CN1078651C - Straightening method for inclined house on soft ground foundation - Google Patents

Straightening method for inclined house on soft ground foundation Download PDF

Info

Publication number
CN1078651C
CN1078651C CN96113492A CN96113492A CN1078651C CN 1078651 C CN1078651 C CN 1078651C CN 96113492 A CN96113492 A CN 96113492A CN 96113492 A CN96113492 A CN 96113492A CN 1078651 C CN1078651 C CN 1078651C
Authority
CN
China
Prior art keywords
correction
well point
building
settlement amount
amount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN96113492A
Other languages
Chinese (zh)
Other versions
CN1157873A (en
Inventor
林礼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN96113492A priority Critical patent/CN1078651C/en
Publication of CN1157873A publication Critical patent/CN1157873A/en
Application granted granted Critical
Publication of CN1078651C publication Critical patent/CN1078651C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The present invention relates to a correcting method for tilted houses on soft soil foundations, which is composed of a soil discharging quantity calculating step, a consolidating pile setting step, a deviation correcting well point drilling step, a forcibly discharged soil sedimentation step, a tamping filler backfilling step and a consolidating pile anchoring step. A foundation is reinforced firstly in the method before correction, bearing layers have shear transformation in correction, and steadying measures such as the backfill of deviation correcting well points, the anchoring process of consolidating piles, etc., are taken rapidly after correction; thus, the present invention has the characteristics of high correcting quality. In addition, soft soil in deep layers is extruded by the bearing layers in large areas in correction and has rapid rheology and creep deformation, and the method has high correcting speed.

