CN1021982C - Method for correcting and reinforcing inclination of house - Google Patents

Method for correcting and reinforcing inclination of house Download PDF

Info

Publication number
CN1021982C
CN1021982C CN 91104382 CN91104382A CN1021982C CN 1021982 C CN1021982 C CN 1021982C CN 91104382 CN91104382 CN 91104382 CN 91104382 A CN91104382 A CN 91104382A CN 1021982 C CN1021982 C CN 1021982C
Authority
CN
China
Prior art keywords
house
reinforcing
hole
correcting
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 91104382
Other languages
Chinese (zh)
Other versions
CN1058069A (en
Inventor
黄正轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 91104382 priority Critical patent/CN1021982C/en
Publication of CN1058069A publication Critical patent/CN1058069A/en
Application granted granted Critical
Publication of CN1021982C publication Critical patent/CN1021982C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention relates to a house inclination correcting and reinforcing method which is characterized in that (1) a certain number of drain holes are drilled on one side edge of an inclined house with small subsidence, which is close to a foundation; (2) pumping water by turns by using a submersible pump, drilling holes at the original hole position by using a special drill bit, and circulating for a plurality of times until the house is supported; (3) and driving a certain number of underpinning reinforcing piles, such as corbel piles, around the erected house. The method has the advantages of simple construction equipment, convenient operation, short construction period, no need of resident household transfer during construction and low cost. The method is suitable for rectifying and reinforcing the deviation of the middle-rise and low-rise buildings in coastal areas.

Description

Method for correcting and then reinforcing inclined house
The present invention relates to the method for a kind of inclined building straightening and reinforcing.
In recent years, the house generally to the high level development, because the coastal area bearing capacity of foundation soil is poor, causes a lot of high-story house run-off the straights, becomes dilapidated house, and this phenomenon rural area is particularly serious.For the correction of tilting building, adopt " open caisson deep layer bath casting method " usually.In the few side of tilting building settling amount, several open caissons are set.After treating that open caisson reaches certain depth, one side the open caisson degree of depth punchinging by the basis.Mix water-supply-pipe, high-pressure hydraulic pump, towards mud.Slime water in the open caisson is discharged to core pool with submersible pump.Russian Patent SU990973 discloses another kind of method for correcting error, in the offside boring of the one side of building inclination, is equipped with and filters water pipe.After extracting underground water out in the boring, the just reduction of inclined plane offside boring base water level down reaches the correction purpose.These two kinds of methods are not held up the reinforcement measure after whole, influences rectifying effect, and preceding a kind of method cost height, construction period are grown, inconvenient operation.A kind of method in back is only applicable to sand clay, inapplicable cohesive soil ground, and the inclined building on this ground is main.
The object of the invention is to propose that a kind of easy construction, cost are low, the method for multistoried building correcting and then reinforcing with reinforcement measure, make the tilting building correction after, can keep relative stability the phase.
Technical solution of the present invention is: in the little side of tilting building sedimentation, bore the suction eye of the some and the degree of depth, take out water and the mud of extruding in the hole with submersible pump and drill bit repeatedly, make the weak soil of substrate fixed by densification, reach the sedimentation unanimity.Stamp around then in the house and reinforce stake, make it that sedimentation no longer take place.Facts have proved that through construction this method has the following advantages: construction equipment is simple, and is easy to operate, the duration is short, generally can finish correction and reinforcing task with 8-16 days, and resident family need not move during construction, and expense is low.
Below in conjunction with embodiment and accompanying drawing thereof content of the present invention is described further.
Fig. 1 is an embodiment drain hole schematic diagram.Among the figure: 1 is the basis, and 2 is drain hole.
Fig. 2 is stake of embodiment bracket and drain hole arrangement diagram.Wherein, Fig. 2 a is the position of bracket stake under the basis, and among the figure, 3 is the bracket stake, and Fig. 2 b is the position of bracket stake and drain hole.
The construction sequence of embodiment correcting and then reinforcing inclined house method is as follows:
(1) bore the drain hole 2 of some at the little lateral edges of tilting building depression near the basis, aperture and hole depth are determined by Practical Calculation, are generally the 300-500 millimeter, hole depth 8-10 rice.
(2) drawn water by turns to two square holes by interstitial hole respectively with several submersible pumps, because the mud in basic deep squeezes in the hole, the aperture dwindles gradually, put to enter until submersible pump, hole in former hole site with drill bit again, inhale mud, the circulation several times obtain holding up whole until the house.
(3) holding up whole house to play the underpinning stake of some all around.The present invention adopts bracket stake 3 as shown in Figure 2, job practices is as follows: (be 500 millimeters away from wall face more than) bores the hole (aperture 300-400 millimeter) of some around the house of holding up after whole, hole depth is determined by calculating, at about one meter dark concrete of Kong Zhongxian cast, dispose the reinforcing bar (bar reinforcement) of ┐ type then, pour into a mould and pile again.This new shape pilework can be constructed in very narrow alley, can be in 1 meter-2 meters depths construction of underground.
This job practices is applicable to the correction and the reinforcing of coastal area median low structure thing, is particularly useful for the correcting and then reinforcing of small towns, rural area tilting building.

Claims (2)

1, a kind of method of correcting and then reinforcing inclined house is included in the little lateral edges of tilting building depression and bores the drain hole of some near the basis, with pump the water in the drain hole is extracted out, it is characterized in that:
(1) draw water by turns to two square holes by interstitial hole respectively with several submersible pumps, put to enter, hole in former hole site with drill bit again until submersible pump, suction mud, the circulation several times, obtain holding up until the house whole,
(2) holding up whole room face to play the underpinning stake of some all around.
2, the method for correcting and then reinforcing inclined house according to claim 1, the underpinning stake that it is characterized in that indication is the bracket stake, job practices is as follows: the hole of boring some around the house of holding up after putting in order, pour into a mould concrete dark about half at Kong Zhongxian, the layout type reinforcing bar is poured into a mould and pile more then.
CN 91104382 1991-06-26 1991-06-26 Method for correcting and reinforcing inclination of house Expired - Fee Related CN1021982C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 91104382 CN1021982C (en) 1991-06-26 1991-06-26 Method for correcting and reinforcing inclination of house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 91104382 CN1021982C (en) 1991-06-26 1991-06-26 Method for correcting and reinforcing inclination of house

Publications (2)

Publication Number Publication Date
CN1058069A CN1058069A (en) 1992-01-22
CN1021982C true CN1021982C (en) 1993-09-01

Family

ID=4906577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 91104382 Expired - Fee Related CN1021982C (en) 1991-06-26 1991-06-26 Method for correcting and reinforcing inclination of house

Country Status (1)

Country Link
CN (1) CN1021982C (en)

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1078651C (en) * 1996-12-31 2002-01-30 林礼 Straightening method for inclined house on soft ground foundation
CN100359100C (en) * 2005-12-29 2008-01-02 徐士龙 Method for treating soft foundition by fast 'high vacuum impacting dense, pile base' compound method
CN102220769A (en) * 2011-04-15 2011-10-19 上海天演建筑物移位工程有限公司 System and method for underpinning and jacking building and adding storeys downwards
CN103161183B (en) * 2011-12-13 2015-08-19 河南省电力勘测设计院 Dry ash storehouse building lot reinforcement means
CN103104101B (en) * 2013-01-18 2015-01-21 大连久鼎特种建筑工程有限公司 Construction deviation correcting method utilizing recursion top pressing method
CN103397668B (en) * 2013-08-06 2015-07-29 中铁第一勘察设计院集团有限公司 The regulation method of each sections uneven settlement of foundation of a kind of railway tunnels
CN104032777B (en) * 2014-05-14 2016-01-20 中冶集团武汉勘察研究院有限公司 Geotechnique's cloth bag combined miniature stake lifting inclination-correcting builds/method of structure
CN105178368B (en) * 2015-06-15 2017-03-08 山东建筑大学 Mini pile stake holes fetches earth building inclination rectification method
CN105133676A (en) * 2015-09-29 2015-12-09 胡忠志 Building inclination rectification construction method
CN105155867B (en) * 2015-09-30 2017-05-31 贵州正业工程技术投资有限公司 A kind of underpinning device of the existing large diameter pile building of Tunnel Passing
CN107313602A (en) * 2016-04-26 2017-11-03 湖北建科结构加固有限责任公司 Building substrate is that sand changes the jetting forced falling rectifying deviation method filled out
CN108396760B (en) * 2016-11-17 2020-02-04 叶香雄 Combined deviation-rectifying construction technology for inclined open caisson
CN109024648B (en) * 2016-12-13 2020-08-28 叶香竹 Deviation rectifying construction method for open caisson
CN108086346B (en) * 2018-01-26 2023-09-08 广东省建筑工程机械施工有限公司 Uneven settlement reinforcing device and overcoming method for tower crane foundation
CN108867723B (en) * 2018-07-24 2020-12-11 山东建筑大学 Method for correcting inclination of frame structure building and adding underground layer
CN109184172B (en) * 2018-09-28 2020-09-04 上海建工集团股份有限公司 Device for regulating and controlling verticality of vertical structural column of integral steel platform formwork and construction method
CN109881722A (en) * 2019-03-20 2019-06-14 上海华铸地基技术有限公司 It is a kind of to utilize Large-diameter Steel open caisson deviation rectification construction method

Also Published As

Publication number Publication date
CN1058069A (en) 1992-01-22

Similar Documents

Publication Publication Date Title
CN1021982C (en) Method for correcting and reinforcing inclination of house
CN107119691B (en) Square deep foundation pit suitable for high bearing pressure of water-rich sand egg layer and excavation method thereof
CN107246006B (en) The pile-filling method of concrete-pile
CN109440762B (en) Construction method of filling pile for drainage pump station
CN109488202A (en) A kind of gravel rock stratum pile foundation drilling construction engineering method containing gravel-boulder bed
CN114108649A (en) Foundation pit reinforcing construction method for mucky soil layer
CN106284311B (en) A kind of dry efficient construction technology of pore-forming cast-in-place concrete pile of rotary drilling rig
CN111456055A (en) Foundation pit dewatering construction method
CN107299640A (en) A kind of variable cross-section well shaft type ground continuous wall base and its construction method
CN110700270B (en) Construction method for non-drainage earthwork excavation of ultra-deep foundation pit
CN103015430A (en) Long auger pressure filling steel reinforced cement-soil pile foundation pit water-resisting and supporting method
CN205804362U (en) The long screw auger drilling deposited pile constructing device of rock can be entered
CN114197455A (en) Construction method of building pile foundation
CN108316288A (en) Half casing guncreting pile construction equipment and construction method
CN211646351U (en) Cast-in-situ bored pile
CN211735404U (en) Anti-over-irrigation system for long spiral bored pile
CN112942341A (en) Construction method for implanting prefabricated pipe pile into complex geology
CN1020492C (en) Inclination-correcting method of inclined tower
CN209620111U (en) A kind of well construction that catchments of soft base hydraulic structure basement
CN113026763A (en) Soft plastic geological groove wall reinforcing method
CN207775868U (en) Diaphram wall
CN2172311Y (en) Earther taking apparatus for planting pile
CN1074805C (en) Foundation structure of hollow well digging and its practice
CN109653193A (en) Inversion underground continuous wall construction method
CN220813922U (en) Karst area deep basal pit falls drainage construction structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee