CN202007741U - 海上风力发电机组 - Google Patents

海上风力发电机组 Download PDF

Info

Publication number
CN202007741U
CN202007741U CN2011200684900U CN201120068490U CN202007741U CN 202007741 U CN202007741 U CN 202007741U CN 2011200684900 U CN2011200684900 U CN 2011200684900U CN 201120068490 U CN201120068490 U CN 201120068490U CN 202007741 U CN202007741 U CN 202007741U
Authority
CN
China
Prior art keywords
wind generating
offshore wind
generating set
tower tube
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200684900U
Other languages
English (en)
Inventor
康周俊
陈杰
李飞
姚强
张俊蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Shengdong Marine Engnieering Co., Ltd.
Original Assignee
NANTONG SHENGDONG WATERWAY ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG SHENGDONG WATERWAY ENGINEERING Co Ltd filed Critical NANTONG SHENGDONG WATERWAY ENGINEERING Co Ltd
Priority to CN2011200684900U priority Critical patent/CN202007741U/zh
Application granted granted Critical
Publication of CN202007741U publication Critical patent/CN202007741U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Abstract

本实用新型公开了一种海上风力发电机组,包括塔筒,塔筒为3节;在塔筒的最上端装置有机舱,机舱的前面装置有风叶。本实用新型方案设计合理更有利于节省安装时间,可以实现各个部件的迅速组装,由于在安装平台上可以把整组风电机组分成两大部件同时进行,减少了海上吊装的时间,大大提高了海上风电安装的效率。

Description

海上风力发电机组
技术领域
本实用新型涉及一种海上风力发电机组,属于机电一体化的设备技术领域。
背景技术
目前的海上风力发电机组的安装方法还使用传统的简单的安装方法,即在安装地点把各部组件一件一件的按顺序安装,此种安装方法要花费较长的时间及增加在海上风电塔筒上的作业难度,因为没有采用科学的一体安装方法,每次的安装均要耗费大量的人力、物力、财力且历时较长,在风电安装过程中也存在着诸多的不便。上述安装的不便需要对传统的风力发电机组进行改进,以利于实现迅速安装。
实用新型内容
本实用新型的目的是提供一种海上风力发电机组以解决上述问题中传统的风力发电机组不利于迅速安装的问题。
为了解决以上技术问题,本实用新型所采用的技术方案是:一种海上风力发电机组,包括塔筒,所述塔筒为3节;在塔筒的最上端装置有机舱,机舱的前面装置有风叶。
一种海上风力发电机组的安装方法,其安装方法的步骤为:
(1)、安装平台上事先装好第一节塔筒、安装好轮毂风叶、辅助安装架;
(2)、在第一节塔筒上安装第二节塔筒;
(3)、在辅助安装架上安装机舱(与步骤2同时进行);
(4)、第二节上塔筒上安装第三节塔筒;
(5).在机舱的前端安装整组轮毂风叶(与步骤4同步进行);
(6).把第一、二、三节塔筒总成吊到指定风场的基座8上;
(7)、将安装好的机舱、轮毂风叶一起吊到已安装好的塔筒的最上方安装。
以上各部件的组成及安装顺序在安装平台上把整组风电机组分为两大安装流程同时进行,减少了海上吊装的时间,大大提高了海上风电安装的效率。本实用新型方案设计合理更有利于节省安装时间,可以实现各个部件的迅速组装,由于在安装平台上把整组风电机组分成两大部件同时进行,减少了海上吊装的时间,大大提高了海上风电安装的效率。
附图说明
图1是工作平台上事先装好第一节塔筒、辅助安装架、安装好风叶程序示意图。
图2是在第一节塔筒上安装第二节塔的筒示意图。
图3是在安装架上安装机舱示意图(与图2同时进行)。
图4是在第二节塔筒上安装第三节塔筒的示意图。
图5是在机舱前端安装整组风叶示意图(与图4同时进行)。
图6是把第一、二、三节塔筒总成吊到指定风场的基座安装示意图。
图7是本实用新型的组成示意图及将安装好的机舱风叶一起吊到已安装好的塔筒上的示意图。
具体实施方式
如图1至图7所示:
海上风力发电机组,塔筒为3节(可根据节数不同调整);在塔筒的最上端装置有机舱6,机舱的前面装置有轮毂风叶1。根据不同的需要配置的多节塔筒及其他部件可以进行迅速的安装。
海上风力发电机组的安装方法,其步骤为:
1、安装平台2上事先装好第一节塔筒3、安装好轮毂风叶1、辅助安装架7;
2、在第一节塔筒3上安装第二节塔筒4;
3、在辅助安装架7上安装机舱6(与步骤2同时进行);
4、第二节上塔筒4上安装第三节塔筒5;
5.在机舱6的前端安装整组轮毂风叶1(与步骤4同步进行);
6.把第一、二、三节塔筒3、4、5总成吊到指定风场的基座8上;
7、将安装好的机舱6、轮毂风叶1一起吊到已安装好的塔筒的最上方安装。
至此本风电安装完毕,安装过程中可以采用其他一些合适的辅助手段。

Claims (1)

1.一种海上风力发电机组,包括塔筒,其特征在于:所述塔筒为3节;在塔筒的最上端装置有机舱,机舱的前面装置有风叶。
CN2011200684900U 2011-03-16 2011-03-16 海上风力发电机组 Expired - Fee Related CN202007741U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200684900U CN202007741U (zh) 2011-03-16 2011-03-16 海上风力发电机组

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200684900U CN202007741U (zh) 2011-03-16 2011-03-16 海上风力发电机组

Publications (1)

Publication Number Publication Date
CN202007741U true CN202007741U (zh) 2011-10-12

Family

ID=44749398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200684900U Expired - Fee Related CN202007741U (zh) 2011-03-16 2011-03-16 海上风力发电机组

Country Status (1)

Country Link
CN (1) CN202007741U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102787988A (zh) * 2012-07-05 2012-11-21 广东明阳风电产业集团有限公司 一种海上风力发电机组安装方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102787988A (zh) * 2012-07-05 2012-11-21 广东明阳风电产业集团有限公司 一种海上风力发电机组安装方法

Similar Documents

Publication Publication Date Title
CN202531352U (zh) 一种导流型垂直轴风力机
CN102174927A (zh) 海上风力发电机组及其安装方法
CN103133267B (zh) 风力发电机组的叶片更换方法及叶片更换辅助系统
CN205369291U (zh) 一种大功率海上风力发电机组单桩基础集成式附件机构
CN202007741U (zh) 海上风力发电机组
CN201206530Y (zh) 高效风能发电装置
CN202360301U (zh) 一种用于冷却塔的发电装置
CN102889179A (zh) 一种垂直轴风力发电装置
CN202878153U (zh) 风力发电机导流罩工装架
CN201851283U (zh) 一种多点多级风力发电机
CN102242688B (zh) 大功率风力发电机及实施大功率风力发电机的风力发电塔
CN204984746U (zh) 自升式塔架维护平台
CN204675721U (zh) 一种新型的风电机组轮毂内起吊装置
CN205955929U (zh) 一种1.5mw 风力发电机组机舱座
CN203035463U (zh) 变桨系统零部件的维护更换装置及风力发电机组
CN202746109U (zh) 一种垂直轴风力发电装置
CN205001121U (zh) 一种风力发电机中利用超越离合器传递扭矩的风轮结构
CN102003343B (zh) 一种高空风力发电场系统及其实现方法
CN202402223U (zh) 一种兆瓦级风力发电机组轮毂检修结构
CN206368773U (zh) 蜂窝风力发电站
CN205955920U (zh) 一种便于维护的风力发电机组后机架
CN1749560A (zh) 集风电场
CN205937004U (zh) 一种1.5mw风力发电机组机舱座的冷却导流结构
CN201705563U (zh) 可独立拆卸的海上风力发电机组
CN203685471U (zh) 一种用于风力发电的风叶

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: NANTONG SHENGDONG OFFSHORE ENGINEERING CO., LTD.

Free format text: FORMER NAME: NANTONG SHENGDONG NAVIGATION ENGINEERING CO., LTD.

CP03 Change of name, title or address

Address after: 226018 Jiangsu province Nantong City Chongchuan District South Century City 17 building 23 layer

Patentee after: Nantong Shengdong Marine Engnieering Co., Ltd.

Address before: 226000 Jiangsu province Nantong City Chongchuan District South Century City 17 building 23 layer

Patentee before: Nantong Shengdong Waterway Engineering Co., Ltd.

DD01 Delivery of document by public notice

Addressee: Nantong Shengdong Marine Engnieering Co., Ltd.

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice

Addressee: Nantong Shengdong Marine Engnieering Co., Ltd.

Document name: Notification of Termination of Patent Right

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111012

Termination date: 20150316

EXPY Termination of patent right or utility model