CN203939008U - City river pile-column framework bank protection structure - Google Patents

City river pile-column framework bank protection structure Download PDF

Info

Publication number
CN203939008U
CN203939008U CN201420308593.3U CN201420308593U CN203939008U CN 203939008 U CN203939008 U CN 203939008U CN 201420308593 U CN201420308593 U CN 201420308593U CN 203939008 U CN203939008 U CN 203939008U
Authority
CN
China
Prior art keywords
concrete
column
pile
river
pile body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420308593.3U
Other languages
Chinese (zh)
Inventor
赖勇
张永进
余锦地
朱亚磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Design Institute of Water Conservancy and Hydroelectric Power
Original Assignee
Zhejiang Design Institute of Water Conservancy and Hydroelectric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Design Institute of Water Conservancy and Hydroelectric Power filed Critical Zhejiang Design Institute of Water Conservancy and Hydroelectric Power
Priority to CN201420308593.3U priority Critical patent/CN203939008U/en
Application granted granted Critical
Publication of CN203939008U publication Critical patent/CN203939008U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

A kind of city river pile-column framework bank protection structure, bank protection structure comprises the concrete beam and plate at the concrete diaphragm between concrete pile body, the pile body that is arranged at bank slope side, the concrete column in river course and bottom girder, pile top.The utility model directly utilizes space enclosing structure to make shore protection, and comprehensive utilization degree is high; In not reducing riverbank land used, keeping bank road unimpeded, neither deepening of riverbed, can expand again the flow section in river course, increases hydrophily; The riverbed face of expansion in framework is implemented earth blanket and cobble river bottom protection layer, is conducive to bryophyte growth, reaches the effect of improving water quality and riverside landscape; Concrete pile body adopts hand excavated pile, in the time not having condition to arrange that builder's road, the narrow construction machinery in construction plant cannot be arranged or surrounding building has higher vibration isolation requirement, still can implement channel revetment Ji An road.

Description

City river pile-column framework bank protection structure
technical field
The utility model relates to the channel revetment structure of a kind of hydraulic engineering and municipal engineering, especially relates to a kind of city river pile-column framework bank protection structure.
Background technology
In city river, because surrounding building is intensive, the land red-line of river course planning or transformation is limited in scope, generally adopt the single formula of rising steeply bank protection structure or top be slope greening band, middle for water balcony, bottom be the compound section bank protection structure of formula shore protection of rising steeply.City river need meet the basic functions such as retaining, water drainage, view, and bank protection structure is conventionally fairly simple, is generally following several structural shape: (1) piece stone barricade; (2) concrete guard wall; (3) concrete " U " shape groove.
Along with socioeconomic development, traditional river regulation theory just progressively changes, and " water quality is limpid, ecological beauty, bank road unimpeded " become the basic demand of city river.
Old town urban architecture is generally near River Construction, supporting available space in river course is smaller, traditional urban river bank protection structure excavation takes up an area large, inconvenience construction when narrow in periphery place, adopts after the space enclosing structures such as steel sheet pile, diaphragm wall, and space enclosing structure has just been born the function of construction provisional protection therein, after channel revetment is built up, be generally to remove or waste treatment, do not double as channel revetment structure, comprehensive utilization degree is not high.
Fix, do not reduce riverbank land used on riverbank and river course overall width and ensure under the unimpeded prerequisite in bank road, tradition channel revetment is except deepening the river course, cannot expand river course flow section, and the river course of narrow dark formula has not only strengthened the enforcement difficulty of shore protection, also deepened the water body of city river, unfavorable safety, hydrophily is poorer.
The underground river structure of box culvert or slab culvert formula is conducive to the stable and top the coast is clear of shore protection, but river course seals completely, can not meet hydrophily requirement, is not suitable for extensive use.
Bottom is that the double-deck river course structure that box culvert, top are open channel can solve few occupation of land simultaneously, shore protection is stablized and hydrophily problem, but be only applicable to abrupt slope, deep trouth section, restricted application, and, the base plate ecological property of hard type is poor completely, is also unfavorable for the purification of water quality.
Utility model content
The purpose of this utility model is to provide a kind of city river pile-column framework bank protection structure, in safeguarding that river course surrounding building is stable, widens river course flow section, improves water quality and ecological effect, improves hydrophily.
The purpose of this utility model is achieved by the following technical solution: a kind of city river pile-column framework bank protection structure, it is mainly by concrete pile body, concrete diaphragm, concrete bottom beam, concrete column and concrete beam plate composition, it is characterized in that: described concrete pile body is arranged at the bank slope side in river course, concrete bottom beam is arranged in river course, described concrete column is cast in by column joint bar on the basis of concrete bottom beam, concrete diaphragm is cast between concrete pile body by dividing plate joint bar, concrete beam plate is cast in the top of concrete pile body and concrete column.
The riverbed face of described concrete column both sides is equipped with earth blanket, is equipped with cobble river bottom protection layer above earth blanket.
Described concrete beam plate surface is provided with side walk slab, and river course lateral edges is provided with guard bar structure.
A construction method for city river pile-column framework bank protection structure, comprises the following steps:
(a) at riverbank construction concrete pile body, described concrete pile body adopts concrete drilling bored concrete pile or hand excavated pile, and the pile body degree of depth is according to calculative determination, and top extends on ground;
(b) cut the open structure at concrete pile body top, excavate the soil body of concrete pile body river course side, the soil body between removing concrete pile body is to the position of center line of concrete pile body, construction dividing plate joint bar, the soil body after concreting dividing plate between concrete pile body is for the wall between a gear concrete pile body, the top cast-in-situ concrete leveling layer of concrete pile body;
(c) in river course foundation ditch, Parallel to the flow direction is constructed after concrete cushion, build the concrete bottom beam for supporting concrete column, reserved column joint bar on concrete bottom beam, concreting column, riverbed, inner side surface construction earth blanket, re-lays cobble river bottom protection layer on it;
(d) at concrete pile body top and concrete column top construction concrete beam plate, concrete beam plate surface adopts side walk slab's facing to form trip pavement, and guard bar structure is established at edge, and concrete beam plate top also can be laid planting soil and be formed greenbelt;
(e) form frame construction by concrete pile body, concrete diaphragm, concrete column, concrete beam plate, after completion, the earth blanket at position, the outer riverbed of implementation framework, re-lays cobble river bottom protection layer on it.
The beneficial effects of the utility model are:
(1) the utility model not only has the gear soil of traditional cities channel revetment, the function of retaining, compared with existing open channel revetment technology, in urban land anxiety, the difficulty of removing, when surrounding building is intensive, the utility model directly utilizes space enclosing structure to make shore protection, and comprehensive utilization degree is high;
(2) tower structure is not in reducing riverbank land used, keeping bank road unimpeded, and neither deepening of riverbed, can expand again the flow section in river course, increases hydrophily;
(3) in framework, the riverbed face of expansion is implemented earth blanket and cobble river bottom protection layer, is conducive to bryophyte growth, reaches the effect of improving water quality and riverside landscape.
(4) the utility model provides a kind of construction method, concrete pile body adopts hand excavated pile, in the time not having condition to arrange that builder's road, the narrow construction machinery in construction plant cannot be arranged or surrounding building has higher vibration isolation requirement, still can implement channel revetment Ji An road.
Brief description of the drawings
Fig. 1 is the lateral view of the pile-column framework bank protection structure for city river that provides of the utility model embodiment.
Fig. 2 is the I--I sectional view of Fig. 1.
Fig. 3 is II-II sectional view of Fig. 1.
Label declaration in figure: 1-concrete pile body; 2-concrete diaphragm; 3-dividing plate joint bar; 4-concrete leveling layer; 5-concrete cushion; 6-concrete bottom beam; 7-concrete column; 8-earth blanket; 9-cobble river bottom protection layer; 10-concrete beam plate; 11-side walk slab; 12-guard bar structure; 13-guardrail joint bar; 14-real stone paint decoration surface; 15-column joint bar; 16-cement mortar screeding layer.
Detailed description of the invention
In order to make the purpose of this utility model, implementer's case and advantage clearer, below in conjunction with drawings and Examples, the utility model is further described.
The utility model is the bank protection structure in one-sided river course, can use separately, also can use in river course, both sides simultaneously.
The main frame structure of the utility model shore protection comprises concrete pile body 1, concrete diaphragm 2, concrete bottom beam 6, concrete column 7, concrete beam plate 10, concrete column 7 is positioned on concrete bottom beam 6 bases, concrete pile body 1 is connected by dividing plate joint bar 3 with concrete diaphragm 2, concrete column 7 is connected by column joint bar 15 with concrete bottom beam 6, and the Reinforcement that concrete beam plate 10 exposes by concrete pile body 1 and concrete column 7 tops is connected and fixed.The riverbed face of concrete column both sides is equipped with earth blanket, re-lays cobble river bottom protection layer on it.
The bank protection structure construction method that Fig. 1 embodiment provides is as follows:
(a) at riverbank construction concrete pile body 1, having ready conditions while adopting bored pile in construction plant, preferentially adopts bored pile, stake footpath 1.0m, spacing 1.5m layout, pile body concrete class must not be lower than C20, the pile body degree of depth is according to calculative determination, and top extends on ground; Construction plant does not have condition to adopt when bored pile, adopts hand excavated pile, utilizes prefabricated walling crib to carry out supporting, and excavation successively is from top to bottom excavated to after projected depth backfill C20 concrete in walling crib.
(b) cut concrete pile body top open structure, excavate the soil body of pile body river course side, the soil body between removing pile body is to pile body center line, arrange the dividing plate joint bar 3 of stationary barrier along pile body short transverse, the soil body after wall between concreting dividing plate 2 between pile body is for soldier pile, pile body top cast-in-situ concrete leveling layer 4.
(c) in river course foundation ditch, after basic smooth compacting, lay concrete cushion 5, the thick 10cm of bed course left and right, strength grade is C10.Bed course top construction concrete bottom beam 6, reserved column joint bar 15 on concrete bottom beam 6, concreting column 7, thick earth blanket 8 and the thick cobble river bottom protection layer 9 of 20cm of framework inland river bed surface construction 20cm, the cobble particle diameter of employing is generally at 2cm~15cm.
(d) at concrete pile body 1 and concrete column 7 top construction concrete beam plates 10, beam slab concrete class is generally not less than C25, thickness of slab 30cm left and right while adopting plain concrete thick plate structure, thickness of slab 12cm~15cm while adopting reinforced concrete beam and plate.
(e) when concrete beam plate 10 surfaces are as trip pavement structure, 2cm solid cement mortar levelling layer 16 is established on surface, re-lay side walk slab 11, trip pavement river course lateral edges is established guard bar structure 12, the column of guard bar structure 12 is fixed on the base of guard bar structure 12, fixing with base and the concrete beam plate 10 of guard bar structure 12 by guardrail joint bar 13.
(f) consider attractive in appearancely, can adopt real stone paint decoration surface 14 on the external surface of concrete beam plate 10 river course sides, the surface of concrete column 7, earth blanket 8, the cobble river bottom protection layer 9 at position, the outer riverbed of shore protection framework are implemented after the completion of shore protection frame construction.
According to view needs, concrete beam plate 10 can substitute with stone material or through antiseptic timber, and top also can directly be laid planting soil and be formed greenbelt.

