CN101849131A - 具有防止形成沉积物的内涂层的管道和施加所述涂层的方法 - Google Patents

具有防止形成沉积物的内涂层的管道和施加所述涂层的方法 Download PDF

Info

Publication number
CN101849131A
CN101849131A CN200980100903A CN200980100903A CN101849131A CN 101849131 A CN101849131 A CN 101849131A CN 200980100903 A CN200980100903 A CN 200980100903A CN 200980100903 A CN200980100903 A CN 200980100903A CN 101849131 A CN101849131 A CN 101849131A
Authority
CN
China
Prior art keywords
pipeline
stopper
coating
polyurethane
internally coated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200980100903A
Other languages
English (en)
Inventor
马利克·法夫萨维维奇·盖森
菲尔多斯·奥斯曼诺维奇·扎马列夫
亚历山大·尼古拉耶维奇·皮卢金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of CN101849131A publication Critical patent/CN101849131A/zh
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L58/00Protection of pipes or pipe fittings against corrosion or incrustation
    • F16L58/02Protection of pipes or pipe fittings against corrosion or incrustation by means of internal or external coatings
    • F16L58/04Coatings characterised by the materials used
    • F16L58/10Coatings characterised by the materials used by rubber or plastics
    • F16L58/1009Coatings characterised by the materials used by rubber or plastics the coating being placed inside the pipe
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C33/00Moulds or cores; Details thereof or accessories therefor
    • B29C33/56Coatings, e.g. enameled or galvanised; Releasing, lubricating or separating agents
    • B29C33/58Applying the releasing agents
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C33/00Moulds or cores; Details thereof or accessories therefor
    • B29C33/76Cores
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/14Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor incorporating preformed parts or layers, e.g. injection moulding around inserts or for coating articles
    • B29C45/14598Coating tubular articles
    • B29C45/14622Lining the inner or outer surface of tubular articles
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/01Risers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/32Component parts, details or accessories; Auxiliary operations
    • B29C43/36Moulds for making articles of definite length, i.e. discrete articles
    • B29C43/361Moulds for making articles of definite length, i.e. discrete articles with pressing members independently movable of the parts for opening or closing the mould, e.g. movable pistons
    • B29C2043/3615Forming elements, e.g. mandrels or rams or stampers or pistons or plungers or punching devices
    • B29C2043/3631Forming elements, e.g. mandrels or rams or stampers or pistons or plungers or punching devices moving in a frame for pressing and stretching; material being subjected to compressing stretching
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/14Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor incorporating preformed parts or layers, e.g. injection moulding around inserts or for coating articles
    • B29C45/14311Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor incorporating preformed parts or layers, e.g. injection moulding around inserts or for coating articles using means for bonding the coating to the articles
    • B29C2045/14327Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor incorporating preformed parts or layers, e.g. injection moulding around inserts or for coating articles using means for bonding the coating to the articles anchoring by forcing the material to pass through a hole in the article
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C33/00Moulds or cores; Details thereof or accessories therefor
    • B29C33/0061Moulds or cores; Details thereof or accessories therefor characterised by the configuration of the material feeding channel
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C33/00Moulds or cores; Details thereof or accessories therefor
    • B29C33/30Mounting, exchanging or centering
    • B29C33/303Mounting, exchanging or centering centering mould parts or halves, e.g. during mounting
    • B29C33/304Mounting, exchanging or centering centering mould parts or halves, e.g. during mounting centering cores
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C37/00Component parts, details, accessories or auxiliary operations, not covered by group B29C33/00 or B29C35/00
    • B29C37/005Compensating volume or shape change during moulding, in general
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C37/00Component parts, details, accessories or auxiliary operations, not covered by group B29C33/00 or B29C35/00
    • B29C37/0078Measures or configurations for obtaining anchoring effects in the contact areas between layers
    • B29C37/0082Mechanical anchoring
    • B29C37/0085Mechanical anchoring by means of openings in the layers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/02Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor of articles of definite length, i.e. discrete articles
    • B29C43/18Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor of articles of definite length, i.e. discrete articles incorporating preformed parts or layers, e.g. compression moulding around inserts or for coating articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/0046Details relating to the filling pattern or flow paths or flow characteristics of moulding material in the mould cavity
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/14Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor incorporating preformed parts or layers, e.g. injection moulding around inserts or for coating articles
    • B29C45/14631Coating reinforcements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29KINDEXING SCHEME ASSOCIATED WITH SUBCLASSES B29B, B29C OR B29D, RELATING TO MOULDING MATERIALS OR TO MATERIALS FOR MOULDS, REINFORCEMENTS, FILLERS OR PREFORMED PARTS, e.g. INSERTS
    • B29K2077/00Use of PA, i.e. polyamides, e.g. polyesteramides or derivatives thereof, as moulding material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29KINDEXING SCHEME ASSOCIATED WITH SUBCLASSES B29B, B29C OR B29D, RELATING TO MOULDING MATERIALS OR TO MATERIALS FOR MOULDS, REINFORCEMENTS, FILLERS OR PREFORMED PARTS, e.g. INSERTS
    • B29K2105/00Condition, form or state of moulded material or of the material to be shaped
    • B29K2105/25Solid
    • B29K2105/253Preform
    • B29K2105/258Tubular
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29KINDEXING SCHEME ASSOCIATED WITH SUBCLASSES B29B, B29C OR B29D, RELATING TO MOULDING MATERIALS OR TO MATERIALS FOR MOULDS, REINFORCEMENTS, FILLERS OR PREFORMED PARTS, e.g. INSERTS
    • B29K2275/00Use of PU, i.e. polyureas or polyurethanes or derivatives thereof, as reinforcement
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29LINDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
    • B29L2023/00Tubular articles
    • B29L2023/22Tubes or pipes, i.e. rigid

