CN106498981A - A kind of brick type municipal administration comprehensive pipeline passage and its construction method - Google Patents

A kind of brick type municipal administration comprehensive pipeline passage and its construction method Download PDF

Info

Publication number
CN106498981A
CN106498981A CN201611108209.5A CN201611108209A CN106498981A CN 106498981 A CN106498981 A CN 106498981A CN 201611108209 A CN201611108209 A CN 201611108209A CN 106498981 A CN106498981 A CN 106498981A
Authority
CN
China
Prior art keywords
municipal administration
brick type
bed course
masonry walls
comprehensive pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611108209.5A
Other languages
Chinese (zh)
Inventor
林光明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing Minghuang Building Materials Technology Co Ltd
Original Assignee
Shaoxing Minghuang Building Materials Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Minghuang Building Materials Technology Co Ltd filed Critical Shaoxing Minghuang Building Materials Technology Co Ltd
Priority to CN201611108209.5A priority Critical patent/CN106498981A/en
Publication of CN106498981A publication Critical patent/CN106498981A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them

Abstract

The present invention relates to a kind of brick type municipal administration comprehensive pipeline passage, including U-shaped precoated plate and prefabricated cover plate, described U-shaped precoated plate includes plain concrete bed course, described plain concrete bed course is provided with two masonry walls being parallel to each other, certain space is formed between two masonry walls, backfill is provided with the outside of the masonry walls, is embedded with several supports on the inside of masonry walls, pipeline, pipeline installation on described support is laid on described plain concrete bed course.The present invention using centralized big specification arrangement, can effectively solving cities and towns pipeline confusion.

Description

A kind of brick type municipal administration comprehensive pipeline passage and its construction method
Technical field
The present invention relates to a kind of brick type municipal administration comprehensive pipeline passage and its construction method, suitable for the power of municipal road The arrangement of electric line, plumbing, gas pipe, illuminator etc. and discharge.
Background technology
At present, using the mode such as pre-buried, built on stilts, domestic highway pipeline arranges that Each performs its own functions for each department substantially, is formed Clear in job responsibility on surface, but actually cannot the coordinating and unifying, cause various chaotic and disunities, has dug today here, the digging day after tomorrow There is opened, substantial amounts of destruction and waste is caused.It is therefore proposed that of the invention.
Content of the invention
For the above-mentioned technical problem of prior art, it is an object of the invention to provide a kind of brick type municipal administration comprehensive pipeline leads to Road and its construction method, its adopt centralized big specification arrangement, can effectively solving cities and towns pipeline confusion.
For reaching above-mentioned purpose, the present invention is achieved by the following technical solutions:
A kind of brick type municipal administration comprehensive pipeline passage, including U-shaped precoated plate and prefabricated cover plate, described U-shaped precoated plate includes element Concrete bed course, described plain concrete bed course are provided with two masonry walls being parallel to each other, and form certain space between two masonry walls, Backfill is provided with the outside of the masonry walls, several supports are embedded with the inside of masonry walls, is laid on described plain concrete bed course Pipeline, pipeline installation on described support.
Described U-shaped precoated plate includes pre-buried connecting plate, and described pre-buried connecting plate is concrete precast block, and described is mixed Solidifying soil prefabricated section is provided with grout groove.
Described concrete precast block is provided with water falling groove.
Described plain concrete bed course is a plane or U-shaped, and when plain concrete bed course is U-shaped, U-shaped chamber is precipitation cleaning well.
The outer layer of described masonry walls scribbles waterproof cement mortar layer.
The inwall of the masonry walls is provided with several bracket holes, and described support is in bracket holes.
Street lamp component is installed on described comprehensive pipeline passage, described street lamp component includes that top is provided with bulb Electric pole, is provided with electric wire in the electric pole, described electric wire is goed deep into the inside of U-shaped precoated plate and is connected with pipeline, described electricity Line bar is connected with prefabricated cover plate by bolt.
Two water fenders are provided with below the prefabricated cover plate, and the side of the water fender is provided with location-plate.
A kind of construction method of brick type municipal administration comprehensive pipeline passage, comprises the following steps:
(1)Pipeline and piping shaft position are made on road according to unified planning, design requirement;
(2)Excavate foundation trench, smooth compacting to designed elevation and the gradient;
(3)Plain concrete bed course is poured, and is conserved;
(4)Build brick wall by laying bricks or stones and paint waterproof cement mortar layer, when building by laying bricks or stones the distance between pre-buried good adjustable support pedestal, support be not no It is more than 1500mm;
(5)The both sides cubic metre of earth and stone is backfilling and compacted after maintenance, forms backfill.
(6)Various pipelines are fixed on hoistway support, and cover cover plate.
The brick type municipal administration comprehensive pipeline passage of the present invention and its construction method have the advantages that:
1st, the present invention only needs to once be constructed, puts things right once and for all, and effectively prevent;
2 present invention achieves comprehensive arrangement, the pipelines such as strong and weak electricity, plumbing, coal gas is provided entirely in the present invention, significantly Reduce cost;
3rd, the present invention adopts heavy in section piping shaft, simultaneously as drainage pipeline, it is to avoid the problems of the difficult row of hydrops;
4th, present invention cleaning is easy to maintenance quick, does not damage;
5th, the present invention can be placed on trolley wire in underground piping well, it is not necessary to dig foundation ditch, casting foundation, convenient and swift and firm Gu, save a large amount of artificial and materials.
Description of the drawings
Structural representations of the Fig. 1 for embodiment 1;
Structural representations of the Fig. 2 for embodiment 2;
Fig. 3 is the structural representation of the U-shaped precoated plate in the present invention;
Fig. 4 is the scheme of installation of the street lamp component in the present invention;
Fig. 5 is the horizontal layout schematic diagram of the present invention;
Fig. 6 is the longitudinal profile arrangement schematic diagram of the present invention;
Fig. 7 is the use state schematic diagram of the present invention;
Fig. 8 is the schematic diagram that the present invention is installed on the road surface being ready for;
Wherein, 1 be the U-shaped precoated plate of assembled, 2 be prefabricated cover plate, 3 for plain concrete bed course, 4 be masonry walls, 5 be backfill, 6 for Frame, 7 be pipeline, 8 be pipeline, 9 be pre-buried connecting plate, 10 be grout groove, 11 be water falling groove, 12 be precipitation cleaning well, 13 be anti- Water cement screed, 14 be bracket holes, 15 be bulb, 16 be electric pole, 17 be electric wire, 18 be bolt, 19 be hole for hoist, 20 be Adjustable support, 21 be pre-buried connecting plate, 22 be water fender, 23 be location-plate.
Specific embodiment
With reference to specific embodiment, the present invention is further illustrated, but protection scope of the present invention is not limited to This.
Embodiment 1
As shown in Fig. 1 and 3-7, the brick type municipal administration comprehensive pipeline passage of the present embodiment 1, including U-shaped precoated plate 1 and prefabricated cover plate 2, the lower section of prefabricated cover plate 2 is provided with two water fenders 22, prevents rubbish from entering pipe line, is also prevented from the direct shower pipe line of rainwater, keeps off The side of water plate 22 is provided with location-plate 23, prevents water fender 22 from shifting.
U-shaped precoated plate 1 includes plain concrete bed course 3, and plain concrete bed course 3 is a plane, and plain concrete bed course 3 is provided with two and is parallel to each other Masonry walls 4, the outer layer of masonry walls 4 scribbles waterproof cement mortar layer 13.
Certain space is formed between two masonry walls 4, and the outside of masonry walls 4 is provided with backfill 5, the inwall of masonry walls 4 Several bracket holes 14 are provided with, support 6 lays pipeline 7, pipeline installation on support 6 in bracket holes 14, on plain concrete bed course 3 8, the such as pipeline such as strong and weak electricity, wired, coal gas.
U-shaped precoated plate 1 in the present embodiment 1 includes pre-buried connecting plate 9, and pre-buried connecting plate 9 is concrete precast block, coagulation Native prefabricated section is provided with water falling groove 11 and grout groove 10, during use, after pre-buried connecting plate 9 is welded, grouting sealing.
The present embodiment 1 is provided with street lamp component on brick type comprehensive pipeline passage, and street lamp component includes that top is provided with The electric pole 16 of bulb 15, is provided with electric wire 17 in electric pole 16, and electric wire 17 is goed deep into the inside of U-shaped precoated plate 1 and is connected with pipeline 8, Electric pole 17 is connected with prefabricated cover plate 2 by bolt 18.
When the present embodiment 1 is used, it is laid immediately on below road surface, and upper surface is laid by greenbelt, forms city Overall appearance.
Embodiment 2
As shown in Fig. 2 the plain concrete bed course 3 in the present embodiment 2 is U-shaped, U-shaped chamber is precipitation cleaning well 2.
Other parts of the present embodiment 2 and its annexation are the known property general knowledge of this area, do not repeat herein.
The construction method of the brick type municipal administration comprehensive pipeline passage of the present embodiment 1 and 2, comprises the following steps:
(1)Pipeline and piping shaft position are made on road according to unified planning, design requirement;
(2)Excavate foundation trench, smooth compacting to designed elevation and the gradient;
(3)Plain concrete bed course is poured, and is conserved;
(4)Build brick wall by laying bricks or stones and paint waterproof cement mortar layer, when building by laying bricks or stones the distance between pre-buried good adjustable support pedestal, support be not no It is more than 1500mm;
(5)The both sides cubic metre of earth and stone is backfilling and compacted after maintenance, forms backfill.
(6)Various pipelines are fixed on hoistway support, and cover cover plate.
For the road surface being ready for, it is also possible to install the brick type municipal administration comprehensive pipeline passage of the present invention, such as Fig. 8 institutes Show.
The present invention using centralized big specification arrangement, can effectively solving cities and towns pipeline confusion.
Above-described embodiment is only used for the inventive concept for illustrating the present invention, rather than the restriction to rights protection of the present invention, All changes for carrying out unsubstantiality using this design to the present invention, all should fall into protection scope of the present invention.

Claims (9)

1. a kind of brick type municipal administration comprehensive pipeline passage, it is characterised in that:Including U-shaped precoated plate and prefabricated cover plate, described is U-shaped Precoated plate includes that plain concrete bed course, described plain concrete bed course are provided with two masonry walls being parallel to each other, shape between two masonry walls Into certain space, backfill on the outside of the masonry walls, is provided with, on the inside of masonry walls, is embedded with several supports, described element Pipeline, pipeline installation on described support is laid on concrete bed course.
2. brick type as claimed in claim 1 municipal administration comprehensive pipeline passage, it is characterised in that:Described U-shaped precoated plate includes Pre-buried connecting plate, described pre-buried connecting plate is concrete precast block, and described concrete precast block is provided with grout groove.
3. brick type as claimed in claim 2 municipal administration comprehensive pipeline passage, it is characterised in that:On described concrete precast block It is provided with water falling groove.
4. brick type as claimed in claim 1 municipal administration comprehensive pipeline passage, it is characterised in that:Described plain concrete bed course is flat for one Face is U-shaped, and when plain concrete bed course is U-shaped, U-shaped chamber is precipitation cleaning well.
5. brick type as claimed in claim 1 municipal administration comprehensive pipeline passage, it is characterised in that:The outer layer of described masonry walls is applied There is waterproof cement mortar layer.
6. brick type as claimed in claim 1 municipal administration comprehensive pipeline passage, it is characterised in that:The inwall of the masonry walls is provided with Several bracket holes, described support is in bracket holes.
7. the municipal comprehensive pipeline passage of brick type as described in claim 1-6 any claim, it is characterised in that:Described Street lamp component is installed on comprehensive pipeline passage, described street lamp component includes that top is provided with the electric pole of bulb, the electricity Be provided with electric wire in line bar, described electric wire is goed deep into the inside of U-shaped precoated plate and is connected with pipeline, described electric pole by bolt with Prefabricated cover plate connection.
8. brick type as claimed in claim 7 municipal administration comprehensive pipeline passage, it is characterised in that:Set below the prefabricated cover plate There are two water fenders, the side of the water fender to be provided with location-plate.
9. the construction method of a kind of brick type municipal administration comprehensive pipeline passage, it is characterised in that comprise the following steps:
(1)Pipeline and piping shaft position are made on road according to unified planning, design requirement;
(2)Excavate foundation trench, smooth compacting to designed elevation and the gradient;
(3)Plain concrete bed course is poured, and is conserved;
(4)Build brick wall by laying bricks or stones and paint waterproof cement mortar layer, when building by laying bricks or stones the distance between pre-buried good adjustable support pedestal, support be not no It is more than 1500mm;
(5)The both sides cubic metre of earth and stone is backfilling and compacted after maintenance, forms backfill;
(6)Various pipelines are fixed on hoistway support, and cover cover plate.
CN201611108209.5A 2016-12-06 2016-12-06 A kind of brick type municipal administration comprehensive pipeline passage and its construction method Pending CN106498981A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611108209.5A CN106498981A (en) 2016-12-06 2016-12-06 A kind of brick type municipal administration comprehensive pipeline passage and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611108209.5A CN106498981A (en) 2016-12-06 2016-12-06 A kind of brick type municipal administration comprehensive pipeline passage and its construction method

Publications (1)

Publication Number Publication Date
CN106498981A true CN106498981A (en) 2017-03-15

Family

ID=58330443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611108209.5A Pending CN106498981A (en) 2016-12-06 2016-12-06 A kind of brick type municipal administration comprehensive pipeline passage and its construction method

Country Status (1)

Country Link
CN (1) CN106498981A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339099A (en) * 2018-11-08 2019-02-15 北京场道市政工程集团有限公司 A kind of municipal works road pavement structure
CN110144967A (en) * 2018-10-31 2019-08-20 上海市政工程设计研究总院(集团)有限公司 A kind of cable type pipe gallery system
CN113566019A (en) * 2021-06-29 2021-10-29 中国二十冶集团有限公司 Construction method for laying drainage pipe network without excavating upper part of ground reservoir

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101807785A (en) * 2010-03-19 2010-08-18 四川电力送变电建设公司 Prefabricated assembled cable trench and installation method thereof
CN201674171U (en) * 2010-03-26 2010-12-15 黄贺明 Combined cable trough
CN202840440U (en) * 2012-07-13 2013-03-27 康冰 Ground prefabricated cable trench
CN203256774U (en) * 2013-04-01 2013-10-30 成都科创佳思科技有限公司 Underground cable trench construction structure for electric engineering
CN104420480A (en) * 2013-08-21 2015-03-18 贵阳铝镁设计研究院有限公司 Collapsible loess area integrated pipe network layout method and structure
CN105951876A (en) * 2016-05-04 2016-09-21 东北大学 Cover plate type precast concrete urban comprehensive pipe gallery and construction method thereof
CN205753309U (en) * 2016-06-07 2016-11-30 福建雅恩思新材料科技有限公司 Prefabricated cable duct
CN206529795U (en) * 2016-12-06 2017-09-29 绍兴明煌建材科技有限公司 A kind of municipal comprehensive pipeline passage of assembled

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101807785A (en) * 2010-03-19 2010-08-18 四川电力送变电建设公司 Prefabricated assembled cable trench and installation method thereof
CN201674171U (en) * 2010-03-26 2010-12-15 黄贺明 Combined cable trough
CN202840440U (en) * 2012-07-13 2013-03-27 康冰 Ground prefabricated cable trench
CN203256774U (en) * 2013-04-01 2013-10-30 成都科创佳思科技有限公司 Underground cable trench construction structure for electric engineering
CN104420480A (en) * 2013-08-21 2015-03-18 贵阳铝镁设计研究院有限公司 Collapsible loess area integrated pipe network layout method and structure
CN105951876A (en) * 2016-05-04 2016-09-21 东北大学 Cover plate type precast concrete urban comprehensive pipe gallery and construction method thereof
CN205753309U (en) * 2016-06-07 2016-11-30 福建雅恩思新材料科技有限公司 Prefabricated cable duct
CN206529795U (en) * 2016-12-06 2017-09-29 绍兴明煌建材科技有限公司 A kind of municipal comprehensive pipeline passage of assembled

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110144967A (en) * 2018-10-31 2019-08-20 上海市政工程设计研究总院(集团)有限公司 A kind of cable type pipe gallery system
CN109339099A (en) * 2018-11-08 2019-02-15 北京场道市政工程集团有限公司 A kind of municipal works road pavement structure
CN109339099B (en) * 2018-11-08 2023-09-22 北京场道市政工程集团有限公司 Municipal works road pavement structure
CN113566019A (en) * 2021-06-29 2021-10-29 中国二十冶集团有限公司 Construction method for laying drainage pipe network without excavating upper part of ground reservoir

Similar Documents

Publication Publication Date Title
CN106759476A (en) A kind of assembled municipal administration comprehensive pipeline passage and its construction method
CN103526770B (en) A kind of construction method of high antiseepage anti-floating pile raft structure
CN104805866A (en) Prefabricated comprehensive pipe gallery and construction method
US11566390B2 (en) Construction method of reclaiming land from the sea based on basement utilization
CN109488371B (en) Waterproof system of full-enclosed waterproof station and dynamic setting and quantity-limiting drainage method
CN206529795U (en) A kind of municipal comprehensive pipeline passage of assembled
CN106498981A (en) A kind of brick type municipal administration comprehensive pipeline passage and its construction method
CN203594041U (en) Piled raft structure with good resistance to seepage and buoyancy
CN109208545B (en) Construction method of artificial landscape overflow dam with energy dissipation effect
CN104164895A (en) Basement generating no water buoyant force
KR200413251Y1 (en) Pedestal structure for water pipeline used in waterworks and drainage, road, river bank and drainage works
CN102425228A (en) Multifunctional environment-friendly movable water tank
CN202401561U (en) Multifunctional environment-friendly movable water channel
CN107023061B (en) Assembled plastic municipal drainage inspection well and construction method
CN203475486U (en) Basement producing no water buoyancy
CN111335445B (en) Construction method of concrete catch basin by using steel pipe as inner mold
JP2010189990A (en) Construction method for replacing bridge for small river
CN110093965A (en) A kind of water discharge method of construction site
CN112854415A (en) Combined landscape prefabricated drainage ditch system based on BIM technology and construction process thereof
CN103015457A (en) Method for building rural brick buried sewage treatment facility
CN210013227U (en) Drainage device capable of effectively reducing anti-floating design water level of basement
CN113818482A (en) New and old pipe gallery connecting method for reducing uneven settlement
CN205688545U (en) A kind of plumbing integration module
CN105888035A (en) Integral assembly reinforced concrete prefabricated draining inspection well
CN214695976U (en) Prefabricated escape canal system of combination formula view based on BIM technique

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170315