CN101841143A - 一种pvc电线导管暗敷设的装配式施工方法 - Google Patents

一种pvc电线导管暗敷设的装配式施工方法 Download PDF

Info

Publication number
CN101841143A
CN101841143A CN 201010177795 CN201010177795A CN101841143A CN 101841143 A CN101841143 A CN 101841143A CN 201010177795 CN201010177795 CN 201010177795 CN 201010177795 A CN201010177795 A CN 201010177795A CN 101841143 A CN101841143 A CN 101841143A
Authority
CN
China
Prior art keywords
elbow
spool
lamp cap
box
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010177795
Other languages
English (en)
Other versions
CN101841143B (zh
Inventor
朱成三
朱杨林
朱春林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN NO.6-ELECTROMECHANICAL INSTALLATION CO., LTD.
Original Assignee
朱成三
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 朱成三 filed Critical 朱成三
Priority to CN2010101777955A priority Critical patent/CN101841143B/zh
Publication of CN101841143A publication Critical patent/CN101841143A/zh
Application granted granted Critical
Publication of CN101841143B publication Critical patent/CN101841143B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

本发明公开了一种PVC电线导管暗敷设的装配式施工方法,按以下步骤进行:1)预先批量制作规格弯头和直接头;2)根据施工图用记号笔将开关、插座、灯头盒位置标示在模板上,并将线管走向用箭头标示;3)将弯头的一端伸出楼面,用线管堵头堵好该端的管口,并用夹具将弯头固定、定位;将点定位节固定在模板标示位置的定位点上,将直接头套在点定位节上定位;灯头盒安装:将灯头盒放置在灯头盒标示位置固定;4)配管:用PVC电线导管及直接头分别与各定位处的弯头、灯头盒、定位点的直接头相连。本发明方法具有质量好、效率高、节约材料、环保、工序简单,操作方便等优点。

