CN102061709A - Engineering machinery construction channel in debris flow state alluvial soil area - Google Patents

Engineering machinery construction channel in debris flow state alluvial soil area Download PDF

Info

Publication number
CN102061709A
CN102061709A CN2010105874329A CN201010587432A CN102061709A CN 102061709 A CN102061709 A CN 102061709A CN 2010105874329 A CN2010105874329 A CN 2010105874329A CN 201010587432 A CN201010587432 A CN 201010587432A CN 102061709 A CN102061709 A CN 102061709A
Authority
CN
China
Prior art keywords
side walls
supporting side
bearing
shaped steel
engineering machinery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010105874329A
Other languages
Chinese (zh)
Other versions
CN102061709B (en
Inventor
郭帅杰
王保田
张福海
张文慧
李守德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201010587432A priority Critical patent/CN102061709B/en
Publication of CN102061709A publication Critical patent/CN102061709A/en
Application granted granted Critical
Publication of CN102061709B publication Critical patent/CN102061709B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses an engineering machinery construction channel in a debris flow state alluvial soil area, comprising more than two channel assembling units which are spliced, wherein each channel assembling unit comprises load-bearing units, an externally wrapping bottom plate and supporting side walls, wherein the outer bottom surface of each load-bearing unit is wrapped with the externally wrapping bottom plate; two opposite side edges of each load-bearing unit are respectively provided with the supporting side walls; two adjacent load-bearing units are connected through a rotating bolt; and two adjacent supporting side walls are connected through a riveted water seal rubber sheet. Thus, the invention is suitable for the overlapping and laying work of a fast channel in a large-area shallow alluvial soil area, provides a prerequisite condition for the smooth development of rescue and relief work, assemblies a fast channel overlapping device by adopting standard assemblies in a modularizing way, has simpleness, convenience, fastness, reliable connection and high overlapping and assembling efficiency and can autonomously select the direction of the channel without presetting anchor cable positioning and open the fast construction channel suitable for medium and small sized construction machinery to fast pass in areas seriously deposited with debris flows and the like.

Description

Mud-rock flow fluidised form alluvial soil district engineering machinery construction passage
Technical field
The present invention relates to a kind of engineering machinery construction passage, belong to anti-mitigation field of engineering technology in the civil engineering.
Background technology
Mud-rock flow is that heavy rain, flood will contain sandstone and the soft soil property massif mighty torrent through saturated dilution back formation, and area, volume and flow are all bigger.Typical mud-rock flow under suitable orographic condition, moves the formation mud-rock flow by suspending thick solid debris thing and be rich in flour sand and the thickness mud of clay is formed.Mud-rock flow can directly bury the station, and facilities such as roadbed, bridges and culverts are destroyed in railway, highway even cottage cities and towns, cause interruption of communication.Sometimes mud-rock flow imports the river course, causes river course transition significantly, causes serious flood and causes enormous economic loss.For example on August 7th, 2010, the bust heavy showers of Zhouqu County, Tibetan Autonomous Prefecture of Gannan is let out under the Luo Jiayu on north, county town, three valley mud-rock flows, rushes at the county town by north orientation south, causes along the river that the house is destroyed by rush of water, and mud-rock flow blocking-up white Dragon River, forms barrier lake; On August 11st, 2010, Longnan City, the Shaanxi heavy rain that happens suddenly within the border causes geological disasters such as mud-rock flow, landslide, causes traffic highway section, many places to be stopped up, and the power communication facility interrupts, institutional settings, industrial enterprise and residenter house water inlet or collapse.
Mud-rock flow causes serious disaster, causes huge life and property loss, and for recovering disaster area ordinary production life order, rebuilding in disaster-hit areas just becomes the key of rescue and relief work.Mud-rock flow later remains a large amount of fluidised form thickness mud, and depth of mud is not of uniform size, causes disaster relief personnel, the emergency work machinery difficulty of marching into the arena, and relief goods such as can't transport smoothly at difficulty.Adopted the helicopter means of transportation in the past in the disaster relief, but have high risk under bad working environments and weather condition, and the air transport freight volume is limited, freight rate is high.Thereby the laying of disaster area rescue road just becomes key one ring of whole disaster area rescue work.
The bridge formation equipment that the common channel establishment that adopts is a PLA pontoon-bridge units, rescue and relief work team open circuit equipment etc., but for the shallow long-pending fluidised form mud of rapid large-area district have still that engineering quantity is big, cost is high, inapplicable, difficulty that engineering machinery can't be marched into the arena, seriously hinder disaster relief process.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, engineering machinery construction passage in a kind of mud-rock flow fluidised form alluvial soil district is provided, it has been simplified mud-rock flow effectively and has remained fluidised form alluvial mud district road pavement program, improve express passway overlap joint efficient, be suitable for remaining the mud district at the shallow deposition rock glacier of large tracts of land and rapidly and efficiently build, modularization is assembled, manufacture process is simple and reliable relatively.
According to above technical purpose, the present invention will take following technical scheme:
A kind of mud-rock flow fluidised form alluvial soil district engineering machinery construction passage, described engineering machinery construction passage is spliced by plural passage module units, described passage module units comprises bearing unit, outsourcing base plate and supporting side walls, the outer bottom of described bearing unit covers wraps up in the outsourcing base plate, and supporting side walls is installed on the limit, two opposite sides of described bearing unit respectively, adjacent two bearing units connect by the rotation latch, then connect by the watertight rubber sheet between the two adjacent supporting side walls.
Described bearing unit comprises vertical load-bearing shaped steel and U-shaped shaped steel purlin frame, the bottom of U-shaped shaped steel purlin frame is installed on vertical load-bearing shaped steel by fastener, supporting side walls then is connected with U-shaped shaped steel purlin frame side arm, and the bottom of supporting side walls is installed on vertical load-bearing shaped steel by hinge simultaneously.
Described supporting side walls adopts the water proof composite board to be made.
Described U-shaped shaped steel purlin frame side arm and the bottom between by the support and connection of type frame.
The two ends of described supporting side walls are provided with the corner cut side, and the inclination alpha of described corner cut side is 60~75 °, and adjacent two supporting side walls are by riveting with the watertight rubber sheet on its corresponding corner cut side.
The seam outside of adjacent two bearing units covers sealing by the watertight rubber sheet of riveted joint.
According to above technical scheme, can realize following beneficial effect:
1, mud-rock flow fluidised form alluvial soil district's engineering machinery construction passage of the present invention adopts the modularization package technique, connect reliably, and the packaging efficiency height, each module is detachably classified and is stored transportation, is convenient to transition;
2, bearing unit connects by detachable Fixed latches, can rotate up and down; Seam between the supporting side walls adopts the watertight rubber sheet by the rivet rivet clasp, and stagnant water effect is better;
3, supporting side walls is Height Adjustable, its with bearing unit between be connected by built-in latch, erectility is sealing effectively, adjacent supports sidewall corner cut in advance forms the corner cut side, is convenient to the rotation of adjacent cells;
4, bearing unit connects with this, can need not to set in advance the fixed orientation anchor cable by overlapping assembling mode step by step to predetermined regional laying road, and device contacts to earth, and power transmission is firm, avoids the poor stability weakness of floating box type passage.
The present invention forms vertical passage by the fixedly connected bearing unit of hinge, and lays the watertight rubber sheet at seam crossing; The bearing unit dual-side is established the supporting side walls that is used to stop muddy water, and water and soil pressure transmits balance by shaped steel purlin frame on the supporting side walls; After bearing unit series connection overlap joint is shaped, fill sandstone material leveling, lay the smooth express passway device of the compound basal plane road surface that is open to traffic, therefore, the present invention is applicable to the lapped layup work of the shallow deposition of large tracts of land slurry district express passway, for the smooth expansion of rescue and relief work provides prerequisite.Speed passage lap device adopts the assembling of standard package modularization, easy to be quick, connect reliable, overlap joint packaging efficiency height, need not to set in advance the anchor cable location, independently the selector channel direction can be opened up one and is suitable for the rapid construction passage that middle-size and small-size construction machinery passes through fast in mud severe siltation zone.
Description of drawings
Fig. 1 is an express passway device lateral sectional drawing;
Fig. 2 connects plan view for bearing unit;
Fig. 3 is the supporting side walls connection diagram;
Wherein: 1 bearing unit; 2 watertight rubber sheets; 3 shaped steel purlin frames; 4 supporting side walls; 5 vertical load-bearing shaped steel; 6 outsourcing base plates; 7 rotation latches; 8 rivet holes; 9 hinges; 10 mud; 11 corner cut sides; 12 sandstone materials; 13 compound basal planes; 14 purlin frames support.
The specific embodiment
Accompanying drawing discloses the structural representation of embodiment involved in the present invention without limitation, explains technical scheme of the present invention below with reference to accompanying drawing.
As shown in Figures 1 to 3, mud-rock flow fluidised form alluvial soil of the present invention district engineering machinery construction passage, described engineering machinery construction passage is spliced by plural passage module units, described passage module units comprises bearing unit 1, outsourcing base plate 6 and supporting side walls 4, the outer bottom of described bearing unit 1 covers wraps up in outsourcing base plate 6, supporting side walls 4 is installed on the limit, two opposite sides of described bearing unit 1 respectively, and adjacent two bearing units 1 connect by rotation latch 7, the seam of adjacent two bearing units 1 outside covers by the watertight rubber sheet 2 of riveted joint simultaneously, then connects by watertight rubber sheet 2 between the two adjacent supporting side walls 4.Wherein, described bearing unit 1 comprises vertical load-bearing shaped steel 5 and U-shaped shaped steel purlin frame 3, the bottom of U-shaped shaped steel purlin frame 3 is installed on vertical load-bearing shaped steel 5, supporting side walls 4 then is connected with the side arm of U-shaped shaped steel purlin frame 3, and the bottom of supporting side walls 4 is installed on vertical load-bearing shaped steel 5 by hinge 9 simultaneously.Described supporting side walls 4 adopts the water proof composite board to be made.Described U-shaped shaped steel purlin frame 3 side arm and the bottom between by the support and connection of type frame.The two ends of described supporting side walls 4 are provided with corner cut side 11, and the inclination alpha of described corner cut side 11 is 60~75 °, and promptly the corner cut of corner cut side 11 is that 15~30 ° of adjacent two supporting side walls 4 are by riveting with watertight rubber sheet 2 on its corresponding corner cut side 11.
Below will explain an Application Example of the present invention.
The mud-rock flow district environment that remains of living in is: fluidised form mud 10 dark 1.0 m, average severe 13 kN/m 3 Unit length mud 10 gross pressures 6.5 kN are provided with that maximal bending moment is about 1000 Nm on the shaped steel purlin frame 3 of bearing diagonal.It makes pavement process:
(1) bearing unit 11 is of a size of 4000 * 4000 mm, it is fixedly connected to form basic framework by vertical load-bearing shaped steel 55 with U-shaped shaped steel purlin frame 33,100 * 100 * 5 mm square tube shaped steel purlin frames 3 are set between the side arm of U-shaped shaped steel purlin frame 3 and the bottom obliquely support 14, the soffit of bearing unit 11 covers wraps up in the thick stainless steel outsourcing base plate 66 of 2 mm.Vertically load-bearing shaped steel 55 is selected i iron for use No. 10, and spacing 0.8 m arranges, is 1000 Nm requirement for bearing capacity can satisfy maximal bending moment; 100 * 100 * 5 mm square tube shaped steel are adopted in the bottom of U-shaped shaped steel purlin frame 33, and spacing 1.0 m arrange; Vertically load-bearing shaped steel 55 is fixed by fastener with the bottom of U-shaped shaped steel purlin frame 33.Connect by rotation latch 77 between the bearing unit 11, and bearing unit 1 seam peripheral hardware watertight rubber sheet 22, and by reserving rivet hole 8 and bearing unit 1 rivet clasp sealing, watertight rubber sheet 22 rivet clasp points are not less than 200 mm with the unit spacing of joints.
(2) supporting side walls 44, be positioned at the passage both sides, be water proof composite board material, be connected with bearing unit 11 by hinge 99, mud 1010 water and soil pressure are delivered to balance on the frame 33 of U-shaped shaped steel purlin on the supporting side walls 44, and this supporting side walls 44 connects the side arm of U-shaped shaped steel purlin frame 33 by fastener.Supporting side walls 44 head and the tail sides cut 30 ° of angles in advance, form corner cut side 1111, peripheral hardware watertight rubber sheet 22, and by reserving rivet hole 8 and bearing unit 1 rivet clasp sealing, rivet clasp point is not less than 200 mm with spacing of joints.
(3) channel group process of assembling: at first vertical load-bearing shaped steel 55 is fixed by standard fastener with U-shaped shaped steel purlin frame 33 and formed unit framework, bottom covers wraps up in outsourcing base plate 66 formation bearing units 11; Supporting side walls 44 is connected with bearing unit 11 by built-in latch 9, and fixing by fastener and U-shaped shaped steel purlin frame 33.Be connected to form in advance according to said process and be no less than four standard blocks overlap joint roads, the upright dash in latter two unit, initial plurality of units level sinks to mud 10, so far work plane is transferred on the passage of overlap joint formation, assemble the subordinate unit successively, new module units is set level secondary upright unit after upright sink to mud 10, overlap joint assembling rule is finished the laying of express way basic framework successively.
(4) after a segment distance is finished in the express passway assembling, inject on the bearing unit 11 sandstone material 12 fill smooth after, lay the compound basal plane 13 of the thick asphalt felt of 30 mm, form smooth passage road surface, according to the packed sandstone piece of the buoyancy effect spaced set ballast of alluvial degree of depth generation.Because supporting side walls 44 and the protective action of upright standard block to mud 10 all can guarantee no mud 10 clean working environments in the passage in the whole construction course.
In sum as can be known, between load-bearing shaped steel of the present invention and the U-shaped shaped steel purlin frame 3 for removably connecting; Also removably connect between supporting side walls 4 and the bearing unit 1, and, make supporting side walls 4 adjustable height because supporting side walls 4 and bearing unit 1 employing hinge 9 is connected, and also removably connect between the adjacent two passage module units, therefore, the present invention is easy to assembly, and transportation is also comparatively convenient.