Abstract

本发明涉及石油生产工业,并涉及防止在管道的内表面上形成沥青-树脂-石蜡沉积物。将聚氨酯涂层施用到管道的内表面上,所述聚氨酯涂层的表面在硬化后变得光滑。通过泵送聚氨酯将所述涂层施用到管道的预先清洁和去除油污的内壁上,直至由管道内壁和塞子形成的环状空腔被填充。为了实现涂层的光滑精整度,使用塞子,其外表面具有第9级以上的表面精整度。

Description

具有防止形成沉积物的内涂层的管道和施加所述涂层的方法
技术领域
本发明涉及石油和天然气工业,更具体地,涉及防止在管道内表面上形成沉积物(沥青质、树脂和石蜡、盐、水合沉积物等),且能够用于涂布在任何烃原料生产方法(石油或天然气)中所用的管道的内表面,不用考虑油井的使用条件和所提取原料的品质。
背景技术
存在用于涂布管道内表面的已知方法,所述方法提供了例如通过使用因压力差而压在管道表面的薄膜带形成的一层或多层涂层(参见2000年4月27日公告的专利RU 2144803)。
这种方法的缺点在于应用于管道内表面的薄膜带涂布方法的复杂特性、涂层对管道表面的低粘附性和低的耐外部腐蚀介质的性能。
存在利用聚合物材料对管道内表面进行涂布的已知方法,所述方法包括:在管道内表面上涂布这种处于稠密流动状态的材料,随后使其固化(参见1998年9月10日公告的专利RU 2118742)。
这种方法的缺点在于,所述熔融聚合物在热机械模件中快速冷却,使得不可能提供均匀的涂层或在聚合物和管道表面之间的牢固结合,这是因为在聚合物主体中发生强烈的热收缩过程。热机械模件沿管道的移动改变了挤出机和模件之间连接元件的长度,以及聚合物沿该元件经过的状况,这降低了涂层品质和聚合物对金属的粘附性。
存在通过压铸法利用热塑性材料来涂布管道表面的已知方法,所述方法包括:将金属管放入模具内;填充达到稠密流动状态的热塑性材料;加热模具;及随后固化并将材料从所述模具中取出(参见2002年7月10日公告的专利RU 2184903)。
这种方法的缺点在于工艺复杂性和与模具制造、特别是用于大尺寸管的模具制造有关的高成本,以及所述方法对于直径小于200mm的管的不适用性。
在石油和天然气工业中一个未解决的问题是,在烃原料生产(石油和天然气)的石油和天然气井所使用的管道壁上的沉积物。该过程从在任何气候条件下开始生产时开始,并持续直至完全阻塞管道。沉积物导致泵设备的加速磨损、管道清洁所花费的成本和时间的增加、因流动面积减少而产生的在管道中的压降,这加大了烃原料的生产不足。
根据烃原料的品质,在不同区域管道清洁操作的时间各不相同,从一天至一年。例如,在buzulukskoe区域,每1~15天清除石蜡沉积物,这取决于井,在Tumen区域该周期为5~20天,在Surgut区域该周期为7~30天。
发明内容
为了解决上述问题,本发明人对在管道内表面上形成沉积物的原因进行详细分析,提出了一种涂布管道内表面的设备和方法,作为解决这种问题的全面解决方案。
存在三个引起在管道内表面上沉积物形成的主要因素:
1.管道内表面的粗糙度;
2.在石油移动期间在管道内表面上的静应力;
3.在管道壁上的温差。
所述因素导致阻止沉积物形成的涂层的设备和方法的需求。
1.涂层厚度为2~8mm,以在管道壁上降低热传导并避免急剧的温差,
2.高度的涂层表面清洁度-光滑表面,
3.防止静应力累积。
除了规定的要求之外,还包括设计用于防止形成沉积物的那些内容,涂层自身和涂布方法应具有下列性质:
1.耐腐蚀介质(酸、碱)性;
2.均匀性、对金属良好的粘附性和水密性,以防止管道内表面的腐蚀;
