CN106759476A - A kind of assembled municipal administration comprehensive pipeline passage and its construction method - Google Patents
A kind of assembled municipal administration comprehensive pipeline passage and its construction method Download PDFInfo
- Publication number
- CN106759476A CN106759476A CN201611108669.8A CN201611108669A CN106759476A CN 106759476 A CN106759476 A CN 106759476A CN 201611108669 A CN201611108669 A CN 201611108669A CN 106759476 A CN106759476 A CN 106759476A
- Authority
- CN
- China
- Prior art keywords
- assembled
- pipeline
- prefabricated
- municipal administration
- shaped
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Sewage (AREA)
Abstract
The present invention relates to a kind of construction method of assembled municipal administration comprehensive pipeline passage, including following step(1)Foundation trench and the gradient are dug out according to design requirement;(2)It is smooth to handle foundation trench well, and lay waterproof cement mortar tack coat;(3)The U-shaped prefabricated pipeline of ready assembled is hung in foundation pile, it is in place after two neighboring prefabricated pipeline components welding is linked together;(4)Grouting, jointing, finishing;(5)The cubic meter of stone backfill of both sides seven, compacting forms backfill, and pour surface layer;(6)Various pipelines are installed in pipeline;(7)Prefabricated cover plate is lifted, fixed.The present invention can effectively solve the confusion of cities and towns pipeline using the big specification arrangement of centralization.
Description
Technical field
The present invention relates to a kind of assembled municipal administration comprehensive pipeline passage and its construction method, suitable for the power of municipal road
The arrangement of electric line, plumbing, gas pipe, illuminator etc. and discharge.
Background technology
At present, domestic highway pipeline arranges that Each performs its own functions for each department using the mode such as pre-buried, built on stilts substantially, is formed
It is clear in job responsibility on surface, but actually cannot the coordinating and unifying, cause various chaotic and disunities, has dug today here, the digging day after tomorrow
There is opened, substantial amounts of destruction and waste is caused.It is therefore proposed that of the invention.
The content of the invention
For the above-mentioned technical problem of prior art, lead to it is an object of the invention to provide a kind of assembled municipal administration comprehensive pipeline
Road and its construction method, it uses centralized big specification to arrange, can effectively solve the confusion of cities and towns pipeline.
To reach above-mentioned purpose, the present invention is achieved by the following technical solutions:
A kind of construction method of assembled municipal administration comprehensive pipeline passage, comprises the following steps:
(1)Foundation trench and the gradient are dug out according to design requirement;
(2)It is smooth to handle foundation trench well, and lay waterproof cement mortar tack coat;
(3)The U-shaped prefabricated pipeline of ready assembled is hung in foundation trench, it is in place after by two neighboring prefabricated pipeline components welding
Link together;
(4)Grouting, jointing, finishing;
(5)The cubic meter of stone backfill of both sides seven, compacting forms backfill, and pour surface layer;
(6)Various pipelines are installed in pipeline;
(7)Prefabricated cover plate is lifted, fixed.
A kind of assembled municipal administration comprehensive pipeline passage, including the U-shaped prefabricated board of assembled and prefabricated cover plate, described assembled
U-shaped prefabricated board includes plain concrete bed course, and described plain concrete bed course is provided with two masonry walls being parallel to each other, between two masonry walls
Certain space is formed, backfill is provided with the outside of the masonry walls, several supports are embedded with the inside of masonry walls, it is described
Pipeline, pipeline installation on described support are laid on plain concrete bed course.
The U-shaped prefabricated board of described assembled includes pre-buried connecting plate, and described pre-buried connecting plate is reinforcing bar prefabricated section, described
Reinforcing bar prefabricated section be provided with grout groove.
Described reinforcing bar prefabricated section is provided with water falling groove.
Described plain concrete bed course is a plane or U-shaped, and when plain concrete bed course is U-shaped, U-shaped chamber is precipitation cleaning well.
The outer layer of described masonry walls scribbles waterproof cement mortar layer.
The inwall of the masonry walls is provided with several bracket holes, and described support is arranged in bracket holes.
Described assembled municipal administration comprehensive pipeline passage, is provided with street lamp component on described comprehensive pipeline passage, described
Street lamp component the electric pole of bulb is installed including top, electric wire is provided with the electric pole, described electric wire is deeply assembled
The inside of the U-shaped prefabricated board of formula is connected with pipeline, and described electric pole is connected by bolt with prefabricated cover plate.
