CN102060201A - 由迁车台侧进出列车的翻车机及其调车系统卸煤装置的布置方法 - Google Patents

由迁车台侧进出列车的翻车机及其调车系统卸煤装置的布置方法 Download PDF

Info

Publication number
CN102060201A
CN102060201A CN 201010561121 CN201010561121A CN102060201A CN 102060201 A CN102060201 A CN 102060201A CN 201010561121 CN201010561121 CN 201010561121 CN 201010561121 A CN201010561121 A CN 201010561121A CN 102060201 A CN102060201 A CN 102060201A
Authority
CN
China
Prior art keywords
transfer platform
line
wagon
empty wagons
locomotive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010561121
Other languages
English (en)
Other versions
CN102060201B (zh
Inventor
叶海颖
许一冰
唐科岐
胡军
陈�田
章艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Original Assignee
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwest Electric Power Design Institute of China Power Engineering Consulting Group filed Critical Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Priority to CN 201010561121 priority Critical patent/CN102060201B/zh
Publication of CN102060201A publication Critical patent/CN102060201A/zh
Application granted granted Critical
Publication of CN102060201B publication Critical patent/CN102060201B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Loading Or Unloading Of Vehicles (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

本发明公开了一种由迁车台侧进出列车的翻车机及其调车系统卸煤装置的布置方法,重车由机车通过规划的两座翻车机室之间的机车走行线牵引至A重车线(或B重车线),整列停放;然后通过机车顶回至A翻车机室(或B翻车机室);空车由A迁车台(或B迁车台)迁至A空车线(或B空车线),在A空车线(或B空车线)停放、组列,然后由机车通过迁车台牵引出厂。本发明的优点是:1、厂区近端仅需布置1-2股铁路线,翻车机室可布置于紧邻厂区的位置。2、大大节省厂内输煤系统投资。3、输煤系统设备布置集中,运行管理方便,厂用电少。