3.弹性,耐裂纹性,在高达-60℃的温度下裂纹与冲击载荷和管道弯曲有关;
4.耐磨性,磨损与在莫氏(Moss)刻度中硬度高达7点的悬浮粒子的流动有关;
5.在-60~+110℃温度范围内保持涂层性能。
所提出技术方案的目的是创造一种涂布管道内表面的设备和方法,从而防止形成沉积物并提供用于任何烃原料生产方法中的长寿命涂层,而不必考虑井使用状况、提取的原料的品质,并且与上述规定的要求一致。
研究调查和多次试验为选择满足所述规定要求的材料(聚氨酯体系)选择提供了基础,其特性示于表1中。
表1聚氨酯体系的主要特性
  技术参数   值
  肖氏(Shore)硬度DIN 53516   80~95A
  拉伸强度DIN 53504   13~45N/mm2
  断裂伸长率DIN 53504   500~600%
  撕裂强度DIN 53515   10~50N/mm
  磨损DIN 53516   8~25mg
  压缩形变23℃/72小时DIN 53517   11~19%
  压缩形变70℃/24小时DIN 53517   30~45%
  回弹性DIN 53512   70~75%
  使用温度范围   -60~110℃
  对冲击载荷的机械记忆   100%
得到如下技术效果:聚氨酯对管道内表面的高度粘附性、具有规定厚度的涂层的光滑表面。
通过一种方法获得了所述技术效果,所述方法涉及:将聚氨酯泵送到环状空腔中,所述环状空腔由管道的内表面和利用心轴插入且具有高度精整的表面的冲孔器形成;保持所述聚氨酯至其完全固化,随后将所述冲孔器从所述管道中取出,从而使得聚氨酯能够完全粘附到管道金属壁上,并能够获得具有光亮精整表面和均匀厚度的涂层。根据聚氨酯收缩比,所述管道可以设有由穿孔的金属筛制成的管,所述管的外径等于所述管道的内径。此外,当加工一些聚氨酯而需要时,在所述聚氨酯泵送之前,利用任何已知方法将所述管道加热至所需温度。
设备组件和涂布方法包括下列操作:
1.将水垢、灰尘和水分从管道内表面上除去,然后对所述表面去除油污。
2.将最小外表面精整度为第9级的塞子插入经清洁和去除油污的管道中。塞子的外径在塞子和管道内壁之间提供了间隙,其等于涂层厚度(2~8mm)。
3.在将塞子插入管道之前,利用单独的润滑剂对其外表面进行润滑以有助于其随后的取出。
4.当聚氨酯的收缩因数超过2%时,则在将塞子插入管道之前,将网管插入到管道的内部空间内,所述网管例如由穿孔的金属制成,其外径等于管道的内径且厚度不超过1.5mm。所述网抵抗聚氨酯的收缩,这提供了具有较好均匀性且对管道壁具有高粘附性的涂层。
5.利用心轴(2)将塞子(1)居中,所述心轴安装在管道面(3)上,同时一个心轴具有用于填充聚氨酯的连接管(4)(图1)。
6.为了满足对某些种类聚氨酯进行加工的工艺要求,使用管状加热元件、炉子或任何其它已知方法将组装的设备加热至所需温度,通常不超过80℃。
7.为了防止在涂层中形成空隙,将所述组装的设备安装在与底部的连接管垂直的位置,然后借助于连接管填充聚氨酯物质,直至空间填满。
8.在聚氨酯完全固化之后,将塞子沿水平位置从管道中取出。
9.对管道面进行机械加工以除去任何毛刺。
与规定材料组合,这种涂布设备和方法的使用提供了均匀涂层,所述涂层具有相等的厚度、光滑的表面、高的耐腐蚀介质的性能、对管道内表面的高粘附性、高耐磨性、耐高温性,这防止了沉积物的形成和相关后果,增加了生产井定期修理和大修之间的时间,最终增加了管道的使用寿命。

