CN101807785A - Prefabricated assembled cable trench and installation method thereof - Google Patents

Prefabricated assembled cable trench and installation method thereof Download PDF

Info

Publication number
CN101807785A
CN101807785A CN201010127920A CN201010127920A CN101807785A CN 101807785 A CN101807785 A CN 101807785A CN 201010127920 A CN201010127920 A CN 201010127920A CN 201010127920 A CN201010127920 A CN 201010127920A CN 101807785 A CN101807785 A CN 101807785A
Authority
CN
China
Prior art keywords
trench
cable
prefabricated assembled
ditch body
cable trench
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201010127920A
Other languages
Chinese (zh)
Inventor
罗洪明
陈刚
李百根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Electric Power Transmission & Transformation Construction Co Ltd
Original Assignee
Sichuan Electric Power Transmission & Transformation Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Electric Power Transmission & Transformation Construction Co Ltd filed Critical Sichuan Electric Power Transmission & Transformation Construction Co Ltd
Priority to CN201010127920A priority Critical patent/CN101807785A/en
Publication of CN101807785A publication Critical patent/CN101807785A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The invention discloses a prefabricated assembled cable trench and an installation method thereof; and the prefabricated assembled cable trench comprises prefabricated cable trench monomers, the cross section of each monomer is U-shaped trench body, the left and the right trench walls are symmetric and gradually shrink to become narrow from down to up, and the bottom is provided with an arc-shaped water drainage tank. The construction method comprises the following steps that: (a) the trench body is arranged on a plain concrete soil bedding layer with the thickness of 100mm, dry hard cement mortar of 30 to 50mm is paved for leveling when in installation, gaps of 5mm are pre-reserved between the cable trench monomers, and waterproof mortar is adopted for jointing; (b) a cable support is directly fixed on the trench wall by a core through bolt and an expansion bolt, grounding flat steel is put on the core through bolt, and both sides are welded with the support; and (c) a brick plastered trench body is adopted for the corner of the cable trench and T-shaped connector. The invention is characterized by convenient construction, good integrity and low cost.

