CN102174927A - 海上风力发电机组及其安装方法 - Google Patents

海上风力发电机组及其安装方法 Download PDF

Info

Publication number
CN102174927A
CN102174927A CN2011100626562A CN201110062656A CN102174927A CN 102174927 A CN102174927 A CN 102174927A CN 2011100626562 A CN2011100626562 A CN 2011100626562A CN 201110062656 A CN201110062656 A CN 201110062656A CN 102174927 A CN102174927 A CN 102174927A
Authority
CN
China
Prior art keywords
cabin
tower tube
installation
tower cylinder
wind generating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011100626562A
Other languages
English (en)
Inventor
康周俊
陈杰
李飞
姚强
张俊蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG SHENGDONG WATERWAY ENGINEERING Co Ltd
Original Assignee
NANTONG SHENGDONG WATERWAY ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG SHENGDONG WATERWAY ENGINEERING Co Ltd filed Critical NANTONG SHENGDONG WATERWAY ENGINEERING Co Ltd
Priority to CN2011100626562A priority Critical patent/CN102174927A/zh
Publication of CN102174927A publication Critical patent/CN102174927A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Wind Motors (AREA)

Abstract

本发明公开了一种海上风力发电机组及其安装方法,包括塔筒,塔筒一般为3节;在塔筒的最上端装置有机舱,机舱的前面装置有风叶。其安装方法的步骤为:安装平台上事先装好第一节塔筒、安装好轮毂风叶、辅助安装架;在第一节塔筒上安装第二节塔筒;在辅助安装架上安装机舱;第二节上塔筒上安装第三节塔筒;在机舱的前端安装整组轮毂风叶;把第一、二、三节塔筒总成吊到指定风场的基座上;将安装好的机舱、轮毂风叶一起吊到已安装好的塔筒的最上方安装。本发明方案设计合理更有利于节省安装时间,由于在安装平台上把整组风电机组分成两大安装流程同时进行,减少了海上吊装的时间,大大提高了海上风电安装的效率。

Description

海上风力发电机组及其安装方法
技术领域
本发明涉及一种海上风力发电机组及其安装方法,属于机电一体化的安装技术领域。
背景技术
目前的海上风力发电机组的安装方法还使用传统的简单的安装方法,即在安装地点把各部组件一件一件的按顺序安装,此种安装方法要花费较长的时间及增加在海上风电塔筒上的作业难度,因为没有采用科学的一体安装方法,每次的安装均要耗费大量的人力、物力、财力且历时较长,在风电安装过程中也存在着诸多的不便。
发明内容
本发明的目的是提供一种海上风力发电机组及其安装方法以解决上述问题中的不足之处。
为了解决以上技术问题,本发明所采用的技术方案是:一种海上风力发电机组,包括塔筒,所述塔筒为3节;在塔筒的最上端装置有机舱,机舱的前面装置有风叶。
一种海上风力发电机组的安装方法,其安装方法的步骤为:
(1)、安装平台上事先装好第一节塔筒、安装好轮毂风叶、辅助安装架;
(2)、在第一节塔筒上安装第二节塔筒;
(3)、在辅助安装架上安装机舱;
(4)、第二节上塔筒上安装第三节塔筒;
(5).在机舱的前端安装整组轮毂风叶;
(6).把第一、二、三节塔筒总成吊到指定风场的基座8上;
(7)、将安装好的机舱、轮毂风叶一起吊到已安装好的塔筒的最上方安装。
以上各部件的组成及安装顺序在安装平台上把整组风电机组分为两大安装流程同时进行,减少了海上吊装的时间,大大提高了海上风电安装的效率。本发明方案设计合理更有利于节省安装时间,由于在安装平台上把整组风电机组分成两大安装流程同时进行,减少了海上吊装的时间,大大提高了海上风电安装的效率。
附图说明
图1是工作平台上事先装好第一节塔筒、辅助安装架、安装好风叶程序示意图。
图2是在第一节塔筒上安装第二节塔的筒示意图。
图3是在安装架上安装机舱示意图(与图2同时进行)。
图4是在第二节塔筒上安装第三节塔筒的示意图。
图5是在机舱前端安装整组风叶示意图(与图4同时进行)。
图6是把第一、二、三节塔筒总成吊到指定风场的基座安装示意图。
图7是本发明的组成示意图及将安装好的机舱风叶一起吊到已安装好的塔筒上的示意图。
具体实施方式
如图1至图7所示:
海上风力发电机组,塔筒为3节(可根据节数不同调整);在塔筒的最上端装置有机舱6,机舱的前面装置有轮毂风叶1。
海上风力发电机组的安装方法,其步骤为:
1、安装平台2上事先装好第一节塔筒3、安装好轮毂风叶1、辅助安装架7;
2、在第一节塔筒3上安装第二节塔筒4;
3、在辅助安装架7上安装机舱6(与步骤2同时进行);
4、第二节上塔筒4上安装第三节塔筒5;
5.在机舱6的前端安装整组轮毂风叶1(与步骤4同步进行);
6.把第一、二、三节塔筒3、4、5总成吊到指定风场的基座8上;
7、将安装好的机舱6、轮毂风叶1一起吊到已安装好的塔筒的最上方安装。
至此本风电安装完毕,安装过程中可以采用其他一些合适的辅助手段。

Claims (2)

1.一种海上风力发电机组,包括塔筒,其特征在于:所述塔筒为3节;在塔筒的最上端装置有机舱,机舱的前面装置有风叶。
2.一种海上风力发电机组的安装方法,其特征在于:所述安装方法其步骤为:
(1)、安装平台上事先装好第一节塔筒、安装好轮毂风叶、辅助安装架;
(2)、在第一节塔筒上安装第二节塔筒;
(3)、在辅助安装架上安装机舱;
(4)、第二节上塔筒上安装第三节塔筒;
(5).在机舱的前端安装整组轮毂风叶;
(6).把第一、二、三节塔筒总成吊到指定风场的基座上;
(7)、将安装好的机舱、轮毂风叶一起吊到已安装好的塔筒的最上方安装。
CN2011100626562A 2011-03-16 2011-03-16 海上风力发电机组及其安装方法 Pending CN102174927A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100626562A CN102174927A (zh) 2011-03-16 2011-03-16 海上风力发电机组及其安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100626562A CN102174927A (zh) 2011-03-16 2011-03-16 海上风力发电机组及其安装方法

Publications (1)

Publication Number Publication Date
CN102174927A true CN102174927A (zh) 2011-09-07

Family

ID=44518143

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100626562A Pending CN102174927A (zh) 2011-03-16 2011-03-16 海上风力发电机组及其安装方法

Country Status (1)

Country Link
CN (1) CN102174927A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102536688A (zh) * 2012-02-14 2012-07-04 江苏海上龙源风力发电有限公司 海上风力机组的兔耳式装配与安装工艺
CN106499590A (zh) * 2016-12-14 2017-03-15 广东明阳风电产业集团有限公司 一种超紧凑两叶片风力发电机组的海上吊装方法
CN107035623A (zh) * 2017-04-26 2017-08-11 中国二十二冶集团有限公司 超高风机塔筒吊装过程中涡激振动抑制方法
CN107044385A (zh) * 2017-04-26 2017-08-15 北京唐浩电力工程技术研究有限公司 一种风机塔筒抗涡激振动减震的安装方法
TWI662186B (zh) * 2015-11-06 2019-06-11 日商日立製作所股份有限公司 Construction method of offshore windmill, offshore windmill and offshore wind power generation equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050134050A1 (en) * 2003-12-18 2005-06-23 Salls Darwin A.Jr. Offshore energy platform
CN101749201A (zh) * 2008-12-02 2010-06-23 通用电气公司 具有改进型塔架的风力涡轮机及其组装方法
CN201615033U (zh) * 2010-01-29 2010-10-27 中交第三航务工程局有限公司 海上风力发电机组柔性安装系统
WO2010117289A9 (en) * 2009-04-07 2010-12-16 Carlos Manuel Chastre Rodrigues Truss tower

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050134050A1 (en) * 2003-12-18 2005-06-23 Salls Darwin A.Jr. Offshore energy platform
CN101749201A (zh) * 2008-12-02 2010-06-23 通用电气公司 具有改进型塔架的风力涡轮机及其组装方法
WO2010117289A9 (en) * 2009-04-07 2010-12-16 Carlos Manuel Chastre Rodrigues Truss tower
CN201615033U (zh) * 2010-01-29 2010-10-27 中交第三航务工程局有限公司 海上风力发电机组柔性安装系统

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102536688A (zh) * 2012-02-14 2012-07-04 江苏海上龙源风力发电有限公司 海上风力机组的兔耳式装配与安装工艺
TWI662186B (zh) * 2015-11-06 2019-06-11 日商日立製作所股份有限公司 Construction method of offshore windmill, offshore windmill and offshore wind power generation equipment
CN106499590A (zh) * 2016-12-14 2017-03-15 广东明阳风电产业集团有限公司 一种超紧凑两叶片风力发电机组的海上吊装方法
CN106499590B (zh) * 2016-12-14 2019-01-22 明阳智慧能源集团股份公司 一种超紧凑两叶片风力发电机组的海上吊装方法
CN107035623A (zh) * 2017-04-26 2017-08-11 中国二十二冶集团有限公司 超高风机塔筒吊装过程中涡激振动抑制方法
CN107044385A (zh) * 2017-04-26 2017-08-15 北京唐浩电力工程技术研究有限公司 一种风机塔筒抗涡激振动减震的安装方法

Similar Documents

Publication Publication Date Title
CN102174927A (zh) 海上风力发电机组及其安装方法
CN205001124U (zh) 一种风力发电装置
CN103133267B (zh) 风力发电机组的叶片更换方法及叶片更换辅助系统
CN102661249A (zh) 一种小型风力发电机自动升降杆
CN202007741U (zh) 海上风力发电机组
CN102889179A (zh) 一种垂直轴风力发电装置
CN206517255U (zh) 一种立式水轮发电机转子安装检修装置
CN202878153U (zh) 风力发电机导流罩工装架
CN103640986B (zh) 风力发电塔附着式鹤咀吊
CN201916128U (zh) 一种新型垂直轴风力发电装置
CN204984746U (zh) 自升式塔架维护平台
CN204675721U (zh) 一种新型的风电机组轮毂内起吊装置
CN202783216U (zh) 高速动车组厨房顶板及设备的安装梁结构
CN205955929U (zh) 一种1.5mw 风力发电机组机舱座
CN202746109U (zh) 一种垂直轴风力发电装置
CN205001121U (zh) 一种风力发电机中利用超越离合器传递扭矩的风轮结构
CN205955920U (zh) 一种便于维护的风力发电机组后机架
CN219509756U (zh) 一种基于多个导向单元的更换风力发电机叶片的装备
CN201769038U (zh) 一种双馈风力发电机集电环的拆装工具
CN202483795U (zh) 风力发电机升降装置
CN105134512B (zh) 一种风机专用的附着垫环
CN202926532U (zh) 一种小型风力发电机自动升降杆
CN102465840A (zh) 一种风力发电机
CN106224178A (zh) 一种1.5mw 风力发电机组机舱座
CN202402223U (zh) 一种兆瓦级风力发电机组轮毂检修结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 226018 Jiangsu province Nantong City Chongchuan District South Century City 17 building 23 layer

Applicant after: Nantong Shengdong Marine Engnieering Co., Ltd.

Address before: 226000 Jiangsu province Nantong City Chongchuan District South Century City 17 building 23 layer

Applicant before: Nantong Shengdong Waterway Engineering Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: NANTONG SHENGDONG NAVIGATION ENGINEERING CO., LTD. TO: NANTONG SHENGDONG OFFSHORE ENGINEERING CO., LTD.

DD01 Delivery of document by public notice

Addressee: Nantong Shengdong Marine Engnieering Co., Ltd.

Document name: Notification that Application Deemed to be Withdrawn

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110907