Description

由迁车台侧进出列车的翻车机及其调车系统卸煤装置的布置方法
技术领域:
本发明属于火力发电厂铁路来煤翻车机卸煤系统领域,涉及一种调车系统卸煤装置的布置方法,尤其是一种由迁车台侧进出列车的翻车机及其调车系统卸煤装置的布置方法。
背景技术:
火力发电厂铁路来煤翻车机卸煤系统,通常的布置方法是折返式布置或者通过式布置,这两种布置型式的共同特点是进厂重车要停放在厂区近端。根据整列进厂的要求,厂区近端需要至少1050m左右的直线铁路线作为重车停放地点。然而,有的时候,受厂区位置影响,厂区近端难以布置下1050m直线铁路线,如果采用常规的折返式或者通过式翻车机卸煤系统布置方法,翻车机室要布置在厂区远端。这样,卸煤系统运输距离太长,增加了转运站、栈桥及带式输送机的投资。因此,有必要对力发电厂铁路来煤翻车机卸煤系统进行进一步的研究,提出行之有效的方法以替代折返式或者通过式的布置方法。
发明内容:
本发明的目的在于提供一种在满足卸煤效率的前提下将翻车机室布置在紧邻厂区而停车线布置在远离厂区的布置方法,以达到节省卸煤煤系统运输距离,减少工程投资的目的。
为达到上述目的,本发明是采取如下技术方法予以实现的:按照如下步骤:
(1)在机车走行线两侧设置A迁车台和B迁车台,在A迁车台后设置A翻车机室,在B迁车台后设置B翻车机室;在A迁车台外侧设置A空调线;在B迁车台外侧设置B空调线;在A迁车台外端设置A空车线,在B迁车台外端设置B空车线,A空车线、B空车线和机车走行线在进车方向交于一点;在A迁车台内端设置A重车线,在B迁车台内端设置B重车线;在A翻车机室设置有A重调线,在B翻车机室设置有B重调线;
(2)重车由机车通过机车走行线牵引至A重车线或B重车线后、整列停放;
(3)然后重车由机车顶回至A翻车机室或B翻车机室;
(4)空车由A迁车台或B迁车台迁至A空车线或B空车线,在A空车线或B空车线停放、组列,然后由机车通过迁车台牵引出厂。
1.进厂重车线兼做机车走行线,布置在两座翻车机室中间。
2.空车停放在翻车机室进厂铁路远端,机车牵引离厂时,整列空车离厂时要通过迁车台。
3.允许空车从空车调车机大臂下通过。
4.空车调车机的轨道长度要加长至70米左右,以便将空车前几列车箱调出迁车台区域。
本发明的优点是:
1、厂区近端仅需布置1-2股铁路线,翻车机室可布置于紧邻厂区的位置。
2、大大节省厂内输煤系统投资。
3、输煤系统设备布置集中,运行管理方便,厂用电少。
附图说明
图1为本发明的布置示意图。
其中:1为A迁车台;1-1为A空调线;1-2为A重调线;1-3为A空车线;1-4为A重车线;1-5为A翻车机室;2为B迁车台;2-1为B空调线;2-2为B重调线;2-3为B空车线;2-4为B重车线;2-5为B翻车机室;3为机车走行线。
具体实施方式:
下面结合附图对本发明作进一步说明:
如图1所示:由迁车台侧进出列车的翻车机及其调车系统卸煤装置的布置方法如下:
重车由机车通过规划的两座翻车机室之间的重车线兼机车走行线牵引至A重车线(或B重车线),整列停放;然后通过机车顶回至A翻车机室(或B翻车机室);空车由A迁车台(或B迁车台)迁至A空车线(或B空车线),在A空车线(或B空车线)停放、组列,然后由机车通过迁车台牵引出厂。
迁车台和空车调车机要根据本发明作适当改进,以满足上述运行方式要求。
1.迁车台要允许整列空车从其上部通过(通过速度小于15km/h),钢结构保证具有足够的强度。迁车台两端设置液压对位装置。迁车台尾部设置自动升降二元缓冲器。在迁车台非进车方向设有光电检测装置,保证机车牵引整列空车过程中,迁车台不离开空车线。
2.空车调车机要采用大臂俯仰结构,需要增加液压站和齿条油缸,允许空车从空车调车机大臂下通过。
以上内容是结合具体的优选实施方式对本发明所作的进一步详细说明,不能认定本发明的具体实施方式仅限于此,对于本发明所属技术领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干简单的推演或替换,都应当视为属于本发明由所提交的权利要求书确定专利保护范围。

Claims (5)

1.由迁车台侧进出列车的翻车机及其调车系统卸煤装置的布置方法,其特征在于,按照如下步骤:
(1)在机车走行线两侧设置A迁车台和B迁车台,在A迁车台后设置A翻车机室,在B迁车台后设置B翻车机室;在A迁车台外侧设置A空调线;在B迁车台外侧设置B空调线;在A迁车台外端设置A空车线,在B迁车台外端设置B空车线,A空车线、B空车线和机车走行线在进车方向交于一点;在A迁车台内端设置A重车线,在B迁车台内端设置B重车线;在A翻车机室设置有A重调线,在B翻车机室设置有B重调线;
(2)重车由机车通过机车走行线牵引至A重车线或B重车线后、整列停放;
(3)然后重车由机车通过机车顶回至A翻车机室或B翻车机室;
(4)空车由A迁车台或B迁车台迁至A空车线或B空车线,在A空车线或B空车线停放、组列,然后由机车通过迁车台牵引出厂。
2.如权利要求1所述由迁车台侧进出列车的翻车机及其调车系统卸煤装置的布置方法,其特征在于:所述机车走行线兼做进厂重车线,布置在两座翻车机室中间。
3.如权利要求1所述由迁车台侧进出列车的翻车机及其调车系统卸煤装置的布置方法,其特征在于:所述空车停放在翻车机室进厂铁路远端,机车牵引离厂时,整列空车离厂时要通过迁车台。
4.如权利要求1所述由迁车台侧进出列车的翻车机及其调车系统卸煤装置的布置方法,其特征在于:所述空车从空车调车机大臂下通过。
5.如权利要求1所述由迁车台侧进出列车的翻车机及其调车系统卸煤装置的布置方法,其特征在于:所述空车调车机的轨道长度要加长至70米左右,以便将空车前几列车箱调出迁车台区域。
CN 201010561121 2010-11-26 2010-11-26 由迁车台侧进出列车的翻车机卸煤装置的布置方法 Active CN102060201B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010561121 CN102060201B (zh) 2010-11-26 2010-11-26 由迁车台侧进出列车的翻车机卸煤装置的布置方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010561121 CN102060201B (zh) 2010-11-26 2010-11-26 由迁车台侧进出列车的翻车机卸煤装置的布置方法

Publications (2)

Publication Number Publication Date
CN102060201A true CN102060201A (zh) 2011-05-18
CN102060201B CN102060201B (zh) 2013-01-09

Family

ID=43995746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010561121 Active CN102060201B (zh) 2010-11-26 2010-11-26 由迁车台侧进出列车的翻车机卸煤装置的布置方法

Country Status (1)

Country Link
CN (1) CN102060201B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103072830A (zh) * 2013-02-21 2013-05-01 中冶赛迪工程技术股份有限公司 一种新型翻车机系统
CN103144977A (zh) * 2013-03-27 2013-06-12 大连华锐重工集团股份有限公司 两用贯通式翻车机卸车系统及其操作方法
CN105480255A (zh) * 2015-12-30 2016-04-13 南车眉山车辆有限公司 一种长大铁路货车迁车装置及迁车方法
CN108773695A (zh) * 2018-07-03 2018-11-09 大连华锐重工集团股份有限公司 一种翻车机系统用双线空车推送系统
CN110950106A (zh) * 2019-12-11 2020-04-03 华电重工股份有限公司 一种卸煤沟端部设置翻车机的方法、电厂卸煤系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19921083A1 (de) * 1999-04-30 2000-11-02 Ver Energiewerke Ag Verfahren und Anordnung zum Auftauen von mit Sattelbodenwaggons transportierten Schüttgütern in mit Entstaubungsanlagen versehenen geschlossenen Bunkeranlagen mit Schwerkraftentladung
US7114909B2 (en) * 2002-11-25 2006-10-03 Ty-Crop Manufacturing, Ltd. Trailer-tilting, load-discharge apparatus and method
CN1876533A (zh) * 2006-06-01 2006-12-13 大连华锐股份有限公司 新型翻车机卸车系统空车调车装置
CN101318597A (zh) * 2008-07-08 2008-12-10 西安交通大学 一种自动引导汽车卸煤配煤系统及方法
CN201250027Y (zh) * 2008-08-20 2009-06-03 大连华锐股份有限公司 翻车机压车装置
CN201437477U (zh) * 2009-08-20 2010-04-14 大连华锐股份有限公司 一种双车翻车机

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19921083A1 (de) * 1999-04-30 2000-11-02 Ver Energiewerke Ag Verfahren und Anordnung zum Auftauen von mit Sattelbodenwaggons transportierten Schüttgütern in mit Entstaubungsanlagen versehenen geschlossenen Bunkeranlagen mit Schwerkraftentladung
US7114909B2 (en) * 2002-11-25 2006-10-03 Ty-Crop Manufacturing, Ltd. Trailer-tilting, load-discharge apparatus and method
CN1876533A (zh) * 2006-06-01 2006-12-13 大连华锐股份有限公司 新型翻车机卸车系统空车调车装置
CN101318597A (zh) * 2008-07-08 2008-12-10 西安交通大学 一种自动引导汽车卸煤配煤系统及方法
CN201250027Y (zh) * 2008-08-20 2009-06-03 大连华锐股份有限公司 翻车机压车装置
CN201437477U (zh) * 2009-08-20 2010-04-14 大连华锐股份有限公司 一种双车翻车机