Claims (2)

1.一种具有防止形成沉积物的内涂层的管道,其包括管道及其内壁上的聚氨酯涂层,所述涂层具有光滑表面,
其特征在于,在聚氨酯固化之后实现最终的涂层外观和特性,其中塞子插入于所述管道中,所述塞子的外径在所述塞子和所述管道壁之间提供了间隙,所述间隙等于涂层厚度。
1.1如权利要求1所述的具有防止形成沉积物的内涂层的管道,其特征在于,当某些种类的聚氨酯的收缩因数超过2%时,则将由穿孔的金属制成的网管插入到所述管道的内部空间内,所述网管的外径等于管道的内径且厚度不超过1.5mm。
1.2如权利要求1所述的具有防止形成沉积物的内涂层的管道,其特征在于,为了获得光滑的涂层表面,所述塞子的最小外表面精整度为第9级,并在填充所述涂层材料之前用单独的润滑剂润滑所述塞子。
1.3如权利要求1所述的具有防止形成沉积物的内涂层的管道,其特征在于,为了提供均匀的涂层厚度,利用安装到管道面上的心轴将所述塞子居中。
2.管道内表面的涂布方法,所述方法防止形成沉积物,包括:对管道内表面进行清洁和去除油污,填充涂层材料,随后使其固化,
其特征在于,将所述涂层材料填充至所述管道的内表面与塞子之间的环状间隙中直至填满该空间。
2.1如权利要求2所述的方法,其特征在于,为了防止在所述涂层中形成空隙,借助于安装在所述管道底面上的所述心轴中的连接管沿垂直位置进行填充。
2.2如权利要求2所述的方法,其特征在于,选择所述塞子的外径,使得在所述塞子与所述管道内径之间的距离等于涂层厚度。
2.3如权利要求2所述的方法,其特征在于,为了满足对某些种类的聚氨酯进行加工的工艺要求,使用环状加热元件、炉子或任何其它已知方法将所述管道加热至所需温度。
2.4如权利要求2所述的方法,其特征在于,在聚氨酯完全固化之后,将所述塞子沿水平位置取出。
CN200980100903A 2007-12-27 2009-02-04 具有防止形成沉积物的内涂层的管道和施加所述涂层的方法 Pending CN101849131A (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
RU2007149567/06A RU2362942C1 (ru) 2007-12-27 2007-12-27 Насосно-компрессорная труба (нкт) с внутренним покрытием, исключающим отложения, и способ его нанесения
PCT/RU2009/000047 WO2009084987A2 (ru) 2007-12-27 2009-02-04 Hkt с внутренним покрытием, исключающим отложения, и способ его нанесения

Publications (1)

Publication Number Publication Date
CN101849131A true CN101849131A (zh) 2010-09-29

Family

ID=40824928

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200980100903A Pending CN101849131A (zh) 2007-12-27 2009-02-04 具有防止形成沉积物的内涂层的管道和施加所述涂层的方法

Country Status (13)

Country Link
US (1) US20100233365A1 (zh)
EP (1) EP2236896A4 (zh)
CN (1) CN101849131A (zh)
AU (1) AU2009203142B2 (zh)
BR (1) BRPI0906405A2 (zh)
CU (1) CU20100130A7 (zh)
EA (1) EA201000933A1 (zh)
EC (1) ECSP10010290A (zh)
EG (1) EG27051A (zh)
MY (1) MY179569A (zh)
RU (1) RU2362942C1 (zh)
TN (1) TN2010000261A1 (zh)
WO (1) WO2009084987A2 (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103619491A (zh) * 2011-03-07 2014-03-05 加拿大原子能有限公司 用于将涂层涂覆于管的内部的方法和装置
CN105675450A (zh) * 2016-03-03 2016-06-15 东北石油大学 浮顶原油储罐传热传质过程实验装置及其实验方法
CN114509467A (zh) * 2020-11-16 2022-05-17 中国石油天然气股份有限公司 蜡沉积模拟装置和方法

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2487229C1 (ru) * 2012-02-14 2013-07-10 Александр Николаевич Переседов Насосно-компрессорная труба
CN102767368B (zh) * 2012-07-20 2014-10-01 中国地质大学(武汉) 基于聚氨酯加固井壁的模拟实验装置
DE102014219308A1 (de) * 2014-09-24 2016-03-24 Mahle International Gmbh Verfahren zum Herstellen einer Anordnung mit einem Rohrkörper und einem Bauteil
US10702882B2 (en) 2014-10-30 2020-07-07 Corning Incorporated Method and system for the selective coating of an interior surface

Family Cites Families (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB817419A (en) * 1957-01-07 1959-07-29 Douglas Randolph Lewis Internally lined pipe and method of making same
SU124896A1 (ru) * 1959-03-14 1959-11-30 Е.С. Зеиде Способ борьбы с отложени ми парафина в лифтовых трубах нефт ных скважин и нефтепроводах
SU129590A1 (ru) * 1959-12-11 1960-11-30 С.Ф. Люшин Способ нанесени лакокрасочного покрыти на внутреннюю поверхность насосно-компрессорных труб
SU492876A1 (ru) * 1972-07-14 1975-11-25 Устройство дл программного управлени
GB2021727B (en) * 1978-05-19 1982-09-15 Nippon Kokan Kk Inner burr cutting and inner surface cleaning apparatus for long pipes of small and medium diameters
JPS61189913A (ja) * 1985-02-19 1986-08-23 Riken Corp 合成樹脂製の管継手製造法
RU2057645C1 (ru) * 1992-12-31 1996-04-10 Войсковая часть 52609 Способ футерования внутренней поверхности металлических труб
JPH08144358A (ja) * 1994-11-22 1996-06-04 Kubota Corp ポーラスライニング管の製造方法
RU2144803C1 (ru) 1996-12-10 2000-01-27 Уральский научно-исследовательский институт травматологии и ортопедии Способ хирургической коррекции шеечно-эпифизарной деформации проксимального отдела бедра
GB9704364D0 (en) * 1997-03-03 1997-04-23 Oil States Ind Uk Ltd Method of, and apparatus for, lining a pipe
RU2118742C1 (ru) 1997-09-29 1998-09-10 Тюменский государственный нефтегазовый университет Способ защиты внутренней поверхности трубопроводов полимерным материалом
CA2374448A1 (en) * 1999-01-26 2000-08-03 Dbs Beschichtung Und Systeme-Technik Gmbh Method for coating the inside of pipes and coating system
RU2184903C1 (ru) 2001-01-29 2002-07-10 Закрытое акционерное общество "Пегас" Способ покрытия поверхностей трубопровода термопластом литьем под давлением
US6796547B1 (en) * 2002-02-20 2004-09-28 Arnco Corporation Collapsible duct
RU31256U1 (ru) * 2003-03-21 2003-07-27 Боровков Дмитрий Владимирович Колонна насосно-компрессорных металлических труб и насосно-компрессорная труба для колонны труб и транспортировки среды на поверхности
DE10324321A1 (de) * 2003-05-27 2004-12-23 Putzmeister Ag Transportrohr für Dickstoffe
US7243409B2 (en) * 2003-07-09 2007-07-17 Lewis John K Weldable conduit method of forming
US20050067037A1 (en) * 2003-09-30 2005-03-31 Conocophillips Company Collapse resistant composite riser
CA2460297C (en) * 2004-02-26 2016-01-12 Industrial Rubber Products, Inc. Rubber polyurethane liner
RU2298642C1 (ru) * 2005-09-14 2007-05-10 Николай Александрович Петров Способ борьбы с асфальтосмолопарафиновыми отложениями в нефтепромысловом оборудовании

