CN206529795U - A kind of municipal comprehensive pipeline passage of assembled - Google Patents

A kind of municipal comprehensive pipeline passage of assembled Download PDF

Info

Publication number
CN206529795U
CN206529795U CN201621327947.4U CN201621327947U CN206529795U CN 206529795 U CN206529795 U CN 206529795U CN 201621327947 U CN201621327947 U CN 201621327947U CN 206529795 U CN206529795 U CN 206529795U
Authority
CN
China
Prior art keywords
assembled
masonry walls
bed course
prefabricated
comprehensive pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621327947.4U
Other languages
Chinese (zh)
Inventor
林光明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing Minghuang Building Materials Technology Co Ltd
Original Assignee
Shaoxing Minghuang Building Materials Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Minghuang Building Materials Technology Co Ltd filed Critical Shaoxing Minghuang Building Materials Technology Co Ltd
Priority to CN201621327947.4U priority Critical patent/CN206529795U/en
Application granted granted Critical
Publication of CN206529795U publication Critical patent/CN206529795U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model is related to a kind of municipal comprehensive pipeline passage of assembled, including the U-shaped prefabricated board of assembled and prefabricated cover plate, the U-shaped prefabricated board of described assembled includes plain concrete bed course, described plain concrete bed course is provided with two masonry walls being parallel to each other, certain space is formed between two masonry walls, the outside of the masonry walls, which is provided with the inside of backfill, masonry walls, is embedded with several supports, pipeline installation on pipeline, described support is laid on described plain concrete bed course.The utility model can effectively solve the confusion of cities and towns pipeline using the big specification arrangement of centralization.

