CN101858118A - 一种钢筋混凝土空心楼板及施工方法 - Google Patents
一种钢筋混凝土空心楼板及施工方法 Download PDFInfo
- Publication number
- CN101858118A CN101858118A CN 201010206982 CN201010206982A CN101858118A CN 101858118 A CN101858118 A CN 101858118A CN 201010206982 CN201010206982 CN 201010206982 CN 201010206982 A CN201010206982 A CN 201010206982A CN 101858118 A CN101858118 A CN 101858118A
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- hollow floor
- reinforced concrete
- prefabricated panel
- concrete hollow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Abstract
本发明公开了一种钢筋混凝土空心楼板及施工方法,该空心楼板包括现浇密肋(1)、预制侧壁(2)、预制底板(3)、现浇顶板(4)。所述的预制底板(3)顶部有凹槽(16),凹槽(16)内填充有轻质材料(17)。其施工方法包括如下步骤:支模板(11),绑扎肋梁钢筋(12),放置预制侧壁(2);将预制底板(3)放置在搁置件(9)上,浇筑混凝土,待混凝土达到一定强度后,拆除搁置件(9),将预制底板(3)放置在预制侧壁(2)的底部凸块(7)上;在预制底板(3)下粉刷砂浆(15),形成整体空心楼板。所述空心楼板的现浇混凝土和预制构件组合,形成共同受力的结构体系,空心楼板的受力性能和整体性更好。预制底板内填充有轻质材料,楼板的重量轻、造价低,保温、隔热性能好,施工方便。
Description
技术领域:
本发明涉及建筑施工领域,具体指一种钢筋混凝土空心楼板及施工方法。
背景技术:
钢筋混凝土现浇空心楼板比钢筋混凝土实心楼板耗料少、楼板重量轻,现有的钢筋混凝土空心楼板(专利申请号200420035588.6)采用的技术是将钢筋混凝土空心预制构件,纵横排列安置在底层钢筋混凝土上,在纵横排列的空心预制构件间隙处填以钢筋混凝土成密肋,形成空心楼板。这种空心楼板有以下不足:钢筋、混凝土耗料多,自重大,增加了楼板的造价,并且楼板的整体性不好。
发明内容:
本发明的目的在于提供一种整体性好,耗料少、楼板重量轻、造价低,保温、隔热性好,施工方便的钢筋混凝土空心楼板。本发明的目的还在于提供一种制作该空心楼板的施工方法。
本发明的目的是这样来实现的,一种钢筋混凝土空心楼板,该空心楼板包括现浇密肋、预制侧壁、预制底板、现浇顶板。本发明的特征在于所述的预制底板顶部有凹槽,凹槽内填充有轻质材料。由于预制底板的凹槽内填充有聚苯板、轻质混凝土等轻质材料,减轻了预制底板的重量,施工更安全、方便,楼板的保温、隔热性更好。
本发明的特征还在于所述的空心楼板由预制侧壁、预制底板、现浇顶板形成空腔。施工时,先将带有搁置件的预制侧壁放置在模板上,然后将预制底板放在搁置件上,浇筑混凝土并达到一定强度后,拆除搁置件,将预制底板放置在预制侧壁的底部凸块上,这样,预制侧壁、预制底板、现浇顶板之间便形成空腔。预制构件与现浇混凝土组合,形成共同受力的结构体系,使得空心楼板的受力性能和整体性更好。
本发明的特征还在于所述的预制侧壁上有顶部凸块或者底部凸块或者同时有顶部凸块和底部凸块。顶部凸块可以使预制底板端部与预制侧壁侧板有一定距离,这样,保证了预制底板在放置到预制侧壁底部凸块的过程中不会被卡住。底部凸块可用来支承预制底板,使预制侧壁和预制底板形成整体。顶部凸块和底部凸块内可以设置钢筋,从而提高预制侧壁的强度和刚度。
本发明的特征还在于所述的预制侧壁顶部有锚固筋。浇筑混凝土后,锚固筋与现浇混凝土粘结、嵌固,使得预制侧壁与现浇混凝土之间的协同工作性更强,空心楼板的受力性能、整体性更好。
本发明的特征还在于所述的预制侧壁上有搁置件。预制侧壁上的搁置件可以用来搁置预制底板,预制底板置于搁置件上,起到模板的作用。待混凝土达到一定强度后,拆除搁置件,将预制底板放置在预制侧壁的底部凸块上。
本发明的特征还在于所述的预制底板上有隔离层。为防止现浇混凝土与预制底板粘结,浇筑混凝土之前,在预制底板上铺设隔离层,这样,预制底板很容易与现浇顶板分离。
本发明的特征还在于所述的预制底板由一块或一块以上的预制板组成。预制底板可以为不同尺寸的预制板拼装而成,使得预制板的制作方便,并且可以满足不同的设计与施工需要。
本发明的特征还在于所述的凹槽内有肋。预制底板的凹槽内有纵肋或横肋或同时有纵肋和横肋,上面覆盖有轻质材料,减轻了空心楼板的重量,便于施工。
本发明的特征还在于所述的预制底板上有孔洞。预制底板上的孔洞可用来安置螺栓,现浇混凝土达到一定强度后,利用螺栓将预制底板与现浇顶板分离,将预制底板放置在预制侧壁的底部凸块上。
为制作上述空心楼板,本发明的施工方法包括如下步骤:(1)支模板,绑扎肋梁钢筋,放置预制侧壁;(2)将预制底板放置在搁置件上,浇筑混凝土,待混凝土达到一定强度后,拆除搁置件,将预制底板放置在预制侧壁的底部凸块上;(3)预制侧壁、预制底板、现浇顶板形成空腔,在预制底板下粉刷砂浆,形成整体空心楼板。
附图说明:
图1为钢筋混凝土空心楼板施工示意图,2为预制侧壁,3为预制底板,4为现浇顶板,6为预制侧壁上的顶部凸块,7为预制侧壁上的底部凸块,8为预制侧壁2顶部的锚固筋,9为搁置件,10为隔离层,11为模板,12为钢筋,13为螺栓,17为轻质材料,18为孔洞。
图2为钢筋混凝土空心楼板整体结构示意图,1为现浇密肋,5为由预制侧壁2、预制底板3、现浇顶板4形成的空腔,15为砂浆。
图3为预制侧壁结构示意图
图4为预制侧壁另一实施例
图5为预制侧壁另一实施例
图6为预制底板与预制侧壁拼装示意图,14为预制板,两块预制板14形成预制底板3,两块预制板14内均填充有轻质材料。
图7为预制底板内凹槽示意图,16为凹槽。
图8为预制底板内凹槽另一实施例,凹槽16内有肋19。
图9为预制底板内凹槽另一实施例
图10为预制底板内凹槽另一实施例
图11为预制底板结构示意图,17为凹槽16内的轻质材料,18为预制底板3上的孔洞,10为预制底板3上的隔离层。
具体实施方式:
下面结合附图对本发明作进一步说明。
本发明如附图1~11所示,一种钢筋混凝土空心楼板,该空心楼板包括现浇密肋1、预制侧壁2、预制底板3、现浇顶板4。所述的预制底板3顶部有凹槽16,凹槽16内填充有轻质材料17。由于预制底板3的凹槽16内填充有聚苯板、轻质混凝土等轻质材料17,减轻了预制底板3的重量,施工更安全、方便,楼板的保温、隔热性更好。
所述的空心楼板由预制侧壁2、预制底板3、现浇顶板4形成空腔5。现场施工时,先支模板11,绑扎肋梁钢筋12,放置预制侧壁2;再将预制底板3放置在搁置件9上,浇筑混凝土,待混凝土达到一定强度后,拆除搁置件9,将预制底板3放置在预制侧壁2的底部凸块7上;预制侧壁2、预制底板3、现浇顶板4形成空腔5,在预制底板3下粉刷砂浆15,形成整体空心楼板。
图1为钢筋混凝土空心楼板施工示意图,图2为钢筋混凝土空心楼板整体结构示意图,5为由预制侧壁2、预制底板3、现浇顶板4形成的空腔,17为轻质材料。在其他附图中,编号相同的,其说明相同。
所述的预制侧壁2上有顶部凸块6或者底部凸块7或者同时有顶部凸块6和底部凸块7。顶部凸块6可以使预制底板3端部与预制侧壁2侧板有一定距离,这样,保证了预制底板3在放置到底部凸块7的过程中不会被卡住。底部凸块7可用来支承预制底板3,使预制侧壁2和预制底板3形成整体。
图3为预制侧壁2结构示意图,6为顶部凸块,7为底部凸块,图4、图5为预制侧壁2的实施例。
所述的预制侧壁2顶部有锚固筋8。浇筑混凝土后,锚固筋8与现浇混凝土粘结、嵌固,预制侧壁2与现浇混凝土之间的协同工作性更强。
所述的预制侧壁2上有搁置件9。预制侧壁2上的搁置件9可以用来搁置预制底板3,预制底板3置于搁置件9上,起到模板的作用。待混凝土达到一定强度后,拆除搁置件9,将预制底板3放置在预制侧壁2的底部凸块7上。
所述的预制底板3上有隔离层10。为防止现浇混凝土与预制底板3粘结,浇筑混凝土之前,在预制底板3上铺设隔离层10,这样,预制底板3很容易与现浇顶板4分离。
所述的预制底板3由一块或一块以上的预制板14组成。图6中的预制底板3由两块预制板14组成,两块预制板14上均有凹槽16,凹槽16内填充有轻质材料17。