Two water fenders are provided with below the prefabricated cover plate, the side of the water fender is provided with location-plate.
Assembled municipal administration comprehensive pipeline passage of the invention and its construction method have the advantages that:
1st, the present invention only needs to once be constructed, puts things right once and for all, and effectively prevent and excavate again and destroy;
2nd, the present invention realizes comprehensive arrangement, the pipelines such as strong and weak electricity, plumbing, coal gas is provided entirely in the present invention, significantly
Reduce cost;
3rd, the present invention uses heavy in section piping shaft, while as drainage pipeline, it is to avoid the problem of the difficult row of ponding;
4th, present invention cleaning is easy to maintenance quick, does not damage;
5th, can be placed on trolley wire in underground piping well by the present invention, it is not necessary to dig foundation ditch, casting foundation, convenient and swift and firm
Gu, save a large amount of artificial and materials;
6th, it is prefabricated assembled with speed of application it is fast, do not need curing time, it is not necessary to often draw water, desilting, a large amount of people of saving
Work and duration.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment 1;
Fig. 2 is the structural representation of embodiment 2;
Fig. 3 is the structural representation of the U-shaped prefabricated board of assembled in the present invention;
Fig. 4 is the scheme of installation of the street lamp component in the present invention;
Fig. 5 is horizontal layout schematic diagram of the invention;
Fig. 6 is that longitudinal profile of the invention arranges schematic diagram;
Fig. 7 and 8 is use state schematic diagram of the invention;
Wherein, 1 be the U-shaped prefabricated board of assembled, 2 be prefabricated cover plate, 3 for plain concrete bed course, 4 be masonry walls, 5 be backfill, 6 be branch
Frame, 7 be pipeline, 8 be pipeline, 9 be pre-buried connecting plate, 10 be grout groove, 11 be water falling groove, 12 be precipitation cleaning well, 13 be anti-
Water cement screed, 14 be bracket holes, 15 be bulb, 16 be electric pole, 17 be electric wire, 18 be bolt, 19 be hole for hoist, 20 be
Adjustable support, 21 be pre-buried connecting plate, 22 be water fender, 23 be location-plate.
Specific embodiment
With reference to specific embodiment, the present invention is further illustrated, but protection scope of the present invention is not limited to
This.
Embodiment 1
As shown in Fig. 1 and 3-8, the assembled of the present embodiment 1 municipal administration comprehensive pipeline passage, including the U-shaped prefabricated board 1 of assembled and pre-
Cover plate processed 2, the lower section of prefabricated cover plate 2 is provided with two water fenders 22, prevents rubbish from entering pipe line, is also prevented from the direct shower pipe of rainwater
Line, the side of water fender 22 is provided with location-plate 23, prevents water fender 22 from shifting.
The U-shaped prefabricated board 1 of assembled includes plain concrete bed course 3, and plain concrete bed course 3 is a plane, and plain concrete bed course 3 is provided with two phases
Mutual parallel masonry walls 4, the outer layer of masonry walls 4 scribbles waterproof cement mortar layer 13.
Certain space is formed between two masonry walls 4, the outside of masonry walls 4 is provided with backfill 5, the inwall of masonry walls 4
Several bracket holes 14 are provided with, support 6 is arranged in bracket holes 14, and pipeline 7, pipeline installation on support 6 are laid on plain concrete bed course 3
8, such as strong and weak electricity, wired, coal gas pipeline.
The U-shaped prefabricated board 1 of assembled in the present embodiment 1 includes pre-buried connecting plate 9, and pre-buried connecting plate 9 is reinforcing bar prefabricated section,
Reinforcing bar prefabricated section is provided with water falling groove 11 and grout groove 10, when using, after pre-buried connecting plate 9 is welded, and grouting sealing.
The present embodiment 1 is provided with street lamp component on assembled comprehensive pipeline passage, and street lamp component is provided with including top
Electric wire 17 is provided with the electric pole 16 of bulb 15, electric pole 16, electric wire 17 gos deep into inside and the pipeline 8 of the U-shaped prefabricated board 1 of assembled
Connection, electric pole 17 is connected by bolt 18 with prefabricated cover plate 2.
When the present embodiment 1 is used, it is laid immediately on below road surface, and upper surface is laid by greenbelt, forms city
Overall appearance.
