CN105155554B - 一种拱形支护体系的深基坑 - Google Patents
一种拱形支护体系的深基坑 Download PDFInfo
- Publication number
- CN105155554B CN105155554B CN201510618051.5A CN201510618051A CN105155554B CN 105155554 B CN105155554 B CN 105155554B CN 201510618051 A CN201510618051 A CN 201510618051A CN 105155554 B CN105155554 B CN 105155554B
- Authority
- CN
- China
- Prior art keywords
- arch
- support
- pile
- basal pit
- deep basal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 claims abstract description 33
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 17
- 239000011230 binding agent Substances 0.000 claims description 10
- 239000011150 reinforced concrete Substances 0.000 claims description 9
- 238000005266 casting Methods 0.000 claims description 2
- 230000015572 biosynthetic process Effects 0.000 abstract description 5
- 241000700608 Sagitta Species 0.000 abstract description 2
- 239000004567 concrete Substances 0.000 description 12
- 238000001816 cooling Methods 0.000 description 10
- 238000000034 method Methods 0.000 description 8
- 238000007789 sealing Methods 0.000 description 8
- 238000002156 mixing Methods 0.000 description 7
- 239000004744 fabric Substances 0.000 description 6
- 239000002689 soil Substances 0.000 description 6
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 230000005484 gravity Effects 0.000 description 3
- 239000011435 rock Substances 0.000 description 3
- 239000007787 solid Substances 0.000 description 3
- 238000003756 stirring Methods 0.000 description 3
- 230000004888 barrier function Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 239000002131 composite material Substances 0.000 description 2
- 230000010485 coping Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 238000009436 residential construction Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510618051.5A CN105155554B (zh) | 2015-09-25 | 2015-09-25 | 一种拱形支护体系的深基坑 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510618051.5A CN105155554B (zh) | 2015-09-25 | 2015-09-25 | 一种拱形支护体系的深基坑 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105155554A CN105155554A (zh) | 2015-12-16 |
CN105155554B true CN105155554B (zh) | 2017-12-05 |
Family
ID=54796572
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510618051.5A Active CN105155554B (zh) | 2015-09-25 | 2015-09-25 | 一种拱形支护体系的深基坑 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105155554B (zh) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108677968A (zh) * | 2018-08-14 | 2018-10-19 | 江西基业科技有限公司 | 改进型深基坑外支护结构 |
CN108729452A (zh) * | 2018-08-14 | 2018-11-02 | 江西基业科技有限公司 | 深基坑外支撑结构 |
CN109024615A (zh) * | 2018-09-05 | 2018-12-18 | 上海地矿工程勘察有限公司 | 拱形布置的双排桩基坑围护结构体系及其应用 |
CN109914833A (zh) * | 2019-03-25 | 2019-06-21 | 五冶集团上海有限公司 | 一种基坑土方开挖阶段防尘棚搭设方法 |
CN110158575B (zh) * | 2019-05-23 | 2020-11-20 | 浙江理工大学 | 地下连续墙施工方法 |
CN110344418A (zh) * | 2019-07-12 | 2019-10-18 | 江苏南通二建集团有限公司 | 一种深基坑中支护体系的结构及其施工工艺 |
CN110387889B (zh) * | 2019-07-23 | 2021-11-02 | 南通大学 | 一种用于长条形深基坑的连拱式基坑支护方法 |
CN110528536B (zh) * | 2019-09-06 | 2020-11-24 | 合肥工业大学 | 一种变异地层非等径双圆弧基坑的组合支护结构 |
CN110924401A (zh) * | 2019-12-13 | 2020-03-27 | 武汉武水水利生态工程技术有限公司 | 一种搅拌桩与灌注桩联合成拱承载的施工基坑支护方式 |
CN111636411A (zh) * | 2020-05-19 | 2020-09-08 | 浙江云泊科技有限公司 | 一种收纳箱车库地下连续墙幅连接的wac工法 |
CN113047307B (zh) * | 2021-04-06 | 2022-05-20 | 新力建设集团有限公司 | 一种大跨度深基坑组合式支护结构 |
CN113235610A (zh) * | 2021-05-13 | 2021-08-10 | 南通大学 | 一种坑外拱形支撑体系的基坑支护结构及其施工方法 |
CN114658002B (zh) * | 2022-04-06 | 2024-02-13 | 武汉市市政工程机械化施工有限公司 | 一种外置预应力钢支撑支护系统及其施工方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000204876A (ja) * | 1999-01-14 | 2000-07-25 | Shimizu Corp | 立坑構造 |
CN1560381A (zh) * | 2004-03-08 | 2005-01-05 | 平 王 | 钢结构锁口梁及利用其进行基坑支护的方法 |
CN101519880A (zh) * | 2009-03-02 | 2009-09-02 | 浙江大学 | 深基坑和护坡工程中可旋转多轴钻孔咬合桩墙围护方法 |
CN101906775A (zh) * | 2008-11-19 | 2010-12-08 | 兰州南特数码科技股份有限公司 | 多功能预制拱片 |
CN202298633U (zh) * | 2011-10-20 | 2012-07-04 | 中交第三航务工程勘察设计院有限公司 | 拱形树根桩隔离桩墙 |
CN204112336U (zh) * | 2014-08-26 | 2015-01-21 | 南京市测绘勘察研究院有限公司 | 一种半圆形预制桩与止水桩构成的基坑支护结构 |
CN204626446U (zh) * | 2015-05-08 | 2015-09-09 | 杨林 | 一种新型建筑地下综合体连续墙结构 |
-
2015
- 2015-09-25 CN CN201510618051.5A patent/CN105155554B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000204876A (ja) * | 1999-01-14 | 2000-07-25 | Shimizu Corp | 立坑構造 |
CN1560381A (zh) * | 2004-03-08 | 2005-01-05 | 平 王 | 钢结构锁口梁及利用其进行基坑支护的方法 |
CN101906775A (zh) * | 2008-11-19 | 2010-12-08 | 兰州南特数码科技股份有限公司 | 多功能预制拱片 |
CN101519880A (zh) * | 2009-03-02 | 2009-09-02 | 浙江大学 | 深基坑和护坡工程中可旋转多轴钻孔咬合桩墙围护方法 |
CN202298633U (zh) * | 2011-10-20 | 2012-07-04 | 中交第三航务工程勘察设计院有限公司 | 拱形树根桩隔离桩墙 |
CN204112336U (zh) * | 2014-08-26 | 2015-01-21 | 南京市测绘勘察研究院有限公司 | 一种半圆形预制桩与止水桩构成的基坑支护结构 |
CN204626446U (zh) * | 2015-05-08 | 2015-09-09 | 杨林 | 一种新型建筑地下综合体连续墙结构 |
Also Published As
Publication number | Publication date |
---|---|
CN105155554A (zh) | 2015-12-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105155554B (zh) | 一种拱形支护体系的深基坑 | |
CN105089061B (zh) | 一种超深基坑支护方法 | |
CN106677189B (zh) | 一种斜桩墙支承式基坑支护结构及其施工方法 | |
CN106049505B (zh) | 一种深基坑支撑支护体系的施工方法 | |
CN205742213U (zh) | 基坑支护结构 | |
CN208379610U (zh) | 一种折线交错式双排桩基坑支护结构 | |
CN101117805A (zh) | 一种地下工程中一桩多用半逆作法的方法 | |
CN103938634B (zh) | 一种深基坑支护结构及施工方法 | |
CN102162258B (zh) | 一种塔吊钢管混凝土高桩塔基结构及构建方法 | |
CN100510281C (zh) | 超大直径、超埋深度调蓄池的半逆作施工方法 | |
CN206928305U (zh) | 一种刚性被动区扶壁式支护结构 | |
CN105862930A (zh) | 一种对新建地下工程下方既有隧道的保护结构 | |
CN110374112A (zh) | 软弱土场地深基坑支护体系及其施工方法 | |
CN104264683B (zh) | 三面环绕文保建筑凹字形超深基坑分区支护方法 | |
CN205557537U (zh) | 一种基坑支护结构 | |
CN106120805A (zh) | 危房环境下的超深基坑支护的施工方法 | |
CN108035360A (zh) | 一种用于基坑支护的方法 | |
CN205804366U (zh) | 一种渣沟结构 | |
CN107313454B (zh) | 一种地下车库的施工方法 | |
CN205804383U (zh) | 一种旋流池止水帷幕 | |
CN211285630U (zh) | 软地基深基坑双道支撑施工结构 | |
CN211447015U (zh) | 一种h形抗滑桩板墙 | |
CN106013168A (zh) | 一种渣沟结构及其施工方法 | |
CN207794098U (zh) | 一种便于底板施工的斜抛撑支护结构 | |
CN205839765U (zh) | 一种考虑土拱和变形空间效应的软土基坑双排桩支护结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 430062 Wuchang, Wuhan, Xu Dong Avenue, international city, building B, block 28, floor 8, floor Applicant after: WUHAN QIANCHENG PILE WORK TECHNOLOGY CO.,LTD. Address before: 430062 Wuchang, Wuhan, Xu Dong Avenue, international city, building B, block 28, floor 8, floor Applicant before: WUHAN HIGH-SPEED RAILWAY PILLING TECHNOLOGY Co.,Ltd. |
|
COR | Change of bibliographic data | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Design of deep foundation pit with arch support system Effective date of registration: 20210302 Granted publication date: 20171205 Pledgee: Guanggu Branch of Wuhan Rural Commercial Bank Co.,Ltd. Pledgor: WUHAN QIANCHENG PILE WORK TECHNOLOGY Co.,Ltd. Registration number: Y2021420000008 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20220120 Granted publication date: 20171205 Pledgee: Guanggu Branch of Wuhan Rural Commercial Bank Co.,Ltd. Pledgor: WUHAN QIANCHENG PILE WORK TECHNOLOGY CO.,LTD. Registration number: Y2021420000008 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Deep foundation pit of arch support system Effective date of registration: 20220125 Granted publication date: 20171205 Pledgee: Guanggu Branch of Wuhan Rural Commercial Bank Co.,Ltd. Pledgor: WUHAN QIANCHENG PILE WORK TECHNOLOGY CO.,LTD. Registration number: Y2022420000033 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20230202 Granted publication date: 20171205 Pledgee: Guanggu Branch of Wuhan Rural Commercial Bank Co.,Ltd. Pledgor: WUHAN QIANCHENG PILE WORK TECHNOLOGY CO.,LTD. Registration number: Y2022420000033 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Deep foundation pit with arch support system Effective date of registration: 20230206 Granted publication date: 20171205 Pledgee: Guanggu Branch of Wuhan Rural Commercial Bank Co.,Ltd. Pledgor: WUHAN QIANCHENG PILE WORK TECHNOLOGY CO.,LTD. Registration number: Y2023420000019 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20171205 Pledgee: Guanggu Branch of Wuhan Rural Commercial Bank Co.,Ltd. Pledgor: WUHAN QIANCHENG PILE WORK TECHNOLOGY CO.,LTD. Registration number: Y2023420000019 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A deep foundation pit with an arched support system Granted publication date: 20171205 Pledgee: Guanggu Branch of Wuhan Rural Commercial Bank Co.,Ltd. Pledgor: WUHAN QIANCHENG PILE WORK TECHNOLOGY CO.,LTD. Registration number: Y2024980014190 |