑支撑系统及施工方法 |
CN101967829A (zh) * | 2010-10-29 | 2011-02-09 | 中国神华能源股份有限公司 | 一种基坑的施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102322063A (zh) | 2012-01-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203145038U (zh) | 格构柱式塔吊基础 | |
CN110206038B (zh) | 一种凹型基坑阳角处的支护结构及施工方法 | |
CN203654294U (zh) | 一种逆作法中基坑的支护结构 | |
CN103938634B (zh) | 一种深基坑支护结构及施工方法 | |
CN102561384A (zh) | 钢抱箍桁架式高桩承台塔吊基础的施工方法及结构 | |
CN205975658U (zh) | 钢平台塔吊基础 | |
CN204590038U (zh) | 一种永久性基坑支护结构 | |
CN108867723B (zh) | 框架结构建筑物纠倾并地下增层的方法 | |
CN205742216U (zh) | 一种用于软弱地质基坑放坡开挖组合式支护结构 | |
CN205557537U (zh) | 一种基坑支护结构 | |
CN101736756B (zh) | 软土地基逆作隔层施工方法 | |
KR20120115704A (ko) | 지반굴착 토공사용 흙막이 시공방법 | |
CN108978677A (zh) | 复杂地形下深基坑开挖组合支护结构 | |
CN203716156U (zh) | 一种深基坑内设坑中坑城门洞式出土施工结构 | |
CN101498133B (zh) | 增大地下室逆作法土方开挖空间的方法和支护结构 | |
CN110904992B (zh) | 整体装配式加装电梯的电梯基础构件及其施工方法 | |
CN105421477A (zh) | 一种塔吊基础的施工方法 | |
CN102322063B (zh) | 一种深基坑二次开挖及支护施工方法 | |
CN106013174A (zh) | 一种基坑支护斜向支撑方法及斜向支撑结构 | |
CN203625911U (zh) | 一种深基坑内设坑中坑城门洞式出土施工结构 | |
CN102787605A (zh) | 软土地基条形基坑支护钢板桩倾斜处理方法 | |
CN211498875U (zh) | 一种基坑支护体系 | |
CN206337566U (zh) | 基坑竖向预应力锚杆支撑结构 | |
CN103215965A (zh) | 层板式高桩承台塔吊基础结构及施工方法 | |
CN202117060U (zh) | 一种深基坑二次开挖及支护施工结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130417 Termination date: 20150628 |
|
EXPY | Termination of patent right or utility model |