Description

A kind of municipal comprehensive pipeline passage of assembled
Technical field
The utility model is related to a kind of municipal comprehensive pipeline passage of assembled, strong and weak electric line suitable for municipal road, The arrangement of plumbing, gas pipe, illuminator etc. and discharge.
Background technology
At present, domestic highway pipeline uses the mode such as pre-buried, built on stilts to arrange that Each performs its own functions for each department substantially, is formed It is clear in job responsibility on surface, but actually can not the coordinating and unifying, cause various chaotic and disunities, has dug today here, the digging day after tomorrow There is opened, substantial amounts of destruction and waste is caused.It is therefore proposed that the utility model.
Utility model content
For the above-mentioned technical problem of prior art, the purpose of this utility model is to provide a kind of municipal integrated pipe of assembled Line passage, it uses centralized big specification arrangement, can effectively solve the confusion of cities and towns pipeline.
To reach above-mentioned purpose, the utility model is achieved through the following technical solutions:
A kind of municipal comprehensive pipeline passage of assembled, including the U-shaped prefabricated board of assembled and prefabricated cover plate, described assembled U-shaped prefabricated board includes plain concrete bed course, and described plain concrete bed course is provided between two masonry walls being parallel to each other, two masonry walls Certain space is formed, the outside of the masonry walls, which is provided with the inside of backfill, masonry walls, is embedded with several supports, described Pipeline installation on pipeline, described support is laid on plain concrete bed course.
The U-shaped prefabricated board of described assembled includes pre-buried connecting plate, and described pre-buried connecting plate is reinforcing bar prefabricated section, described Reinforcing bar prefabricated section be provided with grout groove.
Described reinforcing bar prefabricated section is provided with water falling groove.
Described plain concrete bed course is a plane or U-shaped, when plain concrete bed course is U-shaped, and U-shaped chamber is precipitation cleaning well.
The outer layer of described masonry walls scribbles waterproof cement mortar layer.
The inwall of the masonry walls is provided with several bracket holes, and described support is arranged in bracket holes.
Street lamp component is installed on the municipal comprehensive pipeline passage of described assembled, described comprehensive pipeline passage, it is described Street lamp component include top and be provided with the electric pole of bulb, the electric pole to be provided with electric wire, described electric wire is deeply assembled The inside of the U-shaped prefabricated board of formula is connected with pipeline, and described electric pole is connected by bolt with prefabricated cover plate.
The lower section of the prefabricated cover plate is provided with location-plate provided with two water fenders, the side of the water fender.
The municipal comprehensive pipeline passage of assembled of the present utility model has the advantages that:
1st, the utility model only needs to carry out once to construct, put things right once and for all, and effectively prevent and excavates and destroy again;
2nd, the utility model realizes comprehensive arrangement, and the pipelines such as strong and weak electricity, plumbing, coal gas are provided entirely in into this practicality In new, cost is greatly reduced;
3rd, the utility model uses heavy in section piping shaft, while be used as drainage pipeline, it is to avoid the problem of ponding hardly possible row;
4th, the utility model cleaning is easy to maintenance quick, does not damage;
5th, trolley wire can be placed in underground piping well by the utility model, it is not necessary to dig foundation ditch, casting foundation, convenient fast It is prompt and firm, save a large amount of artificial and materials;
6th, it is prefabricated assembled to have that speed of application is fast, do not need curing time, it is not necessary to often to draw water, desilting, save greatly Measure the artificial and duration.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment 1;
Fig. 2 is the structural representation of embodiment 2;
Fig. 3 be the utility model in the U-shaped prefabricated board of assembled structural representation;
Fig. 4 be the utility model in street lamp component scheme of installation;
Fig. 5 is horizontal layout schematic diagram of the present utility model;
Fig. 6 is that longitudinal profile of the present utility model arranges schematic diagram;
Fig. 7 and 8 is use state schematic diagram of the present utility model;
Wherein, 1 be the U-shaped prefabricated board of assembled, 2 be prefabricated cover plate, 3 be plain concrete bed course, 4 be masonry walls, 5 be backfill, 6 be support, 7 be pipeline, 8 be pipeline, 9 be pre-buried connecting plate, 10 be grout groove, 11 be water falling groove, 12 be precipitation cleaning well, 13 it is waterproof cement mortar layer, 14 be bracket holes, 15 be bulb, 16 be electric pole, 17 be electric wire, 18 be bolt, 19 is lifting Hole, 20 be adjustable support, 21 be pre-buried connecting plate, 22 be water fender, 23 be location-plate.
Embodiment
The utility model is further described with reference to specific embodiment, but protection domain of the present utility model is simultaneously Not limited to this.
Embodiment 1
As shown in Fig. 1 and 3-8, the municipal comprehensive pipeline passage of assembled of the present embodiment 1, including assembled U type prefabricated boards 1 and prefabricated cover plate 2, the lower section of prefabricated cover plate 2 prevents rubbish from entering pipe line, is also prevented from rainwater straight provided with two water fenders 22 Shower pipe line is connect, the side of water fender 22 is provided with location-plate 23, prevents water fender 22 from shifting.
The U-shaped prefabricated board 1 of assembled includes plain concrete bed course 3, and plain concrete bed course 3 is a plane, and plain concrete bed course 3 is provided with two phases Mutual parallel masonry walls 4, the outer layer of masonry walls 4 scribbles waterproof cement mortar layer 13.
Certain space is formed between two masonry walls 4, the outside of masonry walls 4 is provided with backfill 5, the inwall of masonry walls 4 Provided with several bracket holes 14, support 6 is arranged in bracket holes 14, and pipeline installation on pipeline 7, support 6 is laid on plain concrete bed course 3 8, such as strong and weak electricity, wired, coal gas pipeline.
The U-shaped prefabricated board 1 of assembled in the present embodiment 1 includes pre-buried connecting plate 9, and pre-buried connecting plate 9 is reinforcing bar prefabricated section, Reinforcing bar prefabricated section is provided with water falling groove 11 and grout groove 10, in use, after pre-buried connecting plate 9 is welded, grouting sealing.
The present embodiment 1 is provided with street lamp component on assembled comprehensive pipeline passage, and street lamp component is provided with including top Electric wire 17 is provided with the electric pole 16 of bulb 15, electric pole 16, electric wire 17 gos deep into inside and the pipeline of assembled U types prefabricated board 1 8 connections, electric pole 17 is connected by bolt 18 with prefabricated cover plate 2.
The present embodiment 1 forms city in use, be laid immediately on below road surface, and upper surface is laid by greenbelt Overall appearance.
Embodiment 2
As shown in Fig. 2 the plain concrete bed course 3 in the present embodiment 2 is U-shaped, U-shaped chamber is precipitation cleaning well 2.
Other parts and its annexation of the present embodiment 2 are the known property general knowledge of this area, are not repeated herein.
The construction method of the municipal comprehensive pipeline passage of the assembled of Examples 1 and 2, comprises the following steps:
(1) foundation trench and the gradient are dug out according to design requirement;
(2) it is smooth to handle foundation trench well, and lay waterproof cement mortar tack coat;
(3) the U-shaped prefabricated pipeline of ready assembled is hung in foundation trench, it is in place after by two neighboring prefabricated pipeline component It is welded together;
(4) grouting, jointing, finishing;
(5) cubic meter of stone of both sides seven is backfilled, compacting, forms backfill, and pour surface layer;
(6) various pipelines are installed in pipeline;
(7) prefabricated cover plate is lifted, fixed.
The utility model can effectively solve the confusion of cities and towns pipeline using the big specification arrangement of centralization.
Above-described embodiment is only used for illustrating inventive concept of the present utility model, rather than to the utility model rights protection Restriction, it is all using this design to the utility model carry out unsubstantiality change, protection model of the present utility model all should be fallen into Enclose.

Claims (8)

1. a kind of municipal comprehensive pipeline passage of assembled, it is characterised in that:Including the U-shaped prefabricated board of assembled and prefabricated cover plate, institute The U-shaped prefabricated board of assembled stated includes plain concrete bed course, and described plain concrete bed course is provided with two masonry walls being parallel to each other, two Certain space is formed between masonry walls, the outside of the masonry walls, which is provided with the inside of backfill, masonry walls, is embedded with several Pipeline installation on pipeline, described support is laid on support, described plain concrete bed course.
2. the municipal comprehensive pipeline passage of assembled as claimed in claim 1, it is characterised in that:Described assembled is U-shaped prefabricated Plate includes pre-buried connecting plate, and described pre-buried connecting plate is reinforcing bar prefabricated section, and described reinforcing bar prefabricated section is provided with grout groove.
3. the municipal comprehensive pipeline passage of assembled as claimed in claim 2, it is characterised in that:Set on described reinforcing bar prefabricated section There is water falling groove.
4. the municipal comprehensive pipeline passage of assembled as claimed in claim 1, it is characterised in that:Described plain concrete bed course is one flat Face is U-shaped, when plain concrete bed course is U-shaped, and U-shaped chamber is precipitation cleaning well.
5. the municipal comprehensive pipeline passage of assembled as claimed in claim 1, it is characterised in that:The outer layer of described masonry walls is applied There is waterproof cement mortar layer.
6. the municipal comprehensive pipeline passage of assembled as claimed in claim 1, it is characterised in that:The inwall of the masonry walls is provided with Several bracket holes, described support is arranged in bracket holes.
7. the municipal comprehensive pipeline passage of assembled as described in claim 1-6 any claims, it is characterised in that:Described Street lamp component is installed, described street lamp component includes the electric pole that top is provided with bulb, the electricity on comprehensive pipeline passage Electric wire is provided with line bar, the inside that described electric wire gos deep into the U-shaped prefabricated board of assembled is connected with pipeline, and described electric pole passes through Bolt is connected with prefabricated cover plate.
8. the municipal comprehensive pipeline passage of assembled as claimed in claim 7, it is characterised in that:Set below the prefabricated cover plate There are two water fenders, the side of the water fender is provided with location-plate.
CN201621327947.4U 2016-12-06 2016-12-06 A kind of municipal comprehensive pipeline passage of assembled Expired - Fee Related CN206529795U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621327947.4U CN206529795U (en) 2016-12-06 2016-12-06 A kind of municipal comprehensive pipeline passage of assembled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621327947.4U CN206529795U (en) 2016-12-06 2016-12-06 A kind of municipal comprehensive pipeline passage of assembled

Publications (1)

Publication Number Publication Date
CN206529795U true CN206529795U (en) 2017-09-29

Family

ID=59921727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621327947.4U Expired - Fee Related CN206529795U (en) 2016-12-06 2016-12-06 A kind of municipal comprehensive pipeline passage of assembled

Country Status (1)

Country Link
CN (1) CN206529795U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106498981A (en) * 2016-12-06 2017-03-15 绍兴明煌建材科技有限公司 A kind of brick type municipal administration comprehensive pipeline passage and its construction method
CN106759476A (en) * 2016-12-06 2017-05-31 绍兴明煌建材科技有限公司 A kind of assembled municipal administration comprehensive pipeline passage and its construction method
CN107938700A (en) * 2017-11-17 2018-04-20 九州职业技术学院 A kind of installation method of assembled underground pipe gallery

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106498981A (en) * 2016-12-06 2017-03-15 绍兴明煌建材科技有限公司 A kind of brick type municipal administration comprehensive pipeline passage and its construction method
CN106759476A (en) * 2016-12-06 2017-05-31 绍兴明煌建材科技有限公司 A kind of assembled municipal administration comprehensive pipeline passage and its construction method
CN107938700A (en) * 2017-11-17 2018-04-20 九州职业技术学院 A kind of installation method of assembled underground pipe gallery
CN107938700B (en) * 2017-11-17 2019-08-02 九州职业技术学院 A kind of installation method of assembled underground pipe gallery

Similar Documents

Publication Publication Date Title
CN106759476A (en) A kind of assembled municipal administration comprehensive pipeline passage and its construction method
CN103526770B (en) A kind of construction method of high antiseepage anti-floating pile raft structure
CN100412275C (en) Waterproof and plugging construction method for precipitation well in foundation pit
CN104805866A (en) Prefabricated comprehensive pipe gallery and construction method
CN109488371B (en) Waterproof system of full-enclosed waterproof station and dynamic setting and quantity-limiting drainage method
CN206529795U (en) A kind of municipal comprehensive pipeline passage of assembled
US11566390B2 (en) Construction method of reclaiming land from the sea based on basement utilization
CN111119931A (en) Deformation control construction method for shallow-buried and underground-excavated foundation of pebble stratum power tunnel
CN106498981A (en) A kind of brick type municipal administration comprehensive pipeline passage and its construction method
CN203594041U (en) Piled raft structure with good resistance to seepage and buoyancy
CN201943093U (en) Settlement joint water-proof structure for basement with drainage channel
CN104164895A (en) Basement generating no water buoyant force
CN201137209Y (en) Underground drainage device
CN110093965A (en) A kind of water discharge method of construction site
CN102425228A (en) Multifunctional environment-friendly movable water tank
CN219157761U (en) Basement bottom plate high-low span connection structure
CN202401561U (en) Multifunctional environment-friendly movable water channel
CN101597903A (en) A kind of construction method of cylindrical slurry core pile that is used for pattern foundation pit supporting structure
CN107023061B (en) Assembled plastic municipal drainage inspection well and construction method
CN203475486U (en) Basement producing no water buoyancy
CN103615043B (en) Direct-burried drainpipe and the construction method thereof on carrying main equipment or dynamic load ground
CN115961647A (en) Basement roof post-cast strip advanced sealing structure, construction structure and construction method
CN109594590A (en) Building basement waterproof treatment structure and its construction method under the conditions of a kind of rock-mass
CN215166180U (en) Caisson type tertiary drainage system
CN201762729U (en) Anti-seepage structure of solid waste landfill on high-steep side slope or strongly-weathered bedrock

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170929

Termination date: 20181206

CF01 Termination of patent right due to non-payment of annual fee