一种钢筋混凝土空心楼板及施工方法 Download PDFInfo
- Publication number
- CN101864819A CN101864819A CN 201010206968 CN201010206968A CN101864819A CN 101864819 A CN101864819 A CN 101864819A CN 201010206968 CN201010206968 CN 201010206968 CN 201010206968 A CN201010206968 A CN 201010206968A CN 101864819 A CN101864819 A CN 101864819A
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- hollow floor
- prefabricated panel
- cast
- reinforced concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本发明公开了一种钢筋混凝土空心楼板及施工方法,该空心楼板包括现浇密肋(1)、预制侧壁(2)、预制底板(3)、现浇顶板(4)。所述的预制侧壁(2)底部有孔洞或缺口(7),孔洞或缺口(7)中有支撑筋(6)。该空心楼板的施工方法包括如下步骤:架设空心楼板模板(11),绑扎肋梁钢筋(12),放置预制侧壁(2);将预制底板(3)放置在搁置件(9)上,浇筑混凝土,待混凝土达到一定的强度后,拆除搁置件(9),将预制底板(3)放置在预制侧壁底部支撑筋(6)上;预制侧壁(2)、预制底板(3)、现浇顶板(4)形成空腔(5),在预制底板(3)下粉刷砂浆(15),形成整体空心楼板。所述的空心楼板由现浇混凝土和预制构件组成,楼板重量轻,整体性好。
Description
技术领域:
本发明涉及建筑施工领域,具体指一种钢筋混凝土空心楼板及施工方法。
背景技术:
钢筋混凝土现浇空心楼板比钢筋混凝土实心楼板耗料少、楼板重量轻,现有的钢筋混凝土空心楼板(专利申请号200420035588.6)采用的技术是将钢筋混凝土空心预制构件,纵横排列安置在底层钢筋混凝土上,在纵横排列的空心预制构件间隙处填以钢筋混凝土成密肋,形成空心楼板。这种空心楼板有以下不足:钢筋、混凝土耗料多,自重大,增加了楼板的造价,并且楼板的整体性不好。
发明内容:
本发明的目的在于提供一种耗料少、楼板重量轻,造价低的钢筋混凝土空心楼板。本发明的目的还在于提供一种制造该空心楼板的施工方法。
本发明的目的是这样来实现的,该钢筋混凝土空心楼板包括现浇密肋、预制侧壁、预制底板、现浇顶板。本发明的特征在于预制侧壁底部有孔洞或缺口,孔洞或缺口中有支撑筋。施工时,先架设空心楼板模板,绑扎肋梁钢筋,放置预制侧壁;将预制底板放置在搁置件上,浇筑混凝土,待混凝土达到一定的强度后,拆除搁置件,将预制底板放置在预制侧壁底部支撑筋上;预制侧壁、预制底板、现浇顶板形成空腔,在预制底板下粉刷砂浆,形成整体空心楼板。由于预制侧壁底部有孔洞或缺口,孔洞或缺口中植入支撑筋,支撑筋可支撑预制底板,增强预制底板与预制侧壁之间的连接,提高预制底板的抗裂性,增强空心楼板的整体性。
本发明的特征还在于所述的预制侧壁底部有支撑筋。
本发明的特征还在于所述的空心楼板由预制侧壁、预制底板、现浇顶板形成空腔。由预制构件与现浇混凝土形成整体空心楼板,楼板重量轻,整体性好。
本发明的特征还在于所述的预制侧壁顶部有锚固钢筋。预制侧壁顶部有锚固钢筋,浇筑混凝土时,锚固钢筋能加强预制侧壁与现浇混凝土之间的粘结、嵌固,增强预制侧壁与现浇混凝土之间的协同工作性,空心楼板的受力性能、整体性更好。
本发明的特征还在于所述的预制底板端部有二条或二条以上的缺口。预制底板端部缺口搁置在预制侧壁底部支撑筋上,预制底板能够更好地与预制侧壁咬合,形成整体空腔,空心楼板的受力性能和整体性更好。
本发明的特征还在于所述的预制侧壁上部有二个或二个以上孔洞。预制侧壁上部的孔洞可以用来置放搁置件,预制底板置于搁置件上,浇筑顶板混凝土时,预制底板起到模板的作用。待混凝土达到一定强度后,拆除搁置件,将预制底板放置在预制侧壁底部支撑筋上,形成整体空心楼板。
本发明的特征还在于所述的预制底板上有隔离层。由于预制底板上铺设有隔离层,浇筑混凝土时,可以防止现浇混凝土顶板与预制底板粘结,将预制底板放置侧壁底部支撑筋上时,预制底板容易与现浇顶板分离。
本发明的特征还在于所述的预制底板上有孔洞。预制底板上的孔洞可用来安置螺栓,现浇混凝土达到一定强度后,可以利用螺栓将预制底板和现浇顶板分离,将预制底板放置在侧壁底部支撑筋上。
为制作上述空心楼板,本发明的施工方法包括如下步骤:架设空心楼板模板,绑扎肋梁钢筋,放置预制侧壁;将预制底板放置在搁置件上,浇筑混凝土,待混凝土达到一定的强度后,拆除搁置件,将预制底板放置在预制侧壁底部支撑筋上;预制侧壁、预制底板、现浇顶板形成空腔,在预制底板下粉刷砂浆,形成整体空心楼板。
附图说明:
图1为钢筋混凝土双向密肋空心楼板施工示意图。2为预制侧壁,3为预制底板,4为现浇顶板,6为预制侧壁2底部支撑筋,7为预制侧壁2底部孔洞,8为预制侧壁2顶部的锚固钢筋,9为搁置件,10为隔离层,11为模板,12为肋梁钢筋,13为螺栓,14为预制底板孔洞,17为预制侧壁2上部孔洞。
图2为钢筋混凝土双向密肋空心楼板结构示意图。1为现浇密肋,5为预制侧壁2、预制底板3、现浇顶板4形成的空腔,15为砂浆。
图3为预制侧壁与预制底板拼装示意图,16为预制底板端部缺口,预制底板3上有隔离层10。
图4为预制侧壁与预制底板另一拼装实施例,预制侧壁底部有缺口7。
图5为预制底板结构示意图,预制底板3上有隔离层10,预制底板3上有孔洞14,孔洞14中安装螺栓13。
具体实施方式:
本发明如附图1-5所示,该钢筋混凝土空心楼板包括现浇密肋1、预制侧壁2、预制底板3、现浇顶板4。预制侧壁2底部有孔洞或缺口7,孔洞或缺口7中有支撑筋6,空心楼板由预制侧壁2、预制底板3、现浇顶板4形成空腔5,预制侧壁2上有二个或二个以上孔洞7,预制侧壁2顶部有锚固钢筋8,预制底板3端部有二条或二条以上的缺口16,预制侧壁2上部有二个或二个以上孔洞17,预制底板3上有隔离层10,底板3上有孔洞14。现场施工,架设空心楼板模板11,绑扎肋梁钢筋12,放置预制侧壁2;将预制底板3放置在搁置件9上,浇筑混凝土,待混凝土达到一定的强度后,拆除搁置件9,将预制底板3放置在预制侧壁底部支撑筋6上;预制侧壁2、预制底板3、现浇顶板4形成空腔5,在预制底板3下粉刷砂浆15,形成整体空心楼板。图1为钢筋混凝土双向密肋空心楼板施工示意图。图2为钢筋混凝土双向密肋空心楼板结构示意图。
预制侧壁2底部有支撑筋6,图3为预制侧壁2与预制底板3拼装示意图,预制侧壁2底部有支撑筋6,预制底板3有端部缺口16。
空心楼板由预制侧壁2、预制底板3、现浇顶板4形成空腔5。由预制构件与现浇混凝土形成整体空心楼板,楼板重量轻,整体性好。
预制侧壁2顶部有锚固钢筋8,浇筑混凝土时,锚固钢筋8能加强预制侧壁2与现浇混凝土之间的粘结、嵌固,增强预制侧壁2与现浇混凝土之间的协同工作性。
预制底板3端部有二条或二条以上的缺口16。预制底板端部缺口16搁置在预制侧壁底部支撑筋6上,预制底板能够更好地与预制侧壁咬合,形成整体空腔,空心楼板的受力性能和整体性更好。
预制侧壁2上部有二个或二个以上孔洞17。预制侧壁上部的孔洞17可以用来置放搁置件9,预制底板3置于搁置件9上,浇筑顶板混凝土时,预制底板3起到模板的作用。待混凝土达到一定强度后,拆除搁置件,将预制底板3放置在预制侧壁底部支撑筋6上,形成整体空心楼板。
预制底板3上铺设有隔离层10,浇筑混凝土时,可以防止现浇混凝土顶板4与预制底板3粘结。图4为预制侧壁2与预制底板3拼装示意图,预制侧壁底部有缺口7,预制底板3放置在搁置件9上,预制底板3上有隔离层10。
预制底板3上有孔洞14,预制底板3上的孔洞14可用来安置螺栓13,现浇混凝土达到一定强度后,可以利用螺栓13将预制底板3和现浇顶板4分离,将预制底板3放置在侧壁底部支撑筋6上。图5为预制底板结构示意图,预制底板3上有隔离层10,预制底板3上孔洞14,孔洞14中安装螺栓13。
Claims (9)
1.一种钢筋混凝土空心楼板,该空心楼板包括现浇密肋(1)、预制侧壁(2)、预制底板(3)、现浇顶板(4)。本发明的特征在于:所述的预制侧壁(2)底部有孔洞或缺口(7),孔洞或缺口(7)中有支撑筋(6)。
2.根据权利要求1所述的钢筋混凝土空心楼板,其特征在于:所述的预制侧壁(2)底部有支撑筋(6)。
3.根据权利要求1所述的钢筋混凝土空心楼板,其特征在于:所述的空心楼板由预制侧壁(2)、预制底板(3)、现浇顶板(4)形成空腔(5)。
4.根据权利要求1所述的钢筋混凝土空心楼板,其特征在于:所述的预制侧壁(2)顶部有锚固钢筋(8)。
5.根据权利要求1所述的钢筋混凝土空心楼板,其特征在于:所述的预制底板(3)端部有二条或二条以上的缺口(16)。
6.根据权利要求1所述的钢筋混凝土空心楼板,其特征在于:所述的预制侧壁(2)上部有二个或二个以上孔洞(17)。
7.根据权利要求1所述的钢筋混凝土空心楼板,其特征在于:所述的预制底板(3)上有隔离层(10)。
8.根据权利要求1所述的钢筋混凝土空心楼板,其特征在于:所述的预制底板(3)上有孔洞(14)。
9.一种制作权利要求1所述钢筋混凝土空心楼板的施工方法,包括如下步骤:架设空心楼板模板(11),绑扎肋梁钢筋(12),放置预制侧壁(2);将预制底板(3)放置在搁置件(9)上,浇筑混凝土,待混凝土达到一定的强度后,拆除搁置件(9),将预制底板(3)放置在预制侧壁底部支撑筋(6)上;预制侧壁(2)、预制底板(3)、现浇顶板(4)形成空腔(5),在预制底板(3)下粉刷砂浆(15),形成整体空心楼板。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010206968 CN101864819A (zh) | 2010-06-23 | 2010-06-23 | 一种钢筋混凝土空心楼板及施工方法 |
CN 201110101518 CN102261149A (zh) | 2010-06-23 | 2011-04-22 | 一种钢筋混凝土空心楼板 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010206968 CN101864819A (zh) | 2010-06-23 | 2010-06-23 | 一种钢筋混凝土空心楼板及施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101864819A true CN101864819A (zh) | 2010-10-20 |
Family
ID=42956728
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010206968 Withdrawn CN101864819A (zh) | 2010-06-23 | 2010-06-23 | 一种钢筋混凝土空心楼板及施工方法 |
CN 201110101518 Pending CN102261149A (zh) | 2010-06-23 | 2011-04-22 | 一种钢筋混凝土空心楼板 |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110101518 Pending CN102261149A (zh) | 2010-06-23 | 2011-04-22 | 一种钢筋混凝土空心楼板 |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN101864819A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102168463A (zh) * | 2010-11-25 | 2011-08-31 | 吴方伯 | 一种钢筋混凝土空心楼板及施工方法 |
CN104790576A (zh) * | 2015-04-26 | 2015-07-22 | 吴方伯 | 一种叠合楼板及其施工方法 |
CN110952710A (zh) * | 2019-10-14 | 2020-04-03 | 中民筑友科技产业有限公司 | 一种设置免拆模的预制楼板及其生产方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1284402A (en) * | 1968-08-06 | 1972-08-09 | Rheinbau Gmbh | Improvements in and relating to building constructions |
CN2228503Y (zh) * | 1995-06-30 | 1996-06-05 | 张乐 | 带永久性胎模的现浇空心板 |
JPH10205039A (ja) * | 1997-01-27 | 1998-08-04 | Showa Concrete Ind Co Ltd | 合成床スラブ用PCa版の製造方法及び合成床スラブの構築方法 |
CN1598207A (zh) * | 2004-09-01 | 2005-03-23 | 吴方伯 | 一种钢筋混凝土空心楼板 |
CN2695539Y (zh) * | 2004-04-16 | 2005-04-27 | 龚友平 | 密肋夹芯预制板 |
CN101003997A (zh) * | 2005-09-21 | 2007-07-25 | 邱则有 | 一种空心构件 |
CN201198619Y (zh) * | 2008-04-29 | 2009-02-25 | 天颂建设集团有限公司 | 一种用于空心楼盖板中的薄壁箱及空心楼盖板 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE755929A (fr) * | 1969-10-03 | 1971-02-15 | Gasse Jean A | Perfectionnements aux elements de hourdis en polystyrene expanse ou analogues |
CN101260696A (zh) * | 2004-01-06 | 2008-09-10 | 邱则有 | 一种组合钢筋砼空心楼板 |
CN101063332B (zh) * | 2006-04-29 | 2010-12-29 | 邱则有 | 一种砼结构用开口箱 |
-
2010
- 2010-06-23 CN CN 201010206968 patent/CN101864819A/zh not_active Withdrawn
-
2011
- 2011-04-22 CN CN 201110101518 patent/CN102261149A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1284402A (en) * | 1968-08-06 | 1972-08-09 | Rheinbau Gmbh | Improvements in and relating to building constructions |
CN2228503Y (zh) * | 1995-06-30 | 1996-06-05 | 张乐 | 带永久性胎模的现浇空心板 |
JPH10205039A (ja) * | 1997-01-27 | 1998-08-04 | Showa Concrete Ind Co Ltd | 合成床スラブ用PCa版の製造方法及び合成床スラブの構築方法 |
CN2695539Y (zh) * | 2004-04-16 | 2005-04-27 | 龚友平 | 密肋夹芯预制板 |
CN1598207A (zh) * | 2004-09-01 | 2005-03-23 | 吴方伯 | 一种钢筋混凝土空心楼板 |
CN101003997A (zh) * | 2005-09-21 | 2007-07-25 | 邱则有 | 一种空心构件 |
CN201198619Y (zh) * | 2008-04-29 | 2009-02-25 | 天颂建设集团有限公司 | 一种用于空心楼盖板中的薄壁箱及空心楼盖板 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102168463A (zh) * | 2010-11-25 | 2011-08-31 | 吴方伯 | 一种钢筋混凝土空心楼板及施工方法 |
CN104790576A (zh) * | 2015-04-26 | 2015-07-22 | 吴方伯 | 一种叠合楼板及其施工方法 |
CN110952710A (zh) * | 2019-10-14 | 2020-04-03 | 中民筑友科技产业有限公司 | 一种设置免拆模的预制楼板及其生产方法 |
CN110952710B (zh) * | 2019-10-14 | 2023-12-12 | 中民筑友科技产业有限公司 | 一种设置免拆模的预制楼板及其生产方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102261149A (zh) | 2011-11-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101858119B (zh) | 一种钢筋混凝土空心楼板及施工方法 | |
CN104947792B (zh) | 一种简筑绿色轻钢装配式房屋及安装方法 | |
CN102277920B (zh) | 一种钢筋混凝土空心楼板及施工方法 | |
CN106088330B (zh) | 基于3d打印的装配式框架梁和框架柱的连接结构及其施工方法 | |
CN102261148A (zh) | 一种钢筋混凝土空心楼板 | |
CN103470040A (zh) | 一种叠合楼板与梁的拼接方法 | |
CN103935911A (zh) | 塔吊附墙支撑结构及其施工方法 | |
CN105133755A (zh) | 一种钢筋焊接网架复合剪力墙的施工方法及剪力墙结构 | |
CN101914967B (zh) | 一种钢筋混凝土空心楼板及施工方法 | |
CN101906875A (zh) | 一种建筑用空心楼板模板 | |
CN108104284B (zh) | 剪力墙钢臂嵌入楼板的墙板连接结构及装配方法 | |
CN101858118A (zh) | 一种钢筋混凝土空心楼板及施工方法 | |
CN107975165B (zh) | 叠合墙体结构及其制作方法 | |
CN201771075U (zh) | 一种钢筋混凝土空心楼板 | |
CN101864819A (zh) | 一种钢筋混凝土空心楼板及施工方法 | |
CN101871240B (zh) | 一种钢筋混凝土空心楼板及施工方法 | |
CN206220297U (zh) | 预制剪力墙 | |
CN102003009A (zh) | 一种钢筋混凝土空心楼板及施工方法 | |
CN201771078U (zh) | 一种钢筋混凝土空心楼板 | |
CN107938891B (zh) | 叠合墙体结构及其制作方法 | |
CN102251673B (zh) | 一种钢筋混凝土空心楼板施工方法 | |
CN102287023B (zh) | 一种钢筋混凝土叠合楼板的施工方法 | |
CN201850763U (zh) | 一种建筑用空心楼板模板 | |
CN101906839A (zh) | 一种钢筋混凝土空心楼板及施工方法 | |
CN102251612A (zh) | 一种钢筋混凝土空心楼板及施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C04 | Withdrawal of patent application after publication (patent law 2001) | ||
WW01 | Invention patent application withdrawn after publication |
Open date: 20101020 |