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103619491A (zh) * 2011-03-07 2014-03-05 加拿大原子能有限公司 用于将涂层涂覆于管的内部的方法和装置
CN103619491B (zh) * 2011-03-07 2016-03-16 加拿大原子能有限公司 用于将涂层涂覆于管的内部的方法和装置
CN105675450A (zh) * 2016-03-03 2016-06-15 东北石油大学 浮顶原油储罐传热传质过程实验装置及其实验方法
CN105675450B (zh) * 2016-03-03 2018-03-20 东北石油大学 浮顶原油储罐传热传质过程实验装置及其实验方法
CN114509467A (zh) * 2020-11-16 2022-05-17 中国石油天然气股份有限公司 蜡沉积模拟装置和方法

Also Published As

Publication number Publication date
TN2010000261A1 (en) 2011-11-11
WO2009084987A2 (ru) 2009-07-09
AU2009203142A1 (en) 2009-07-09
AU2009203142B2 (en) 2013-05-16
WO2009084987A3 (ru) 2009-09-11
RU2362942C1 (ru) 2009-07-27
EP2236896A2 (de) 2010-10-06
BRPI0906405A2 (pt) 2015-07-14
US20100233365A1 (en) 2010-09-16
EA201000933A1 (ru) 2010-12-30
MY179569A (en) 2020-11-11
EG27051A (en) 2015-04-29
EP2236896A4 (de) 2014-05-21
ECSP10010290A (es) 2011-02-28
CU20100130A7 (es) 2012-06-21

Similar Documents

Publication Publication Date Title
CN101849131A (zh) 具有防止形成沉积物的内涂层的管道和施加所述涂层的方法
CN102909237B (zh) 一种ta18厚壁管材的制备方法
CN102022588A (zh) 一种衬塑钢塑复合管及其制造方法
CN1963278A (zh) 超高分子量聚乙烯复合管及其制造方法
CN101972791B (zh) 薄壁不锈钢三通管件冷压成形装置及成形方法
CN110776746A (zh) 一种工程机械高压胶管配方及生产工艺
CN203702013U (zh) 一种耐磨防腐复合抽油杆
CA2710830C (en) The oilwell tubing with coating that prevents buildup, and the method for applying coating
CN114352239B (zh) 超高应变回复形状记忆合金筛管材料及制备方法与应用
CN205424230U (zh) 一种新型防腐蚀耐磨l型管道
CN205592498U (zh) 一种保温耐腐蚀型石油管道放置架
CN114752156A (zh) 热塑成型管道非开挖修复材料及其制备方法和应用
CN114636047A (zh) 一种热力管道的不锈钢内衬修复方法
CN111086244A (zh) 一种旧油管抽油杆内外包覆碳纤维材料的再造修复工艺
CN107377931A (zh) 一种电机壳体压铸模具
CN106519902A (zh) 一种渣浆泵过流部件表面环氧树脂修补工艺
CN105131384A (zh) 一种耐磨蚀的复合管材及其制备方法
CN102410423B (zh) 一种具有抗蚀性能的氟塑料金属管道补偿器及制备方法
CN204025962U (zh) 可多次修复降磨防腐复合管
CN111203685A (zh) 一种腐蚀偏磨废旧油管热轧修复方法
CN104197123B (zh) 可多次修复降磨防腐复合管的制造方法
CN110711690A (zh) 一种采油井和注水井套管内壁水下涂敷防腐工艺
CN116716021A (zh) 一种油套管用高耐磨粉末内涂层涂料及其制备方法
CN201851799U (zh) 钢骨架增强型尼龙管道
US20040037988A1 (en) Composite pipe formed by a metallic pipe with inner lining resistant to aggressive agents, method for manufacturing said pipe and use thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20100929