CN102071684A - 现浇混凝土成型基础桩的施工方法 - Google Patents

现浇混凝土成型基础桩的施工方法 Download PDF

Info

Publication number
CN102071684A
CN102071684A CN 201110022793 CN201110022793A CN102071684A CN 102071684 A CN102071684 A CN 102071684A CN 201110022793 CN201110022793 CN 201110022793 CN 201110022793 A CN201110022793 A CN 201110022793A CN 102071684 A CN102071684 A CN 102071684A
Authority
CN
China
Prior art keywords
hollow sleeve
reinforcing cage
pile
concrete
vibration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201110022793
Other languages
English (en)
Other versions
CN102071684B (zh
Inventor
徐醒华
徐情根
刘淑芬
金永革
游永康
谢志华
刘毓胄
何志培
李冠华
邓锦波
万淑芬
陈玉连
徐浩原
区栋良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Hengchang Construction Engineering Co ltd
Original Assignee
DONGGUAN HUAYE CIVIL FOUNDATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DONGGUAN HUAYE CIVIL FOUNDATION ENGINEERING Co Ltd filed Critical DONGGUAN HUAYE CIVIL FOUNDATION ENGINEERING Co Ltd
Priority to CN2011100227933A priority Critical patent/CN102071684B/zh
Publication of CN102071684A publication Critical patent/CN102071684A/zh
Application granted granted Critical
Publication of CN102071684B publication Critical patent/CN102071684B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明涉及一种现浇混凝土成型基础桩的施工方法,将带有包边桩尖的中空套管压入地下完成压桩工程,该包边桩尖顶端固定有连接网;将钢筋笼插入中空套管中,使钢筋笼底部的卡勾卡住连接网的网孔,防止钢筋笼上浮移位;将振动拔桩机安置于中空套管上,并向中空套管中灌入混凝土,同时启动振动拔桩机带动中空套管一起振动,从而振实中空套管内混凝土,使混凝土与网筋笼得以有效结合;在灌完混凝土后,振动拔桩机启动侧向间歇性振动,以振松中空套管外侧土壤,并同时由振动拔桩机向上将中空套管从地下拔出即成型桩;在拔出中空套管的过程中,由于钢筋笼底端的卡勾是与连接网的网孔预先卡住,可减少钢筋笼移位。本发明施工简便,成本低,工程质量高。

Description

现浇混凝土成型基础桩的施工方法
技术领域
本发明涉及土木建筑工程基础桩的施工方法,尤其是指一种现浇混凝土成型基础桩的施工方法。
背景技术
如中国专利授权公告CN100387787C所公开一种现浇混凝土桩的施工方法,先将带桩尖的外管采用振动法或静压法或锤击法打入地下,取出外管内的土后将钢筋笼置入外管内并用混凝土灌满开口桩尖的内腔,再将内芯置入外管内,用振动器置入内芯与钢筋笼间,并逐步将混凝土注入由内芯和外管构成的空间内,当混凝土注入一段高度时,多次起动振动器振动设定的时间而振实混凝土,再于外力的作用下静拔外管上移即可;然而现有技术存在如下缺失:第一、采用内芯与钢筋笼配合,施工繁琐,成本高;第二、在向上拔出外管时,钢筋笼容易上浮移位,造成管桩质量达不到要求;第三、振动器设置于内芯与钢筋笼之间,虽然可以振实混凝土,但由于外管外侧的土壤应力无法克制,强行拔出外管仍然会存在混凝土桩断裂之现象。
发明内容
本发明主要目的在于提供一种现浇混凝土成型基础桩的施工方法,其施工简便,且易于拔桩,并在拔桩时减少钢筋笼移位,保证成型桩的工程质量。
为实现上述之目的,本发明采取如下技术方案:
一种现浇混凝土成型基础桩的施工方法,将带有包边桩尖的中空套管压入地下完成压桩工程,该包边桩尖顶端固定有连接网,该连接网至少有一部分网孔位于中空套管底端;将钢筋笼插入中空套管中,该钢筋笼底部具有卡勾,使钢筋笼底部的卡勾卡住连接网的网孔,防止钢筋笼上浮移位;将振动拔桩机安置于中空套管上,并向中空套管中灌入混凝土,同时启动振动拔桩机带动中空套管一起振动,从而振实中空套管内混凝土,并与网筋笼得以有效结合;灌完混凝土后,振动拔桩机启动侧向间歇性振动,以振松中空套管外侧土壤,并同时由振动拔桩机向上将中空套管从地下拔出即成型桩。
进一步,拔桩过程中,通过振动拔桩机将中空套管间隔多次拔出,每拔出一次间隔下压一次直至拔出为止,每次下压的距离是上一次拔出距离的一半。
进一步,所述桩尖与连接网是通过焊接固定,钢筋网笼的卡勾具有卡住网孔的倒刺。
进一步,所述包边桩尖顶部周缘具有包边,中空套管底端套于该包边内。
本发明优点在于:对中空套管外侧采用侧向间歇性振动,以便有效地拔出中空套管,并且在拔出中空套管的过程中,由于钢筋笼底端的卡勾是与连接网的网孔预先卡住,可减少钢筋笼移位;而包边桩尖的包边套于中空套管外且不用固接,如此可充分利用管桩与土(岩)存在收缩恢复的时间差的时效性,减少中空套管上拔时与土(岩)的摩擦力而便于拔中空套管。本发明施工简便,成本低,工程质量高。
附图说明
图1是本发明之施工方法框图;
图2是本发明之施工过程中的结构示意图;
图3是本发明之连接网结构示意图。
具体实施方式
下面结合附图与具体实施方式对本发明作进一步描述。
请参阅图1至图3所示,一种现浇混凝土成型基础桩的施工方法,其中,包括下述步骤:
1、压桩:将带有包边桩尖11的中空套管10压入地下完成压桩工程,该包边桩尖11顶端固定有连接网20,其可通过焊接方式进行固定;该连接网20至少有一部分网孔21位于中空套管10底端,便于钢筋笼30伸入中空套管10内方便与连接网20对接;所述包边桩尖11顶部周缘具有包边111,中空套管10底端仅是套于该包边111内且不用固接,也就是指包边111直径比中空套管10直径大一点且不用连接,如此可充分利用管桩与土(岩)存在收缩恢复的时间差的时效性,减少中空套管10上拔时与土(岩)的摩擦力而便于后续拔中空套管。
2、安装钢筋笼30:将钢筋笼30插入中空套管10中,该钢筋笼30底部伸出有卡勾31,使钢筋笼30底部的卡勾31卡住连接网20的网孔21,防止钢筋笼30上浮移位。为使钢筋笼30稳固卡住网孔21,该卡勾31上具有卡住网孔的倒刺。
3、灌混凝土:将振动拔桩机40安置于中空套管10上,并向中空套管10中灌入混凝土40,同时启动振动拔桩机40带动中空套管10一起振动,从而振实中空套管10内混凝土,并与钢筋笼30得以有效结合;该振动拔桩机50可采用现有配备振动器41的结构,在此不加予赘述。
4、拔桩:灌完混凝土50后,振动拔桩机启动侧向间歇性振动,即一侧振动后换至向另一侧振动,以振松中空套管10外侧土壤,并同时由振动拔桩机50向上将中空套管10从地下拔出即成型桩,拔出的中空套管10可循环利用。为保证更好地完成拔桩,经反复实践,在拔桩过程中,通过振动拔桩机40将中空套管10间隔多次拔出,每拔出一次间隔下压一次直至拔出为止,每次下压的距离是上一次拔出距离的一半,这样可有效地减少中空套管10外侧受土壤的附加应力,避免断桩现象发生,有利于拔桩作业;例如,第一次将中空套管向上拔出1m后再将中空套管10振动下压0.5m,再接着向上拔出1m后再下压,如此循环直至拔出中空套管为止。
本发明设计重点在于:在拔出中空套管的过程中,对中空套管外侧采用侧向间歇性振动,可有效地振松中空套管外侧的土壤,有利于拔出该中空套管,并且因钢筋笼底端的卡勾是与连接网的网孔预先卡住,可减少钢筋笼移位,本发明施工简便,成本低,工程质量高。
以上所述,仅是本发明较佳实施例而已,并非对本发明的技术范围作任何限制,故凡是依据本发明的技术实质对以上实施例所作的任何细微修改、等同变化与修饰,均仍属于本发明技术方案的范围内。 

Claims (4)

1.一种现浇混凝土成型基础桩的施工方法,其特征在于:包括如下步骤
   a、压桩:将带有包边桩尖的中空套管压入地下,该包边桩尖顶端固定有连接网,该连接网至少有一部分网孔位于中空套管底端;
    b、安装钢筋笼:该钢筋笼底部具有卡勾,将钢筋笼插入中空套管中,使钢筋笼底部的卡勾卡住连接网的网孔,防止钢筋笼上浮移位;
    c、灌混凝土:将振动拔桩机安置于中空套管上,并向中空套管中灌入混凝土,同时启动振动拔桩机带动中空套管一起振动,从而振实中空套管内混凝土,并与网筋笼得以有效结合;
d、拔桩:灌完混凝土后,振动拔桩机启动侧向间歇性振动,以振松中空套管外侧土壤,并同时由振动拔桩机向上将中空套管从地下拔出即成型桩。
2.根据权利要求1所述现浇混凝土成型基础桩的施工方法,其特征在于:拔桩过程中,通过振动拔桩机将中空套管间隔多次振动拔出,每振动拔出一次后间隔振动下压一次直至拔出为止,每次下压的距离是上一次拔出距离的一半。
3.根据权利要求1所述现浇混凝土成型基础桩的施工方法,其特征在于:所述桩尖与连接网是通过焊接固定,钢筋网笼的卡勾具有卡住网孔的倒刺。
4.根据权利要求1所述现浇混凝土成型基础桩的施工方法,其特征在于:所述包边桩尖顶部周缘具有包边,中空套管底端套于该包边内。
CN2011100227933A 2011-01-20 2011-01-20 现浇混凝土成型基础桩的施工方法 Expired - Fee Related CN102071684B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100227933A CN102071684B (zh) 2011-01-20 2011-01-20 现浇混凝土成型基础桩的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100227933A CN102071684B (zh) 2011-01-20 2011-01-20 现浇混凝土成型基础桩的施工方法

Publications (2)

Publication Number Publication Date
CN102071684A true CN102071684A (zh) 2011-05-25
CN102071684B CN102071684B (zh) 2012-05-30

Family

ID=44030424

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100227933A Expired - Fee Related CN102071684B (zh) 2011-01-20 2011-01-20 现浇混凝土成型基础桩的施工方法

Country Status (1)

Country Link
CN (1) CN102071684B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105698437A (zh) * 2016-01-29 2016-06-22 上海诺佛尔生态科技股份有限公司 一种地源热泵用u形接头、地源热泵及地源热泵施工方法
CN106012865A (zh) * 2016-07-30 2016-10-12 董超超 桥墩基础桩一次成型机
CN107217665A (zh) * 2017-05-03 2017-09-29 民族建设集团有限公司 一种针对松软土质的抗拉拔刺桩结构及其施工方法
CN115852961A (zh) * 2022-11-29 2023-03-28 华侨大学 一种防止颈缩和带笼的沉管灌注桩施工处理方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001182054A (ja) * 1999-12-28 2001-07-03 Masaaki Nakahara 場所打ち杭の杭頭余盛部の除去方法及び除去用具
RU2270899C2 (ru) * 2004-04-22 2006-02-27 Общество с ограниченной ответственностью "Магнит" Способ обработки бетонных смесей при возведении буронабивных свай и устройство для его осуществления
CN101492916A (zh) * 2009-02-12 2009-07-29 李小红 高强度波纹套管基桩及其现场浇注方法
CN101532290A (zh) * 2009-02-25 2009-09-16 河海大学 加固软土地基的带孔波纹塑料套管粒料注浆桩及加固方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001182054A (ja) * 1999-12-28 2001-07-03 Masaaki Nakahara 場所打ち杭の杭頭余盛部の除去方法及び除去用具
RU2270899C2 (ru) * 2004-04-22 2006-02-27 Общество с ограниченной ответственностью "Магнит" Способ обработки бетонных смесей при возведении буронабивных свай и устройство для его осуществления
CN101492916A (zh) * 2009-02-12 2009-07-29 李小红 高强度波纹套管基桩及其现场浇注方法
CN101532290A (zh) * 2009-02-25 2009-09-16 河海大学 加固软土地基的带孔波纹塑料套管粒料注浆桩及加固方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105698437A (zh) * 2016-01-29 2016-06-22 上海诺佛尔生态科技股份有限公司 一种地源热泵用u形接头、地源热泵及地源热泵施工方法
CN105698437B (zh) * 2016-01-29 2017-11-10 上海诺佛尔生态科技股份有限公司 一种地源热泵用u形接头、地源热泵及地源热泵施工方法
CN106012865A (zh) * 2016-07-30 2016-10-12 董超超 桥墩基础桩一次成型机
CN107217665A (zh) * 2017-05-03 2017-09-29 民族建设集团有限公司 一种针对松软土质的抗拉拔刺桩结构及其施工方法
CN107217665B (zh) * 2017-05-03 2019-12-24 民族建设集团有限公司 一种针对松软土质的抗拉拔刺桩结构及其施工方法
CN115852961A (zh) * 2022-11-29 2023-03-28 华侨大学 一种防止颈缩和带笼的沉管灌注桩施工处理方法

Also Published As

Publication number Publication date
CN102071684B (zh) 2012-05-30

Similar Documents

Publication Publication Date Title
CN102071684B (zh) 现浇混凝土成型基础桩的施工方法
CN102733377B (zh) 混凝土桩的施工方法
CN105350525A (zh) 一种桩的施工方法
CN102444122A (zh) 一种桩的施工方法
KR20090092973A (ko) 기존 교량의 보수, 보강시 지반에 설치되는 강재말뚝의압입방법 및 장치
CN103114578B (zh) 注浆成型扩底桩及其施工方法和扩底装置
KR20090055080A (ko) 기시공된 기초 콘크리트체의 보강구조 및 방법
CN110258571A (zh) 一种灌注桩沉管压灌施工方法
KR101236765B1 (ko) 말뚝이나 인장부재의 지지력 확대를 위해 천공확장부에 접합채움재를 타설하는 방법 및 그 장치
CN109853564A (zh) 一种挤密桩的施工方法及专用內夯管锤
CN203174595U (zh) 一种可回收钢护筒
JP2003268767A (ja) 削孔ロッドを用いた二重管掘り小径杭の構築方法
JP2016169591A (ja) 回転圧入鋼管杭の施工方法
KR101341260B1 (ko) 기존 콘크리트 기초 구조물의 보강 공법
WO2010005137A1 (en) Geogrid structure preventing bulging failure of stone column and method constructing the stone column by the geogrid structure
JP6229294B2 (ja) 地下構造、及び地下躯体を有する建造物の建替え方法
CN202730756U (zh) 一种用于钻孔灌注桩施工的套管接连装置
KR101105853B1 (ko) 몰드 케이스를 이용한 현장타설 콘크리트말뚝의 시공 방법
KR101345457B1 (ko) 파일 압입기와 이 파일 압입기를 이용한 파일 압입 시공 방법
KR101184444B1 (ko) 하중전달장치와 마이크로파일부를 이용한 기둥보강방법
KR20100123576A (ko) 개량형 마이크로 파일 시공방법과 개량형 마이크로 파일 구조체 및 개량형 마이크로 파일 구조체의 요철단면관
CN106192980A (zh) 一种高频振动密实砂石地基的方法
CN103147436B (zh) 一种无噪音管内夯扩压灌扩头桩施工方法
CN111395319A (zh) 一种全夯式二次挤土单头扩底桩的施工方法
EP2209948B1 (en) Method for the creation of a foundation pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200509

Address after: Shop No.25, Taoyuan Lane 2, banxianshan, Hengli Town, Dongguan City, Guangdong Province

Patentee after: Dongguan Hengchang Construction Engineering Co.,Ltd.

Address before: 523000 Guangdong province Dongguan Dongcheng road yellow village street outside No. 16

Patentee before: DONGGUAN HUAYE CIVIL FOUNDATION ENGINEERING Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120530

Termination date: 20220120

CF01 Termination of patent right due to non-payment of annual fee