CN102069893A - 大型甲板分段滚翻工艺 - Google Patents
大型甲板分段滚翻工艺 Download PDFInfo
- Publication number
- CN102069893A CN102069893A CN200910233266XA CN200910233266A CN102069893A CN 102069893 A CN102069893 A CN 102069893A CN 200910233266X A CN200910233266X A CN 200910233266XA CN 200910233266 A CN200910233266 A CN 200910233266A CN 102069893 A CN102069893 A CN 102069893A
- Authority
- CN
- China
- Prior art keywords
- hook
- ground
- segmentation
- stressed
- major
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
本发明涉及到一种大型甲板分段滚翻工艺,它是在甲板分段的下口增设滚翻装置,分段翻身时,让其借助滚翻装置以地面为支点绕地面旋转;滚翻过程中分段重量由两副钩和地面承担,装置下端做成圆弧状,并与分段牢固连接,同时在结构和滚翻装置间用槽钢连接,在以地面为支点的地方设置一个用钢板铺平的宽500毫米深300毫米的坑,使支点不能任意滑动。本发明在大型甲板分段上增设滚翻装置,在龙门吊吊钩承载偏小的情况下同样可以翻身合拢,这不但提高了生产效率,缩短坞内建造周期,而且为今后小吊翻大分段提供了借鉴。
Description
技术领域:本发明涉及到一种散货轮的甲板安装工艺,特别是涉及到一种大型甲板分段滚翻工艺。
背景技术:在建造散货轮的过程中,所在船坞的门吊主钩为200T,两副钩各为100T,而115K散货轮的甲板分段重量较重,若前后两分段总组合拢时主钩和副钩都无法承受总段重量(最重的达310吨),若采用单个分段合拢次序,则将增加坞内的工作量,延长船舶在坞内的建造时间。如115K散货轮甲板分组段GD14P包括了D14P,D15P,S14P,S15P和T11P一共5个小分段,总重为310T,以舷侧外板总组。分段长19.34M,宽12.8M,高度为12.4M。分段重心如图。若分段按正常情况翻身,主钩换钩时,两副钩将承受分段全部重量,显然这种情况是不允许的。
发明内容:本发明的目的就是要提供一种大型甲板分段滚翻工艺,能够有效地解决以上所存在的缺陷,本发明的目的是这样实现的,大型甲板分段滚翻工艺,在GD14P的下口增设滚翻装置,分段翻身时,让其借助滚翻装置以地面为支点绕地面旋转;滚翻过程中分段重量由两副钩和地面承担,地面受力将超过110T;装置下端做成圆弧状,并与分段牢固连接,同时在结构和滚翻装置间用槽钢连接,在以地面为支点的地方设置一个用钢板铺平的宽500毫米深300毫米的坑;将分段运到龙门吊下场地,主副钩与分段连接好,将分段水平吊起,此时主副钩的受力分别为125T和185T,均未超过允许受力。将副钩慢慢上提,主钩慢慢下放,将分段处于倾斜状态分段,这时应注意保证主副钩重量吨位在允许范围内,继续提升副钩,当分段与地面的夹角达到约30度时,主副钩的受力分别为188T和122T;这时,分段停止旋转,将主副钩同时缓慢下放使滚翻装置置于地面坑内;主钩继续下放直至其受力为零,然后继续上提副钩,使分段绕坑内继续旋转。当分段与地面的夹角达到约45度时,将吊车的主钩改为与甲板面近船中的吊耳连接,并保持受力为100T;继续慢慢提升副钩,将分段绕地面旋转,缓慢增加主钩的受力直至150T,副钩保持缓慢上提,当分段与地面夹角达到约62度时,此时主钩受力为61T,副钩受力为150T,地面受力为100T,主副钩保持同步上升,分段离开地面,此时主钩受力为191T,副钩受力为119T;继续调整主副钩和分段状态直至满足合拢要求。本发明大型甲板分段滚翻工艺,是在大型甲板分段上增设滚翻装置,在龙门吊吊钩承载偏小的情况下同样可以翻身合拢,这不但提高了生产效率,缩短坞内建造周期,而且为今后小吊翻大分段提供了借鉴。
附图说明:图1是甲板分段图
图2是加装了滚翻装置的甲板分段图
图3a甲板分段翻身主、副钩受力图(30度时临空)
图3b甲板分段翻身主、副钩受力图(30度时着地)
图3c甲板分段翻身主、副钩受力图(45度时着地)
图3d甲板分段翻身主、副钩受力图(62度时着地)
图3e甲板分段翻身主、副钩受力图(62度时临空)
图3f甲板分段翻身主、副钩受力图(正态上船台)
具体实施方式:下面结合附图对本发明作进一步说明
在图1中,本发明甲板分组段GD14P包括了D14P,D15P,S14P,S15P和T11P一共5个小分段,总重为310T,以舷侧外板总组。分段长19.34M,宽12.8M,高度为12.4M。分段重心如图1所示。若分段按正常情况翻身,主钩换钩时,两副钩将承受分段全部重量,显然这种情况是不允许的。因此,我们考虑借地面分担部分力。
如图2所示,在GD14P的下口增设滚翻装置。分段翻身时,让其借助滚翻装置以地面为支点绕地面旋转。滚翻过程中分段重量由两副钩和地面承担,地面受力将超过110T。由于分段绕地面旋转,因此装置下端做成圆弧状,以方便翻身,并与分段牢固连接,同时在结构和滚翻装置间,装置内结构之间用槽钢连接,以增加结构强度和刚度。为保证安全,我们按《船体结构设计手册》对装置的强度和刚度进行了计算。
由于装置下端做成圆弧状,分段滚身又以地面为支点绕地面旋转,地面受力很大,因此需要防止分段旋转时移动以及地面承载。为此我们事前在地面挖一个宽500深300毫米的坑(长度根据该型总段的最大值适当加裕量),坑四周及底部用钢板铺平。当分段在坑内翻身时,坑能承载分段翻身时的重量,同时分段也只能在坑内移动。将分段运到龙门吊下场地,主副钩与分段连接好,将分段水平吊起,此时可以看到,主副钩的受力分别为125T和185T,均未超过允许受力。将副钩慢慢上提,主钩慢慢下放,将分段处于倾斜状态分段,这时应注意保证主副钩重量吨位在允许范围内,继续提升副钩,当总段与地面的夹角达到约30度时,主副钩的受力分别为188T和122T。这时,分段停止旋转,将主副钩同时缓慢下放使滚翻装置置于地面坑内。主钩继续下放直至其受力为零。然后继续上提副钩,使分段绕坑内继续旋转。当分段与地面的夹角达到约45度时,将吊车的主钩改为与甲板面近船中的吊耳连接,并保持受力为100T。继续慢慢提升副钩,将分段绕地面旋转,缓慢增加主钩的受力直至150T,副钩保持缓慢上提,当分段与地面夹角达到约62度时,此时主钩受力为61T,副钩受力为150T,地面受力为100T。主副钩保持同步上升,分段离开地面,此时主钩受力为191T,副钩受力为119T。继续调整主副钩和分段状态直至满足合拢要求。
在分段翻身整个过程中,不难看到主副钩在其中的一段时期内都非常接近各自的允许载荷,考虑到重心和重量统计的误差,龙门吊吊钩已经接近满载。因此吊车主副钩在调整时速度要尽量慢,以减少动载荷,以确保分段安全翻身。本发明大型分段如增设滚翻装置,在龙门吊吊钩承载偏小的情况下同样可以翻身合拢,这不但提高了生产效率,缩短坞内建造周期,而且为今后小吊翻大分段提供了借鉴。
Claims (1)
1.大型甲板分段滚翻工艺,其特征是在甲板分段的下口增设滚翻装置,分段翻身时,让其借助滚翻装置以地面为支点绕地面旋转;滚翻过程中分段重量由两副钩和地面承担,地面受力将超过110T;装置下端做成圆弧状,并与分段牢固连接,同时在结构和滚翻装置间用槽钢连接,在以地面为支点的地方设置一个用钢板铺平的宽500毫米深300毫米的坑;将分段运到龙门吊下场地,主副钩与分段连接好,将分段水平吊起,此时主副钩的受力分别为125T和185T;继续提升副钩,当分段与地面的夹角达到约30度时,主副钩的受力分别为188T和122T;这时,分段停止旋转,将主副钩同时缓慢下放使滚翻装置置于地面坑内;主钩继续下放直至其受力为零,然后继续上提副钩,使分段绕坑内继续旋转;当分段与地面的夹角达到约45度时,将吊车的主钩改为与甲板面近船中的吊耳连接,并保持受力为100T;继续慢慢提升副钩,将分段绕地面旋转,缓慢增加主钩的受力直至150T,副钩保持缓慢上提,当分段与地面夹角达到约62度时,此时主钩受力为61T,副钩受力为150T,地面受力为100T,主副钩保持同步上升,分段离开地面,此时主钩受力为191T,副钩受力为119T;继续调整主副钩和分段状态直至满足合拢要求。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910233266XA CN102069893A (zh) | 2009-11-24 | 2009-11-24 | 大型甲板分段滚翻工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910233266XA CN102069893A (zh) | 2009-11-24 | 2009-11-24 | 大型甲板分段滚翻工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102069893A true CN102069893A (zh) | 2011-05-25 |
Family
ID=44028698
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910233266XA Pending CN102069893A (zh) | 2009-11-24 | 2009-11-24 | 大型甲板分段滚翻工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102069893A (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103661800A (zh) * | 2013-11-29 | 2014-03-26 | 大连船舶重工集团有限公司 | 船舶建造过程中设置夹紧保护机构的船体分段翻身设备 |
CN103661799A (zh) * | 2013-11-29 | 2014-03-26 | 大连船舶重工集团有限公司 | 船舶建造过程中基于升降滚轮的船体分段翻身设备 |
CN104528525A (zh) * | 2014-12-19 | 2015-04-22 | 华泰重工(南通)有限公司 | 一种分段着地翻身工艺 |
CN105799860A (zh) * | 2014-12-30 | 2016-07-27 | 江苏现代造船技术有限公司 | 一种大型船舶c型总段的翻身方法 |
CN110282582A (zh) * | 2019-05-25 | 2019-09-27 | 招商局重工(江苏)有限公司 | 一种薄板分段翻身装置 |