Description

Prefabricated assembled cable trench and installation method
Technical field
The present invention relates to transformer station's inner cable ditch manufacturing and construction method thereof, particularly prefabricated assembled cable trench manufacturing and construction method thereof.
Background technology
At present, the common practice of transformer station's cable trough has two kinds: a kind of is brick setting surface plastering cable trough; Another kind is the cast-in-place concrete cable trough.Along with the continuous development of power engineering, the requirement of duration, safety construction is improved constantly, above two kinds of cable troughs showed its shortcoming:
1) above-mentioned two kinds of cable trough site operation operation procedures are various, long in time limit, and resource cost is bigger, cause on-the-spot chaotic and potential safety hazard increase, and management difficulty strengthens, and is unfavorable for carrying out of safety construction;
2) cost of above-mentioned two kinds of cable troughs all is higher than prefabricated assembled cable trench, according to 1 meter cable trough measuring and calculating, about 700 yuan/meter of the cost of brick surface plastering ditch body, about 900 yuan/meter of armored concrete cable trough cost;
3) Comparatively speaking, brick cable trough is because brick technological requirement of plastering is higher, and the quality of plastering is generally on the low side, occurs common quality defect easily; Then there is the formwork difficulty in the cast-in-situ steel reinforced concrete cable trough, and ditch body concrete surface smoothness is difficult to guarantee;
4) globality of brick cable trough and less stable normal occur tilting, collapse, problem such as distortion;
5) advocate " amphitypy one is changed " according to state net company, i.e. resource-conserving, environmentally friendly, industrialization demands, carrying out prefabricated assembled cable trench will be the development in future direction.Above-mentioned two kinds of cable troughs are because resource cost is many, and the situ wet operation procedure is many, long in time limit, safety construction is poor, can not adapt to the needs of current power engineering development.
Summary of the invention
The prefabricated assembled cable trench that the purpose of this invention is to provide a kind of manufacturing simple in structure, convenient, convenient construction.
The object of the present invention is achieved like this: a kind of prefabricated assembled cable trench, form by pre-fabricated electric cables ditch monomer, the section of each cable trough monomer is " U " font ditch body, and left and right furrow bank symmetry and left and right furrow bank shrink gradually from the bottom to top and narrow down, and the arc-like rows tank is arranged at ditch body bottom.
The length of above-mentioned cable trough monomer is 1m.
Be embedded with the reinforcing bar suspension ring on the above-mentioned cable trough monomer.
Another object of the present invention provides a kind of installation method of prefabricated assembled cable trench, and its installation method is as follows:
A), the ditch body is installed on the thick plain concrete soil padding of 100mm shop 30~50mm dry cement mortar leveling during installation, ditch body employing crane lifting installation; During installation, reserve the 5mm slit between adjacent two cable trough monomers, adopt the waterproof mortar cementation of fissures, jointing;
B), cable bearer directly is fixed on the furrow bank with punching bolt and expansion bolt, the ground connection band steel is placed on the punching bolt, card is pressed between support and the furrow bank when support is installed, both sides and support welding;
C), cable trough corner and T connector place ditch body adopt the brick ditch body of plastering.
Compared with prior art, the invention has the beneficial effects as follows:
1, prefabricated assembled cable trench has solved existing brick formula and the numerous and diverse problem of armored concrete formula cable trough wet trade program of plastering, and has the advantages that the construction period is short, save resource, easy construction.
2, the manufacturing cost of prefabricated assembled cable trench is only 600 yuan/meter, has the low advantage of cost.
3, compare with brick formula cable trough, the present invention has good integrity and advantages of high strength.
4, prefabricated assembled cable trench bottom of trench surfacing is beneficial to and drains the water away, and has solved the common fault of bottom of trench ponding well.
Description of drawings
Fig. 1 is the schematic perspective view of the assembly unit of two pre-fabricated electric cables ditch monomers;
Fig. 2 is the front view (rhone and cable bearer etc. are shown) of pre-fabricated electric cables ditch monomer shown in Figure 1.
Embodiment
Fig. 1 illustrates, the present invention is made up of pre-fabricated electric cables ditch monomer, the section of each cable trough monomer 1 is " U " font ditch body, ditch body internal orifice is wide at the top and narrow at the bottom, the left and right furrow bank section of ditch body is up-narrow and down-wide, left and right furrow bank symmetry and left and right furrow bank shrink gradually from the bottom to top and narrow down, and arc-like rows tank 1a is arranged at ditch body bottom.The length of cable trough monomer is 1m.Be embedded with the reinforcing bar suspension ring on the cable trough monomer.
Referring to Fig. 2, a kind of installation method of prefabricated assembled cable trench, carry out according to the following steps:
A), the ditch body is installed on the thick plain concrete soil padding of 100mm shop 30~50mm dry cement mortar leveling during installation, 8 tons of cranes liftings of ditch body employing installation; During installation, reserve the 5mm slit between adjacent two cable trough monomers, adopt the waterproof mortar cementation of fissures, jointing;
B), cable bearer 2 usefulness punching bolts 4 and expansion bolt 5 directly be fixed on the furrow bank, ground connection band steel 3 is placed on the punching bolt, card is pressed between support and the furrow bank when support is installed, both sides and support welding;
C), cable trough corner and T connector place ditch body adopt the brick ditch body of plastering.
The invention reside in the deficiency that solves the traditional cable ditch design of current transformer station, construction, take a kind of novelly, meet the assembly type cable slot that state net company " amphitypy one is changed " requires.
Its design feature, method for prefabricating and mounting process are as follows:
1, on this cable duct Cross section Design, be aspect form removal and economical with materials when prefabricated, ditch body inboard is designed to type wide at the top and narrow at the bottom, and the external side of ditch is designed to up-narrow and down-wide type, and furrow bank shrinks gradually from the bottom to top and narrows down. In the middle of the cable slot body bottom, the dark arc draining of the wide 20mm of 50mm sulculus is set, can strengthens the bottom of trench drain function, reduce bottom of trench ponding. Consider that simultaneously lifting and transhipment are convenient, be symmetrical arranged the reinforcing bar suspension ring at furrow bank.
2, this prefabricated assembled cable trench template adopts punching block to make, and the size that can measure is according to demand made many cover templates.
3, the ditch body reaches and is transported to the scene with machinery after the intensity and installs successively. Bottom of trench places on the C15 concrete cushion, and bottom of trench is straight according to the drainage grade leveling with the dry cement mortar. Consider that cable duct belongs to outdoor structures, be subjected to atmospheric effect bigger, do not use the caulking joint of organic waterproof material, joint filling in durability and anti-aging, the waterproof mortar cementation of fissures, jointing are adopted in the slit between the ditch body.
4, installing cables support and grounding flat steel. Need to perforate on furrow bank, available professional hole making drill operation.

Claims (4)

1. prefabricated assembled cable trench, it is characterized in that: form by pre-fabricated electric cables ditch monomer, the section of each cable trough monomer (1) is " U " font ditch body, and left and right furrow bank symmetry and left and right furrow bank shrink gradually from the bottom to top and narrow down, and arc-like rows tank (1a) is arranged at ditch body bottom.
2. according to the described prefabricated assembled cable trench of claim 1, it is characterized in that: the length of described cable trough monomer is 1m.
3. according to claim 1 or 2 described prefabricated assembled cable trench, it is characterized in that: be embedded with the reinforcing bar suspension ring on the described cable trough monomer.
4. installation method of prefabricated assembled cable trench according to claim 1 is characterized in that: carry out according to the following steps:
A), the ditch body is installed on the thick plain concrete soil padding of 100mm shop 30~50mm dry cement mortar leveling during installation, ditch body employing crane lifting installation; During installation, reserve the 5mm slit between adjacent two cable trough monomers, adopt the waterproof mortar cementation of fissures, jointing;
B), cable bearer (2) directly is fixed on the furrow bank with punching bolt (4) and expansion bolt (5), ground connection band steel (3) is placed on the punching bolt, card is pressed between support and the furrow bank when support is installed, both sides and cable bearer welding;
C), cable trough corner and T connector place ditch body adopt the brick ditch body of plastering.
CN201010127920A 2010-03-19 2010-03-19 Prefabricated assembled cable trench and installation method thereof Pending CN101807785A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010127920A CN101807785A (en) 2010-03-19 2010-03-19 Prefabricated assembled cable trench and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010127920A CN101807785A (en) 2010-03-19 2010-03-19 Prefabricated assembled cable trench and installation method thereof

Publications (1)

Publication Number Publication Date
CN101807785A true CN101807785A (en) 2010-08-18

Family

ID=42609443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010127920A Pending CN101807785A (en) 2010-03-19 2010-03-19 Prefabricated assembled cable trench and installation method thereof

Country Status (1)

Country Link
CN (1) CN101807785A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103545781A (en) * 2013-10-30 2014-01-29 云南黔康电力科技有限公司 Safely-grounded underground cable duct bank channel
CN104410030A (en) * 2014-12-05 2015-03-11 浙江省电力设计院 Light concrete laminated slab assembly type cable trench and forming method thereof
CN106253190A (en) * 2016-09-12 2016-12-21 广州电力设计院 Cable duct structure, cabling arrangements and cable laying method
CN106498981A (en) * 2016-12-06 2017-03-15 绍兴明煌建材科技有限公司 A kind of brick type municipal administration comprehensive pipeline passage and its construction method
CN106759476A (en) * 2016-12-06 2017-05-31 绍兴明煌建材科技有限公司 A kind of assembled municipal administration comprehensive pipeline passage and its construction method
CN107482564A (en) * 2017-08-18 2017-12-15 国网上海市电力公司 A kind of assembly type cable slot
CN109119929A (en) * 2018-10-12 2019-01-01 中建局集团第二建筑有限公司 A kind of pipe trench high-tension cable concrete support installation fixed structure and its construction method
CN110690679A (en) * 2018-07-04 2020-01-14 山西太钢不锈钢股份有限公司 Multi-loop same-groove cable direct-buried laying method
CN112064672A (en) * 2020-08-05 2020-12-11 周昆 Zipper type municipal pipeline trench convenient to overhaul and maintain and using method thereof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103545781A (en) * 2013-10-30 2014-01-29 云南黔康电力科技有限公司 Safely-grounded underground cable duct bank channel
CN104410030A (en) * 2014-12-05 2015-03-11 浙江省电力设计院 Light concrete laminated slab assembly type cable trench and forming method thereof
CN106253190A (en) * 2016-09-12 2016-12-21 广州电力设计院 Cable duct structure, cabling arrangements and cable laying method
CN106253190B (en) * 2016-09-12 2018-07-31 广州电力设计院 Cable duct structure, cabling arrangements and cable laying method
CN106498981A (en) * 2016-12-06 2017-03-15 绍兴明煌建材科技有限公司 A kind of brick type municipal administration comprehensive pipeline passage and its construction method
CN106759476A (en) * 2016-12-06 2017-05-31 绍兴明煌建材科技有限公司 A kind of assembled municipal administration comprehensive pipeline passage and its construction method
CN107482564A (en) * 2017-08-18 2017-12-15 国网上海市电力公司 A kind of assembly type cable slot
CN110690679A (en) * 2018-07-04 2020-01-14 山西太钢不锈钢股份有限公司 Multi-loop same-groove cable direct-buried laying method
CN109119929A (en) * 2018-10-12 2019-01-01 中建局集团第二建筑有限公司 A kind of pipe trench high-tension cable concrete support installation fixed structure and its construction method
CN112064672A (en) * 2020-08-05 2020-12-11 周昆 Zipper type municipal pipeline trench convenient to overhaul and maintain and using method thereof

Similar Documents

Publication Publication Date Title
CN101807785A (en) Prefabricated assembled cable trench and installation method thereof
CN201280725Y (en) Post-casting construction precast slab for basement of buildings
CN110552706A (en) Permanent-temporary combined shield hoisting hole sealing structure and method
CN107268675A (en) The laying method and structure of a kind of many storehouse underground pipe galleries of combined type
CN210713156U (en) Prefabricated assembled sump pit structure
CN201639249U (en) Prefabricated assembly type cable duct
CN109356126B (en) Semi-prefabricated gallery structure and gallery construction method
CN109137984A (en) Assembled integral mixes prefabricated pipe gallery
CN212452765U (en) Two-in-one underground pipe gallery structure
CN203284814U (en) Transformer substation prefabricated concrete water-scattering device
CN203247838U (en) Fully-buried basement side wall post-pouring belt advance water stop formwork
CN110056071A (en) A kind of municipal administration storm sewer assembling module and construction method
CN114319410A (en) Wind power generation grid-connected power equipment assembly type foundation structure and installation construction process
CN108521097A (en) A kind of prefabricated tunnel of electric power and its installation method
CN211900603U (en) Face combination shield structure hole of hoist enclosed construction forever
CN210887323U (en) Connect and build engineering underground structure construction joint watertight fittings
CN108396985B (en) Hole plugging structure
CN211948320U (en) Structure of steel pipe square and round transition section
CN217683557U (en) Prefabricated sleeper beam of municipal works concrete pipe
CN218028146U (en) Prefabricated assembled template that foundation engineering used
CN217159236U (en) Novel assembled cable pit
CN110158627A (en) A kind of basis in prefabricated transformer substation power distribution unit building and construction method
CN116556323B (en) Underground station bottom plate adjustable uplift pile adopting cover-excavation method and construction method
CN215483081U (en) Gravity type retaining wall
CN220644342U (en) Waterproof structure for bottom of basement outer wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20100818