CN101949261A - 组合式潜孔锤及其施工方法 - Google Patents
组合式潜孔锤及其施工方法 Download PDFInfo
- Publication number
- CN101949261A CN101949261A CN2010102988385A CN201010298838A CN101949261A CN 101949261 A CN101949261 A CN 101949261A CN 2010102988385 A CN2010102988385 A CN 2010102988385A CN 201010298838 A CN201010298838 A CN 201010298838A CN 101949261 A CN101949261 A CN 101949261A
- Authority
- CN
- China
- Prior art keywords
- combined type
- hole hammer
- type down
- hole
- air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 25
- 238000005553 drilling Methods 0.000 claims description 31
- 238000007789 sealing Methods 0.000 claims description 14
- 238000009527 percussion Methods 0.000 claims description 5
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 239000002893 slag Substances 0.000 claims description 4
- 230000009471 action Effects 0.000 claims description 3
- 230000010412 perfusion Effects 0.000 claims description 3
- 238000009826 distribution Methods 0.000 abstract description 9
- 230000008901 benefit Effects 0.000 abstract description 3
- 238000012423 maintenance Methods 0.000 abstract description 3
- 238000004080 punching Methods 0.000 abstract description 3
- 238000000034 method Methods 0.000 abstract description 2
- 230000001105 regulatory effect Effects 0.000 abstract 2
- 239000011435 rock Substances 0.000 description 7
- 239000000956 alloy Substances 0.000 description 4
- 229910045601 alloy Inorganic materials 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000007812 deficiency Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 150000001875 compounds Chemical class 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000009711 regulatory function Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B4/00—Drives for drilling, used in the borehole
- E21B4/16—Plural down-hole drives, e.g. for combined percussion and rotary drilling; Drives for multi-bit drilling units
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
Description
Claims (8)
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010298838 CN101949261B (zh) | 2010-09-30 | 2010-09-30 | 组合式潜孔锤及其施工方法 |
PCT/CN2011/076226 WO2012041084A1 (zh) | 2010-09-30 | 2011-06-23 | 组合式潜孔锤 |
JP2013530541A JP5948333B2 (ja) | 2010-09-30 | 2011-06-23 | 組合せ式ダウンザホールハンマー |
EP11827980.1A EP2623705B1 (en) | 2010-09-30 | 2011-06-23 | Combined down-the-hole hammer |
KR1020137011112A KR101746822B1 (ko) | 2010-09-30 | 2011-06-23 | 조합식 다운 홀 해머 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010298838 CN101949261B (zh) | 2010-09-30 | 2010-09-30 | 组合式潜孔锤及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101949261A true CN101949261A (zh) | 2011-01-19 |
CN101949261B CN101949261B (zh) | 2013-03-13 |
Family
ID=43452875
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010298838 Active CN101949261B (zh) | 2010-09-30 | 2010-09-30 | 组合式潜孔锤及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101949261B (zh) |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102518393A (zh) * | 2011-12-15 | 2012-06-27 | 贵州航天天马机电科技有限公司 | 一种组合潜孔锤 |
CN102971481A (zh) * | 2011-02-11 | 2013-03-13 | 陈樑材 | 环形孔钻孔机 |
CN103046863A (zh) * | 2011-10-13 | 2013-04-17 | 佺鸿机械有限公司 | 具灌浆管道的气动锤孔钻 |
CN103244049A (zh) * | 2012-02-10 | 2013-08-14 | 震东机械设备有限公司 | 用于控制dth锤的丛式钻孔机的操作的方法及装置 |
CN103726802A (zh) * | 2013-12-26 | 2014-04-16 | 北京市三一重机有限公司 | 排渣装置和旋挖钻机 |
US9175517B2 (en) | 2012-02-10 | 2015-11-03 | Top Mark Mechanical Equipment Limited | Method and apparatus for controlling the operation of cluster drill of down-the-hole hammers |
CN105041220A (zh) * | 2015-07-27 | 2015-11-11 | 王乐康 | 一种全液压反循环钻机的冲击钻头 |
CN105041199A (zh) * | 2015-05-28 | 2015-11-11 | 山东中瑞工程机械有限公司 | 集束式潜孔锤 |
CN105350909A (zh) * | 2015-11-23 | 2016-02-24 | 贵州航天天马机电科技有限公司 | 一种节能捆绑式组合锤 |
CN105934557A (zh) * | 2014-01-21 | 2016-09-07 | 山特维克知识产权股份有限公司 | 快速释放潜孔锤钻头组件 |
CN106194006A (zh) * | 2016-09-09 | 2016-12-07 | 北京中车重工机械有限公司 | 一种集束式潜孔锤 |
CN106223840A (zh) * | 2016-09-09 | 2016-12-14 | 北京中车重工机械有限公司 | 集束式潜孔锤及其潜孔锤单体锁固机构 |
CN106285459A (zh) * | 2016-10-28 | 2017-01-04 | 北京中车重工机械有限公司 | 潜孔锤单体的上接头和集束式潜孔锤 |
CN106437495A (zh) * | 2016-10-28 | 2017-02-22 | 北京中车重工机械有限公司 | 潜孔锤单体的下接头和集束式潜孔锤 |
CN107687320A (zh) * | 2017-09-15 | 2018-02-13 | 湖南新金刚工程机械有限公司 | 一种集束式潜孔锤 |
CN111550179A (zh) * | 2020-05-22 | 2020-08-18 | 杨忠财 | 一种连续墙嵌岩成墙系统及方法 |
CN112196460A (zh) * | 2020-09-08 | 2021-01-08 | 李新形 | 一种地下连续墙潜孔锤成槽机及其使用方法 |
CN114740725A (zh) * | 2022-04-20 | 2022-07-12 | 中交投资南京有限公司 | 用于贯通式潜孔锤的压力数据处理方法、控制方法及终端 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3958645A (en) * | 1972-04-24 | 1976-05-25 | Bakerdrill, Inc. | Bore hole air hammer |
CN85204567U (zh) * | 1985-10-26 | 1987-11-07 | 唐山工程技术学院 | 混合排气式潜孔风动冲击器 |
JPH09328983A (ja) * | 1996-06-12 | 1997-12-22 | Sun Tec:Kk | ダウンザホールハンマー |
JP2007146446A (ja) * | 2005-11-25 | 2007-06-14 | Kazunari Furuki | 掘削装置、掘削装置を備えた回転式掘削機及び回転駆動装置、地中掘削工法 |
CN101100859A (zh) * | 2007-06-06 | 2008-01-09 | 周洪生 | 嵌入岩石的桩基施工方法和设备 |
CN201027489Y (zh) * | 2007-06-06 | 2008-02-27 | 周洪生 | 捆绑式冲击锤 |
CN201786250U (zh) * | 2010-09-30 | 2011-04-06 | 湖南山河智能机械股份有限公司 | 组合式潜孔锤 |
-
2010
- 2010-09-30 CN CN 201010298838 patent/CN101949261B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3958645A (en) * | 1972-04-24 | 1976-05-25 | Bakerdrill, Inc. | Bore hole air hammer |
CN85204567U (zh) * | 1985-10-26 | 1987-11-07 | 唐山工程技术学院 | 混合排气式潜孔风动冲击器 |
JPH09328983A (ja) * | 1996-06-12 | 1997-12-22 | Sun Tec:Kk | ダウンザホールハンマー |
JP2007146446A (ja) * | 2005-11-25 | 2007-06-14 | Kazunari Furuki | 掘削装置、掘削装置を備えた回転式掘削機及び回転駆動装置、地中掘削工法 |
CN101100859A (zh) * | 2007-06-06 | 2008-01-09 | 周洪生 | 嵌入岩石的桩基施工方法和设备 |
CN201027489Y (zh) * | 2007-06-06 | 2008-02-27 | 周洪生 | 捆绑式冲击锤 |
CN201786250U (zh) * | 2010-09-30 | 2011-04-06 | 湖南山河智能机械股份有限公司 | 组合式潜孔锤 |
Non-Patent Citations (2)
Title |
---|
吴建明,朱忠宁: "空气潜孔锤灌注桩施工工艺及方法", 《山西建筑》, vol. 36, no. 9, 31 March 2010 (2010-03-31), pages 89 - 90 * |
黄辉等: "发展大直径钻孔灌注桩捆绑式气动潜孔锤的一种设想", 《资源环境与工程》, vol. 23, no. 2, 30 April 2009 (2009-04-30), pages 141 - 143 * |
Cited By (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9322216B2 (en) | 2011-02-11 | 2016-04-26 | Top Mark Mechanical Equipment Limited | Annulus ring hole drill |
CN102971481A (zh) * | 2011-02-11 | 2013-03-13 | 陈樑材 | 环形孔钻孔机 |
EP2673450A4 (en) * | 2011-02-11 | 2018-01-03 | Mark Mechanical Equipment Limited Top | Annulus ring hole drill |
CN102971481B (zh) * | 2011-02-11 | 2015-11-25 | 陈樑材 | 环形孔钻孔机 |
CN103046863A (zh) * | 2011-10-13 | 2013-04-17 | 佺鸿机械有限公司 | 具灌浆管道的气动锤孔钻 |
CN102518393B (zh) * | 2011-12-15 | 2014-01-22 | 贵州航天天马机电科技有限公司 | 一种组合潜孔锤 |
CN102518393A (zh) * | 2011-12-15 | 2012-06-27 | 贵州航天天马机电科技有限公司 | 一种组合潜孔锤 |
CN103244049A (zh) * | 2012-02-10 | 2013-08-14 | 震东机械设备有限公司 | 用于控制dth锤的丛式钻孔机的操作的方法及装置 |
US9175517B2 (en) | 2012-02-10 | 2015-11-03 | Top Mark Mechanical Equipment Limited | Method and apparatus for controlling the operation of cluster drill of down-the-hole hammers |
CN103244049B (zh) * | 2012-02-10 | 2016-01-20 | 震东机械设备有限公司 | 用于钻孔的装置 |
CN103726802A (zh) * | 2013-12-26 | 2014-04-16 | 北京市三一重机有限公司 | 排渣装置和旋挖钻机 |
CN103726802B (zh) * | 2013-12-26 | 2016-05-25 | 北京市三一重机有限公司 | 排渣装置和旋挖钻机 |
CN105934557B (zh) * | 2014-01-21 | 2019-08-06 | 山特维克知识产权股份有限公司 | 快速释放潜孔锤钻头组件 |
CN105934557A (zh) * | 2014-01-21 | 2016-09-07 | 山特维克知识产权股份有限公司 | 快速释放潜孔锤钻头组件 |
CN105041199A (zh) * | 2015-05-28 | 2015-11-11 | 山东中瑞工程机械有限公司 | 集束式潜孔锤 |
CN105041220A (zh) * | 2015-07-27 | 2015-11-11 | 王乐康 | 一种全液压反循环钻机的冲击钻头 |
CN105350909A (zh) * | 2015-11-23 | 2016-02-24 | 贵州航天天马机电科技有限公司 | 一种节能捆绑式组合锤 |
CN106223840A (zh) * | 2016-09-09 | 2016-12-14 | 北京中车重工机械有限公司 | 集束式潜孔锤及其潜孔锤单体锁固机构 |
CN106194006A (zh) * | 2016-09-09 | 2016-12-07 | 北京中车重工机械有限公司 | 一种集束式潜孔锤 |
CN106437495A (zh) * | 2016-10-28 | 2017-02-22 | 北京中车重工机械有限公司 | 潜孔锤单体的下接头和集束式潜孔锤 |
CN106285459A (zh) * | 2016-10-28 | 2017-01-04 | 北京中车重工机械有限公司 | 潜孔锤单体的上接头和集束式潜孔锤 |
CN107687320A (zh) * | 2017-09-15 | 2018-02-13 | 湖南新金刚工程机械有限公司 | 一种集束式潜孔锤 |
CN107687320B (zh) * | 2017-09-15 | 2024-02-09 | 湖南新金刚工程机械有限公司 | 一种集束式潜孔锤 |
CN111550179A (zh) * | 2020-05-22 | 2020-08-18 | 杨忠财 | 一种连续墙嵌岩成墙系统及方法 |
CN112196460A (zh) * | 2020-09-08 | 2021-01-08 | 李新形 | 一种地下连续墙潜孔锤成槽机及其使用方法 |
CN112196460B (zh) * | 2020-09-08 | 2023-10-27 | 李新形 | 一种地下连续墙潜孔锤成槽机及其使用方法 |
CN114740725A (zh) * | 2022-04-20 | 2022-07-12 | 中交投资南京有限公司 | 用于贯通式潜孔锤的压力数据处理方法、控制方法及终端 |
CN114740725B (zh) * | 2022-04-20 | 2022-09-20 | 中交投资南京有限公司 | 用于贯通式潜孔锤的压力数据处理方法、控制方法及终端 |
Also Published As
Publication number | Publication date |
---|---|
CN101949261B (zh) | 2013-03-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101949261B (zh) | 组合式潜孔锤及其施工方法 | |
CN101967955B (zh) | 一种自公转组合式潜孔锤及其施工方法 | |
CN201786252U (zh) | 一种自公转组合式潜孔锤 | |
CN201747280U (zh) | 一种冲击筒钻具及旋挖钻机 | |
JP5948333B2 (ja) | 組合せ式ダウンザホールハンマー | |
CN101831906A (zh) | 一种干式气动凿岩钻孔桩机及其工法 | |
CN201786251U (zh) | 一种组合式潜孔锤 | |
CN102418473A (zh) | 地下挖掘用挖掘装置、旋转式挖掘机和地下挖掘方法 | |
CN201786250U (zh) | 组合式潜孔锤 | |
CN111119726B (zh) | 一种环形集束式潜孔锤 | |
CN112727352A (zh) | 一种旋挖钻驱动气举反循环潜孔锤钻机及其使用方法 | |
CN111594039A (zh) | 一种大直径组合式空气反循环潜孔锤 | |
CN105041246A (zh) | 一种正反循环潜孔锤转换结构 | |
CN101484657B (zh) | 地下挖掘用挖掘装置、旋转式挖掘机和地下挖掘方法 | |
CN204663435U (zh) | 正反循环潜孔锤转换结构 | |
CN113356753A (zh) | 一种组合式可变口径集束式潜孔锤 | |
CN102518393B (zh) | 一种组合潜孔锤 | |
KR20150107439A (ko) | Pr 천공 장치 및 공법 | |
CN104389515B (zh) | 一种液压钻机冲击锤 | |
CN217080384U (zh) | 一种双套管钻孔清孔结构 | |
CN210659913U (zh) | 泥浆循环式集束潜孔锤钻具 | |
CN112696149A (zh) | 潜孔取芯锤头及环形潜孔锤 | |
CN114075923A (zh) | 液压潜孔锤咬合桩组合钻头 | |
CN102434097A (zh) | 快速成桩工艺 | |
CN102425370A (zh) | 孔底油压马达碎石器组合动力钻具施工方法及装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: 410100 Hunan province Changsha Xingsha City Economic and Technological Development Zone Li Xiang Road No. 16 sunward Industrial Park Applicant after: Sunward Intelligent Equipment Co., Ltd. Address before: 410100 Hunan province Changsha Xingsha City Economic and Technological Development Zone Li Xiang Road No. 2 sunward Industrial Park Applicant before: Shanhe Intelligent Machinery Co., Ltd., Hunan |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: HU NAN SUNWARD INTELLIGENT MACHINERY CO., LTD. TO: SUNWARD INTELLIGENT EQUIPMENT CO., LTD. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |