Summary of the invention
The technical problem to be solved in the present invention is to overcome existing defective, and a kind of simple and easy gas distribution pipe and using method thereof of simple and easy, easy to operate processing organic waste is provided.
In order to solve the problems of the technologies described above, the invention provides following technical scheme:
A kind of simple and easy gas distribution pipe of handling organic waste, described gas distribution pipe is provided with a plurality of ventilation holes, the end sealing of gas distribution pipe, the other end is a ring flange; Be provided with outside the tube wall of described gas distribution pipe near ring flange and pull hook.
Further, the material of described gas distribution pipe is metal or PVC; The pipeline of described gas distribution pipe is a round shape; The aperture of described ventilation hole is 0.5-1.5cm.
Further, the aperture of described ventilation hole is 1cm.
A kind of using method of handling the simple and easy gas distribution pipe of organic waste may further comprise the steps:
(1) above-mentioned gas distribution pipe is placed on the place;
(2) with organic waste be deposited on the gas distribution pipe after filler mixes than 10:1-6 by weight, stacking highly be 0.5-2 rice, and is inserted with thermometer on the heap body, body 50cm is piled in the thermometer insertion, places 8-48 hour;
(3) ring flange is connected with blower outlet, the intermittently starting gas blower ventilates to the heap body by gas distribution pipe, and the timed interval of intermittently starting is 0.5-2 hour, and each ventilation time is 10-30 minute, and ventilation pressure is 2kpa-9.8kpa;
(4) wait to ferment when afterwards temperature drops to below 35 ℃, gas distribution pipe is connected disconnection with gas blower, gas distribution pipe is pulled out the heap body by hook.
Further, described organic waste is 10:3 with filler weight part ratio; Described height is 1 meter, places 24 hours; The timed interval of described intermittently starting is 1 hour, and each ventilation time is 20 minutes, and ventilation pressure is 5kpa; Described temperature drops to 35 ℃.
Further, described organic waste is feces of livestock and poultry, municipal sludge, domestic refuse.Described filler is straw, rice chaff, wheat bran, Chinese medicine slag.Use an above gas distribution pipe in the described heap body simultaneously.
Further, use two above gas distribution pipes in the described heap body simultaneously, adjacent gas distribution pipe is parallel, and spacing is 80-120cm.
Distribution device of the present invention is simple and easy, and using method is simple.Use equipment is few, does not need special-purpose place, and floor space is little, is convenient to operation, and is good to organic castoff compost fermentation result of use, can produce the local processing of organic waste.Be applicable to middle-size and small-size livestock and poultry farm, small sewage treatment plant etc.
Embodiment
Below in conjunction with accompanying drawing the preferred embodiments of the present invention are described, should be appreciated that preferred embodiment described herein only is used for description and interpretation the present invention, and be not used in qualification the present invention.
Embodiment 1
A kind of simple and easy gas distribution pipe of handling organic waste, described gas distribution pipe is provided with a plurality of ventilation holes, the end sealing of gas distribution pipe, the other end is a ring flange; Gas distribution pipe is provided with the hook that is used to pull near the tube wall outside of ring flange.The material of gas distribution pipe is a metal, and the pipeline of described gas distribution pipe is a round shape.The aperture of ventilation hole is 0.5cm.
A kind of using method of handling the simple and easy gas distribution pipe of organic waste may further comprise the steps:
(1) on the place that an above-mentioned gas distribution pipe is laid;
(2) with feces of livestock and poultry be deposited on the gas distribution pipe after straw mixes than 10:1 by weight, stack and highly be 0.5 meter, and on the heap body, be inserted with thermometer, thermometer inserts piles body 50cm, places 8 hours;
(3) ring flange is connected with blower outlet, the intermittently starting gas blower ventilates to the heap body by gas distribution pipe, and the timed interval of intermittently starting is 0.5 hour, and each ventilation time is 10 minutes, and ventilation pressure is 2kpa, ferments;
(4) after the fermentation beginning, the thermometer registration rises earlier and afterwards descends, and when treating that leavening temperature drops to 35 ℃, gas distribution pipe is connected disconnection with gas blower, by hook gas distribution pipe is pulled out the heap body, and the material that composting is good promptly can use.
Embodiment 2
A kind of simple and easy gas distribution pipe of handling organic waste, described gas distribution pipe is provided with a plurality of ventilation holes, the end sealing of gas distribution pipe, the other end is a ring flange; Gas distribution pipe is provided with the hook that is used to pull near the tube wall outside of ring flange.The material of gas distribution pipe is a metal, and the pipeline of described gas distribution pipe is a round shape.The aperture of ventilation hole is 1cm.
A kind of using method of handling the simple and easy gas distribution pipe of organic waste may further comprise the steps:
(1) on the place that two above-mentioned gas distribution pipes are laid, adjacent gas distribution pipe is parallel, and spacing is 80cm;
(2) with municipal sludge be deposited on the gas distribution pipe after rice chaff is mixed than 10:3 by weight, stack and highly be 1 meter, and on the heap body, be inserted with thermometer, thermometer inserts piles body 50cm, places 24 hours;
(3) ring flange is connected with blower outlet, the intermittently starting gas blower ventilates to the heap body by gas distribution pipe, and the timed interval of intermittently starting is 1 hour, and each ventilation time is 20 minutes, and ventilation pressure is 5kpa, ferments;
(4) after the fermentation beginning, the thermometer registration rises earlier and afterwards descends, and when treating that leavening temperature drops to 35 ℃, gas distribution pipe is connected disconnection with gas blower, by hook gas distribution pipe is pulled out the heap body, and the material that composting is good promptly can use.
Embodiment 3
A kind of simple and easy gas distribution pipe of handling organic waste, described gas distribution pipe is provided with a plurality of ventilation holes, the end sealing of gas distribution pipe, the other end is a ring flange; Gas distribution pipe is provided with the hook that is used to pull near the tube wall outside of ring flange.The material of gas distribution pipe is PVC, and the pipeline of described gas distribution pipe is a round shape.The aperture of ventilation hole is 1cm.
A kind of using method of handling the simple and easy gas distribution pipe of organic waste may further comprise the steps:
(1) on the place that three above-mentioned gas distribution pipes are laid, adjacent gas distribution pipe is parallel, and spacing is 100cm;
(2) with municipal sludge be deposited on the gas distribution pipe after wheat bran mixes than 10:4 by weight, stack and highly be 1.5 meters, and on the heap body, be inserted with thermometer, thermometer inserts piles body 50cm, places 32 hours;
(3) ring flange is connected with blower outlet, the intermittently starting gas blower ventilates to the heap body by gas distribution pipe, and the timed interval of intermittently starting is 1 hour, and each ventilation time is 20 minutes, and ventilation pressure is 5kpa, ferments;
(4) after the fermentation beginning, the thermometer registration rises earlier and afterwards descends, and when treating that leavening temperature drops to 30 ℃, gas distribution pipe is connected disconnection with gas blower, by hook gas distribution pipe is pulled out the heap body, and the material that composting is good promptly can use.
Embodiment 4
A kind of simple and easy gas distribution pipe of handling organic waste, described gas distribution pipe is provided with a plurality of ventilation holes, the end sealing of gas distribution pipe, the other end is a ring flange; Gas distribution pipe is provided with the hook that is used to pull near the tube wall outside of ring flange.The material of gas distribution pipe is PVC, and the pipeline of described gas distribution pipe is a round shape.The aperture of ventilation hole is 1.5cm.
A kind of using method of handling the simple and easy gas distribution pipe of organic waste may further comprise the steps:
(1) on the place that three gas distribution pipes are laid, adjacent gas distribution pipe is parallel, and spacing is 120cm;
(2) with domestic refuse be deposited on the gas distribution pipe after Chinese medicine slag mixes than 10:6 by weight, stack and highly be 2 meters, and on the heap body, be inserted with thermometer, thermometer inserts piles body 50cm, places 48 hours;
(3) ring flange is connected with blower outlet, the intermittently starting gas blower ventilates to the heap body by gas distribution pipe, and the timed interval of intermittently starting is 2 hours, and each ventilation time is 30 minutes, and ventilation pressure is 9.8kpa, ferments;
(4) after the fermentation beginning, the thermometer registration rises earlier and afterwards descends, and when treating that leavening temperature drops to 25 ℃, gas distribution pipe is connected disconnection with gas blower, by hook gas distribution pipe is pulled out the heap body, and the material that composting is good promptly can use.
It should be noted that at last: the above only is the preferred embodiments of the present invention, be not limited to the present invention, although the present invention is had been described in detail with reference to previous embodiment, for a person skilled in the art, it still can be made amendment to the technical scheme that aforementioned each embodiment put down in writing, and perhaps part technical characterictic wherein is equal to replacement.Within the spirit and principles in the present invention all, any modification of being done, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.