CN102031869A - 水平模板钢结构托架 - Google Patents
水平模板钢结构托架 Download PDFInfo
- Publication number
- CN102031869A CN102031869A CN 201110030519 CN201110030519A CN102031869A CN 102031869 A CN102031869 A CN 102031869A CN 201110030519 CN201110030519 CN 201110030519 CN 201110030519 A CN201110030519 A CN 201110030519A CN 102031869 A CN102031869 A CN 102031869A
- Authority
- CN
- China
- Prior art keywords
- girder
- secondary beam
- primary
- steel work
- work carriage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 52
- 239000010959 steel Substances 0.000 title claims abstract description 52
- 238000009416 shuttering Methods 0.000 claims description 29
- 230000008878 coupling Effects 0.000 claims description 18
- 238000010168 coupling process Methods 0.000 claims description 18
- 238000005859 coupling reaction Methods 0.000 claims description 18
- 238000009434 installation Methods 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 18
- 210000001503 joint Anatomy 0.000 description 6
- 238000010586 diagram Methods 0.000 description 4
- 230000003044 adaptive effect Effects 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000009415 formwork Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 239000007799 cork Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100305190A CN102031869B (zh) | 2011-01-28 | 2011-01-28 | 水平模板钢结构托架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100305190A CN102031869B (zh) | 2011-01-28 | 2011-01-28 | 水平模板钢结构托架 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102031869A true CN102031869A (zh) | 2011-04-27 |
CN102031869B CN102031869B (zh) | 2012-02-22 |
Family
ID=43885264
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011100305190A Active CN102031869B (zh) | 2011-01-28 | 2011-01-28 | 水平模板钢结构托架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102031869B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107542040A (zh) * | 2017-10-19 | 2018-01-05 | 安徽建诚国际经济技术合作有限公司 | 一种建筑施工作业支撑机构及其安装方法 |
CN109072620A (zh) * | 2016-02-02 | 2018-12-21 | 乌尔玛Cye,S.公司 | 水平模板 |
CN110670873A (zh) * | 2019-10-11 | 2020-01-10 | 中建三局集团有限公司 | 一种超高大截面混凝土柱钢模板的托撑体系及施工方法 |
CN110847376A (zh) * | 2019-11-26 | 2020-02-28 | 西安建筑科技大学 | 一种圆竹构成的大跨度屋面体系 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10258985A (ja) * | 1997-03-19 | 1998-09-29 | Nozawa Corp | 中空パネルの吊り上げ金具及び中空パネルの吊り上げ方法 |
GB2325012A (en) * | 1997-05-06 | 1998-11-11 | Shih Lung Li | Steel post for supporting a molding board |
EP1234930A2 (en) * | 2001-01-12 | 2002-08-28 | New Tecno Plast - S.R.L. | Tie rod for the realisation of formworks for reinforced concrete |
CN201043354Y (zh) * | 2007-04-28 | 2008-04-02 | 北京卓良模板有限公司 | 整体式建筑模板及模板托架 |
CN201428249Y (zh) * | 2009-04-16 | 2010-03-24 | 赵更生 | 建筑模板支撑结构 |
CN101736900A (zh) * | 2009-12-08 | 2010-06-16 | 中国建筑第八工程局有限公司 | 独立支撑模板体系 |
CN201507114U (zh) * | 2009-09-22 | 2010-06-16 | 马荣全 | 建筑顶板和梁模板的支撑结构 |
-
2011
- 2011-01-28 CN CN2011100305190A patent/CN102031869B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10258985A (ja) * | 1997-03-19 | 1998-09-29 | Nozawa Corp | 中空パネルの吊り上げ金具及び中空パネルの吊り上げ方法 |
GB2325012A (en) * | 1997-05-06 | 1998-11-11 | Shih Lung Li | Steel post for supporting a molding board |
EP1234930A2 (en) * | 2001-01-12 | 2002-08-28 | New Tecno Plast - S.R.L. | Tie rod for the realisation of formworks for reinforced concrete |
CN201043354Y (zh) * | 2007-04-28 | 2008-04-02 | 北京卓良模板有限公司 | 整体式建筑模板及模板托架 |