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103072830A (zh) * 2013-02-21 2013-05-01 中冶赛迪工程技术股份有限公司 一种新型翻车机系统
CN103072830B (zh) * 2013-02-21 2016-01-06 中冶赛迪工程技术股份有限公司 一种新型翻车机系统
CN103144977A (zh) * 2013-03-27 2013-06-12 大连华锐重工集团股份有限公司 两用贯通式翻车机卸车系统及其操作方法
CN103144977B (zh) * 2013-03-27 2015-04-08 大连华锐重工集团股份有限公司 两用贯通式翻车机卸车系统及其操作方法
CN105480255A (zh) * 2015-12-30 2016-04-13 南车眉山车辆有限公司 一种长大铁路货车迁车装置及迁车方法
CN108773695A (zh) * 2018-07-03 2018-11-09 大连华锐重工集团股份有限公司 一种翻车机系统用双线空车推送系统
CN108773695B (zh) * 2018-07-03 2023-07-25 大连华锐重工集团股份有限公司 一种翻车机系统用双线空车推送系统
CN110950106A (zh) * 2019-12-11 2020-04-03 华电重工股份有限公司 一种卸煤沟端部设置翻车机的方法、电厂卸煤系统

Also Published As

Publication number Publication date
CN102060201B (zh) 2013-01-09

Similar Documents

Publication Publication Date Title
CN102060201B (zh) 由迁车台侧进出列车的翻车机卸煤装置的布置方法
CN201620324U (zh) 一种铁路综合维修车
CN102102321A (zh) 一种铁路综合维修车
CN104527649B (zh) 一种铁路无调车编组站系统
CN104118738B (zh) 一种折返式翻车机翻卸系统及其使用方法
CN107226094A (zh) 一种重载铁路车场“2线夹1机走”线束结构设计
CN103469705B (zh) 轨排铺轨机及其铺轨方法
CN111762687A (zh) 一种集装箱公铁联运侧面装卸系统及方法
CN208469803U (zh) 适用于车站的轨道系统
CN110422182A (zh) 一种铁水联运轨道牵引车系统及方法
CN108846243A (zh) 一种重载铁路环形装车站平面基本结构设计
CN101798026B (zh) 一种不摘钩专用敞车用折返式翻车机卸车系统
CN204078945U (zh) 一种折返式翻车机翻卸系统
CN107053979A (zh) 公铁两用自动转运车
CN106743009A (zh) 一种双环形轨道的穿梭车调度方法
CN203529498U (zh) 高效折返式翻车机卸车系统
CN202358704U (zh) 多功能折返式单车翻车机卸车系统
CN208636829U (zh) 一种重载铁路环形装车站
CN209369821U (zh) 一种用于在狭小工作井中双向掘进的盾构施工台车运输系统
CN211200100U (zh) 一种运梁车转向架与架桥喂梁机构一体化的装置
CN210557510U (zh) 过道岔低压轨道搬运平台
CN107559024A (zh) 一种地铁暗挖区间正线装配式二衬预制管片洞内运输方法
CN113320549A (zh) 一种环抱接轨站的重载铁路专用线装车站平面布置结构
CN2412801Y (zh) 铁路编组站车厢横移搬运设备
CN216272085U (zh) 架空式地铁停车场卸车结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: NORTHWEST ELECTRIC POWER DESIGN INSTITUTE OF CHINA

Free format text: FORMER NAME: NORTHWEST ELECTRIC POWER DESIGN INSTITUTE, CHINA POWER ENGINEERING CONSULTING GROUP CORPORATION

CP01 Change in the name or title of a patent holder

Address after: 710075 Xi'an province high tech Development Zone, unity South Road, No. 22, No.

Patentee after: NORTHWEST ELECTRIC POWER DESIGN INSTITUTE CO., LTD. OF CHINA POWER ENGINEERING CONSULTING GROUP

Address before: 710075 Xi'an province high tech Development Zone, unity South Road, No. 22, No.

Patentee before: Northwest Electric Power Design Institute, China Power Engineering Consulting Group Corporation