CN108978677A - 复杂地形下深基坑开挖组合支护结构 - Google Patents
复杂地形下深基坑开挖组合支护结构 Download PDFInfo
- Publication number
- CN108978677A CN108978677A CN201811026031.9A CN201811026031A CN108978677A CN 108978677 A CN108978677 A CN 108978677A CN 201811026031 A CN201811026031 A CN 201811026031A CN 108978677 A CN108978677 A CN 108978677A
- Authority
- CN
- China
- Prior art keywords
- campshed
- wall
- pit digging
- support structure
- combined support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Abstract
本发明公开了一种复杂地形下深基坑开挖组合支护结构,包括:地下连续墙,所述地下连续墙设置于所述深层区,地下连续墙底部向下延伸嵌入基岩;排桩,所述排桩设置于所述浅层区,排桩底部向下延伸嵌入基岩;帽梁,所述帽梁设置于所述排桩顶部并将排桩整体连接固定,涉及建筑结构技术领域。本发明针对实际地形,因地制宜,既能充分满足深基坑开挖的支护要求,安全有效,又能降低施工难度,降低支护结构造价,可有效保证基坑开挖安全,经济实用。
Description
技术领域
本发明涉及建筑结构技术领域,具体是涉及一种复杂地形下深基坑开挖组合支护结构。
背景技术
基坑(1)是在基础设计位置按基底标高和基础平面尺寸所开挖的土坑,通常基坑(1)包括覆盖层较厚、基岩埋深较深的深层区(11),及覆盖层较薄、基岩埋深较浅的浅层区(12)。开挖较深及邻近有建筑物者,可用基坑壁支护、喷射混凝土护壁等方法防护外侧土层坍入。而在土木工程施工进行深基坑开挖时,需要根据地质情况进行基坑支护设计,常用的深基坑支护形式包括悬臂式钢板桩、支撑式钢板桩、悬臂式排桩、拉锚式排桩、双排桩、地下连续墙等。其中拉锚式排桩和地下连续墙应用较广泛,又以拉锚式排桩施工最为便捷,造价较低。对于覆盖层厚、基岩埋深较深的基坑支护,受土层锚杆张拉力限制,设计施工难度较大,拉锚式排桩支护无法满足支护要求,而地下连续墙施工复杂,造价较高,因此,对于复杂地形下的深基坑开挖,须寻求一种既能满足支护要求,造价又相对较低的支护结构。
发明内容
本发明的目的是为了克服上述背景技术的不足,提供一种既能满足支护要求,造价又相对较低的复杂地形下深基坑开挖组合支护结构。
本发明提供一种复杂地形下深基坑开挖组合支护结构,包括:
地下连续墙,所述地下连续墙设置于所述深层区,地下连续墙底部向下延伸嵌入基岩;
排桩,所述排桩设置于所述浅层区,排桩底部向下延伸嵌入基岩;
帽梁,所述帽梁设置于所述排桩顶部并将排桩整体连接固定。
在上述技术方案的基础上,所述地下连续墙包括适用于直线段的直线段地连墙,及适用于转角处的圆弧段地连墙。
在上述技术方案的基础上,所述直线段地连墙及排桩顶部的外侧均设置有锚杆作为支撑。
在上述技术方案的基础上,所述圆弧段地连墙与所述排桩之间设置直线段地连墙作为过渡。
在上述技术方案的基础上,所述帽梁还设置于所述地下连续墙顶部,并将地下连续墙及排桩整体连接固定。
在上述技术方案的基础上,所述转角位置处的两组排桩之间设置有角撑。
与现有技术相比,本发明的优点如下:
(1)本发明的深基坑开挖组合支护结构根据基坑覆盖层厚度及基岩埋深深度,在基坑深层区采用刚度较大的地下连续墙进行支护,在基坑浅层区采用施工便捷的排桩进行支护,针对实际地形,因地制宜,既能充分满足深基坑开挖的支护要求,安全有效,又能降低施工难度,降低支护结构造价,可有效保证基坑开挖安全,经济实用。
(2)本发明的深基坑开挖组合支护结构的地下连续墙在直线段位置处采用直线段地连墙,在转角位置处采用圆弧段地连墙,并且圆弧段地连墙与排桩之间设置直线段地连墙作为过渡,直线段地连墙的长度通过倾覆滑动稳定计算确定,使地下连续墙在外部土压作用下只受沿轴线方向的轴力,可增大地下连续墙的整体稳定性。
(3)本发明的深基坑开挖组合支护结构的直线段地连墙及排桩底部向下延伸嵌入基岩,顶部的外侧均设置有锚杆作为支撑,锚杆之间的间距根据受力计算来确定,使整体支护结构更加牢固稳定。
附图说明
图1是本发明实施例的深基坑开挖组合支护结构的俯视图;
图2是本发明实施例的深基坑开挖组合支护结构的侧视图。
附图标记:1—基坑,11—深层区,12—浅层区,2—地下连续墙,21—直线段地连墙,22—圆弧段地连墙,3—排桩,4—帽梁,5—锚杆,6—角撑。
具体实施方式
下面结合附图及具体实施例对本发明作进一步的详细描述。
参见图1至图2所示,本发明实施例提供一种复杂地形下深基坑开挖组合支护结构,包括:
地下连续墙2,所述地下连续墙2设置于所述深层区11,地下连续墙2底部向下延伸嵌入基岩;
排桩3,所述排桩3设置于所述浅层区12,排桩3底部向下延伸嵌入基岩;
帽梁4,所述帽梁4设置于所述排桩3顶部并将排桩3整体固定连接。
本发明的深基坑开挖组合支护结构根据基坑1覆盖层厚度及基岩埋深深度,在基坑深层区11采用刚度较大的地下连续墙2进行支护,在基坑浅层区12采用施工便捷的排桩3进行支护,针对实际地形,因地制宜,既能充分满足深基坑开挖的支护要求,安全有效,又能降低施工难度,降低支护结构造价,可有效保证基坑1开挖安全,经济实用。
在上述实施例的技术方案的基础上,进一步,所述地下连续墙2包括适用于直线段的直线段地连墙21,及适用于转角处的圆弧段地连墙22;使地下连续墙2的结构与地形的适配度更高,有利于改善地下连续墙2的受力情况,提高其稳定性和稳固程度。
在上述实施例的技术方案的基础上,进一步,所述直线段地连墙21及排桩3顶部的外侧均设置有锚杆5作为支撑;直线段地连墙21及排桩3底部向下延伸嵌入基岩,顶部的外侧均设置有锚杆5作为支撑,锚杆5之间的间距根据受力计算来确定,使整体支护结构更加牢固稳定。
在上述实施例的技术方案的基础上,进一步,所述圆弧段地连墙22与所述排桩3之间设置直线段地连墙21作为过渡;直线段地连墙21的长度通过倾覆滑动稳定计算确定,使地下连续墙2在外部土压作用下只受沿轴线方向的轴力,可增大地下连续墙2的整体稳定性。
在上述实施例的技术方案的基础上,进一步,所述帽梁4还设置于所述地下连续墙2顶部,并将地下连续墙2及排桩3整体固定连接;通过帽梁4将地下连续墙2与排桩3整体固定连接起来,使整个组合支护结构成为一个整体,受力更均匀,稳定性强,支护安全可靠。
在上述实施例的技术方案的基础上,进一步,所述转角位置处的两组排桩3之间设置有角撑6;在转角位置处设置角撑6,角撑6产生预应力,使两组排桩3之间固定更稳定,便于基坑1开挖。
本领域的技术人员可以对本发明实施例进行各种修改和变型,倘若这些修改和变型在本发明权利要求及其等同技术的范围之内,则这些修改和变型也在本发明的保护范围之内。
说明书中未详细描述的内容为本领域技术人员公知的现有技术。
Claims (6)
1.复杂地形下深基坑开挖组合支护结构,其特征在于,包括:
地下连续墙(2),所述地下连续墙(2)设置于所述深层区(11),地下连续墙(2)底部向下延伸嵌入基岩;
排桩(3),所述排桩(3)设置于所述浅层区(12),排桩(3)底部向下延伸嵌入基岩;
帽梁(4),所述帽梁(4)设置于所述排桩(3)顶部并将排桩(3)整体固定连接。
2.如权利要求1所述的复杂地形下深基坑开挖组合支护结构,其特征在于:所述地下连续墙(2)包括适用于直线段的直线段地连墙(21),及适用于转角处的圆弧段地连墙(22)。
3.如权利要求2所述的复杂地形下深基坑开挖组合支护结构,其特征在于:所述直线段地连墙(21)及排桩(3)顶部的外侧均设置有锚杆(5)作为支撑。
4.如权利要求2所述的复杂地形下深基坑开挖组合支护结构,其特征在于:所述圆弧段地连墙(22)与所述排桩(3)之间设置直线段地连墙(21)作为过渡。
5.如权利要求1所述的复杂地形下深基坑开挖组合支护结构,其特征在于:所述帽梁(4)还设置于所述地下连续墙(2)顶部,并将地下连续墙(2)及排桩(3)整体固定连接。
