CN101968138B - Pccp管道现场开孔施工方法 - Google Patents

Pccp管道现场开孔施工方法 Download PDF

Info

Publication number
CN101968138B
CN101968138B CN201010524216A CN201010524216A CN101968138B CN 101968138 B CN101968138 B CN 101968138B CN 201010524216 A CN201010524216 A CN 201010524216A CN 201010524216 A CN201010524216 A CN 201010524216A CN 101968138 B CN101968138 B CN 101968138B
Authority
CN
China
Prior art keywords
pipeline
epoxy resin
mortar
resin mortar
tapping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201010524216A
Other languages
English (en)
Other versions
CN101968138A (zh
Inventor
刘川
张春明
李扬端
阙小平
陈明轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINJIANG GUOTONG TUBE CO Ltd
SICHUAN GUOTONG CONCRETE PRODUCTS CO Ltd
Original Assignee
XINJIANG GUOTONG TUBE CO Ltd
SICHUAN GUOTONG CONCRETE PRODUCTS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINJIANG GUOTONG TUBE CO Ltd, SICHUAN GUOTONG CONCRETE PRODUCTS CO Ltd filed Critical XINJIANG GUOTONG TUBE CO Ltd
Priority to CN201010524216A priority Critical patent/CN101968138B/zh
Publication of CN101968138A publication Critical patent/CN101968138A/zh
Application granted granted Critical
Publication of CN101968138B publication Critical patent/CN101968138B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

本发明公开了一种PCCP管道现场开孔施工方法,在开孔时,通过预应力钢丝锚固实现了标准管道的预应力不损失;开孔段管体结构补强通过带支管钢制套管来实现;开孔处密封通过膨胀砂浆和环氧砂浆来实现。本发明的积极效果是:可以方便高效地在已经安装的PCCP标准管管道上现场开孔,实现了在已安装的PCCP管道标准管上直接开孔,而不影响管道本身结构、给管道造成功能上的损坏,能有效地缩短施工周期、降低施工成本。

Description

PCCP管道现场开孔施工方法
技术领域
本发明涉及一种管道施工方法,尤其是涉及一种PCCP管道现场开孔施工方法。
背景技术
目前,对于混凝土结构的管道支管线引出结构,通常需要通过先在工厂预制带支管的管道配件,然后在管道安装时实现。由于规划等多方面原因,在实际工程中会出现在主管线上临时接支管线的情况,而对于已经完成安装的混凝土管道的支管线引出结构,只能通过破管及更换管道实现,这样会导致施工周期长,成本高。
发明内容
为了克服现有技术的上述缺点,本发明提供了一种PCCP管道现场开孔施工方法,实现在已安装的PCCP管道标准管上直接开孔,而不影响管道本身结构、给管道造成功能上的损坏,能有效地缩短施工周期、降低施工成本。
本发明解决其技术问题所采用的技术方案是:一种PCCP管道现场开孔施工方法,包括以下步骤:
第一步,在标准管开孔位置剃掉原有砂浆保护层,露出预应力钢丝,在开孔时需要截断的环向预应力钢丝上、比开孔直径大30mm的位置,装上预应力钢丝用锚固块,对预应力钢丝进行锚固,并用环氧砂浆将所有预应力钢丝用锚固块抹平,使预应力钢丝用锚固块预埋于环氧砂浆中,环氧砂浆的厚度大于等于原标准管砂浆保护层的厚度,且开孔处不抹环氧砂浆;
第二步,将带支管钢制套管分为两半在开孔位置现场焊接成整体套管,套管内径大于预开孔标准管外径100mm;
第三步,在带支管钢制套管和原标准管之间的间隙中密实填充膨胀砂浆;
第四步,在开孔处截断钢丝并利用开孔工具进行管道开孔,管道开孔处与带支管钢制套管支管连接处用环氧砂浆抹平密封。
与现有技术相比,本发明的积极效果是:可以方便高效地在已经安装的PCCP标准管管道上现场开孔,且在开孔时,通过预应力钢丝锚固实现了标准管道的预应力不损失而保证管道结构强度不变且不影响管道的正常使用功能;开孔段管体结构补强通过带支管钢制套管来实现;开孔处密封通过膨胀砂浆和环氧砂浆来实现。
具体实施方式
一种PCCP管道现场开孔施工方法,包括如下步骤:
第一步:在标准管开孔位置剃掉原有砂浆保护层,露出预应力钢丝,在开孔时需要截断的环向预应力钢丝上、比开孔直径大30mm的位置,装上预应力钢丝用锚固块,实现预应力钢丝锚固,并用环氧砂浆将所有预应力钢丝用锚固块抹平,使预应力钢丝用锚固块预埋于环氧砂浆中,环氧砂浆的厚度大于等于原标准管砂浆保护层的厚度,且开孔处不抹环氧砂浆;
第二步:将带支管钢制套管分为两半在开孔位置现场焊接成整体套管,套管内径大于预开孔标准管外径100mm;
第三步:在带支管钢制套管和原标准管之间的间隙中密实填充膨胀砂浆;
第四步:在开孔处截断钢丝并利用开孔工具进行管道开孔,管道开孔处与带支管钢制套管支管连接处用环氧砂浆抹平密封。

Claims (1)

1.一种PCCP管道现场开孔施工方法,其特征在于:包括以下步骤:
第一步,在标准管开孔位置剃掉原有砂浆保护层,露出预应力钢丝,在开孔时需要截断的环向预应力钢丝上、比开孔直径大30mm的位置,装上预应力钢丝用锚固块,对预应力钢丝进行锚固,并用环氧砂浆将所有预应力钢丝用锚固块抹平,使预应力钢丝用锚固块预埋于环氧砂浆中,环氧砂浆的厚度大于等于原标准管砂浆保护层的厚度,且开孔处不抹环氧砂浆;
第二步,将带支管的钢制套管分为两半在开孔位置现场焊接成整体套管,套管内径大于预开孔标准管外径100mm;
第三步,在带支管钢制套管和原标准管之间的间隙中密实填充膨胀砂浆;
第四步,在开孔处截断钢丝并利用开孔工具进行管道开孔,管道开孔处与带支管钢制套管支管连接处用环氧砂浆抹平密封。
CN201010524216A 2010-10-29 2010-10-29 Pccp管道现场开孔施工方法 Active CN101968138B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010524216A CN101968138B (zh) 2010-10-29 2010-10-29 Pccp管道现场开孔施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010524216A CN101968138B (zh) 2010-10-29 2010-10-29 Pccp管道现场开孔施工方法

Publications (2)

Publication Number Publication Date
CN101968138A CN101968138A (zh) 2011-02-09
CN101968138B true CN101968138B (zh) 2012-10-03

Family

ID=43547339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010524216A Active CN101968138B (zh) 2010-10-29 2010-10-29 Pccp管道现场开孔施工方法

Country Status (1)

Country Link
CN (1) CN101968138B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105065774B (zh) * 2015-08-14 2017-05-31 腾达建设集团股份有限公司 一种地下管道支接施工方法
CN107178655B (zh) * 2016-03-09 2019-06-21 中国水利水电第十一工程局有限公司 复杂地形条件下pccp管的施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2700673Y (zh) * 2004-06-04 2005-05-18 李鹏 双向组合式锚固块
CN200981293Y (zh) * 2006-12-07 2007-11-28 新疆国统管道股份有限公司 Pccp管双向绕丝组合锚固装置
CN101625061A (zh) * 2009-05-27 2010-01-13 无锡华毅管道有限公司 预应力钢筒混凝土管管线应急抢修方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4848407A (en) * 1987-06-30 1989-07-18 Chevron Research Company Pipeline rehabilitation method utilizing articulated gasketed-joint pipe

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2700673Y (zh) * 2004-06-04 2005-05-18 李鹏 双向组合式锚固块
CN200981293Y (zh) * 2006-12-07 2007-11-28 新疆国统管道股份有限公司 Pccp管双向绕丝组合锚固装置
CN101625061A (zh) * 2009-05-27 2010-01-13 无锡华毅管道有限公司 预应力钢筒混凝土管管线应急抢修方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张敬辉等.无粘结预应力钢丝束肋形梁板开孔实例.《广东土木与建筑》.2004,(第10期), *
陈莉婷.预应力钢筒混凝土管(PCCP)停水开孔接分支管的方法介绍.《给水排水》.2010,第36卷(第1期), *

Also Published As

Publication number Publication date
CN101968138A (zh) 2011-02-09

Similar Documents

Publication Publication Date Title
CN102071776A (zh) 预制套灌浆钢筋连接套筒及其施工方法
CN108316944A (zh) 一种预制装配顶管防水系统
CN101956388A (zh) 一种灌浆固定海洋平台立管的新型卡子装置及其固定方法
CN103836268A (zh) 地下室混凝土外墙防水套管安装工法
CN101968138B (zh) Pccp管道现场开孔施工方法
CN208778877U (zh) 非预置防水套管装置
CN107514097B (zh) 预应力波纹管组件及其安装施工方法
RU2657381C2 (ru) Способ производства обетонированной трубы с кабель-каналом
CN205617425U (zh) 一种地下综合管廊预制拼装结构
CN205712499U (zh) 一种砼体预埋件
CN204844469U (zh) 预制剪力墙安装用预埋钢管孔定位装置
CN207598253U (zh) 一种预制装配顶管防水系统
CN103133785A (zh) 管道穿墙部位的防水处理结构
CN201843220U (zh) 建筑物填充墙拉结筋结构
CN211126998U (zh) 具有防水功能的穿墙套管组合
CN219954520U (zh) 一种地下室侧壁开洞的建筑节点
CN107762158B (zh) 一种在预应力波纹管上安装排气管的方法
CN108343065B (zh) 二次劈裂注浆的抗压连接结构及施工方法
CN106677050A (zh) 一种t梁预应力管道出浆装置
CN221121269U (zh) 一种管廊侧墙穿墙管防水结构
CN109281408A (zh) 一种综合管廊预埋件
CN212804595U (zh) 一种预埋构件串联套筒连接结构
CN208121813U (zh) 一种装配式钢筋混凝土管
CN103114723B (zh) 一种固定模板用装置的使用方法
CN213836546U (zh) 一种后装配橡胶止水带固端螺母预埋装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20110209

Assignee: GUANGDONG HAIYUAN PIPELINE CO., LTD.

Assignor: Sichuan national union concrete products Co., Ltd.|Xinjiang national pipeline Limited by Share Ltd

Contract record no.: 2015440000545

Denomination of invention: Holing construction method on PCCP pipeline site

Granted publication date: 20121003

License type: Exclusive License

Record date: 20150811

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model