CN101858119B - 一种钢筋混凝土空心楼板及施工方法 - Google Patents
一种钢筋混凝土空心楼板及施工方法 Download PDFInfo
- Publication number
- CN101858119B CN101858119B CN2010102069997A CN201010206999A CN101858119B CN 101858119 B CN101858119 B CN 101858119B CN 2010102069997 A CN2010102069997 A CN 2010102069997A CN 201010206999 A CN201010206999 A CN 201010206999A CN 101858119 B CN101858119 B CN 101858119B
- Authority
- CN
- China
- Prior art keywords
- cast
- prefabricated panel
- hollow floor
- reinforced concrete
- floor slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000011150 reinforced concrete Substances 0.000 title claims abstract description 19
- 238000010276 construction Methods 0.000 title abstract description 7
- 239000004567 concrete Substances 0.000 claims abstract description 12
- 239000004570 mortar (masonry) Substances 0.000 claims abstract description 7
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 14
- 239000010959 steel Substances 0.000 claims description 14
- 230000002787 reinforcement Effects 0.000 claims description 11
- 238000000926 separation method Methods 0.000 claims description 8
- 238000009415 formwork Methods 0.000 claims description 4
- 238000011065 in-situ storage Methods 0.000 abstract description 8
- 229910001294 Reinforcing steel Inorganic materials 0.000 abstract description 2
- 230000001680 brushing effect Effects 0.000 abstract 1
- 238000000034 method Methods 0.000 abstract 1
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000009435 building construction Methods 0.000 description 2
- 238000007596 consolidation process Methods 0.000 description 2
- 238000005336 cracking Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 208000002925 dental caries Diseases 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
- Panels For Use In Building Construction (AREA)
Abstract
本发明公开了一种钢筋混凝土空心楼板及施工方法,该空心楼板包括现浇密肋(1)、现浇顶板(2)、预制底板(3)。所述的现浇密肋(1)底部有凸块(5)。该空心楼板的施工方法包括如下步骤:架设空心楼板底模板(8),绑扎肋梁钢筋(11),放置侧模板(9);将预制底板(3)放置在侧模板(9)上,浇筑混凝土,待混凝土达到一定的强度后,拆除侧模板(9),将钢筋网(10)、预制底板(3)放置在底部凸块(5)上;现浇密肋(1)、现浇顶板(2)、预制底板(3)形成空腔(4),在预制底板(3)下粉刷砂浆(6),形成整体空心楼板。所述的空心楼板整体性好,刚度大,承载力高,使用寿命长,施工工序简单,预制底板(3)可机械化生产,能有效提高施工速度和质量。
Description
技术领域:
本发明涉及建筑施工领域,具体指一种钢筋混凝土空心楼板及施工方法。
背景技术:
钢筋混凝土现浇空心楼板比钢筋混凝土实心楼板耗料少、楼板重量轻,现有的钢筋混凝土空心楼板(专利申请号200420035588.6)采用的技术是将钢筋混凝土空心预制构件,纵横排列放置在底层钢筋混凝土上,在纵横排列的空心预制构件间隙处填以钢筋混凝土成密肋,形成空心楼板。这种空心楼板有以下不足:钢筋、混凝土耗料多,增加了楼板的造价,并且楼板的整体性不好;再者,盒形空心构件体积大、重量大,构造复杂,不便于制作、运输。
发明内容:
本发明的目的在于提供一种耗料少、造价低、整体性好,并且预制构件体积小、重量轻,构造简单,便于制作、运输,施工方便、快速的钢筋混凝土空心楼板施工方法。
本发明的目的是这样来实现的,一种钢筋混凝土空心楼板,该空心楼板包括现浇密肋、现浇顶板、预制底板。所述的现浇密肋底部有凸块。钢筋混凝土空心楼板的施工方法包括如下步骤:架设空心楼板底模板,绑扎肋梁钢筋,放置侧模板;将预制底板放置在侧模板上,浇筑混凝土,待混凝土达到一定的强度后,拆除侧模板,将钢筋网、预制底板放置在底部凸块上;现浇密肋、现浇顶板、预制底板形成空腔,在预制底板下粉刷砂浆,形成整体空心楼板。
本发明的特征还在于所述的预制底板下有钢筋网,可以提高预制底板的整体性和抗裂性能。
本发明的特征还在于所述的预制底板由一块以上的预制板拼装而成,预制板体积小、重量轻,构造简单,可以机械化生产,现场拼装,施工速度快。
所述的空心楼板由现浇密肋、现浇顶板、预制底板形成空腔,现浇密肋、现浇顶板与预制底板共同作用,整体性好,刚度大,形成的空腔可以减轻楼板重量。
所述的现浇密肋底部有凸块,凸块作为预制底板的支座。在拼装预制底板时,将钢筋网、预制底板放置在现浇密肋底部凸块上,在预制底板底面抹一层砂浆,整体性好,施工速度快。
本发明的特征还在于所述的预制底板上有孔洞。预制底板上的孔洞可用来安装螺栓,现浇混凝土达到一定强度后,可以利用螺栓将预制底板和现浇顶板分离,将预制底板放置在现浇密肋底部凸块上。
本发明的特征还在于所述的预制底板上有隔离层。由于预制底板上铺设有隔离层,浇筑混凝土时,可以防止现浇混凝土顶板与预制底板粘结,将预制底板放置到现浇密肋底部凸块上时,预制底板容易与现浇顶板分离。
附图说明:
图1为空心楼板预制底板3布置示意图,3为预制底板,7为预制底板3上的孔洞,8为底模板,9为侧模板11为肋梁钢筋,12为预制底板3上的隔离层。
图2为空心楼板钢筋网布置示意图,1为现浇密肋,2为现浇顶板,5为现浇密肋1底部凸块,10为钢筋网。
图3为空心楼板结构示意图,4为现浇密肋1、现浇顶板2、预制底板3形成的空腔,6为砂浆。
图4为预制底板3结构示意图,12为预制底板3上的隔离层,7为预制底板3上的孔洞,孔洞7中安装螺栓13。
具体实施方式:
本发明如附图1-4所示,一种钢筋混凝土空心楼板,该空心楼板包括现浇密肋1、现浇顶板2、预制底板3。所述的现浇密肋1底部有凸块5。钢筋混凝土空心楼板的施工方法包括如下步骤:架设空心楼板底模板8,绑扎肋梁钢筋11,放置侧模板9;将预制底板3放置在侧模板9上,浇筑混凝土,待混凝土达到一定的强度后,拆除侧模板9,将钢筋网10、预制底板3放置在底部凸块5上;现浇密肋1、现浇顶板2、预制底板3形成空腔4,在预制底板3下粉刷砂浆6,形成整体空心楼板。
图1为空心楼板预制底板3布置示意图。图2为空心楼板钢筋网布置示意图。图3为空心楼板结构示意图。
本发明的特征还在于所述的预制底板3下有钢筋网10,可以提高预制底板3的整体性和抗裂性能。
本发明的特征还在于所述的预制底板3由一块以上的预制板拼装而成,预制板体积小、重量轻,构造简单,可以机械化生产,现场拼装,施工速度快。
所述的空心楼板由现浇密肋1、现浇顶板2、预制底板3形成空腔4,现浇密肋1、现浇顶板2与预制底板3共同作用,整体性好,刚度大,形成的空腔4可以减轻楼板重量。
所述的现浇密肋1底部有凸块5,凸块5作为预制底板3的支座,在拼装预制底板3时,将钢筋网10、预制底板3放置在现浇密肋1底部凸块5上,在预制底板3底面抹一层砂浆6,整体性好,施工速度快。
本发明的特征还在于所述的预制底板3上有孔洞7。预制底板3上的孔洞7可用来安装螺栓13,现浇混凝土达到一定强度后,可以利用螺栓13将预制底板3和现浇顶板2分离,将预制底板3放置在现浇密肋1底部凸块5上。
本发明的特征还在于所述的预制底板3上有隔离层12。由于预制底板3上铺设有隔离层12,浇筑混凝土时,可以防止现浇顶板2与预制底板3粘结,将预制底板3放置到现浇密肋1底部凸块5上时,预制底板3容易与现浇顶板2分离。
图4为预制底板3结构示意图,预制底板3上有隔离层12,预制底板3上有孔洞7,孔洞7中安装螺栓13。
该钢筋混凝土空心楼板,不仅用于房屋建筑,而且也用于桥梁的铺设。
Claims (5)
1.一种钢筋混凝土空心楼板,该空心楼板包括现浇密肋(1)、现浇顶板(2)、预制底板(3),所述的现浇密肋(1)底部有凸块(5),钢筋混凝土空心楼板的施工方法包括如下步骤:架设空心楼板底模板(8),绑扎肋梁钢筋(11),放置侧模板(9);将预制底板(3)放置在侧模板(9)上,浇筑混凝土,待混凝土达到一定的强度后,拆除侧模板(9),将钢筋网(10)、预制底板(3)放置在底部凸块(5)上;现浇密肋(1)、现浇顶板(2)、预制底板(3)形成空腔(4),在预制底板(3)下粉刷砂浆(6),形成整体空心楼板。
2.根据权利要求1所述的钢筋混凝土空心楼板,其特征在于:所述的预制底板(3)下有钢筋网(10)。
3.根据权利要求1所述的钢筋混凝土空心楼板,其特征在于:所述的预制底板(3)由一块以上的预制板拼装而成。
4.根据权利要求1所述的钢筋混凝土空心楼板,其特征在于:所述的预制底板(3)上有孔洞(7)。
5.根据权利要求1所述的钢筋混凝土空心楼板,其特征在于:所述的预制底板(3)上有隔离层(12)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102069997A CN101858119B (zh) | 2010-06-23 | 2010-06-23 | 一种钢筋混凝土空心楼板及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102069997A CN101858119B (zh) | 2010-06-23 | 2010-06-23 | 一种钢筋混凝土空心楼板及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101858119A CN101858119A (zh) | 2010-10-13 |
CN101858119B true CN101858119B (zh) | 2012-08-22 |
Family
ID=42944258
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010102069997A Expired - Fee Related CN101858119B (zh) | 2010-06-23 | 2010-06-23 | 一种钢筋混凝土空心楼板及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101858119B (zh) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102182268B (zh) * | 2010-11-25 | 2013-04-03 | 吴方伯 | 一种钢筋混凝土空心楼板及施工方法 |
CN104314211B (zh) * | 2014-10-11 | 2016-01-27 | 上海建工四建集团有限公司 | 一种具有隔音效果的中空混凝土板及其施工方法 |
CN104294983B (zh) * | 2014-10-11 | 2016-03-23 | 上海建工四建集团有限公司 | 一种双层中空隔声混凝土板及其施工方法 |
CN104631680B (zh) * | 2015-02-13 | 2018-05-22 | 上海建工二建集团有限公司 | 一种薄壁方箱楼盖的施工方法 |
CN105421633B (zh) * | 2015-12-16 | 2017-11-28 | 广东省建筑设计研究院 | 一种能够减轻自重且具有良好结构刚度的混合型楼盖 |
CN106836592B (zh) * | 2017-03-03 | 2020-02-11 | 重庆大学 | 部分预制装配式后叠合空心楼盖 |
CN107700731A (zh) * | 2017-09-28 | 2018-02-16 | 贵州皆盈科技开发有限公司 | 一种装配式楼盖及施工方法 |
CN109113042A (zh) * | 2018-08-01 | 2019-01-01 | 五冶集团上海有限公司 | 软地基地坪施工用混凝土架空胎膜及施工方法 |
CN109339323A (zh) * | 2018-10-22 | 2019-02-15 | 中国十七冶集团有限公司 | 一种装配整体式空心楼盖结构体系及其施工方法 |
CN109680929B (zh) * | 2018-12-29 | 2021-03-26 | 贵州皆盈科技开发有限公司 | 一种叠合截面密肋楼盖施工用套模及其施工方法 |
CN110359612A (zh) * | 2019-06-12 | 2019-10-22 | 东南大学 | 一种装配式新型双向密肋压型钢板组合楼板 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2228503Y (zh) * | 1995-06-30 | 1996-06-05 | 张乐 | 带永久性胎模的现浇空心板 |
CN100381665C (zh) * | 2000-02-25 | 2008-04-16 | 邱则有 | 钢骨非抽芯成孔现浇钢筋砼空心楼盖及其施工方法 |
CN2695539Y (zh) * | 2004-04-16 | 2005-04-27 | 龚友平 | 密肋夹芯预制板 |
CN1247864C (zh) * | 2004-09-01 | 2006-03-29 | 吴方伯 | 一种钢筋混凝土空心楼板 |
CN201198619Y (zh) * | 2008-04-29 | 2009-02-25 | 天颂建设集团有限公司 | 一种用于空心楼盖板中的薄壁箱及空心楼盖板 |
-
2010
- 2010-06-23 CN CN2010102069997A patent/CN101858119B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN101858119A (zh) | 2010-10-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101858119B (zh) | 一种钢筋混凝土空心楼板及施工方法 | |
CN202559569U (zh) | 一种装配整体式自保温暗密肋轻质叠合楼板 | |
CN105317137A (zh) | 预制墙体、墙板及其施工方法以及预制墙板生产方法 | |
CN108104284B (zh) | 剪力墙钢臂嵌入楼板的墙板连接结构及装配方法 | |
CN102261148A (zh) | 一种钢筋混凝土空心楼板 | |
CN102277920B (zh) | 一种钢筋混凝土空心楼板及施工方法 | |
CN104594555A (zh) | 一种带横向高强混凝土隔板的预制装配钢筋混凝土梁及施工方法 | |
CN104947846A (zh) | 一种装配整体式框架填充轻质内墙板及其制备方法 | |
CN102235048B (zh) | 一种钢筋混凝土空心楼板 | |
CN205224332U (zh) | 预制墙体和预制墙板 | |
CN210421568U (zh) | 一种装配式梁、板结构 | |
CN102251673B (zh) | 一种钢筋混凝土空心楼板施工方法 | |
CN101864819A (zh) | 一种钢筋混凝土空心楼板及施工方法 | |
CN205444514U (zh) | 一种承重轻质保温一体板 | |
CN101487309A (zh) | 一种现浇楼板用预制板及现浇楼板的施工方法 | |
CN104047381A (zh) | 装配整体式少筋混凝土剪力墙结构 | |
CN102251612A (zh) | 一种钢筋混凝土空心楼板及施工方法 | |
CN201771078U (zh) | 一种钢筋混凝土空心楼板 | |
CN201850763U (zh) | 一种建筑用空心楼板模板 | |
CN102251611B (zh) | 一种钢筋混凝土空心楼板及施工方法 | |
CN102261147A (zh) | 一种钢筋混凝土空心楼板 | |
CN201358535Y (zh) | 一种现浇楼板用预制板 | |
CN104196242A (zh) | 预制装配式构件薄腹梁叠浇快速拆模施工方法 | |
CN205530891U (zh) | 自保温暗密肋轻质组合楼盖 | |
CN101906839A (zh) | 一种钢筋混凝土空心楼板及施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20221028 Address after: Xiangjiang Century City, Kaifu District, Changsha City, Hunan Province 410008 Patentee after: Wu Chong Address before: 410082 Hunan province Changsha Lushan Road Structure Engineering Research Institute Hunan University Patentee before: Wu Fangbo |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120822 |
|
CF01 | Termination of patent right due to non-payment of annual fee |