6.如权利要求1所述的复杂地形下深基坑开挖组合支护结构,其特征在于:所述转角位置处的两组排桩(3)之间设置有角撑(6)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811026031.9A CN108978677A (zh) | 2018-09-04 | 2018-09-04 | 复杂地形下深基坑开挖组合支护结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811026031.9A CN108978677A (zh) | 2018-09-04 | 2018-09-04 | 复杂地形下深基坑开挖组合支护结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108978677A true CN108978677A (zh) | 2018-12-11 |
Family
ID=64548762
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811026031.9A Pending CN108978677A (zh) | 2018-09-04 | 2018-09-04 | 复杂地形下深基坑开挖组合支护结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108978677A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110158630A (zh) * | 2019-05-31 | 2019-08-23 | 广西路桥工程集团有限公司 | 一种深厚覆盖层地区大跨拱桥环形地下连续墙基础 |
CN110206040A (zh) * | 2019-06-11 | 2019-09-06 | 中铁六局集团有限公司工程设计院 | 一种方形深基坑无嵌固混凝土墙支护结构 |
WO2021013200A1 (zh) * | 2019-07-24 | 2021-01-28 | 青岛理工大学 | 一种咬合桩与地连墙联合基坑支护结构及方法 |
CN112861208A (zh) * | 2021-01-07 | 2021-05-28 | 青岛理工大学 | 一种排桩支护体系转化地下连续墙支护结构的分析方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2436553Y (zh) * | 2000-01-31 | 2001-06-27 | 彭高培 | 拱墙式自立支护结构 |
CN104652448A (zh) * | 2015-01-10 | 2015-05-27 | 华东交通大学 | 一种不平衡基坑支护设计方法 |
CN204491624U (zh) * | 2014-12-22 | 2015-07-22 | 上海建工集团股份有限公司 | 软土地区非对称深大基坑同步开挖支护体系 |
CN204875805U (zh) * | 2015-02-05 | 2015-12-16 | 北京瑞腾基础工程技术有限公司 | 一种复合深基坑支护体系 |
CN108468335A (zh) * | 2018-03-26 | 2018-08-31 | 华东交通大学 | 一种非等长组合围护桩设计方法 |
-
2018
- 2018-09-04 CN CN201811026031.9A patent/CN108978677A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2436553Y (zh) * | 2000-01-31 | 2001-06-27 | 彭高培 | 拱墙式自立支护结构 |
CN204491624U (zh) * | 2014-12-22 | 2015-07-22 | 上海建工集团股份有限公司 | 软土地区非对称深大基坑同步开挖支护体系 |
CN104652448A (zh) * | 2015-01-10 | 2015-05-27 | 华东交通大学 | 一种不平衡基坑支护设计方法 |
CN204875805U (zh) * | 2015-02-05 | 2015-12-16 | 北京瑞腾基础工程技术有限公司 | 一种复合深基坑支护体系 |
CN108468335A (zh) * | 2018-03-26 | 2018-08-31 | 华东交通大学 | 一种非等长组合围护桩设计方法 |
Non-Patent Citations (2)
Title |
---|
但礼堂: "《深基坑支护选型排桩和地下连续墙的优选分析》", 《城市建设理论研究》 * |
刘熙媛: "《基础工程》", 30 November 2009, 中国建材工业出版社 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110158630A (zh) * | 2019-05-31 | 2019-08-23 | 广西路桥工程集团有限公司 | 一种深厚覆盖层地区大跨拱桥环形地下连续墙基础 |
CN110206040A (zh) * | 2019-06-11 | 2019-09-06 | 中铁六局集团有限公司工程设计院 | 一种方形深基坑无嵌固混凝土墙支护结构 |
WO2021013200A1 (zh) * | 2019-07-24 | 2021-01-28 | 青岛理工大学 | 一种咬合桩与地连墙联合基坑支护结构及方法 |
CN112861208A (zh) * | 2021-01-07 | 2021-05-28 | 青岛理工大学 | 一种排桩支护体系转化地下连续墙支护结构的分析方法 |
CN112861208B (zh) * | 2021-01-07 | 2022-08-16 | 青岛理工大学 | 一种排桩支护体系转化地下连续墙支护结构的分析方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108978677A (zh) | 复杂地形下深基坑开挖组合支护结构 | |
CN205776249U (zh) | 一种组合型内支撑结构 | |
CN105155554B (zh) | 一种拱形支护体系的深基坑 | |
CN203654294U (zh) | 一种逆作法中基坑的支护结构 | |
CN105780779A (zh) | 外设压密注浆的拉森钢板桩复合支护结构及其使用方法 | |
CN103938634B (zh) | 一种深基坑支护结构及施工方法 | |
CN103103988A (zh) | 利用中心岛楼板水平支撑结构的基坑施工方法 | |
CN105155602A (zh) | 一种多支点地基加固综合纠倾方法 | |
CN110374112A (zh) | 软弱土场地深基坑支护体系及其施工方法 | |
CN205975658U (zh) | 钢平台塔吊基础 | |
CN110206038A (zh) | 一种凹型基坑阳角处的支护结构及施工方法 | |
CN203716156U (zh) | 一种深基坑内设坑中坑城门洞式出土施工结构 | |
CN205875193U (zh) | 一种装配式桩柱一体化结构 | |
CN207525758U (zh) | 一种加强型基坑排桩支护结构 | |
CN204825923U (zh) | 一种接力式基坑支护结构 | |
CN104195956A (zh) | 膺架式水域连续梁现浇支架及其搭建方法 | |
CN105421477A (zh) | 一种塔吊基础的施工方法 | |
CN103243721B (zh) | 软弱地质条件下高层建筑筏板基础及核心筒开挖施工方法 | |
CN105544559B (zh) | 采用预制构件进行基坑支护的结构及方法 | |
CN205382942U (zh) | 既有设施下多层地下空间幕架式暗挖施工的支护结构 | |
CN204849777U (zh) | 倾斜式压顶板双排桩支护结构 | |
CN203625911U (zh) | 一种深基坑内设坑中坑城门洞式出土施工结构 | |
CN207228124U (zh) | 用于深基坑支护的格构锚结构 | |
CN202830969U (zh) | 悬臂式挡土墙的纠偏加固结构 | |
CN104695447B (zh) | 深地下室支护 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181211 |