CN201428249Y (zh) * | 2009-04-16 | 2010-03-24 | 赵更生 | 建筑模板支撑结构 |
CN201507114U (zh) * | 2009-09-22 | 2010-06-16 | 马荣全 | 建筑顶板和梁模板的支撑结构 |
CN101736900A (zh) * | 2009-12-08 | 2010-06-16 | 中国建筑第八工程局有限公司 | 独立支撑模板体系 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109072620A (zh) * | 2016-02-02 | 2018-12-21 | 乌尔玛Cye,S.公司 | 水平模板 |
CN107542040A (zh) * | 2017-10-19 | 2018-01-05 | 安徽建诚国际经济技术合作有限公司 | 一种建筑施工作业支撑机构及其安装方法 |
CN110670873A (zh) * | 2019-10-11 | 2020-01-10 | 中建三局集团有限公司 | 一种超高大截面混凝土柱钢模板的托撑体系及施工方法 |
CN110670873B (zh) * | 2019-10-11 | 2021-03-26 | 中建三局集团有限公司 | 一种超高大截面混凝土柱钢模板的托撑体系及施工方法 |
CN110847376A (zh) * | 2019-11-26 | 2020-02-28 | 西安建筑科技大学 | 一种圆竹构成的大跨度屋面体系 |
Also Published As
Publication number | Publication date |
---|---|
CN102031869B (zh) | 2012-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211172382U (zh) | 一种钢梁连接节点 | |
CN101949212A (zh) | 楼板可拆模板支撑系统及其施工方法 | |
CN104196231A (zh) | 一种混凝土楼板铝合金模板及其施工方法 | |
CN102031869B (zh) | 水平模板钢结构托架 | |
CN106760634B (zh) | 活动房 | |
CN202012192U (zh) | 钢结构托架 | |
CN105421748A (zh) | 一种悬挑脚手架的锚固装置 | |
CN105275203A (zh) | 伸缩梁及利用其制作的可调模架体系和该模架的施工方法 | |
CN201943345U (zh) | 工具式水平模板钢结构托架 | |
CN111236620A (zh) | 一种锚固螺栓套管及可回收悬挑脚手架锚固螺栓施工方法 | |
CN202220434U (zh) | 铝合金建筑模板组件 | |
CN106894625B (zh) | 模块化外挂式脚手架 | |
CN207314826U (zh) | 一种工具式单侧支模体系 | |
CN106088579A (zh) | 钢筋混凝土墙体模板的搭设方法 | |
CN202467172U (zh) | 一种与楼面钢梁腹板连接的刚支撑结构 | |
CN108952207A (zh) | 一种钢结构建筑的增层结构及增层方法 | |
CN211369529U (zh) | 一种用于伸缩缝处的模板 | |
CN204728688U (zh) | 一种建筑用组合模板 | |
CN210289158U (zh) | 叠合板与梁或墙连接的临时支托装置 | |
CN209907886U (zh) | 一种可调节的装配式楼梯施工平台 | |
KR200392341Y1 (ko) | 공중비계용 고정장치 | |
CN209212239U (zh) | 一种竖井顶板混凝土施工装置 | |
CN202338108U (zh) | 一种固定在楼面钢梁下翼板钢木支座刚支撑结构 | |
CN106193587A (zh) | 铝合金建筑模板拼接组件 | |
CN202031323U (zh) | 一种钢筋混凝土梁早拆模板体系的多功能加筋板 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
CB03 | Change of inventor or designer information |
Inventor after: Ma Rongquan Inventor after: Zhao Yajun Inventor after: Li Dong Inventor after: Chen Junjie Inventor after: Ma Jianting Inventor before: Ma Rongquan Inventor before: Zhao Yajun Inventor before: Li Dong Inventor before: Chen Junjie |
|
COR | Change of bibliographic data | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160701 Address after: 200135 Shanghai City, Pudong New Area source deep road, No. 269 Patentee after: China Construction Eighth Engineering Division Co., Ltd. Patentee after: Beijing Demann Rick Technology Development Co. Ltd. Address before: 200135 Shanghai City, Pudong New Area source deep road, No. 269 Patentee before: China Construction Eighth Engineering Division Co., Ltd. |
|
CB03 | Change of inventor or designer information |
Inventor after: Ma Rongquan Inventor after: Zhao Yajun Inventor after: Li Dong Inventor after: Chen Junjie Inventor before: Ma Rongquan Inventor before: Zhao Yajun Inventor before: Li Dong Inventor before: Chen Junjie Inventor before: Ma Jianting |
|
CB03 | Change of inventor or designer information | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170914 Address after: 200122 China (Shanghai) free trade test zone, 1568 Century Avenue, 27 floor Patentee after: China Construction Eighth Engineering Division Co., Ltd. Address before: 200135 Shanghai City, Pudong New Area source deep road, No. 269 Co-patentee before: Beijing Demann Rick Technology Development Co. Ltd. Patentee before: China Construction Eighth Engineering Division Co., Ltd. |
|
TR01 | Transfer of patent right |