CN201674171U - Combined cable trough - Google Patents
Combined cable trough Download PDFInfo
- Publication number
- CN201674171U CN201674171U CN2010201460086U CN201020146008U CN201674171U CN 201674171 U CN201674171 U CN 201674171U CN 2010201460086 U CN2010201460086 U CN 2010201460086U CN 201020146008 U CN201020146008 U CN 201020146008U CN 201674171 U CN201674171 U CN 201674171U
- Authority
- CN
- China
- Prior art keywords
- cell body
- cable
- described cell
- cable bearer
- bearer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model discloses a combined cable trough, which comprises a trough body and brackets. Each side on the trough body along the length direction of the trough is provided with a row of cable bracket reserved holes. The brackets are directly inserted into the reserved holes by adopting an inserted method, and then the bracket reserved hole parts are sealed by cement mortar at the tail parts of the brackets. Compared with the prior art, the utility model is more convenient for manual operation, can adopt prefabrication-type product production for the cable trough body, then carries out splicing on site, cancels field masonry, almost has no influence on the operation environment, splices the cable trough with the brackets in one step, then hoists and connects the whole body and has the advantages of high splicing speed, high efficiency, low construction cost, high integrated intensity and good durability.
Description
Technical field
The utility model relates to a kind of electric power and communication cable trough, specifically is exactly a kind of little to the operation field environmental impact, and group speed is fast, the combined cable trench that efficiency of construction is high.
Background technology
Build the quickening of process along with modernization internationalization city, urban electric power circuit and communication line are progressively gone underground by underground, in order to bury cable underground, the cable trough (or claiming cable trough) that generally will have cross section to take the shape of the letter U, on the sidewall of cable trough, be extended with cable bearer, also be provided with cover plate on the cable trough.
Traditional cable trough adopts clay common brick, masonry of cement mortar to form often, when building by laying bricks or stones cable bearer is directly imbedded in the body of wall.Because the main material of masonry is solid clay common brick, and solid clay common brick occupies cultivated land in a large number because of its production, consumes energy, it is a kind of nondegradable resource consumption finished product, progressively limited the quantity of even ban use of by each large, medium and small city, and the scene builds cable trough by laying bricks or stones, various raw material not manageability, engineering construction efficient is low, the construction period long, expense is big, also near the resident construction place is brought certain puzzlement simultaneously.
The utility model content
The purpose of this utility model provides a kind of little to environmental impact, the combined cable trench that the fast efficient of speed of application is high.
The purpose of this utility model can realize by following technical scheme:
A kind of combined cable trench, comprise a plurality of cable beareves, it is characterized in that: also comprise the connected head-to-tail cell body of more piece, described cell body cross section takes the shape of the letter U, described cable bearer is arranged above and below and is located on the sidewall of described cell body, and two row cable bearer height of the two side of described cell body are corresponding.
On the basis of the above, the utility model can also be done further improvement:
The inside of described cell body is provided with reinforced mesh, reinforced mesh and cell body shape, big or small corresponding.
The both ends of the surface of described cell body are chamfering by groove inwall place, after being convenient to connect end to end mutually between the cell body, with cement mortar abutment joint are carried out shutoff.
Two row cable beareves on the two side of described cell body front and back dislocation are mutually arranged.
Be provided with the cable bearer reserving hole corresponding to the cable bearer placement on the two side of described cell body, described cable bearer is bumped into described cable bearer reserving hole.
Described cell body two side is provided with the wall thickness thickening at cable bearer reserving hole place extremely more than or equal to 100mm.
On the end face of described cell body two side, the place is provided with groove corresponding to the cable bearer reserving hole, and bottom portion of groove is provided with hoisting ring, and the hoisting ring end face is lower than described cell body sidewall end face.
After described cable bearer is bumped into reserving hole, make the support afterbody leave the space, carry out the afterbody shutoff with the cement mortar plugged zone apart from cell body sidewall outer surface.
Back gauge groove end, the most Last hole of described cable bearer reserving hole is more than or equal to 200mm; It is 100mm, trapezoidal for 60mm highly that the top cross section of the two side of described cell body is thickness.
Beneficial effect: compared with prior art, the utility model adopts prefabricated formal product production to the cable cell body, carries out assembly unit with cable bearer at the scene then, behind the cable trough rigging out, suspension ring hole, cell body and slit, cell body connection place all adopt cement mortar to seal obstruction, cancelled the scene and built by laying bricks or stones, operating environment has not almost been had influence, the manual work of being more convenient for, after cable trough and the disposable assembly unit of cable bearer again lifting connect, assembly unit speed is fast, the efficient height, and operating expenses is low.And the bulk strength height, good endurance.
Description of drawings
Below in conjunction with the drawings and specific embodiments, the utility model is described in further details.
Fig. 1 looks schematic diagram (band half section) for the master of the utility model embodiment;
Fig. 2 is the left view (band broken section) of Fig. 1;
Fig. 3 is the vertical view of Fig. 1;
Fig. 4 is the cell body schematic front view of the utility model embodiment;
Fig. 5 is the left view of Fig. 4;
Fig. 6 is the vertical view of Fig. 4;
Fig. 7 looks schematic diagram for the master who is provided with reinforced mesh in the cell body of the utility model embodiment;
Fig. 8 is the vertical view of Fig. 7;
Fig. 9 is the support hole enlarged diagram that cable bearer is housed of the utility model embodiment;
Figure 10 is the hoisting ring schematic top plan view of the utility model embodiment;
Figure 11 is the broken section enlarged diagram of Figure 10.
In the accompanying drawing: 1-cell body, 2-cable bearer, 3-reserving hole, 4-hoisting ring, 5-mortar plugged zone, 6-chamfering.
Embodiment
Combined cable trench is one of embodiment of the present utility model as shown in Figure 1 to Figure 3, comprise a plurality of cable beareves 2 and comprise the connected head-to-tail cell body 1 of more piece, the cell body cross section takes the shape of the letter U, cable bearer is arranged above and below and is located on the sidewall of described cell body, and two row cable bearer height of the two side of cell body are corresponding.
Referring to Fig. 4 to Fig. 6, the unit length of cell body 1 is 1000mm, and the heavy wall benchmark of two side is 50mm, and the upper design in cell body 1 two side becomes thickness to be 100mm, highly to be the trapezoidal cross-section of 60mm.
Be provided with cable bearer reserving hole 3 corresponding to the cable bearer placement on the two side of cell body, cable bearer is bumped in the cable bearer reserving hole, the quantity of reserving hole 3 is adjusted according to the number of plies of cable bearer, and the mutual front and back dislocation of two row cable beareves on the two side of cell body is arranged.
In the present embodiment, every sidewall is provided with 4 support reserving holes in the single cell body, and 4 support reserving hole height on the two side are corresponding, the front and back mutual dislocation arranges that the closest approach of back gauge groove end, the most Last hole of cable bearer reserving hole is 200mm.
In addition, the cell body two side is provided with the wall thickness at cable bearer reserving hole place and thickeies to 160mm, makes cable bearer 2 have enough spaces to be bumped into, and simultaneously cell body is played booster action.
In order to reinforce cell body, cell body 1 inside also can be equipped with reinforced mesh, and reinforced mesh is corresponding with cell body 1 size, as shown in Figure 7.
Be illustrated in figure 1 as support and combined cable trench assembling schematic diagram, 8 supports 2 are bumped into respectively in 8 support reserving holes 2, guarantee that simultaneously support 3 afterbodys have the 10mm distance apart from the cell body surface, carry out the afterbody shutoff with the mortar plugged zone, as shown in Figure 9.
Carry out shutoff for the ease of being coupled to each other the back abutment joint between the cell body 1, also each designs the chamfering 6 that a 20 * 20mm is arranged by groove inwall place in the cell body both ends of the surface, as Fig. 3 or shown in Figure 6.
Simultaneously, for the ease of the lifting of combined cable trench, also be provided with hoisting ring 5, as shown in Figure 10 and Figure 11 in cable cell body both sides.On the end face of cell body 1 two side, the place is provided with groove corresponding to the cable bearer reserving hole, and bottom portion of groove is provided with hoisting ring, and the hoisting ring end face is lower than cell body sidewall end face 5-10mm.
After cable trough had lifted, the slit of suspension ring hole, cell body and cell body connection place all adopted cement mortar to seal obstruction.
Concrete work progress of the present utility model is: after cable trough digs, at first cable bearer is embedded cell body, and with cement mortar plug rack afterbody, the cable trough external member that will assemble cable bearer by hoisting ring hangs in the cable trough afterwards, with cement mortar support preformed hole and the combination groove interface section at hoisting ring place carried out shutoff, in case underground water infiltrates thereafter.
In addition, the width of combined cable trench, highly, wall thickness, the cable trough number of plies of setting up, all can be according to project situation, top bearing load size cases adjusts accordingly, the foregoing description only is used for helping to understand the utility model, and is not used in restriction the utility model.
Adopting this kind combination cable groove because of not using clay brick, only use the part cement mortar to be used for the slit shutoff on a small quantity, thereby environment is influenced hardly, is a kind of environment-friendly cable groove.The combination cable groove that the utility model proposes adopts the prefabricated production of batch production, at the scene special stand is bumped into the method for row lifting more then, has cancelled the scene and has built by laying bricks or stones, quick for installation rapid, speed of application improves more than three times, can reduce operating expenses 50%, and cable trough intensity height, not cracky.
Claims (9)
1. combined cable trench, comprise a plurality of cable beareves, it is characterized in that: also comprise the connected head-to-tail cell body of more piece, described cell body cross section takes the shape of the letter U, described cable bearer is arranged above and below and is located on the sidewall of described cell body, and two row cable bearer height of the two side of described cell body are corresponding.
2. combined cable trench according to claim 1 is characterized in that: the inside of described cell body is provided with reinforced mesh, reinforced mesh and cell body shape, big or small corresponding.
3. combined cable trench according to claim 2 is characterized in that: the both ends of the surface of described cell body are chamfering by groove inwall place.
4. combined cable trench according to claim 3 is characterized in that: two row cable beareves on the two side of described cell body front and back dislocation are mutually arranged.
5. combined cable trench according to claim 4 is characterized in that: be provided with the cable bearer reserving hole corresponding to the cable bearer placement on the two side of described cell body, described cable bearer is bumped into described cable bearer reserving hole.
6. combined cable trench according to claim 5 is characterized in that: described cell body two side is provided with the wall thickness thickening at cable bearer reserving hole place extremely more than or equal to 100mm.
7. combined cable trench according to claim 6 is characterized in that: on the end face of described cell body two side, the place is provided with groove corresponding to the cable bearer reserving hole, and bottom portion of groove is provided with hoisting ring, and the hoisting ring end face is lower than described cell body sidewall end face.
8. combined cable trench according to claim 7 is characterized in that: after described cable bearer is bumped into reserving hole, make the support afterbody leave the space of carrying out the afterbody shutoff with the cement mortar plugged zone apart from cell body sidewall outer surface.
9. combined cable trench according to claim 7 is characterized in that: back gauge groove end, the most Last hole of described cable bearer reserving hole is more than or equal to 200mm; It is 100mm, trapezoidal for 60mm highly that the top cross section of the two side of described cell body is thickness.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201460086U CN201674171U (en) | 2010-03-26 | 2010-03-26 | Combined cable trough |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201460086U CN201674171U (en) | 2010-03-26 | 2010-03-26 | Combined cable trough |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201674171U true CN201674171U (en) | 2010-12-15 |
Family
ID=43331579
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010201460086U Expired - Lifetime CN201674171U (en) | 2010-03-26 | 2010-03-26 | Combined cable trough |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201674171U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106498981A (en) * | 2016-12-06 | 2017-03-15 | 绍兴明煌建材科技有限公司 | A kind of brick type municipal administration comprehensive pipeline passage and its construction method |
CN106759476A (en) * | 2016-12-06 | 2017-05-31 | 绍兴明煌建材科技有限公司 | A kind of assembled municipal administration comprehensive pipeline passage and its construction method |
CN108649518A (en) * | 2018-06-04 | 2018-10-12 | 浙江华云电力工程设计咨询有限公司 | A kind of Combined cable support |
CN112252135A (en) * | 2020-10-30 | 2021-01-22 | 济南城建集团有限公司 | Prefabricated integrated pipeline combined side mold and construction method |
-
2010
- 2010-03-26 CN CN2010201460086U patent/CN201674171U/en not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106498981A (en) * | 2016-12-06 | 2017-03-15 | 绍兴明煌建材科技有限公司 | A kind of brick type municipal administration comprehensive pipeline passage and its construction method |
CN106759476A (en) * | 2016-12-06 | 2017-05-31 | 绍兴明煌建材科技有限公司 | A kind of assembled municipal administration comprehensive pipeline passage and its construction method |
CN108649518A (en) * | 2018-06-04 | 2018-10-12 | 浙江华云电力工程设计咨询有限公司 | A kind of Combined cable support |
CN112252135A (en) * | 2020-10-30 | 2021-01-22 | 济南城建集团有限公司 | Prefabricated integrated pipeline combined side mold and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101820156B (en) | Combined cable trench | |
CN105908862B (en) | A kind of production method of masonry shell in 3D printing reinforced masonry shear wall | |
CN203834739U (en) | End steel board connection, positioning and assembly type shear wall structure | |
CN201339197Y (en) | Self-pressure tower tube base | |
CN203574339U (en) | Cable support for cable trench | |
CN203080430U (en) | Assembly and cast-in-place combined type reinforced concrete pipe type culvert | |
CN201674171U (en) | Combined cable trough | |
CN102011410A (en) | Prefabricated prestressed underground continuous wall and construction method thereof | |
CN113513015A (en) | Semi-prefabricated concrete reinforcement cage underground continuous wall and construction method | |
CN107443550A (en) | Prefabricated cushion cap template and its installation method | |
CN203389471U (en) | Ceramic water film dust collector | |
CN203270627U (en) | Construction joint structure of shear wall | |
CN203334270U (en) | Mountable buried type prefabricated hollow underground diaphragm wall | |
CN202596184U (en) | Lifting node for assembly type large wallboard | |
CN107332187A (en) | Power transmission sequence matrix assembly type cable slot and its method for paving | |
CN106760173B (en) | Prefabricated plate at post-pouring zone of basement outer wall | |
CN210395436U (en) | Prefabricated moulding bed device | |
CN203684497U (en) | Novel chain block | |
CN105133630A (en) | Prefabricated part for constructing foundation forming molds | |
CN202596025U (en) | Preformed frame light big wall plate | |
CN211006701U (en) | Foundation pit supporting structure integrating pile and wall | |
CN203546754U (en) | Prefabricated reinforced concrete manhole for communication pipeline | |
CN104141321A (en) | Basement side wall late poured band blocking method and used blocking steel plate | |
CN208586619U (en) | A kind of assembled deep foundation pit supporting structure | |
CN103195192A (en) | Wallboard connecting structure and process for buildings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20101215 |