Claims (3)

1. a city river pile-column framework bank protection structure, it is mainly by concrete pile body (1), concrete diaphragm (2), concrete bottom beam (6), concrete column (7) and concrete beam plate (10) composition, it is characterized in that: described concrete pile body (1) is arranged at the bank slope side in river course, concrete bottom beam (6) is arranged in river course, described concrete column (7) is cast on the basis of concrete bottom beam (6) by column joint bar (15), concrete diaphragm (2) is cast between concrete pile body (1) by dividing plate joint bar (3), concrete beam plate (10) is cast in the top of concrete pile body (1) and concrete column (7).
2. city river pile-column framework bank protection structure according to claim 1, is characterized in that: the riverbed face of described concrete column (7) both sides is equipped with earth blanket (8), and earth blanket (8) is equipped with cobble river bottom protection layer (9) above.
3. city river pile-column framework bank protection structure according to claim 1, is characterized in that: described concrete beam plate (10) surface is provided with side walk slab (11), and its river course lateral edges is provided with guard bar structure (12).
CN201420308593.3U 2014-06-11 2014-06-11 City river pile-column framework bank protection structure Expired - Lifetime CN203939008U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420308593.3U CN203939008U (en) 2014-06-11 2014-06-11 City river pile-column framework bank protection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420308593.3U CN203939008U (en) 2014-06-11 2014-06-11 City river pile-column framework bank protection structure

Publications (1)

Publication Number Publication Date
CN203939008U true CN203939008U (en) 2014-11-12

Family

ID=51858335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420308593.3U Expired - Lifetime CN203939008U (en) 2014-06-11 2014-06-11 City river pile-column framework bank protection structure

Country Status (1)

Country Link
CN (1) CN203939008U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018460A (en) * 2014-06-11 2014-09-03 浙江省水利水电勘测设计院 Pile and column type frame bank-protection structure of city watercourse and construction method thereof
CN112376420A (en) * 2020-09-29 2021-02-19 福州市规划设计研究院 Construction method for paving sidewalk on lake

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018460A (en) * 2014-06-11 2014-09-03 浙江省水利水电勘测设计院 Pile and column type frame bank-protection structure of city watercourse and construction method thereof
CN112376420A (en) * 2020-09-29 2021-02-19 福州市规划设计研究院 Construction method for paving sidewalk on lake

Similar Documents

Publication Publication Date Title
CN203603105U (en) Wall plate type ecological retaining wall bank protection structure
CN202718138U (en) Self-locking type ecological retaining wall structure
CN206428709U (en) A kind of highway slope protection
CN109826065B (en) High-fill roadbed protection system and construction method thereof
CN102373675B (en) Fabricated culvert member and construction method thereof
CN203939008U (en) City river pile-column framework bank protection structure
CN104372765A (en) Frame column type frame bank protection structure for city watercourse and construction method of bank protection structure
CN207568626U (en) A kind of tunnel structure for expansive stratum
CN204174636U (en) In-situ deposited prefabricated combined retaining wall structure
CN112031119B (en) Large-section flood discharge ditch for mountainous terrain and construction method thereof
CN201502019U (en) Permeable ground structure
CN104018460A (en) Pile and column type frame bank-protection structure of city watercourse and construction method thereof
CN208748462U (en) Can rapid construction high-bearing capacity pervious surface
CN207469190U (en) A kind of infitration galleries structure of efficient draining
CN216077128U (en) Subway double-layer full-section freezing underground excavation transfer station structure
CN202370001U (en) Shoring structure
CN214301528U (en) Sponge transformation system for urban river retaining wall
CN204282291U (en) City river frame pillar framework bank protection structure
CN111962632A (en) Rainwater sewer and construction method thereof
CN101603299B (en) Broken line type dam joint structure and construction method thereof
CN206457856U (en) A kind of ground crack resistence structure
CN206245321U (en) Cut slope composite supporting construction
CN204690782U (en) Mutual embedding reinforcement formula Ecological Retaining Wall
CN219772852U (en) Multi-functional ecological river course section structure
CN215052633U (en) Pile box type retaining wall for slope protection

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant