CN102251531A - 锁口套箱围堰 - Google Patents
锁口套箱围堰 Download PDFInfo
- Publication number
- CN102251531A CN102251531A CN 201110111002 CN201110111002A CN102251531A CN 102251531 A CN102251531 A CN 102251531A CN 201110111002 CN201110111002 CN 201110111002 CN 201110111002 A CN201110111002 A CN 201110111002A CN 102251531 A CN102251531 A CN 102251531A
- Authority
- CN
- China
- Prior art keywords
- cofferdam
- fore shaft
- rib
- locking notch
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
本发明公开了一种锁口套箱围堰,解决了现有的钢围堰水下拼装锁口部位容易出现渗漏的技术问题。包括围堰左侧板(1)和围堰右侧板(7),先视围堰平面尺寸大小将围堰侧板分块,每块围堰接口处设置锁口,锁口为子母扣。在所述的围堰左侧板(1)的外侧面上通过左竖肋(4)和子锁口横肋(5)连接有子锁口钢管(6),在围堰右侧板(7)的外侧面上通过右竖肋(10)和母锁口横肋(11)连接有母锁口钢管(11),左槽钢(3)与右槽钢(9)扣接在一起组成封闭的封水仓(13),并且设置在子锁口横肋(5)的右端的子锁口钢管(6)活动设置在带有缺口的母锁口钢管(12)中。本发明为桥墩水下承台土建施工,提供了简单、实用和高效的施工设备。
Description
技术领域
本发明涉及一种土建施工设备,特别涉及一种用于桥墩水下承台施工的套箱围堰。
背景技术
在桥墩水下承台土建施工过程中,应用到钢套箱。一般钢套箱先是在加工工厂分块定制,然后运到现场,再分块拼装成一个整体,最后整体下沉定位到施工现场。这种工作过程,不但需要大型起吊设备,并且存在难以精确下沉定位的问题。若分块下沉后再合拢成围堰,存在合拢处缝隙处理不好,常出现渗漏的事故。
发明内容
本发明提供了提供了一种锁口套箱围堰,解决了现有的钢围堰水下拼装锁口部位容易出现渗漏的技术问题。
本发明是通过以下方案解决以上问题的:
一种锁口套箱围堰,包括围堰左侧板和围堰右侧板,在所述的围堰左侧板的外侧面上相互间隔平行地设置有左横肋,在左横肋的右端焊接有槽口向右的左槽钢,且左槽钢的内侧边与围堰左侧板的右端固定焊接在一起;在所述的围堰右侧板的外侧面上相互间隔平行地设置有右横肋,在右横肋的左端焊接有槽口向左的右槽钢,且右槽钢的内侧边与围堰右侧板的左端固定焊接在一起;在围堰左侧板的外侧面上相互间隔平行地固定焊接有与围堰左侧板垂直的左竖肋,在左竖肋的右侧面上相互间隔平行地固定焊接有与左竖肋垂直的子锁口横肋,在子锁口横肋的右端焊接有子锁口钢管,子锁口钢管与围堰左侧板平行;在围堰右侧板的外侧面上相互间隔平行地固定焊接有与围堰右侧板垂直的右竖肋,在右竖肋的左侧面上相互间隔平行地固定焊接有与右竖肋垂直的母锁口横肋,在母锁口横肋的左端焊接有母锁口钢管,母锁口钢管与围堰右侧板平行,在母锁口钢管的左侧面设置有缺口;当围堰左侧板与围堰右侧板拼装在一起时,所述的左槽钢与右槽钢扣接在一起组成封闭的封水仓,并且设置在子锁口横肋的右端的子锁口钢管活动套接在带有缺口的母锁口钢管中。
当围堰左侧板与围堰右侧板拼装在一起时,左竖肋、子锁口横肋、母锁口横肋、右竖肋和封水仓的外围共同组成备用封水仓,在备用封水仓中灌注有粘土水泥砂浆,在封水仓灌注有水下絮凝砂浆。
本发明即方便了钢套围堰的运输,又解决了在施工现场进行拼装容易出现渗漏的问题,为桥墩水下承台土建施工,提供了简单、实用和高效的施工设备。
附图说明
图1是本发明的锁口连接前的结构示意图
图2是本发明的锁口连接后的结构示意图。
具体实施例
一种锁口套箱围堰,包括围堰左侧板1和围堰右侧板7,在所述的围堰左侧板1的外侧面上相互间隔平行地设置有左横肋2,在左横肋2的右端焊接有槽口向右的左槽钢3,且左槽钢3的内侧边与围堰左侧板1的右端固定焊接在一起;在所述的围堰右侧板7的外侧面上相互间隔平行地设置有右横肋8,在右横肋8的左端焊接有槽口向左的右槽钢9,且右槽钢9的内侧边与围堰右侧板7的左端固定焊接在一起;在围堰左侧板1的外侧面上相互间隔平行地固定焊接有与围堰左侧板1垂直的左竖肋4,在左竖肋4的右侧面上相互间隔平行地固定焊接有与左竖肋4垂直的子锁口横肋5,在子锁口横肋5的右端焊接有子锁口钢管6,子锁口钢管6与围堰左侧板1平行设置;在围堰右侧板7的外侧面上相互间隔平行地固定焊接有与围堰右侧板7垂直的右竖肋10,在右竖肋10的左侧面上相互间隔平行地固定焊接有与右竖肋10垂直的母锁口横肋11,在母锁口横肋11的左端焊接有母锁口钢管12,母锁口钢管12与围堰右侧板7平行设置,在母锁口钢管12的左侧面设置有缺口;当围堰左侧板1与围堰右侧板7拼装在一起时,所述的左槽钢3与右槽钢9扣接在一起组成封闭的封水仓13,并且设置在子锁口横肋5的右端的子锁口钢管6活动套接在带有缺口的母锁口钢管12中。
当围堰左侧板1与围堰右侧板7拼装在一起时,左竖肋4、子锁口横肋5、母锁口横肋11、右竖肋10和封水仓13的外围共同组成备用备用封水仓14,在备用封水仓14中灌注有粘土水泥砂浆,在封水仓13灌注有水下絮凝砂浆。
具体施工时,钻孔桩完工后,拆除水上钻孔平台,保留定位桩,用于围堰防护,安装钢套箱围堰内支撑及导向梁现场分块下插钢围堰,下插过程中保证左槽钢3与右槽钢9两齿之间密贴,子锁口钢管6准确插入母锁口钢管12之中。围堰内清除到底,水下封底后在封水仓13内灌注水下絮凝砂浆,必要时也可在备用封水仓14内灌注粘土水泥砂浆。封水成功后,即可抽水进行承台施工。
Claims (2)
1.一种锁口套箱围堰,包括围堰左侧板(1)和围堰右侧板(7),其特征在于,在所述的围堰左侧板(1)的外侧面上相互间隔平行地设置有左横肋(2),在左横肋(2)的右端焊接有槽口向右的左槽钢(3),且左槽钢(3)的内侧边与围堰左侧板(1)的右端固定焊接在一起;在所述的围堰右侧板(7)的外侧面上相互间隔平行地设置有右横肋(8),在右横肋(8)的左端焊接有槽口向左的右槽钢(9),且右槽钢(9)的内侧边与围堰右侧板(7)的左端固定焊接在一起;在围堰左侧板(1)的外侧面上相互间隔平行地固定焊接有与围堰左侧板(1)垂直的左竖肋(4),在左竖肋(4)的右侧面上相互间隔平行地固定焊接有与左竖肋(4)垂直的子锁口横肋(5),在子锁口横肋(5)的右端焊接有子锁口钢管(6),子锁口钢管(6)与围堰左侧板(1)平行设置;在围堰右侧板(7)的外侧面上相互间隔平行地固定焊接有与围堰右侧板(7)垂直的右竖肋(10),在右竖肋(10)的左侧面上相互间隔平行地固定焊接有与右竖肋(10)垂直的母锁口横肋(11),在母锁口横肋(11)的左端焊接有母锁口钢管(12),母锁口钢管(12)与围堰右侧板(7)平行设置,在母锁口钢管(12)的左侧面设置有缺口;当围堰左侧板(1)与围堰右侧板(7)拼装在一起时,所述的左槽钢(3)与右槽钢(9)扣接在一起组成封闭的封水仓(13),并且设置在子锁口横肋(5)的右端的子锁口钢管(6)活动设置在带有缺口的母锁口钢管(12)中。
2.根据权利要求1所述的一种锁口套箱围堰,其特征在于,当围堰左侧板(1)与围堰右侧板(7)拼装在一起时,左竖肋(4)、子锁口横肋(5)、母锁口横肋(11)、右竖肋(10)和封水仓(13)的外围共同组成备用封水仓(14),在备用封水仓(14)中灌注有粘土水泥砂浆,在封水仓(13)灌注有水下絮凝砂浆。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110111002 CN102251531A (zh) | 2011-04-29 | 2011-04-29 | 锁口套箱围堰 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110111002 CN102251531A (zh) | 2011-04-29 | 2011-04-29 | 锁口套箱围堰 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102251531A true CN102251531A (zh) | 2011-11-23 |
Family
ID=44979075
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110111002 Pending CN102251531A (zh) | 2011-04-29 | 2011-04-29 | 锁口套箱围堰 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102251531A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105819389A (zh) * | 2016-05-11 | 2016-08-03 | 江苏建筑职业技术学院 | 一种用于车辆装卸危化品防止泄漏扩散的围堰 |
CN106592613A (zh) * | 2016-12-01 | 2017-04-26 | 浙江海洋大学 | 一种桥墩施工围堰结构 |
CN106638639A (zh) * | 2016-12-29 | 2017-05-10 | 河南位登建筑工程有限公司 | 钢套箱围堰及其桥梁建筑设备 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004316133A (ja) * | 2003-04-14 | 2004-11-11 | Ohbayashi Corp | 仮締切工法 |
CN101182717A (zh) * | 2007-07-30 | 2008-05-21 | 中铁十八局集团有限公司 | 锁口钢管桩围堰施工方法 |
CN201695379U (zh) * | 2010-02-02 | 2011-01-05 | 中交二公局第五工程有限公司 | 钢围堰锁扣式连接止水装置 |
CN202039374U (zh) * | 2011-04-29 | 2011-11-16 | 中铁十九局集团第一工程有限公司 | 锁口套箱围堰 |
-
2011
- 2011-04-29 CN CN 201110111002 patent/CN102251531A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004316133A (ja) * | 2003-04-14 | 2004-11-11 | Ohbayashi Corp | 仮締切工法 |
CN101182717A (zh) * | 2007-07-30 | 2008-05-21 | 中铁十八局集团有限公司 | 锁口钢管桩围堰施工方法 |
CN201695379U (zh) * | 2010-02-02 | 2011-01-05 | 中交二公局第五工程有限公司 | 钢围堰锁扣式连接止水装置 |
CN202039374U (zh) * | 2011-04-29 | 2011-11-16 | 中铁十九局集团第一工程有限公司 | 锁口套箱围堰 |
Non-Patent Citations (1)
Title |
---|
《铁道建筑技术》 20060220 王崇艾 锁口式钢套箱围堰的设计与施工 , 第01期 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105819389A (zh) * | 2016-05-11 | 2016-08-03 | 江苏建筑职业技术学院 | 一种用于车辆装卸危化品防止泄漏扩散的围堰 |
CN105819389B (zh) * | 2016-05-11 | 2017-11-10 | 江苏建筑职业技术学院 | 一种用于车辆装卸危化品防止泄漏扩散的围堰 |
CN106592613A (zh) * | 2016-12-01 | 2017-04-26 | 浙江海洋大学 | 一种桥墩施工围堰结构 |
CN106638639A (zh) * | 2016-12-29 | 2017-05-10 | 河南位登建筑工程有限公司 | 钢套箱围堰及其桥梁建筑设备 |
CN106638639B (zh) * | 2016-12-29 | 2019-08-16 | 河南位登建筑工程有限公司 | 钢套箱围堰及其桥梁建筑设备 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102251531A (zh) | 锁口套箱围堰 | |
CN203729255U (zh) | 一种箱肋式的重力码头结构 | |
JP5124697B1 (ja) | 液状化防止構造および液状化防止工法 | |
JP2010156191A (ja) | L形補強構造物、該l形補強構造物を設置した補強構造及び補強方法 | |
CN104328792B (zh) | 无底双壁钢套箱拼装结构 | |
CN202039374U (zh) | 锁口套箱围堰 | |
JP2007297826A (ja) | 橋脚の鋼板を用いた補強方法 | |
CN204533963U (zh) | 一种基坑内置管道架空装置 | |
CN104265301A (zh) | 矩形顶管大角度斜交进洞施工方法 | |
CN103132465A (zh) | 一种紧贴桩基承台的地下箱涵建造方法 | |
CN211228568U (zh) | 具有隔槽的沉井系统 | |
JP5022947B2 (ja) | 仮締切作業函およびその設置方法 | |
CN204690770U (zh) | 一种可多方位定位连接的炉渣混凝土胎模板 | |
JP6548455B2 (ja) | 連続壁の止水構造 | |
CN102383432A (zh) | 三轴(二轴)水泥土搅拌桩中插h型钢筋砼板桩围护方法 | |
CN205000332U (zh) | 一种后打桩海上风机基础施工装置与桩套管连接结构 | |
CN201915442U (zh) | 一种海洋水下拼装式取水口 | |
CN207685818U (zh) | 一种可重复利用的导墙装置 | |
CN102434718A (zh) | 一种顶管机始发的端头加固方法 | |
JP2007009610A (ja) | 矩形圧入ケーソンと矩形圧入ケーソンによる刃口排土方法 | |
CN202175961U (zh) | 地连墙钢筋笼燕尾式封头结构 | |
CN205152958U (zh) | 一种新型组合钢板桩 | |
CN111827265A (zh) | 一种型钢混凝土地下连续墙构建方法 | |
CN109356216B (zh) | 一种锯链式铣槽机掘进润滑减阻系统及其使用方法 | |
JP2015028295A (ja) | 止水構造およびその構築方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20111123 |