Description

Antidote behind the inclined building on the soft foundation
The present invention relates to the antidote behind the inclined building on a kind of soft foundation.
It also is method at the correcting and then reinforcing behind the inclined building on the soft foundation that CN1058069A discloses a kind of, it is at the little sidetracking some of tilting building sedimentation and the suction eye of the degree of depth, take out the water that from the weak soil layer, is extruded out that accumulates in the hole with submersible pump repeatedly, make the weak soil of substrate fixed by densification, reach the sedimentation unanimity, stamp around then in the house and reinforce stake, make it that sedimentation no longer take place.Obviously, this method has been ignored 2 points: the one, and in the process of boring suction eye, ignored the big side of tilting building sedimentation and still continued sedimentation; The 2nd, ignored the influence of the bearing stratum under the basis (crust layer) to the correction process, in addition, adopt drainage to rectify a deviation, process is longer.
The objective of the invention is provides a kind of correction quality height, the antidote that straightening speed is fast for the tilting building on the soft foundation.
This method is made up of following steps:
One, a variety of causes of analysis-by-synthesis inclined building is measured tilt quantity, calculates the casting amount of correcting;
Two, in the big side of building settlement amount the reinforcing stake is set along position, the basic edge of a wing, be provided with along position, the basic edge of a wing in other little each side of building settlement amount then and reinforce stake, and the density of the reinforcing stake of the big side of building settlement amount is greater than the density of the reinforcing stake of other little each side of building settlement amount;
Three, in little each side of building settlement amount along edge of foundation, by the deep mixed correction well point of how much boring of casting amount, the density of correction well point should be enough to make bearing stratum to produce shear strain, and causes the deep layer weak soil to produce rheology and creep;
Four, from correction discharges of directly fetching earth the well point, force each little side group plinth of building settlement amount together with bearing stratum to the counter-rotation that tilts, the correction of multimetering simultaneously value, the casting amount of well point of respectively rectifying a deviation of adjustment at any time prevents the house torsional deformation;
Five, when the rectification degree reaches permissible value, stop the casting of holing immediately, and rapidly to each correction well point backfill filler, and the shake puddling is real, stops flowing and wriggling of deep layer weak soil.
Six, when the rectification degree value of touching the mark, with the reinforcing stake around the basis with basic anchoring.
The characteristics of above-mentioned antidote are:
One, at first ground has been taked reinforcement measure before the rectification, strengthened the bearing capacity of foundation, prevented the further inclination in house, made the big side of building settlement amount become the firm fulcrum of rectifying a deviation in rotating simultaneously.
Two, after the bearing stratum shear, house and basis are rotated with bearing stratum and corrected, and be little to the house quality influence, the correction quality height, and simultaneously, the deep layer weak soil is subjected to the large tracts of land extruding of bearing stratum, and stress increases, and causes mud rheology and creep rapid, and straightening speed is exceedingly fast.
Three, taked the measure of backfill correction well point after the rectification rapidly, can effectively prevent flowing and wriggling of deep layer weak soil, and preformed reinforcing stake, anchoring rapidly again, buffering inertia in the balance correcting process, therefore, this method is not only corrected soon, and can make the house promptly become stable at short notice.
Illustrate particular content of the present invention below in conjunction with drawings and Examples.
Fig. 1: the plan view of house, basis, reinforcing stake and correction well point;
Fig. 2: house east elevation figure;
Fig. 3: rectification rate of settling figure.
Embodiment is four floor rooms, brick mix structure, and steel bar concrete banding pattern basis, slope is 2.36% after measured, and tiltangle is 1.352 °, and vertical error is 295MM, and the terrace differential settlement is 207MM.
Calculate by following simplified formula according to step 1, rectification casting amount: V = A . B . Δ 2 2
In the formula: V-casting amount (M 3)
The long limit size (M) in A-basis
B-basis minor face size (M)
Δ 2-terrace differential settlement (M)
The A=29.85M of present embodiment
B=10.75M
Δ 2=0.207M
V=33.21M as calculated 3
According to step 2, along the distribution of the reinforcing stake 1 on the basic edge of a wing as shown in Figure 1, wherein the spud pile of the side that the building settlement amount is big at first is provided with, the reinforcing stake 1 of each side that the building settlement amount is little is provided with then, and the density of the reinforcing stake 1 of the big side of building settlement amount is greater than the density of the reinforcing stake 1 of each little side of building settlement amount.
According to step 3, along the distribution of the correction well point 2 of edge of foundation as shown in Figure 1, the little place of settling amount, the casting amount is then many, the degree of depth of correction well wants dark, is noted that the density of correction well point should be enough to make bearing stratum to produce shear strain, and causes the deep layer weak soil to produce rheology and creep.
According to step 4, adopt the casting of fetching earth of facility such as the people tries hard to recommend rig, total casting amount of each well point of rectifying a deviation is with less than 33M 3Come strict control for standard, must not exceed, the key of this step is a multimetering correction value, whether the correction value of observing each point is synchronous, as occur will in time adjusting position, the degree of depth and the casting speed of correction well point 2 unusually, make the house to the opposite direction normal rotation that tilts.
According to step 5, when the degree of correcting when the house reaches permissible value, should prevent flowing and wriggling of deep layer weak soil immediately, its measure is to stop the casting of holing, and rapidly to correction well point 2 backfill fillers, and the shake puddling is real, and this job requirement was assaulted in one hour and is finished.Best filler is the sand rubble of slag or 2: 1, and after the backfill, the house is corrected will enter the inertia phase buffer.
According to step 6, when the degree of correcting when the house reaches standard value, should prevent the rectification inertia in house immediately, its measure be with along the reinforcing stake 1 on the basic edge of a wing with basic anchoring.The method of anchoring is to pour into high-intensity concrete to reinforcing the gap location that stake 1 reserves between with the basis, also need mix in case of necessity and urge agent with fixed attention an amount of morning by force.
Fig. 3 has write down the correcting process of present embodiment, as shown in the figure, and from beginning drilling well forced landing, to finishing the casting task substantially, the about 18CM of settling amount, the time only needs five days, adds the inertia phase buffer, also only ten days time, straightening speed is very fast, and by inspection, the slope after the rectification only is 1.2 ‰, vertical error only is 15MM, less than standard value 38MM.