Claims (6)

1. mud-rock flow fluidised form alluvial soil district engineering machinery construction passage, it is characterized in that, described engineering machinery construction passage is spliced by plural passage module units, described passage module units comprises bearing unit, outsourcing base plate and supporting side walls, the outer bottom of described bearing unit covers wraps up in the outsourcing base plate, supporting side walls is installed on the limit, two opposite sides of described bearing unit respectively, adjacent two bearing units connect by the rotation latch, then connect by the watertight rubber sheet between the two adjacent supporting side walls.
2. according to the described mud-rock flow fluidised form of claim 1 alluvial soil district engineering machinery construction passage, it is characterized in that, described bearing unit comprises vertical load-bearing shaped steel and U-shaped shaped steel purlin frame, the bottom of U-shaped shaped steel purlin frame is installed on vertical load-bearing shaped steel, supporting side walls then is connected with the side arm of U-shaped shaped steel purlin frame, and the bottom of supporting side walls is connected with bearing unit edge longitudinal load-bearing shaped steel by hinge simultaneously.
3. according to the described mud-rock flow fluidised form of claim 2 alluvial soil district engineering machinery construction passage, it is characterized in that described supporting side walls adopts the water proof composite board to be made.
4. according to the described mud-rock flow fluidised form of claim 2 alluvial soil district engineering machinery construction passage, it is characterized in that, be connected by purlin frame bracing reinforcement between the side arm of described U-shaped shaped steel purlin frame and the bottom.
5. according to the described mud-rock flow fluidised form of claim 1 alluvial soil district engineering machinery construction passage, it is characterized in that, the two ends of described supporting side walls are provided with the corner cut side, the inclination alpha of described corner cut side is 60~75 °, and adjacent two supporting side walls are by rivet hole on the corresponding corner cut side of reserving and the riveted joint of watertight rubber sheet.
6. according to the described mud-rock flow fluidised form of claim 1 alluvial soil district engineering machinery construction passage, it is characterized in that the seam outside of adjacent two bearing units covers sealing by the watertight rubber sheet of riveted joint.
CN201010587432A 2010-12-15 2010-12-15 Engineering machinery construction channel in debris flow state alluvial soil area Expired - Fee Related CN102061709B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010587432A CN102061709B (en) 2010-12-15 2010-12-15 Engineering machinery construction channel in debris flow state alluvial soil area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010587432A CN102061709B (en) 2010-12-15 2010-12-15 Engineering machinery construction channel in debris flow state alluvial soil area

Publications (2)

Publication Number Publication Date
CN102061709A true CN102061709A (en) 2011-05-18
CN102061709B CN102061709B (en) 2012-09-26

Family

ID=43997191

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010587432A Expired - Fee Related CN102061709B (en) 2010-12-15 2010-12-15 Engineering machinery construction channel in debris flow state alluvial soil area

Country Status (1)

Country Link
CN (1) CN102061709B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103452368A (en) * 2013-09-11 2013-12-18 云南大红山管道有限公司 Slurry accident pool and construction method thereof
CN109098208A (en) * 2018-08-31 2018-12-28 郭毅轩 A kind of seabed tunnel and its construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE893989A (en) * 1982-07-30 1983-01-31 Dynamique Du Batiment Dynabat Prefabricated concrete road tunnel - is made of thin walled sections in open cutting with wet concrete poured over reinforcing grid
CN101289862A (en) * 2008-04-09 2008-10-22 中交三航局第二工程有限公司 Foundation ditch construction method in water for supporting circuit purlin
CN201538961U (en) * 2009-10-13 2010-08-04 中国石油天然气股份有限公司 Component for feeding oil gas onto artificial island through submerged pipelines
CN201581656U (en) * 2009-12-04 2010-09-15 中建四局第六建筑工程有限公司 Steel trestle for large-scale complicated construction sites

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE893989A (en) * 1982-07-30 1983-01-31 Dynamique Du Batiment Dynabat Prefabricated concrete road tunnel - is made of thin walled sections in open cutting with wet concrete poured over reinforcing grid
CN101289862A (en) * 2008-04-09 2008-10-22 中交三航局第二工程有限公司 Foundation ditch construction method in water for supporting circuit purlin
CN201538961U (en) * 2009-10-13 2010-08-04 中国石油天然气股份有限公司 Component for feeding oil gas onto artificial island through submerged pipelines
CN201581656U (en) * 2009-12-04 2010-09-15 中建四局第六建筑工程有限公司 Steel trestle for large-scale complicated construction sites

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103452368A (en) * 2013-09-11 2013-12-18 云南大红山管道有限公司 Slurry accident pool and construction method thereof
CN103452368B (en) * 2013-09-11 2016-01-20 云南大红山管道有限公司 A kind of slurry accident pool and construction method thereof
CN109098208A (en) * 2018-08-31 2018-12-28 郭毅轩 A kind of seabed tunnel and its construction method

Also Published As

Publication number Publication date
CN102061709B (en) 2012-09-26

Similar Documents

Publication Publication Date Title
Hong Typical underwater tunnels in the mainland of China and related tunneling technologies
CN1837506B (en) Construction method for excavating box-shape structure over an operating tunnel
CN203603105U (en) Wall plate type ecological retaining wall bank protection structure
CN102306225B (en) Method for simulating construction course and tunnel deformation influence value of multiline overlapping tunnel
CN102080548B (en) Construction method of tunnel to cross airport runway by shield method
CN205662947U (en) Coincide assembled underground pipe gallery system
CN202559376U (en) Near-river municipal administration road structure below viaduct bridge
CN101775821B (en) Device and method for vertically transporting earthwork by reverse construction method
CN104018405B (en) The double-deck road structure that a kind of " stake-anchor-framework " is compound
CN202280462U (en) Pipe segment for building subway station through large-diameter shield tunneling expanded excavation
CN104131565B (en) A kind of against making the construction method that the earthwork is just made to excavate
CN102864946B (en) Process for supporting existing buildings through structural steel and horizontal rachel rod member and additionally adding multilayer basement
CN203583528U (en) Waterproof structure for joints of sidewall and top and bottom plates of peat soft soil stratum subway station
CN102359112A (en) Method for bracing foundation pit by using steel box piles
CN103711056A (en) Steel tool type temporary construction road and construction method thereof
CN102061709B (en) Engineering machinery construction channel in debris flow state alluvial soil area
CN202247719U (en) Corresponding corrugated pre-stressed anti-sedimentation culvert pipe for bridge
CN205382942U (en) Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility
Song et al. The overall design of Qingdao Jiaozhou Bay subsea tunnel
CN103866787B (en) A kind of spacious reverse masonry method concrete cut that digs builds construction technology
CN216077128U (en) Subway double-layer full-section freezing underground excavation transfer station structure
Zhong Technical innovation for Sanyang Road cross-river tunnel project
CN203939008U (en) City river pile-column framework bank protection structure
CN203922510U (en) A kind of simple and easy cable machine that is arranged in slope
CN208563372U (en) Steel case-concrete assembly integration leads to structure from immersed tube

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120926

Termination date: 20141215

EXPY Termination of patent right or utility model