CN101914992A - 高炉基础大体积混凝土水冷却温度控制方法 - Google Patents

高炉基础大体积混凝土水冷却温度控制方法 Download PDF

Info

Publication number
CN101914992A
CN101914992A CN 201010254596 CN201010254596A CN101914992A CN 101914992 A CN101914992 A CN 101914992A CN 201010254596 CN201010254596 CN 201010254596 CN 201010254596 A CN201010254596 A CN 201010254596A CN 101914992 A CN101914992 A CN 101914992A
Authority
CN
China
Prior art keywords
water
temperature
concrete
cooling
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010254596
Other languages
English (en)
Inventor
肖策
张永杰
纪建成
高有为
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin MCC20 Construction Co Ltd
Original Assignee
Tianjin MCC20 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin MCC20 Construction Co Ltd filed Critical Tianjin MCC20 Construction Co Ltd
Priority to CN 201010254596 priority Critical patent/CN101914992A/zh
Publication of CN101914992A publication Critical patent/CN101914992A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本发明涉及高炉基础大体积混凝土水冷却温度控制方法;(一)在混凝土基础钢筋固定架上预埋循环水冷却钢管;连接冷却水钢管;进行通水压力试验,检查是否有漏水点;(二)混凝土浇筑开始,就开启水泵进行循环冷却水;(三)水温监测;调节进水口温度与出水口温度差值控制在20~25℃;(四)控制混凝土的内部最高温度与表面温差在20~25℃。预埋冷却水管可以减小混凝土内外温度的差值,避免混凝土产生结构裂缝;缩短混凝土内部热量散发的时间,减少混凝土结构的养护时间,保证了混凝土质量。工效至少可提高四倍,大大节约成本,提高工作效率,为下道工序提前施工创造条件。

Description

高炉基础大体积混凝土水冷却温度控制方法
技术领域
本发明涉及在高炉基础顶大体积混凝土施工方法,特别涉及一种控制混凝土内部水冷却温度控制方法。
背景技术
在冶金工业设备基础工程施工中,尤其是高炉工程,随着高炉规模的增大,基础混凝土数量相应增加,大体积混凝土在连续浇筑和硬化过程中,水泥水化反应产生大量水化热,由于混凝土截面尺寸大,热阻很大,内部水化热量聚集不易散发,水化升温高,而表面散热较快,混凝土内部和表面形成较大温差。混凝土内部和表面温差变化加上外部环境因素、拆模及荷载等的影响,导致不均匀的温度变形和温度应力,一旦拉应力超过混凝土即时抗拉强度,就会在混凝土表面或内部产生裂缝。混凝土裂缝的发生与发展,不仅影响工程外观,还会加速混凝土碳化,影响结构的抗冻性能、抗渗性能,导致水分及有害物质渗入,诱发钢筋锈蚀或加速混凝土的自然老化,从而损害工程结构的承载能力、使用功能和耐久性,甚至于成为结构破坏的前兆,直接影响工程效益的发挥。所以,必须采取各种措施预防或减少混凝土结构裂缝的产生。
发明内容
本发明为解决高炉基础大体积混凝土的技术问题而提供一种简便易行、效率高、质量可靠,可以在多种条件下进行施工的高炉基础大体积混凝土施工方法。
本发明为解决技术问题所采取的技术方案是:
一种高炉基础大体积混凝土水冷却温度控制方法,其特征在于包括以下步骤:
(一)在混凝土基础钢筋固定架上预埋循环水冷却钢管;连接冷却水钢管;进行通水压力试验,检查是否有漏水点;
(二)混凝土浇筑开始,就开启水泵进行循环冷却水;
(三)水温监测:调节进水口温度与出水口温度差值控制在20~25℃。
(四)控制混凝土的内部最高温度与表面温差在20~25℃。
所述的(一)在混凝土基础钢筋固定架上预埋循环水冷却钢管的方法是:单根冷却水钢管
Figure BDA0000024525520000011
影响范围直径为1~1.5m,连接组成钢管网片;每层冷却水钢管采用均匀等距离布置;两层冷却水钢管采用上下错开;三层及三层以上采用相邻层错开的布置。
所述的(一)连接冷却水钢管是采用套丝、管箍或弯头连接预埋的钢管;或采用焊接连接方式。
所述的(二)混凝土浇筑到冷却水管底部时,立即开始通水。
所述的(三)水温监测是:进出口的水温在第1~7天每2小时测一次,根据测温的结果随时调整进水温度及流量,调节进水口温度与出水口温度差值控制在20~25℃。
所述的(四)控制混凝土的内部最高温度与表面温差在20~25℃。在基坑边放置一个或多个调温水箱,并设置一个或多个水泵;通过阀门调节冷热水比例,控制进水温度及流量。
所述的控制混凝土的内部最高温度与表面温差方法是:在基坑边放置一个或多个调温水箱,并设置一个或多个水泵;通过阀门调节冷热水比例,控制进水温度及流量。
本发明具有的优点和积极效果是:预埋冷却水管可以减小混凝土内外温度的差值,避免混凝土产生结构裂缝;缩短混凝土内部热量散发的时间,减少混凝土结构的养护时间,保证了混凝土质量。工效至少可提高四倍,大大节约成本,提高工作效率,为下道工序提前施工创造条件。
附图说明
图1是本发明高炉基础冷却水管平面布置图;
图2是图1中a-a处剖面图;
图3是本发明水冷却管一层、两层、三层及三层以上布置示意图;
图4a是实施例2的粗轧机基础冷水管布置图;
图4b是图4a中b-b处剖面图;
图5a是实施例3的布置图;
图5b是5a中c-c处剖面图;
其中:1-冷却水管、2-水箱、3-钢筋固定架。
具体实施方式
下面结合附图对本发明做进一步的详细说明:
为能进一步了解本发明的发明内容、特点及功效,兹例举天钢3200m3高炉基础工程实施为例,并配合附图详细说明如下:
天钢3200m3高炉基础外轮廓为矩形,长57m,宽42.6m。基础底标高-5.000m至±0.000部分为普通C25混凝土,混凝土总量约为11000m3
实施例1:如图1、2所示,高炉基础底板钢筋绑扎完成后,在钢筋固定架3上进行冷却水管1施工,在基础中53m×38.6m的范围内,预埋直径48mm@1500mm的蛇型通水管3层,第一层距混凝土垫层1m、第二层距混凝土垫层2.5m、第三层距混凝土垫层4m每层为间距1500mm的钢管组成的网片;采用管箍和弯头连接预埋钢管;在混凝土浇筑前需要进行通水渗漏试验,并对渗水点进行修理;(二)混凝土浇筑到冷却水管标高时立即开始通水;当混凝土浇筑第一层冷却水管底部时,马上开启水泵,第一层冷却水管开始循环;当混凝土浇筑的第二层冷却水管底部时,立即开启水泵,第二层冷却水管进入循环状态;当混凝土浇筑第三层冷却水管底部时,立即开启水泵,第三层冷却水管开始循环;(三)进出口的水温在第1~7天每2小时测一次,根据测温的结果随时调整进水温度及流量;(四)利用阀门调节进水口温度与出水口温度差值控制在25℃,当进水口温度与出水口温度差超过25℃,立即采取措施降低进水口的温度,可以利用降水井里水作为循环水,也可以利用冰块放在水箱里,起到降低水温的作用;另一种方法是更换水泵,采用功率更大、流量更大的水泵,通过增加流量的办法,在相同的时间内,排出更多水化热,把混凝土内部温度将下来,控制混凝土的内部最高温度与表面温度之差控制在25℃;达到使整个基础温度均匀下降的目的。在基坑边放置4个调温水箱2,并设置6个水泵(3台备用)。通过阀门调节冷热水比例,控制进水温度及流量。经过检查,没有发现任何裂缝,受到监理和业主的表扬。
实施例2:如图4a、b所示,南山铝合金加工总厂热轧工程,粗轧机区设备基础主要包括粗轧机及立辊轧机基础,整个基础位于8-12/B-F线之间,地基挖至-9.1m、-10.1m,顶面标高围绕±0.000起伏变化较多。基础长36.625m、宽48.385m。沿10线方向有一条2.0m长后浇带贯通基础,混凝土量约8600m3,混凝土强度等级为C30.S6。对基础实行外保温内降温的双控措施,为此,在基础中预埋
Figure BDA0000024525520000031
@1500mm的蛇型通水管6(7)层,水平布置在基础边内500mm,高度方向在基础边内1500mm,每层为纵横间距2000mm的钢管组成的网架,层高1500mm。达到使整个基础温度均匀下降的目的。每层冷水管均有一个进水口和出水口,进水口和出水口3m3水箱分别用一根
Figure BDA0000024525520000032
管相连,每层进水口设一个阀门。模板拆除后,没有发现混凝土裂缝,得到业主的认可。
实施例3:如图5a、b所示南山轻合金热轧工程精轧机基础,位于30-34/B-F线之间长50.0m,宽60.0m。地基挖至-7.1m、-9.1m、-10.1m、-12.1m,顶面标高起伏变化较多。沿D轴方向有一条1.0m宽后浇带贯通基础。混凝土量约7800m3,混凝土强度等级为C30.S6。对基础实行外保温内降温的双控措施,为此,在基础中预埋
Figure BDA0000024525520000033
@1500mm的蛇型通水管6层,布置在基础边内500mm,每层为纵横间距2000mm的钢管组成的网架,层高1500mm。达到使整个基础温度均匀下降的目的。每层冷水管均有一个进水口和出水口,进水口和出水口分别用一根
Figure BDA0000024525520000034
管与3m3水箱相连,每层进水口设一个阀门。模板拆除后,没有发现混凝土裂缝,得到业主的认可。
实施例4:如实施例1的方法和条件,所不同的是:预埋直径
Figure BDA0000024525520000035
@1000mm的蛇型通水管3层,第一层距混凝土垫层1m、第二层距混凝土垫层2m、第三层距混凝土垫层3m每层为间距1000mm的钢管组成的网片,采用焊接连接方式;利用阀门调节进水口温度与出水口温度差值控制在20℃;控制混凝土的内部最高温度与表面温度之差控制在20℃;达到使整个基础温度均匀下降的目的。在基坑边放置6个调温水箱,并设置6个水泵(3台备用)。通过阀门调节冷热水比例,控制进水温度及流量。经过检查,没有发现任何裂缝。受到监理和业主的表扬。
实施例5:如实施例1的方法和条件,所不同的是:预埋直径
Figure BDA0000024525520000041
@1500mm的蛇型通水管3层,第一层距混凝土垫层1m、第二层距混凝土垫层2.5m、第三层距混凝土垫层4m每层为间距1500mm的钢管组成的网片,采用套丝连接;利用阀门调节进水口温度与出水口温度差值控制在24℃;控制混凝土的内部最高温度与表面温度之差控制在24℃;达到使整个基础温度均匀下降的目的。在基坑边放置4个调温水箱,并设置4个水泵(2台备用)。通过阀门调节冷热水比例,控制进水温度及流量。经过检查,没有发现任何裂缝。受到监理和业主的表扬。

Claims (6)

1.一种高炉基础大体积混凝土水冷却温度控制方法,其特征在于包括以下步骤:
(一)在混凝土基础钢筋固定架上预埋循环水冷却钢管;连接冷却水钢管;进行通水压力试验,检查是否有漏水点;
(二)混凝土浇筑开始,就开启水泵进行循环冷却水;
(三)水温监测:调节进水口温度与出水口温度差值控制在20~25℃。
(四)控制混凝土的内部最高温度与表面温差在20~25℃。
2.如权利要求1所述的控制方法,其特征在于所述的(一)在混凝土基础钢筋固定架上预埋循环水冷却钢管的方法是:单根冷却水钢管影响范围直径为1~1.5m,连接组成钢管网片;每层冷却水钢管采用均匀等距离布置;两层冷却水钢管采用上下错开;三层及三层以上采用相邻层错开的布置。
3.如权利要求1所述的控制方法,其特征在于所述的(一)连接冷却水钢管是采用套丝、管箍或弯头连接预埋的钢管.;或采用焊接连接方式。
4.如权利要求1所述的控制方法,其特征在于所述的(二)混凝土浇筑到冷却水管底部时,立即开始通水。
5.如权利要求1所述的控制方法,其特征在于所述的(三)水温监测是:进出口的水温在第1~7天每2小时测一次,根据测温的结果随时调整进水温度及流量,调节进水口温度与出水口温度差值控制在20~25℃。
6.如权利要求1所述的控制方法,其特征在于所述的(四)控制混凝土的内部最高温度与表面温差在20~25℃;在基坑边放置一个或多个调温水箱,并设置一个或多个水泵;通过阀门调节冷热水比例,控制进水温度及流量。
CN 201010254596 2010-08-16 2010-08-16 高炉基础大体积混凝土水冷却温度控制方法 Pending CN101914992A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010254596 CN101914992A (zh) 2010-08-16 2010-08-16 高炉基础大体积混凝土水冷却温度控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010254596 CN101914992A (zh) 2010-08-16 2010-08-16 高炉基础大体积混凝土水冷却温度控制方法

Publications (1)

Publication Number Publication Date
CN101914992A true CN101914992A (zh) 2010-12-15

Family

ID=43322610

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010254596 Pending CN101914992A (zh) 2010-08-16 2010-08-16 高炉基础大体积混凝土水冷却温度控制方法

Country Status (1)

Country Link
CN (1) CN101914992A (zh)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102134911A (zh) * 2011-04-27 2011-07-27 河海大学 一种计算大体积混凝土水管冷却温度场的方法
CN102720364A (zh) * 2012-06-25 2012-10-10 广东省长大公路工程有限公司 大体积混凝土施工的自动控温工艺
CN102758534A (zh) * 2012-07-30 2012-10-31 中建商品混凝土有限公司 一种大体积混凝土的降温方法
CN103526761A (zh) * 2013-10-24 2014-01-22 中国一冶集团有限公司 大体积混凝土自动温控、养护装置及方法
CN104563514A (zh) * 2014-12-05 2015-04-29 中交一航局第三工程有限公司 大体积混凝土循环冷却降温系统
CN104612402A (zh) * 2014-12-21 2015-05-13 中国中铁航空港建设集团有限公司 一种循环水高效控制大体积基础混凝土裂缝的系统及作法
CN105155540A (zh) * 2015-05-13 2015-12-16 陈志刚 一种在建大体积混凝土的智能水冷控制方法及系统
CN106968439A (zh) * 2017-04-19 2017-07-21 中铁大桥局集团第二工程有限公司 一种大体积混凝土构件的分级调温冷却系统及方法
CN107216087A (zh) * 2017-07-12 2017-09-29 张启志 一种建筑施工用预拌砂浆绿色施工方法
CN107905232A (zh) * 2017-11-03 2018-04-13 山东水总有限公司 一种挡潮闸闸墩大体积混凝土通水冷却施工方法及装置
CN109024284A (zh) * 2018-07-09 2018-12-18 贵州新联爆破工程集团有限公司 一种空心板简支梁浇筑混凝土降温装置
CN109372254A (zh) * 2018-12-13 2019-02-22 中水北方勘测设计研究有限责任公司 用于浇筑大体积混凝土墙体的控温模板组件
CN110259165A (zh) * 2019-06-12 2019-09-20 同济大学 一种大体积混凝土自循环控温养护系统及养护方法
CN110805168A (zh) * 2019-11-15 2020-02-18 中国十七冶集团有限公司 一种钢板混凝土剪力墙防开裂用钢板预热系统
CN111592593A (zh) * 2020-05-23 2020-08-28 新疆畜牧科学院畜牧业质量标准研究所(新疆维吾尔自治区种羊与羊毛羊绒质量安全监督检验中心) 一种胶原抗冻多肽分离装置
CN112174693A (zh) * 2020-10-15 2021-01-05 长江三峡集团福建能源投资有限公司 一种用于海上风电大体积混凝土的温控冷却设备及方法
CN113202317A (zh) * 2021-04-30 2021-08-03 中国水利水电第四工程局有限公司 一种亚热带大体积混凝土施工养护方法
CN116771145B (zh) * 2023-06-16 2024-03-08 中国水利水电第三工程局有限公司 一种高温干热天气下大体积混凝土施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1182159A (zh) * 1997-09-05 1998-05-20 赵明权 在大体积混凝土中造孔技术
JP2007303159A (ja) * 2006-05-11 2007-11-22 Hazama Corp コンクリート構造物のひび割れ抑制方法
CN101638940A (zh) * 2009-05-26 2010-02-03 中冶集团华冶资源开发有限责任公司 大板块、大体积混凝土无缝施工方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1182159A (zh) * 1997-09-05 1998-05-20 赵明权 在大体积混凝土中造孔技术
JP2007303159A (ja) * 2006-05-11 2007-11-22 Hazama Corp コンクリート構造物のひび割れ抑制方法
CN101638940A (zh) * 2009-05-26 2010-02-03 中冶集团华冶资源开发有限责任公司 大板块、大体积混凝土无缝施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《科技风》 20100331 肖策等 高炉基础大体积混凝土水冷却温度控制技术施工工法 69、89 , 第6期 2 *

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102134911A (zh) * 2011-04-27 2011-07-27 河海大学 一种计算大体积混凝土水管冷却温度场的方法
CN102134911B (zh) * 2011-04-27 2012-05-09 河海大学 一种计算大体积混凝土水管冷却温度场的方法
CN102720364A (zh) * 2012-06-25 2012-10-10 广东省长大公路工程有限公司 大体积混凝土施工的自动控温工艺
CN102720364B (zh) * 2012-06-25 2015-05-13 广东省长大公路工程有限公司 大体积混凝土施工的自动控温工艺
CN102758534A (zh) * 2012-07-30 2012-10-31 中建商品混凝土有限公司 一种大体积混凝土的降温方法
CN102758534B (zh) * 2012-07-30 2014-06-04 中建商品混凝土有限公司 一种大体积混凝土的降温方法
CN103526761A (zh) * 2013-10-24 2014-01-22 中国一冶集团有限公司 大体积混凝土自动温控、养护装置及方法
CN103526761B (zh) * 2013-10-24 2015-05-20 中国一冶集团有限公司 大体积混凝土自动温控、养护装置及方法
CN104563514A (zh) * 2014-12-05 2015-04-29 中交一航局第三工程有限公司 大体积混凝土循环冷却降温系统
CN104563514B (zh) * 2014-12-05 2017-01-25 中交一航局第三工程有限公司 大体积混凝土循环冷却降温系统
CN104612402A (zh) * 2014-12-21 2015-05-13 中国中铁航空港建设集团有限公司 一种循环水高效控制大体积基础混凝土裂缝的系统及作法
CN105155540A (zh) * 2015-05-13 2015-12-16 陈志刚 一种在建大体积混凝土的智能水冷控制方法及系统
CN106968439A (zh) * 2017-04-19 2017-07-21 中铁大桥局集团第二工程有限公司 一种大体积混凝土构件的分级调温冷却系统及方法
CN107216087A (zh) * 2017-07-12 2017-09-29 张启志 一种建筑施工用预拌砂浆绿色施工方法
CN107905232A (zh) * 2017-11-03 2018-04-13 山东水总有限公司 一种挡潮闸闸墩大体积混凝土通水冷却施工方法及装置
CN109024284A (zh) * 2018-07-09 2018-12-18 贵州新联爆破工程集团有限公司 一种空心板简支梁浇筑混凝土降温装置
CN109372254B (zh) * 2018-12-13 2024-02-27 中水北方勘测设计研究有限责任公司 用于浇筑大体积混凝土墙体的控温模板组件
CN109372254A (zh) * 2018-12-13 2019-02-22 中水北方勘测设计研究有限责任公司 用于浇筑大体积混凝土墙体的控温模板组件
CN110259165A (zh) * 2019-06-12 2019-09-20 同济大学 一种大体积混凝土自循环控温养护系统及养护方法
CN110805168A (zh) * 2019-11-15 2020-02-18 中国十七冶集团有限公司 一种钢板混凝土剪力墙防开裂用钢板预热系统
CN111592593A (zh) * 2020-05-23 2020-08-28 新疆畜牧科学院畜牧业质量标准研究所(新疆维吾尔自治区种羊与羊毛羊绒质量安全监督检验中心) 一种胶原抗冻多肽分离装置
CN111592593B (zh) * 2020-05-23 2023-11-28 新疆畜牧科学院畜牧业质量标准研究所(新疆维吾尔自治区种羊与羊毛羊绒质量安全监督检验中心) 一种胶原抗冻多肽分离装置
CN112174693B (zh) * 2020-10-15 2024-01-26 长江三峡集团福建能源投资有限公司 一种用于海上风电大体积混凝土的温控冷却设备及方法
CN112174693A (zh) * 2020-10-15 2021-01-05 长江三峡集团福建能源投资有限公司 一种用于海上风电大体积混凝土的温控冷却设备及方法
CN113202317A (zh) * 2021-04-30 2021-08-03 中国水利水电第四工程局有限公司 一种亚热带大体积混凝土施工养护方法
CN113202317B (zh) * 2021-04-30 2021-10-22 中国水利水电第四工程局有限公司 一种亚热带大体积混凝土施工养护方法
CN116771145B (zh) * 2023-06-16 2024-03-08 中国水利水电第三工程局有限公司 一种高温干热天气下大体积混凝土施工方法

Similar Documents

Publication Publication Date Title
CN101914992A (zh) 高炉基础大体积混凝土水冷却温度控制方法
CN104018673B (zh) 超大体积砼一次连续浇注多循环实时温控施工工艺
CN111472358B (zh) 一种大体积混凝土基础内部冷却降温方法
CN110414046B (zh) 衬砌结构低热水泥混凝土的温控防裂方法
CN105649108A (zh) 管廊箱型隧道侧墙裂缝控制方法
CN104695709B (zh) 采用相变材料的大体积混凝土裂缝控制方法
CN102704483B (zh) 降温管网兼做建筑底板多层钢筋支撑架的方法
CN110569553B (zh) 掺粉煤灰低发热量衬砌混凝土通水冷却龄期控制方法
CN105672341A (zh) 一种大体积建筑基础施工方法
CN110438996A (zh) 一种浇筑大体积混凝土降温装置
CN102011492B (zh) 用于控制大体积混凝土结构上出现裂缝的方法
CN208251141U (zh) 一种采用珠光砂混凝土预制板的冷箱基础结构
CN105822068A (zh) 高温环境下的超长薄壁混凝土墙浇筑和养护方法
CN216196782U (zh) 超厚大体积混凝土单层多回路水冷却系统
CN107010993B (zh) 用于大体积混凝土的冷却降温系统
CN113886926B (zh) 高压水道引水岔管温控防裂方法
CN113191043B (zh) 水工隧洞衬砌混凝土温度裂缝控制强约束方法及温控系统
CN205329693U (zh) 一种建筑基础结构
CN111364466B (zh) 一种干船坞底板施工方法
CN108589765B (zh) 一种采用珠光砂混凝土预制板的冷箱基础结构及其施工方法
CN113882433A (zh) 盾构工作井内衬墙温控防裂方法
CN114277799A (zh) 抽水蓄能电站地下厂房蜗壳外围混凝土结构温控防裂方法
CN113191038B (zh) 衬砌砼温降速率优化控制方法及系统
CN219219021U (zh) 一种大体积混凝土冷却循环装置
CN211499968U (zh) 一种防止冰冻的结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20101215