所述的凹槽16内有肋19。预制底板3的凹槽16内有纵肋或横肋或同时有纵肋和横肋,上面覆盖有轻质材料17,减轻了空心楼板的重量,便于施工。图7为预制底板内凹槽示意图,16为凹槽,凹槽16内填充有轻质材料17,图8、图9、图10为预制底板内凹槽的实施例,凹槽16内有肋19,肋19上覆盖有轻质材料17。
所述的预制底板3上有孔洞16。预制底板3上的孔洞16可用来安置螺栓13,现浇混凝土达到一定强度后,利用螺栓13将预制底板3与现浇顶板4分离,将预制底板3放置在预制侧壁2的底部凸块7上。图11为预制底板结构示意图,10为预制底板3上的隔离层,18为预制底板上的孔洞。
Claims (10)
1.一种钢筋混凝土空心楼板,该空心楼板包括现浇密肋(1)、预制侧壁(2)、预制底板(3)、现浇顶板(4)。本发明的特征在于:所述的预制底板(3)顶部有凹槽(16),凹槽(16)内填充有轻质材料(17)。
2.根据权利要求1所述的钢筋混凝土空心楼板,其特征在于:所述的空心楼板由预制侧壁(2)、预制底板(3)、现浇顶板(4)形成空腔(5)。
3.根据权利要求1所述的钢筋混凝土空心楼板,其特征在于:所述的预制侧壁(2)上有顶部凸块(6)或者底部凸块(7)或者同时有顶部凸块(6)和底部凸块(7)。
4.根据权利要求1所述的钢筋混凝土空心楼板,其特征在于:所述的预制侧壁(2)顶部有锚固筋(8)。
5.根据权利要求1所述的钢筋混凝土空心楼板,其特征在于:所述的预制侧壁(2)上有搁置件(9)。
6.根据权利要求1所述的钢筋混凝土空心楼板,其特征在于:所述的预制底板(3)上有隔离层(10)。
7.根据权利要求1所述的钢筋混凝土空心楼板,其特征在于:所述的预制底板(3)由一块或一块以上预制板(14)组成。
8.根据权利要求1所述的钢筋混凝土空心楼板,其特征在于:所述的凹槽(16)内有肋(19)。
9.根据权利要求1所述的钢筋混凝土空心楼板,其特征在于:所述的预制底板(3)上有孔洞(18)。
10.一种制作权利要求1所述钢筋混凝土空心楼板的施工方法,包括如下步骤:支模板(11),绑扎肋梁钢筋(12),放置预制侧壁(2);将预制底板(3)放置在搁置件(9)上,浇筑混凝土,待混凝土达到一定强度后,拆除搁置件(9),将预制底板(3)放置在预制侧壁(2)的底部凸块(7)上;预制侧壁(2)、预制底板(3)、现浇顶板(4)形成空腔(5),在预制底板(3)下粉刷砂浆(15),形成整体空心楼板。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010206982 CN101858118A (zh) | 2010-06-23 | 2010-06-23 | 一种钢筋混凝土空心楼板及施工方法 |
CN201110101413.5A CN102235048B (zh) | 2010-06-23 | 2011-04-22 | 一种钢筋混凝土空心楼板 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010206982 CN101858118A (zh) | 2010-06-23 | 2010-06-23 | 一种钢筋混凝土空心楼板及施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101858118A true CN101858118A (zh) | 2010-10-13 |
Family
ID=42944257
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010206982 Withdrawn CN101858118A (zh) | 2010-06-23 | 2010-06-23 | 一种钢筋混凝土空心楼板及施工方法 |
CN201110101413.5A Active CN102235048B (zh) | 2010-06-23 | 2011-04-22 | 一种钢筋混凝土空心楼板 |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110101413.5A Active CN102235048B (zh) | 2010-06-23 | 2011-04-22 | 一种钢筋混凝土空心楼板 |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN101858118A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102168463A (zh) * | 2010-11-25 | 2011-08-31 | 吴方伯 | 一种钢筋混凝土空心楼板及施工方法 |
CN102182268A (zh) * | 2010-11-25 | 2011-09-14 | 吴方伯 | 一种钢筋混凝土空心楼板及施工方法 |
CN104847045A (zh) * | 2015-05-12 | 2015-08-19 | 华汇工程设计集团股份有限公司 | 一种预制整浇井字形楼盖结构 |
CN116607683A (zh) * | 2023-05-23 | 2023-08-18 | 山东建筑大学 | 一种装配式预制楼板 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104763086B (zh) * | 2015-02-05 | 2017-11-03 | 昆山生态屋建筑技术有限公司 | 一种密肋楼板的组装式自承重模具 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2395366A1 (fr) * | 1977-06-22 | 1979-01-19 | Babu Jean Pierre | Element prefabrique double de coffrage et parement pour la construction de dalles de plafond en beton |
CN1779095A (zh) * | 2004-11-24 | 2006-05-31 | 邱则有 | 一种砼空心板 |
CN101260696A (zh) * | 2004-01-06 | 2008-09-10 | 邱则有 | 一种组合钢筋砼空心楼板 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1284402A (en) * | 1968-08-06 | 1972-08-09 | Rheinbau Gmbh | Improvements in and relating to building constructions |
CN2228503Y (zh) * | 1995-06-30 | 1996-06-05 | 张乐 | 带永久性胎模的现浇空心板 |
CN2695539Y (zh) * | 2004-04-16 | 2005-04-27 | 龚友平 | 密肋夹芯预制板 |
CN101003997A (zh) * | 2005-09-21 | 2007-07-25 | 邱则有 | 一种空心构件 |
-
2010
- 2010-06-23 CN CN 201010206982 patent/CN101858118A/zh not_active Withdrawn
-
2011
- 2011-04-22 CN CN201110101413.5A patent/CN102235048B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2395366A1 (fr) * | 1977-06-22 | 1979-01-19 | Babu Jean Pierre | Element prefabrique double de coffrage et parement pour la construction de dalles de plafond en beton |
CN101260696A (zh) * | 2004-01-06 | 2008-09-10 | 邱则有 | 一种组合钢筋砼空心楼板 |
CN1779095A (zh) * | 2004-11-24 | 2006-05-31 | 邱则有 | 一种砼空心板 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102168463A (zh) * | 2010-11-25 | 2011-08-31 | 吴方伯 | 一种钢筋混凝土空心楼板及施工方法 |
CN102182268A (zh) * | 2010-11-25 | 2011-09-14 | 吴方伯 | 一种钢筋混凝土空心楼板及施工方法 |
CN102182268B (zh) * | 2010-11-25 | 2013-04-03 | 吴方伯 | 一种钢筋混凝土空心楼板及施工方法 |
CN104847045A (zh) * | 2015-05-12 | 2015-08-19 | 华汇工程设计集团股份有限公司 | 一种预制整浇井字形楼盖结构 |
CN116607683A (zh) * | 2023-05-23 | 2023-08-18 | 山东建筑大学 | 一种装配式预制楼板 |
CN116607683B (zh) * | 2023-05-23 | 2023-11-21 | 山东建筑大学 | 一种装配式预制楼板 |
Also Published As
Publication number | Publication date |
---|---|
CN102235048A (zh) | 2011-11-09 |
CN102235048B (zh) | 2013-05-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11085186B2 (en) | Thermal-insulated exterior wall boards, dedicated molds and making methods thereof | |
CN101858119B (zh) | 一种钢筋混凝土空心楼板及施工方法 | |
KR100903398B1 (ko) | 프리캐스트 섬유보강 와이어매쉬 슬래브 | |
CN102277920B (zh) | 一种钢筋混凝土空心楼板及施工方法 | |
CN102261148A (zh) | 一种钢筋混凝土空心楼板 | |
CN103741842A (zh) | 一种轻型装配式剪力墙结构 | |
CN101858118A (zh) | 一种钢筋混凝土空心楼板及施工方法 | |
CN101906875A (zh) | 一种建筑用空心楼板模板 | |
CN107975165B (zh) | 叠合墙体结构及其制作方法 | |
CN101914967B (zh) | 一种钢筋混凝土空心楼板及施工方法 | |
CN103061451A (zh) | 带洞口混凝土墙体的水平分层复合连梁及其施工方法 | |
CN201771075U (zh) | 一种钢筋混凝土空心楼板 | |
CN105040823A (zh) | 一种剪刀楼梯的隔墙板与楼层梁的连接结构及其施工方法 | |
CN101871240B (zh) | 一种钢筋混凝土空心楼板及施工方法 | |
CN107938891B (zh) | 叠合墙体结构及其制作方法 | |
CN106638260A (zh) | 一种组合式箱梁构造及其制造方法 | |
CN201771078U (zh) | 一种钢筋混凝土空心楼板 | |
CN101864819A (zh) | 一种钢筋混凝土空心楼板及施工方法 | |
CN110894744A (zh) | 用于制作剪力墙的桁架墙板、使用该墙板制作的剪力墙及其制作方法 | |
CN102251673B (zh) | 一种钢筋混凝土空心楼板施工方法 | |
CN108571065A (zh) | 基于钢板连通接头的装配式钢筋混凝土框架结构 | |
CN210459515U (zh) | 一种装配式混凝土框架结构 | |
CN109440992B (zh) | 一种全干式预制装配混凝土板柱结构体系 | |
CN201850763U (zh) | 一种建筑用空心楼板模板 | |
CN102409846B (zh) | 一种建筑用空心楼板模板及其拼装方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C04 | Withdrawal of patent application after publication (patent law 2001) | ||
WW01 | Invention patent application withdrawn after publication |
Open date: 20101013 |