CN110304547A (zh) * | 2019-05-25 | 2019-10-08 | 招商局重工(江苏)有限公司 | 一种邮轮分段的翻身方法 |
CN111017843A (zh) * | 2019-11-15 | 2020-04-17 | 沪东中华造船(集团)有限公司 | 一种挂舵臂分段的翻身吊装方法 |
CN112093665A (zh) * | 2020-09-04 | 2020-12-18 | 中交三航(南通)海洋工程有限公司 | 一种风电基础桩法兰段翻身工艺 |
-
2009
- 2009-11-24 CN CN200910233266XA patent/CN102069893A/zh active Pending
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103661800A (zh) * | 2013-11-29 | 2014-03-26 | 大连船舶重工集团有限公司 | 船舶建造过程中设置夹紧保护机构的船体分段翻身设备 |
CN103661799A (zh) * | 2013-11-29 | 2014-03-26 | 大连船舶重工集团有限公司 | 船舶建造过程中基于升降滚轮的船体分段翻身设备 |
CN104528525A (zh) * | 2014-12-19 | 2015-04-22 | 华泰重工(南通)有限公司 | 一种分段着地翻身工艺 |
CN105799860A (zh) * | 2014-12-30 | 2016-07-27 | 江苏现代造船技术有限公司 | 一种大型船舶c型总段的翻身方法 |
CN110282582A (zh) * | 2019-05-25 | 2019-09-27 | 招商局重工(江苏)有限公司 | 一种薄板分段翻身装置 |
CN110304547A (zh) * | 2019-05-25 | 2019-10-08 | 招商局重工(江苏)有限公司 | 一种邮轮分段的翻身方法 |
CN110282582B (zh) * | 2019-05-25 | 2024-03-15 | 招商局重工(江苏)有限公司 | 一种薄板分段翻身装置 |
CN111017843A (zh) * | 2019-11-15 | 2020-04-17 | 沪东中华造船(集团)有限公司 | 一种挂舵臂分段的翻身吊装方法 |
CN112093665A (zh) * | 2020-09-04 | 2020-12-18 | 中交三航(南通)海洋工程有限公司 | 一种风电基础桩法兰段翻身工艺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102069893A (zh) | 大型甲板分段滚翻工艺 | |
CN202022670U (zh) | 一种水平滚轮非对称布置的回转起重机 | |
NL2017637B1 (en) | Self-propelled jack-up vessel | |
KR100623202B1 (ko) | 대형 구조물 이송장치 및 이송방법 | |
CN101858067B (zh) | 半圆体竖向预制翻转扶正、水上安装工艺 | |
WO2009138043A1 (zh) | 船岸双支撑式货物装卸船机 | |
CN103072899B (zh) | 超大型筒体分段吊装工艺 | |
US1939037A (en) | Method of handling cargo in ships' holds | |
CN103476670B (zh) | 包括起重机的船只 | |
WO2014070024A2 (en) | A transportation and installation system and method | |
CN204279882U (zh) | 一种输送臂可回收的运输船 | |
CN101767634A (zh) | 自装自卸集装箱船 | |
CN105799860A (zh) | 一种大型船舶c型总段的翻身方法 | |
CN106976530A (zh) | 半潜式平台 | |
CN111017130B (zh) | 提高船闸通航能力的方法 | |
RU2320529C1 (ru) | Плавучее подъемное средство большой грузоподъемности | |
CN202225997U (zh) | 一种挂舵臂 | |
CN104802942A (zh) | 一种起重驳船 | |
CN204659960U (zh) | 一种大型矿砂船的舯横剖面结构 | |
NO142208B (no) | Fartoey for transport av containere e.l. | |
CN201512789U (zh) | 一种大型打桩船的桩架支撑装置 | |
CN202765875U (zh) | 超大轨距起重机运输设备 | |
CN103193152B (zh) | 链斗式卸船机的吊装装置及方法 | |
KR101145253B1 (ko) | 피칭 텐셔너 장치 | |
CN201834681U (zh) | 降低设备尾部溜尾高度的翻转机构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20110525 |