Embodiment 2
As shown in Fig. 2 the plain concrete bed course 3 in the present embodiment 2 is U-shaped, U-shaped chamber is precipitation cleaning well 2.
Other parts and its annexation of the present embodiment 2 are the known property general knowledge of this area, are not repeated herein.
The construction method of the assembled municipal administration comprehensive pipeline passage of embodiment 1 and 2, comprises the following steps:
(1)Foundation trench and the gradient are dug out according to design requirement;
(2)It is smooth to handle foundation trench well, and lay waterproof cement mortar tack coat;
(3)The U-shaped prefabricated pipeline of ready assembled is hung in foundation trench, it is in place after by two neighboring prefabricated pipeline components welding
Link together;
(4)Grouting, jointing, finishing;
(5)The cubic meter of stone backfill of both sides seven, compacting forms backfill, and pour surface layer;
(6)Various pipelines are installed in pipeline;
(7)Prefabricated cover plate is lifted, fixed.
The present invention can effectively solve the confusion of cities and towns pipeline using the big specification arrangement of centralization.
Above-described embodiment is only used for illustrating inventive concept of the invention, rather than the restriction to rights protection of the present invention,
All changes for carrying out unsubstantiality to the present invention using this design, all should fall into protection scope of the present invention.
Claims (9)
1. the construction method of a kind of assembled municipal administration comprehensive pipeline passage, it is characterised in that comprise the following steps:
(1)Foundation trench and the gradient are dug out according to design requirement;
(2)It is smooth to handle foundation trench well, and lay waterproof cement mortar tack coat;
(3)The U-shaped prefabricated pipeline of ready assembled is hung in foundation trench, it is in place after by two neighboring prefabricated pipeline components welding
Link together;
(4)Grouting, jointing, finishing;
(5)The cubic meter of stone backfill of both sides seven, compacting forms backfill, and pour surface layer;
(6)Various pipelines are installed in pipeline;
(7)Prefabricated cover plate is lifted, fixed.
2. a kind of assembled municipal administration comprehensive pipeline passage, it is characterised in that:Including the U-shaped prefabricated board of assembled and prefabricated cover plate, institute
The U-shaped prefabricated board of assembled stated includes plain concrete bed course, and described plain concrete bed course is provided with two masonry walls being parallel to each other, two
Certain space is formed between masonry walls, backfill is provided with the outside of the masonry walls, several are embedded with the inside of masonry walls
Support, pipeline, pipeline installation on described support are laid on described plain concrete bed course.
3. assembled as claimed in claim 2 municipal administration comprehensive pipeline passage, it is characterised in that:Described assembled is U-shaped prefabricated
Plate includes pre-buried connecting plate, and described pre-buried connecting plate is reinforcing bar prefabricated section, and described reinforcing bar prefabricated section is provided with grout groove.
4. assembled as claimed in claim 3 municipal administration comprehensive pipeline passage, it is characterised in that:Set on described reinforcing bar prefabricated section
There is water falling groove.
5. assembled as claimed in claim 2 municipal administration comprehensive pipeline passage, it is characterised in that:Described plain concrete bed course is one flat
Face is U-shaped, and when plain concrete bed course is U-shaped, U-shaped chamber is precipitation cleaning well.
6. assembled as claimed in claim 2 municipal administration comprehensive pipeline passage, it is characterised in that:The outer layer of described masonry walls is applied
There is waterproof cement mortar layer.
7. assembled as claimed in claim 2 municipal administration comprehensive pipeline passage, it is characterised in that:The inwall of the masonry walls is provided with
Several bracket holes, described support is arranged in bracket holes.
8. the municipal comprehensive pipeline passage of assembled as described in claim 1-7 any claims, it is characterised in that:Described
Street lamp component is installed, described street lamp component is provided with the electric pole of bulb, the electricity including top on comprehensive pipeline passage
Electric wire is provided with line bar, the inside that described electric wire gos deep into the U-shaped prefabricated board of assembled is connected with pipeline, and described electric pole passes through
Bolt is connected with prefabricated cover plate.
9. assembled as claimed in claim 8 municipal administration comprehensive pipeline passage, it is characterised in that:Set below the prefabricated cover plate
There are two water fenders, the side of the water fender is provided with location-plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611108669.8A CN106759476A (en) | 2016-12-06 | 2016-12-06 | A kind of assembled municipal administration comprehensive pipeline passage and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611108669.8A CN106759476A (en) | 2016-12-06 | 2016-12-06 | A kind of assembled municipal administration comprehensive pipeline passage and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106759476A true CN106759476A (en) | 2017-05-31 |
Family
ID=58878283
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611108669.8A Pending CN106759476A (en) | 2016-12-06 | 2016-12-06 | A kind of assembled municipal administration comprehensive pipeline passage and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106759476A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107938700A (en) * | 2017-11-17 | 2018-04-20 | 九州职业技术学院 | A kind of installation method of assembled underground pipe gallery |
CN109853325A (en) * | 2019-01-24 | 2019-06-07 | 杭州大胜照明工程有限公司 | A kind of road lighting engineering construction method |
CN110306989A (en) * | 2019-07-04 | 2019-10-08 | 中铁二十局集团第四工程有限公司 | A kind of non-open cut assembled pipe canal digging support reinforcement method |
CN111254945A (en) * | 2020-01-19 | 2020-06-09 | 江西海鑫建设有限公司 | Construction method of municipal comprehensive pipeline channel |
CN112228631A (en) * | 2020-11-03 | 2021-01-15 | 呼和浩特中燃城市燃气发展有限公司 | Pipeline reinforcing system |
CN113802670A (en) * | 2021-10-25 | 2021-12-17 | 中国建筑第四工程局有限公司 | Assembly type temporary pipeline comprehensive arrangement structure |
CN114370019A (en) * | 2022-01-18 | 2022-04-19 | 深圳市市政工程总公司 | Assembled centralized central partition belt structure |
US20220356655A1 (en) * | 2021-05-06 | 2022-11-10 | Saudi Arabian Oil Company | Utility ducts and vaults for vehicle/pedestrian crossings |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101807785A (en) * | 2010-03-19 | 2010-08-18 | 四川电力送变电建设公司 | Prefabricated assembled cable trench and installation method thereof |
CN201674171U (en) * | 2010-03-26 | 2010-12-15 | 黄贺明 | Combined cable trough |
CN202840440U (en) * | 2012-07-13 | 2013-03-27 | 康冰 | Ground prefabricated cable trench |
CN203256774U (en) * | 2013-04-01 | 2013-10-30 | 成都科创佳思科技有限公司 | Underground cable trench construction structure for electric engineering |
CN104420480A (en) * | 2013-08-21 | 2015-03-18 | 贵阳铝镁设计研究院有限公司 | Collapsible loess area integrated pipe network layout method and structure |
CN105951876A (en) * | 2016-05-04 | 2016-09-21 | 东北大学 | Cover plate type precast concrete urban comprehensive pipe gallery and construction method thereof |
CN205753309U (en) * | 2016-06-07 | 2016-11-30 | 福建雅恩思新材料科技有限公司 | Prefabricated cable duct |
CN206529795U (en) * | 2016-12-06 | 2017-09-29 | 绍兴明煌建材科技有限公司 | A kind of municipal comprehensive pipeline passage of assembled |
-
2016
- 2016-12-06 CN CN201611108669.8A patent/CN106759476A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101807785A (en) * | 2010-03-19 | 2010-08-18 | 四川电力送变电建设公司 | Prefabricated assembled cable trench and installation method thereof |
CN201674171U (en) * | 2010-03-26 | 2010-12-15 | 黄贺明 | Combined cable trough |
CN202840440U (en) * | 2012-07-13 | 2013-03-27 | 康冰 | Ground prefabricated cable trench |
CN203256774U (en) * | 2013-04-01 | 2013-10-30 | 成都科创佳思科技有限公司 | Underground cable trench construction structure for electric engineering |
CN104420480A (en) * | 2013-08-21 | 2015-03-18 | 贵阳铝镁设计研究院有限公司 | Collapsible loess area integrated pipe network layout method and structure |
CN105951876A (en) * | 2016-05-04 | 2016-09-21 | 东北大学 | Cover plate type precast concrete urban comprehensive pipe gallery and construction method thereof |
CN205753309U (en) * | 2016-06-07 | 2016-11-30 | 福建雅恩思新材料科技有限公司 | Prefabricated cable duct |
CN206529795U (en) * | 2016-12-06 | 2017-09-29 | 绍兴明煌建材科技有限公司 | A kind of municipal comprehensive pipeline passage of assembled |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107938700A (en) * | 2017-11-17 | 2018-04-20 | 九州职业技术学院 | A kind of installation method of assembled underground pipe gallery |
CN107938700B (en) * | 2017-11-17 | 2019-08-02 | 九州职业技术学院 | A kind of installation method of assembled underground pipe gallery |
CN109853325A (en) * | 2019-01-24 | 2019-06-07 | 杭州大胜照明工程有限公司 | A kind of road lighting engineering construction method |
CN109853325B (en) * | 2019-01-24 | 2021-11-12 | 浙江大胜科技工程有限公司 | Road lighting engineering construction method |
CN110306989A (en) * | 2019-07-04 | 2019-10-08 | 中铁二十局集团第四工程有限公司 | A kind of non-open cut assembled pipe canal digging support reinforcement method |
CN111254945A (en) * | 2020-01-19 | 2020-06-09 | 江西海鑫建设有限公司 | Construction method of municipal comprehensive pipeline channel |
CN112228631A (en) * | 2020-11-03 | 2021-01-15 | 呼和浩特中燃城市燃气发展有限公司 | Pipeline reinforcing system |
US20220356655A1 (en) * | 2021-05-06 | 2022-11-10 | Saudi Arabian Oil Company | Utility ducts and vaults for vehicle/pedestrian crossings |
CN113802670A (en) * | 2021-10-25 | 2021-12-17 | 中国建筑第四工程局有限公司 | Assembly type temporary pipeline comprehensive arrangement structure |
CN113802670B (en) * | 2021-10-25 | 2023-02-28 | 中国建筑第四工程局有限公司 | Assembly type temporary pipeline comprehensive arrangement structure |
CN114370019A (en) * | 2022-01-18 | 2022-04-19 | 深圳市市政工程总公司 | Assembled centralized central partition belt structure |
CN114370019B (en) * | 2022-01-18 | 2023-08-18 | 深圳市市政工程总公司 | Assembled centralized central partition belt structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106759476A (en) | A kind of assembled municipal administration comprehensive pipeline passage and its construction method | |
CN103526770B (en) | A kind of construction method of high antiseepage anti-floating pile raft structure | |
CN100412275C (en) | Waterproof and plugging construction method for precipitation well in foundation pit | |
CN104805866A (en) | Prefabricated comprehensive pipe gallery and construction method | |
CN104895174A (en) | Construction method of large-diameter rain sewage pipeline assembling type component structure | |
CN109488371B (en) | Waterproof system of full-enclosed waterproof station and dynamic setting and quantity-limiting drainage method | |
US11566390B2 (en) | Construction method of reclaiming land from the sea based on basement utilization | |
CN206529795U (en) | A kind of municipal comprehensive pipeline passage of assembled | |
CN204753627U (en) | Prefabricated comprehensive piping lane | |
CN104452829A (en) | Piled raft foundation anti-floating structure and construction method | |
CN111119931A (en) | Deformation control construction method for shallow-buried and underground-excavated foundation of pebble stratum power tunnel | |
CN203145029U (en) | Plugging structure for deep foundation pit dewatering well | |
CN106498981A (en) | A kind of brick type municipal administration comprehensive pipeline passage and its construction method | |
CN203594041U (en) | Piled raft structure with good resistance to seepage and buoyancy | |
CN104131576A (en) | Impervious structure of waterproof curtain and construction method thereof | |
CN104164895A (en) | Basement generating no water buoyant force | |
CN103205986A (en) | Concrete raft foundation construction-joint grouting device and construction method | |
CN102425228A (en) | Multifunctional environment-friendly movable water tank | |
CN110093965A (en) | A kind of water discharge method of construction site | |
CN202401561U (en) | Multifunctional environment-friendly movable water channel | |
CN112900294A (en) | Lining structure for box culvert repair and construction method thereof | |
KR20100054537A (en) | Tunnel abutment precast block structure and drainage structure of new concept and method constructing abutment used by them | |
CN115961647A (en) | Basement roof post-cast strip advanced sealing structure, construction structure and construction method | |
CN103615043B (en) | Direct-burried drainpipe and the construction method thereof on carrying main equipment or dynamic load ground | |
CN107023061B (en) | Assembled plastic municipal drainage inspection well and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |
|
RJ01 | Rejection of invention patent application after publication |