Description

一种PVC电线导管暗敷设的装配式施工方法
技术领域
本发明属于线管施工方法,具体涉及一种PVC电线导管暗敷设的装配式施工方法。
背景技术
电线导管的敷设是各类建筑施工不可缺少的项目。目前,现浇楼板内的PVC电线导管暗敷设,一直停留在现场弯弯,胶带绑扎定位及胶带封堵管口,直接头用胶水粘接,穿梁线管在模板上开孔的传统工艺上,其方法如下:
1、放线:将进开关、插座及穿梁板的线管分别标示在模板上;
2、钻孔:将穿梁、穿板线管孔开好,并将木屑处理干净;
3、敷管:待钢筋安装完成后,将现场弯制好的弯头对准标示线用扎丝固定在钢筋上,再将伸出楼面的弯管合在一起并垂直楼面,用胶带绑扎固定,并用胶带封堵好管口,再将线管另一端用注塑直接头与线管胶接。
现有线管的敷设方法有很多弊端:一是现场弯制,由于PVC电线导管材料反弹度受温度、时间等因素影响较大,因此,角度、弧度无法保证,上墙弯头位移现象严重,难以垂直于地面,事后修正多出现鸭嘴巴状的扁管现象,而且管头超出地面过多,浪费材料;二是胶带绑扎,只能将伸出楼面的弯头绑在一起固定,无法调制两管中心距离与接线盒线管入口中心距相匹配,无法保护外力对伸出楼面管头的破坏(如拆模时的模板、架管及扣件的坠落);三是胶带封口和拆除麻烦,胶带不可重复使用,易磨损,可靠性差;四是模板钻孔施工麻烦且对模板破坏性大,降低了模板的使用周转率,混凝土浇注时易漏浆,影响质量;五是墙体砌筑时需要清理预埋,费时费力。
发明内容
本发明要解决的技术问题是克服以上现有技术的不足,提供一种操作方便、简单、高效、节约、质量易控的PVC电线导管暗敷设的装配式施工方法。
实现本发明目的的技术方案如下:PVC电线导管施工方法包括以下步骤:
1、预先批量制作规格弯头和直接头;
2、标示位置:根据施工图用记号笔将开关、插座、灯头盒位置标示在模板上,并将线管走向用箭头标示;
3、定位安装:
a)弯头安装:将步骤1制作的弯头伸出楼面的一端,用线管堵头堵好该端的管口,并用夹具将此处弯头固定在一起,再用扎丝将弯头绑扎在记号处的圈梁钢筋上定位;
b)穿梁线管点定位节安装:将点定位节放在模板标示位置上固定;
c)灯头盒安装:将灯头盒放置在灯头盒标示位置上固定;
4、配管:待楼板钢筋安装完成后,用PVC电线导管及直接头分别与各定位处的弯头、灯头盒、点定位节相连,并用扎丝将PVC电线导管绑扎在钢筋上。
所述步骤1的弯头制作,是将PVC电线导管按弯头所需长度下料,用弯管机弯制弯头,在热水槽中用弯头定型器将弯头定形。
所述步骤1的直接头制作,是采用PVC电线导管敷设中余下的尾料,按所需尺寸将尾料下为胚料,在PVC电线导管接头成形机上用与本PVC电线导管相配合的扩咀将胚料两头的管口加工制成直接头(该直接头的插口为带椎插口,安装时,只需将线管旋转插入,无需胶水即可密封,还可自缩达到一定的紧度)。
本发明方法还包括以下步骤:
5、弯管成品保护:混凝土初凝后,将高出楼面的线管夹具下压至楼面,将超出夹具的弯头的管头去掉,并将原堵头取出,重新塞入弯头的管口进行成品保护。此时的夹具全方位的保护了出楼面管头任何外力对它的破坏;
6、开关插座盒安装:
a)插座盒安装:墙体砌筑完成后,依据施工图安装插座盒,并将此处预埋好的管头清理出来,用切割机在墙体上切割一条管头与插座盒相连的管槽,再将弯头管口的堵头取出,提升夹具至适当位置作为直接头,将线管插入夹具内与插座盒线管入口相连了;
b)开关盒安装:墙体砌筑完成后,依据施工图将开关盒安装位置标示在墙体上,并将此处混凝土梁内预埋好的线管直接头接口清理出来,用切割机在墙体上切割一条直接头接口与开关盒相连的管槽,用线管将开关盒与接头接口相连。
本发明方法具有以下有益效果:由于预先批量制作规格弯头,工作效率高,减少了在现场安装的工作量,创造了先安装各定位点待楼板钢筋安装完成后,快速连管的条件,克服了传统方法先安钢筋后装线管,工作量过于集中带来的麻烦(如需多配施工人员,增长工期等)。利用PVC电线导管的尾料制作直接头可以节约材料、安装简便快捷、密封性好、无需胶水、利于环保,采用线管堵头、夹具、点定位节等辅助工具使得施工质量可靠性更高,工序更简单,操作更方便,实现文明施工。
附图说明
图1是弯头安装的立面示意图。
图2是弯头安装的平面示意图。
图3是穿梁线管点定位节的安装示意图。
图4是灯头盒安装的示意图。
图5、图6是弯头成品施工的示意图。
图7是插座盒安装施工的示意图。
图8是开关盒安装施工的示意图。
具体实施方式
本发明方法按以下步骤进行:
1、预先批量制作规格弯头和直接头;
a)弯头制作:预先将PVC电线导管按弯头所需长度下料,用弯管机弯制好弯头,再在热水槽中用弯头定型器定形;
b)直接头制作:采用PVC电线导管敷设中余下的尾料,按长度大于10CM的尺寸下料为胚料,在PVC电线导管接头成形机上用与所述PVC电线导管相配合的扩咀加工胚料两端的接口制成直接头;
2、标示位置:根据施工图用记号笔将开关、插座、灯头盒位置标示在模板上,并将线管走向用箭头标示;
3、定位安装:
a)弯头安装:如图1和图2所示,将步骤1制作的弯头3伸出楼面的一端,用线管堵头1堵好该端的管口,并用夹具2将此处弯头3固定在一起,再用扎丝将弯头3绑扎在记号处模板5上的圈梁钢筋4上定位;
b)穿梁线管点定位节安装:如图3所示,将点定位节6用螺钉7固定在模板5标示位置;
c)灯头盒安装:如图4所示,将灯头盒10放置在灯头盒标示位置,用螺钉11将灯头盒10固定在木模板5上;
4、配管:待楼板钢筋安装完成后,用PVC电线导管9及直接头分别与各定位处的弯头3、灯头盒10、点定位节6相连,并用扎丝将PVC电线导管绑扎在钢筋上(参见图1、图2、图3、图4);
5、弯管成品保护:见图5、图6,混凝土12初凝后,将高出楼面13的线管夹具2下压至楼面13(图5),将超出夹具的弯头3的管头去掉,并将原堵头1取出,重新塞入弯头3的管口(图6)进行成品保护。此时的夹具全方位的保护了出楼面管头任何外力对它的破坏;
6、开关插座盒安装:
a)插座盒安装:如图7所示,墙体砌筑完成后,依据施工图安装插座盒,并将此处预埋好的管头清理出来,用切割机在墙体上切割一条管头与插座盒相连的管槽,再将弯头3管口的堵头1取出,提升夹具2至适当位置作为直接头,将线管9插入夹具2内与插座盒14线管入口相连;
b)开关盒安装:如图8所示,墙体15砌筑完成后,依据施工图将开关盒安装位置标示在墙体上,并将此处混凝土梁16内预埋好的线管直接头17接口清理出来,用切割机在墙体上切割一条直接头17接口与开关盒18相连的管槽,用线管9将开关盒18与接头17接口相连。

Claims (4)

1.一种PVC电线导管暗敷设的装配式施工方法,其特征是按以下步骤进行:
1)、预先批量制作规格弯头和直接头;
2)、标示位置:根据施工图用记号笔将开关、插座、灯头盒位置标示在模板上,并将线管走向用箭头标示;
3)、定位安装:
a)弯头安装:将步骤1制作的弯头伸出楼面的一端,用线管堵头堵好该端的管口,并用夹具将此处弯头固定在一起,再用扎丝将弯头绑扎在记号处的圈梁钢筋上定位;
b)穿梁线管点定位节安装:将点定位节放在模板标示位置上固定;
c)灯头盒安装:将灯头盒放置在灯头盒标示位置上固定;
4)、配管:待楼板钢筋安装完成后,用PVC电线导管及直接头分别与各定位处的弯头、灯头盒、点定位节相连,并用扎丝将PVC电线导管绑扎在钢筋上。
2.根据权利要求1所述的PVC电线导管暗敷设的装配式施工方法,其特征是所述步骤1)的弯头制作,是将PVC电线导管按弯头所需长度下料,用弯管机弯制弯头,在热水槽中用弯头定型器将弯头定形。
3.根据权利要求1所述的PVC电线导管暗敷设的装配式施工方法,其特征是所述步骤1)的直接头制作,是采用PVC电线导管敷设中余下的尾料,按所需尺寸将尾料下为胚料,在PVC电线导管接头成形机上用与本PVC电线导管相配合的扩咀将胚料两头的管口加工制成直接头。
4.根据权利要求1所述的PVC电线导管的施工方法,其特征是还包括以下步骤:
5)、弯管成品保护:混凝土初凝后,将高出楼面的线管夹具下压至楼面,将超出夹具的弯头的管头去掉,并将原堵头取出,重新塞入弯头的管口进行成品保护。此时的夹具全方位的保护了出楼面管头任何外力对它的破坏;
6)、开关插座盒安装:
a)插座盒安装:墙体砌筑完成后,依据施工图安装插座盒,并将此处预埋好的管头清理出来,用切割机在墙体上切割一条管头与插座盒相连的管槽,再将弯头管口的堵头取出,提升夹具至适当位置作为直接头,将线管插入夹具内与插座盒线管入口相连了;
b)开关盒安装:墙体砌筑完成后,依据施工图将开关盒安装位置标示在墙体上,并将此处混凝土梁内预埋好的线管直接头接口清理出来,用切割机在墙体上切割一条直接头接口与开关盒相连的管槽,用线管将开关盒与接头接口相连。
CN2010101777955A 2010-05-20 2010-05-20 一种pvc电线导管暗敷设的装配式施工方法 Expired - Fee Related CN101841143B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101777955A CN101841143B (zh) 2010-05-20 2010-05-20 一种pvc电线导管暗敷设的装配式施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101777955A CN101841143B (zh) 2010-05-20 2010-05-20 一种pvc电线导管暗敷设的装配式施工方法

Publications (2)

Publication Number Publication Date
CN101841143A true CN101841143A (zh) 2010-09-22
CN101841143B CN101841143B (zh) 2012-09-26

Family

ID=42744350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101777955A Expired - Fee Related CN101841143B (zh) 2010-05-20 2010-05-20 一种pvc电线导管暗敷设的装配式施工方法

Country Status (1)

Country Link
CN (1) CN101841143B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106041801A (zh) * 2016-07-20 2016-10-26 梁启明 一种调节盒载具
CN106532552A (zh) * 2016-12-28 2017-03-22 淮北矿业(集团)工程建设有限责任公司 一种线管预埋施工工艺
CN107769130A (zh) * 2016-09-06 2018-03-06 北京新创迪克系统集成技术有限公司 一种紧定式镀锌薄壁钢导管的铺设方法
CN110364959A (zh) * 2019-07-16 2019-10-22 上海一建安装工程有限公司 一种电气安装工程质量控制方法
CN112054434A (zh) * 2020-08-05 2020-12-08 业之峰诺华家居装饰集团股份有限公司 一种加强型穿线管布线工艺

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1123866A (zh) * 1995-08-08 1996-06-05 张善青 一种楼板与管道间隙防渗漏施工方法及设备
WO1996025616A1 (de) * 1995-02-14 1996-08-22 Karl Kortmann Stützvorrichtung für rohre in mauerdurchführungen
JP2002199546A (ja) * 2000-12-28 2002-07-12 Furukawa Electric Co Ltd:The 屋内配線用ボックス
CN1483906A (zh) * 2003-08-04 2004-03-24 有利华建筑预制件(深圳)有限公司 带线管的预制楼面板和建筑物楼板的半预制施工方法
CN1880818A (zh) * 2005-06-15 2006-12-20 王建民 一种室内天棚楼板上暗敷设盘管的施工方法
CN101392560A (zh) * 2008-09-25 2009-03-25 陕西省第三建筑工程公司 建筑安装管道套管一次到位施工方法
CN201232358Y (zh) * 2008-06-13 2009-05-06 中建三局第二建设工程有限责任公司 混凝土楼板上套管预留预埋装置
CN201245974Y (zh) * 2008-08-19 2009-05-27 中建三局第一建设工程有限责任公司 Upvc套管预留预埋系统
CN100536270C (zh) * 2006-07-27 2009-09-02 北京阔达建筑装饰工程有限责任公司 家庭装修工程电路改造单管单线制施工材料及施工方法
CN101225909B (zh) * 2008-01-23 2010-08-04 莱西市建筑总公司 电气安装工程预埋定位套管

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1996025616A1 (de) * 1995-02-14 1996-08-22 Karl Kortmann Stützvorrichtung für rohre in mauerdurchführungen
CN1123866A (zh) * 1995-08-08 1996-06-05 张善青 一种楼板与管道间隙防渗漏施工方法及设备
JP2002199546A (ja) * 2000-12-28 2002-07-12 Furukawa Electric Co Ltd:The 屋内配線用ボックス
CN1483906A (zh) * 2003-08-04 2004-03-24 有利华建筑预制件(深圳)有限公司 带线管的预制楼面板和建筑物楼板的半预制施工方法
CN1880818A (zh) * 2005-06-15 2006-12-20 王建民 一种室内天棚楼板上暗敷设盘管的施工方法
CN100536270C (zh) * 2006-07-27 2009-09-02 北京阔达建筑装饰工程有限责任公司 家庭装修工程电路改造单管单线制施工材料及施工方法
CN101225909B (zh) * 2008-01-23 2010-08-04 莱西市建筑总公司 电气安装工程预埋定位套管
CN201232358Y (zh) * 2008-06-13 2009-05-06 中建三局第二建设工程有限责任公司 混凝土楼板上套管预留预埋装置
CN201245974Y (zh) * 2008-08-19 2009-05-27 中建三局第一建设工程有限责任公司 Upvc套管预留预埋系统
CN101392560A (zh) * 2008-09-25 2009-03-25 陕西省第三建筑工程公司 建筑安装管道套管一次到位施工方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106041801A (zh) * 2016-07-20 2016-10-26 梁启明 一种调节盒载具
CN107769130A (zh) * 2016-09-06 2018-03-06 北京新创迪克系统集成技术有限公司 一种紧定式镀锌薄壁钢导管的铺设方法
CN106532552A (zh) * 2016-12-28 2017-03-22 淮北矿业(集团)工程建设有限责任公司 一种线管预埋施工工艺
CN110364959A (zh) * 2019-07-16 2019-10-22 上海一建安装工程有限公司 一种电气安装工程质量控制方法
CN112054434A (zh) * 2020-08-05 2020-12-08 业之峰诺华家居装饰集团股份有限公司 一种加强型穿线管布线工艺

Also Published As

Publication number Publication date
CN101841143B (zh) 2012-09-26

Similar Documents

Publication Publication Date Title
CN101841143B (zh) 一种pvc电线导管暗敷设的装配式施工方法
CN103061504B (zh) 混凝土板管道安装预留洞施工模具及施工方法
CN212317492U (zh) 一种方便接管的梁内竖向预埋穿线管结构
CN111005431B (zh) 市政管道安装结构及其施工方法
CN207229922U (zh) 可调式上下水管道固定装置
CN106401148A (zh) 一种室内水管施工方法
CN101575844B (zh) 一种水平埋设钢筋精确对位连接的方法
CN215772322U (zh) 一种室内电线敷设用夹钳装置
CN107740497A (zh) 一种水工建筑物过流面预埋地脚螺栓的施工方法
CN105735487A (zh) 一种墙拉筋组件
CN213304915U (zh) 一种模板免开孔电气管线预埋件
CN210067479U (zh) 建筑配管安装设备
CN201360123Y (zh) 线缆伸缩保护套管
CN202074166U (zh) 马鞍形快速管接头
CN201593305U (zh) 混凝土内部预埋管定位及固定装置
CN207453121U (zh) 一种水工建筑物过流面预埋地脚螺栓
CN205976565U (zh) 一种pvc管管根保护套
CN202101672U (zh) 一种新型沉降观测点装置
CN201245974Y (zh) Upvc套管预留预埋系统
CN111139817A (zh) 一种便于地铁盾构穿越的地下连续墙施工方法及结构
CN110905205B (zh) 一种暗敷设电线导管保护施工方法
CN219420160U (zh) 地面线管保护扣盒
CN214379840U (zh) 一种pvc电线管用保护罩
CN204760910U (zh) 暗配管穿引线装置
CN206432646U (zh) 一种扣式pvc管接头

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HUNAN NO. 6- ELECTROMECHANICAL INSTALLATION CO., L

Free format text: FORMER OWNER: ZHU CHENGSAN

Effective date: 20131231

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 410005 CHANGSHA, HUNAN PROVINCE TO: 410015 CHANGSHA, HUNAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20131231

Address after: 8, 410015 floor, No. 296 West labour Road, Tianxin District, Hunan, Changsha

Patentee after: HUNAN NO.6-ELECTROMECHANICAL INSTALLATION CO., LTD.

Address before: 410005, Hunan province Changsha Takahashi Market West Gate wealth times District 2, building 304 room

Patentee before: Zhu Chengsan

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120926

Termination date: 20200520

CF01 Termination of patent right due to non-payment of annual fee