Claims (1)

1, the antidote behind the inclined building on a kind of soft foundation is characterized in that: be made up of following steps:
One, a variety of causes of analysis-by-synthesis inclined building is measured tilt quantity, calculates the casting amount of correcting;
Two, in the big side of building settlement amount reinforcing stake (1) is set along position, the basic edge of a wing, be provided with along position, the basic edge of a wing in other little each side of building settlement amount then and reinforce stake (1), and the density of the reinforcing stake (1) of the big side of building settlement amount is greater than the density of the reinforcing stake (1) of other little each side of building settlement amount;
Three, in little each side of building settlement amount along edge of foundation, by the deep mixed correction well point (2) of how much boring of casting amount, the density of correction well point (2) should be enough to make bearing stratum to produce shear strain, and causes the deep layer weak soil to produce rheology and creep;
Four, discharges of from correction well point (2), directly fetching earth, force each little side group plinth of building settlement amount together with bearing stratum to the counter-rotation that tilts, the correction of multimetering simultaneously value, the casting amount of well point (2) of respectively rectifying a deviation of adjustment at any time prevents the house torsional deformation;
Five, when the rectification degree reaches permissible value, stop the casting of holing immediately, and rapidly to each correction well point (2) backfill filler, and the shake puddling is real, stops flowing and wriggling of deep layer weak soil.
Six, when the rectification degree value of touching the mark, with the reinforcing stake (1) around the basis with basic anchoring.
CN96113492A 1996-12-31 1996-12-31 Straightening method for inclined house on soft ground foundation Expired - Fee Related CN1078651C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN96113492A CN1078651C (en) 1996-12-31 1996-12-31 Straightening method for inclined house on soft ground foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN96113492A CN1078651C (en) 1996-12-31 1996-12-31 Straightening method for inclined house on soft ground foundation

Publications (2)

Publication Number Publication Date
CN1157873A CN1157873A (en) 1997-08-27
CN1078651C true CN1078651C (en) 2002-01-30

Family

ID=5121878

Family Applications (1)

Application Number Title Priority Date Filing Date
CN96113492A Expired - Fee Related CN1078651C (en) 1996-12-31 1996-12-31 Straightening method for inclined house on soft ground foundation

Country Status (1)

Country Link
CN (1) CN1078651C (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101787717B (en) * 2010-03-13 2011-09-14 中铁西北科学研究院有限公司 Controllable accurate combined inclination correction method
CN102155021A (en) * 2011-05-10 2011-08-17 河北二十冶工程技术有限公司 Method for correcting open caisson in collapsible loess area
CN103161183B (en) * 2011-12-13 2015-08-19 河南省电力勘测设计院 Dry ash storehouse building lot reinforcement means
CN105178368B (en) * 2015-06-15 2017-03-08 山东建筑大学 Mini pile stake holes fetches earth building inclination rectification method
CN106320403A (en) * 2016-09-20 2017-01-11 武汉理工大学 Inclination rectification and reinforcement method for existing building
CN108396794B (en) * 2016-11-29 2020-01-17 叶香雄 Deviation rectifying method for building
CN107299650B (en) * 2017-07-12 2019-08-16 杭州圣基建筑特种工程有限公司 A kind of remote open caisson casting method for correcting error
CN108193723A (en) * 2017-12-29 2018-06-22 浙江省建筑设计研究院 A kind of subsidence control method based on building stress relief method rectification
CN109653187B (en) * 2018-12-25 2020-12-15 上海勘察设计研究院(集团)有限公司 Method for reducing uneven towing settlement of anchor rod static pressure pile
CN113373928B (en) * 2021-06-02 2022-08-26 国网湖北省电力有限公司襄阳供电公司 Immersion type reinforcing pile wetland installation device capable of correcting inclination

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU525781A1 (en) * 1974-05-23 1976-08-25 Магнитогорский горно-металлургический институт им. Г.И.Носова Method of adjusting the vertical position of a high-rise structure
SU787556A1 (en) * 1979-01-25 1980-12-15 Государственный Сибирский Зональный Проектный Научно-Исследовательский Институт По Проектированию Мельнично- Крупяных, Комбикормовых Предприятий И Элеваторно-Складского Хозяйства Method of levelling-out a structure
DE3827004A1 (en) * 1988-08-09 1990-02-15 Gkn Keller Gmbh Method and arrangement for compensating for settlement of the development at the surface, preferably inclined positions of buildings
DE4000647A1 (en) * 1990-01-11 1991-07-18 Kodron Rudolf S Dipl Ing Leaning tower straightening system - involves drilling boreholes under high side to promote sinkage to correct lean
CN1058069A (en) * 1991-06-26 1992-01-22 黄正轩 The method of correcting and then reinforcing inclined house
DE4027181A1 (en) * 1990-08-28 1992-03-05 Harald Weisz Building tilt correction method - involves forming small dia. horizontal chambers below foundation on opposite side

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU525781A1 (en) * 1974-05-23 1976-08-25 Магнитогорский горно-металлургический институт им. Г.И.Носова Method of adjusting the vertical position of a high-rise structure
SU787556A1 (en) * 1979-01-25 1980-12-15 Государственный Сибирский Зональный Проектный Научно-Исследовательский Институт По Проектированию Мельнично- Крупяных, Комбикормовых Предприятий И Элеваторно-Складского Хозяйства Method of levelling-out a structure
DE3827004A1 (en) * 1988-08-09 1990-02-15 Gkn Keller Gmbh Method and arrangement for compensating for settlement of the development at the surface, preferably inclined positions of buildings
DE4000647A1 (en) * 1990-01-11 1991-07-18 Kodron Rudolf S Dipl Ing Leaning tower straightening system - involves drilling boreholes under high side to promote sinkage to correct lean
DE4027181A1 (en) * 1990-08-28 1992-03-05 Harald Weisz Building tilt correction method - involves forming small dia. horizontal chambers below foundation on opposite side
CN1058069A (en) * 1991-06-26 1992-01-22 黄正轩 The method of correcting and then reinforcing inclined house

Also Published As

Publication number Publication date
CN1157873A (en) 1997-08-27

Similar Documents

Publication Publication Date Title
Burland et al. The stabilisation of the Leaning Tower of Pisa
CN1078651C (en) Straightening method for inclined house on soft ground foundation
JP5243669B1 (en) Method of tilting structure and improving ground
US6659692B1 (en) Apparatus and method for supporting a structure with a pier and helix
CN112267472A (en) Construction process for foundation pit support of inclined pile of advanced mixing pile
CN1078285C (en) Controlled construction method and apparatus for rectifying inclined building
CN111851543A (en) Long and narrow deep foundation pit construction cofferdam structure and use method thereof
US20070048095A1 (en) Supported Underpinning Piers
Ergun Deep excavations
CN111794102B (en) Sheet pile type anchorage structure and construction method thereof
JP5301059B1 (en) Method of tilting structure and improving ground
JP2858998B2 (en) Construction method of temporary supporting column for reverse driving method
Kempfert et al. Pile foundation
Santoyo et al. Geotechnical considerations for hardening the subsoil in Mexico City's Metropolitan Cathedral
CN109881723A (en) A kind of comprehensive controllable method for correcting error of anchor jacked pile
CN113863705B (en) Method for underpinning and reinforcing existing building based on static pressure jet grouting steel pipe pile and application device
CN214061633U (en) Protection structure for soil excavation sidewalk in soft soil area
CN214993745U (en) Be applicable to artifical hole digging pile foundation pile week slip casting and consolidate subassembly
CN114657987B (en) Construction method for inserting cement soil pile into steel pipe without shock sensation
CN219690535U (en) Interpolation precast pile TRD wall combines bracing formula IMS stirring stake foundation ditch combination supporting construction
CN211773974U (en) Building inclination correcting and sinking accelerating device
CN206591526U (en) A kind of super-huge karst dead zone embedded rock pile wall-attaching type backfill steel reinforced concrete dado structure
CN210621709U (en) Inclined support foundation pit supporting structure based on steel pipe pile and Larsen steel plate
Finno et al. Analysis and performance of the excavation for the Chicago-state subway renovation project and its effects on adjacent structure
KR20050012873A (en) Method of constructing cantilevered continuous walls for retaining earth and cutting off water ang method of constructing wall structures while performing soil improvement at the same time.(C.R.C.W.: Cantilevered retaining cutting wall)

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee