CN101871354A - 大步距连续支护式超前支架及其移架方法 - Google Patents
大步距连续支护式超前支架及其移架方法 Download PDFInfo
- Publication number
- CN101871354A CN101871354A CN201010198335A CN201010198335A CN101871354A CN 101871354 A CN101871354 A CN 101871354A CN 201010198335 A CN201010198335 A CN 201010198335A CN 201010198335 A CN201010198335 A CN 201010198335A CN 101871354 A CN101871354 A CN 101871354A
- Authority
- CN
- China
- Prior art keywords
- frame
- supporting type
- forepole
- continuous supporting
- step pitch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开了一种大步距连续支护式超前支架及其移架方法,包括多组支架,每组支架包括两个边架和至少一个中间架,相邻两组支架的间距为2-4个采煤机截深的距离。按照先移后架、再移前架;先移边架、再移中间架的原则移架。中架与边交替前移,实现连续支护,采用大步距推移技术,减少移架次数,解决对巷道顶板因反复支撑而造成顶板破碎问题。
Description
技术领域
本发明涉及一种煤矿巷道支护的液压支架,尤其涉及一种大步距连续支护式超前支架及其移架方法。
背景技术
在井下采煤工作面,井下对顺槽的支护采用人工单体支柱的形式,随着采煤工作面的推进,井下工人不断撤、撑单体支柱,如此往复,效率低、安全性差。
现有技术中,采用超前支架对顺槽巷道进行支护,并通过推移千斤顶进行移架,受推移千斤顶行程限制,推移千斤顶行程不可能做的特别大。这就必须反复移架、循环支护,按照规范要求,支护范围大于20米,以常用的865mm推移步距为例计算,需要约24次循环支护(其它推移步距如900mm,800mm等均可以此类推)。
上述现有技术至少存在以下缺点:
对巷道顶板因反复支撑,容易造成顶板破碎,且移架效率低。
发明内容
本发明的目的是提供一种移架次数少、不易造成顶板破碎,且移架效率高的大步距连续支护式超前支架及其移架方法。
本发明的目的是通过以下技术方案实现的:
本发明的大步距连续支护式超前支架,包括多组支架,每组支架包括两个边架和至少一个中间架,相邻两组支架的间距为2-4个采煤机截深的距离。
本发明的上述的大步距连续支护式超前支架的移架方法,按照以下原则移架:
先移后架、再移前架;先移边架、再移中间架。
由上述本发明提供的技术方案可以看出,本发明所述的大步距连续支护式超前支架及其移架方法,由于相邻两组支架的间距为2-4个采煤机截深的距离,按照先移后架、再移前架;先移边架、再移中间架的原则移架。中架与边交替前移,实现连续支护,采用大步距推移技术,减少移架次数,解决对巷道顶板因反复支撑而造成顶板破碎问题。
附图说明
图1a为本发明的具体实施例中三架一组的布置示意图一;
图1b为本发明的具体实施例中三架一组的布置示意图二;
图2a为本发明的具体实施例中四架一组的布置示意图一;
图2b为本发明的具体实施例中四架一组的布置示意图二;
图3为本发明的大步距连续支护式超前支架应用状态的布置示意图。
具体实施方式
本发明的大步距连续支护式超前支架,其较佳的具体实施方式如图1a、图1b、图2a、图2b所示:
包括多组支架,每组支架包括两个边架1和至少一个中间架2,相邻两组支架的间距为2-4个采煤机截深的距离。
每组支架的边架和中间架可以前后平齐布置;也可以前后交错布置,相邻两组支架的边架与边架之间的间距和中间架与中间架之间的间距分别为2-4个采煤机截深的距离。
具体每组支架可以包括两个边架和两个中间架的四架一组的形式,也可以采用两个边架和一个中间架的三架一组的形式。
采煤机截深的距离一般为800-900mm。
本发明的上述的大步距连续支护式超前支架的移架方法,其较佳的具体实施方式如图3所示:
按照以下原则移架:先移后架、再移前架;先移边架、再移中间架。
具体移架过程中,可以最后一组支架的移架步距为1个采煤机截深的距离,其它支架的移架步距为2-4个采煤机截深的距离。
本发明的超前支架为沿巷道断面横向布置,三架或四架一组;超前支架移架方式为分内、外两组交替移架,移架步距为2个或3个或4个采煤机截深的距离,中架与边交替前移,实现连续支护;采用大步距推移技术,减少移架次数,解决对巷道顶板因反复支撑而造成顶板破碎问题。
具体实施例的支护次数:
当用移架步距为2个865mm或3个865mm或4个865mm时,需要支护次数仅为5次,相比现有技术减少了19次,减少80%,提高了支护工作效率。
具体可以根据实际情况确定超前支架组数量;根据实际情况可布置整组布置或非整组布置,如:整组加中架一架或两架,或整组加边架一架或两架等等。
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。
Claims (7)
1.一种大步距连续支护式超前支架,其特征在于,包括多组支架,每组支架包括两个边架和至少一个中间架,相邻两组支架的间距为2-4个采煤机截深的距离。
2.根据权利要求1所述的大步距连续支护式超前支架,其特征在于,每组支架的边架和中间架前后平齐布置。
3.根据权利要求1所述的大步距连续支护式超前支架,其特征在于,每组支架的边架和中间架前后交错布置,相邻两组支架的边架与边架之间的间距和中间架与中间架之间的间距分别为2-4个采煤机截深的距离。
4.根据权利要求1至3任一项所述的大步距连续支护式超前支架,其特征在于,每组支架包括两个中间架。
5.根据权利要求1至3任一项所述的大步距连续支护式超前支架,其特征在于,所述采煤机截深的距离为800-900mm。
6.一种权利要求1至3任一项所述的大步距连续支护式超前支架的移架方法,其特征在于,按照以下原则移架:
先移后架、再移前架;先移边架、再移中间架。
7.根据权利要求6所述的大步距连续支护式超前支架的移架方法,其特征在于,最后一组支架的移架步距为1个采煤机截深的距离,其它支架的移架步距为2-4个采煤机截深的距离。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010198335A CN101871354A (zh) | 2010-06-04 | 2010-06-04 | 大步距连续支护式超前支架及其移架方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010198335A CN101871354A (zh) | 2010-06-04 | 2010-06-04 | 大步距连续支护式超前支架及其移架方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101871354A true CN101871354A (zh) | 2010-10-27 |
Family
ID=42996421
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010198335A Pending CN101871354A (zh) | 2010-06-04 | 2010-06-04 | 大步距连续支护式超前支架及其移架方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101871354A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104500117A (zh) * | 2014-12-10 | 2015-04-08 | 中煤北京煤矿机械有限责任公司 | 无反复支撑连续支护超前液压支架 |
CN106968699A (zh) * | 2017-05-05 | 2017-07-21 | 李信斌 | 一种联排式顶板支护设备 |
CN108547651A (zh) * | 2018-06-11 | 2018-09-18 | 山东天晟机械装备股份有限公司 | 一种具有全断面防护防冲作用的超前液压支架 |
CN108756984A (zh) * | 2018-07-03 | 2018-11-06 | 唐忠义 | 超前支架及防冲超前支架系统 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1039835A (en) * | 1964-06-18 | 1966-08-24 | Bergwerksverband Gmbh | Improvements in or relating to coal face support systems |
US3434389A (en) * | 1965-01-21 | 1969-03-25 | Gewerk Eisenhuette Westfalia | Automatic sequence cycle controlled advanceable mining prop arrangement |
CN2189645Y (zh) * | 1993-12-02 | 1995-02-15 | 中国矿业大学 | 掘进头临时支护特种液压支架 |
DE19513998C1 (de) * | 1995-04-13 | 1996-05-23 | Bergbau Technik Gmbh & Co Deut | Schreitausbau zur Unterstützung der Streckenfirste an Strebrand im Übergangsbereich Streb/Strecke |
RU2186977C2 (ru) * | 2000-06-20 | 2002-08-10 | Институт угля и углехимии СО РАН | Способ разработки пологого угольного пласта |
CN101096911A (zh) * | 2006-06-30 | 2008-01-02 | 兖州煤业股份有限公司 | 综放工作面运顺端头液压支架 |
CN101315031A (zh) * | 2007-05-29 | 2008-12-03 | 兖州煤业股份有限公司 | 综放工作面轨顺端头支架 |
CN101338684A (zh) * | 2008-08-20 | 2009-01-07 | 天地科技股份有限公司 | 组合导向滑移式超前支护液压支架 |
CN201225163Y (zh) * | 2008-07-03 | 2009-04-22 | 天地科技股份有限公司 | 煤矿短壁开采用自移液压支架 |
-
2010
- 2010-06-04 CN CN201010198335A patent/CN101871354A/zh active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1039835A (en) * | 1964-06-18 | 1966-08-24 | Bergwerksverband Gmbh | Improvements in or relating to coal face support systems |
US3434389A (en) * | 1965-01-21 | 1969-03-25 | Gewerk Eisenhuette Westfalia | Automatic sequence cycle controlled advanceable mining prop arrangement |
CN2189645Y (zh) * | 1993-12-02 | 1995-02-15 | 中国矿业大学 | 掘进头临时支护特种液压支架 |
DE19513998C1 (de) * | 1995-04-13 | 1996-05-23 | Bergbau Technik Gmbh & Co Deut | Schreitausbau zur Unterstützung der Streckenfirste an Strebrand im Übergangsbereich Streb/Strecke |
RU2186977C2 (ru) * | 2000-06-20 | 2002-08-10 | Институт угля и углехимии СО РАН | Способ разработки пологого угольного пласта |
CN101096911A (zh) * | 2006-06-30 | 2008-01-02 | 兖州煤业股份有限公司 | 综放工作面运顺端头液压支架 |
CN101315031A (zh) * | 2007-05-29 | 2008-12-03 | 兖州煤业股份有限公司 | 综放工作面轨顺端头支架 |
CN201225163Y (zh) * | 2008-07-03 | 2009-04-22 | 天地科技股份有限公司 | 煤矿短壁开采用自移液压支架 |
CN101338684A (zh) * | 2008-08-20 | 2009-01-07 | 天地科技股份有限公司 | 组合导向滑移式超前支护液压支架 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104500117A (zh) * | 2014-12-10 | 2015-04-08 | 中煤北京煤矿机械有限责任公司 | 无反复支撑连续支护超前液压支架 |
CN106968699A (zh) * | 2017-05-05 | 2017-07-21 | 李信斌 | 一种联排式顶板支护设备 |
CN108547651A (zh) * | 2018-06-11 | 2018-09-18 | 山东天晟机械装备股份有限公司 | 一种具有全断面防护防冲作用的超前液压支架 |
CN108547651B (zh) * | 2018-06-11 | 2023-12-19 | 山东天晟机械装备股份有限公司 | 一种具有全断面防护防冲作用的超前液压支架 |
CN108756984A (zh) * | 2018-07-03 | 2018-11-06 | 唐忠义 | 超前支架及防冲超前支架系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101251022B (zh) | 综掘机及时支护装置 | |
CN101349159B (zh) | 一种单通道无轨胶轮车回撤综采工作面的方法 | |
CN101749018B (zh) | 煤柱直接回收采煤法 | |
CN203669865U (zh) | 恒支护掘锚机 | |
CN106522953B (zh) | 一种急倾斜厚煤层走向长壁综放开采动态分段采放工艺 | |
CN102383794B (zh) | 综放工作面后部输送机交叉侧卸布置配套方式与支架结构 | |
CN109057810A (zh) | 一种盾构空推通过矿山法隧道的施工方法及辅助装置 | |
CN101892856B (zh) | 煤矿井下充填采煤专用液压支架 | |
CN101761338A (zh) | 一种固体充填采煤半断面单腿棚沿空留巷方法 | |
CN203905953U (zh) | 一种硬岩快速掘进机 | |
CN101775991A (zh) | 综采工作面沿空留巷巷道大缩量支架支护方法 | |
CN101871354A (zh) | 大步距连续支护式超前支架及其移架方法 | |
CN102418525B (zh) | 软煤层长壁大采高综合机械化采煤末采方法 | |
CN103174448A (zh) | 巷道综掘作业及时支护方法 | |
CN203403900U (zh) | 吊装自移式锚杆锚索支护设备 | |
CN201170107Y (zh) | 综掘机及时支护装置 | |
CN203962014U (zh) | 综采充填两用工作面液压支架 | |
CN203700978U (zh) | 箱涵先导管幕装置 | |
CN102748052B (zh) | 综采轨道顺槽循环前移式超前支护系统 | |
CN202810858U (zh) | 一种巷道掘进机 | |
CN202402030U (zh) | 矩形全断面连采机 | |
CN202578740U (zh) | 巷道掘进交错式支护装置 | |
CN202659267U (zh) | 整体分级跨越式步移支架 | |
CN107826664B (zh) | 一种用于煤矿主运输系统的皮带机尾大跨度支撑与快移方法 | |
CN102410016B (zh) | 矩形全断面连采机 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20101027 |