CN107332187A - Power transmission sequence matrix assembly type cable slot and its method for paving - Google Patents

Power transmission sequence matrix assembly type cable slot and its method for paving Download PDF

Info

Publication number
CN107332187A
CN107332187A CN201710606578.5A CN201710606578A CN107332187A CN 107332187 A CN107332187 A CN 107332187A CN 201710606578 A CN201710606578 A CN 201710606578A CN 107332187 A CN107332187 A CN 107332187A
Authority
CN
China
Prior art keywords
ditch body
section
power transmission
joggle
transmission sequence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710606578.5A
Other languages
Chinese (zh)
Inventor
林国新
陈孝湘
唐自强
魏志强
张礼朝
吴征
吴勤斌
李宏进
吴聂根
林锐
林宇彬
吴登峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Fujian Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd
Fujian Electric Power Survey and Design Institute
Original Assignee
State Grid Fujian Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd
Fujian Electric Power Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Fujian Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd, Fujian Electric Power Survey and Design Institute filed Critical State Grid Fujian Electric Power Co Ltd
Priority to CN201710606578.5A priority Critical patent/CN107332187A/en
Publication of CN107332187A publication Critical patent/CN107332187A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G9/00Installations of electric cables or lines in or on the ground or water
    • H02G9/02Installations of electric cables or lines in or on the ground or water laid directly in or on the ground, river-bed or sea-bottom; Coverings therefor, e.g. tile
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
    • H02G1/08Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle through tubing or conduit, e.g. rod or draw wire for pushing or pulling

Abstract

The present invention relates to the cable duct framework laid on a kind of power transmission sequence, particularly a kind of power transmission sequence matrix assembly type cable slot and its method for paving, its structural feature is, the cable duct is made up of the sequentially connection of plural number section ditch body head and the tail, often the cross section of section ditch body is constructed in matrix, including bottom plate and biside plate;The medial surface of biside plate is embedded with multiple groove profile cable bearer built-in fittings, and the groove profile cable bearer built-in fitting is perpendicular to backplane;Often the front end face of section ditch body is provided with tenon, rear end face is then the mortise joggle of mortise, tenon and previous section ditch body rear end face, and the tenon joggle of mortise then with later section ditch body front end face, formed in the gap at end to end construction, joggle and be pressed with hydro-expansive rubber bar;Often section ditch body is fixedly connected with forward and backward section ditch body junction in joggle using a plurality of single ended bolts.Advantage is:Construction work amount is reduced, shortens the construction period, the efficiency of long-distance transport is improved, construction cost is reduced, expands the scope that assembly type cable slot is applied in KV Electric Transmissions.

Description

Power transmission sequence matrix assembly type cable slot and its method for paving
Technical field
The present invention relates to the cable duct framework laid on a kind of power transmission sequence, particularly a kind of power transmission sequence matrix assembled Cable duct and its method for paving, are particularly suitable for use in that corridor is narrow, do not possess in-situ precast, and the nervous power transmission line of construction period In the engineering of road.
Background technology
Chinese patent 200810162805.0 provides a kind of transforming plant assembly type cable slot body and method for paving, with transverse direction Overall " U " type cross-section structure, segmentation prefabricating reproduces field splicing, and be substantially all prefabricated at the scene, it is not necessary to consider remote Transport, assembling process.This prefabricated, fabricated cable slot body can greatly reduce construction work amount, shorten construction period, Efficiency of construction and construction quality are improved, construction cost is reduced.But this assembled of transformer station is applied to power transmission sequence work Cheng Shang, then can there are the following problems:
1st, in transformer station, less, the raceway groove total length in a transformer station is few, and can provide wider construction for cable duct section Place, therefore use in-situ precast, the method for on-site consolidation more, it is not necessary to prefabrication and long-distance transportation;And in power transmission line In the engineering of road, because circuit mileage is long, and corridor limit value, so scene does not possess the site condition of prefabricated ditch section, the patent Technical scheme can not be applied directly.
2nd, the body of power transformation station cable ditch employs water-proof concrete, although spigot-and-socket tongue and groove is used between longitudinal channel The mode of connection, seam crossing water-proof function is less demanding, but is substantially all in transformer station and disclosure satisfy that engine request.But For KV Electric Transmissions, the environmental condition on raceway groove periphery is complicated, mostly the shallower city city of level of ground water, waterproof requirement Height, then original interface mode is no longer applicable.
3rd, because the environment and the environment in power transmission sequence corridor in use transformer station are far from each other, power transformation station cable ditch The cable duct that method for paving can not also be applied to power transmission sequence be mated formation engineering.
At present, the cable slot body of power transmission sequence is built by the way of scene is built by laying bricks or stones, is taken, arduously, it is difficult to meet Current engineering construction requirement.
The content of the invention
It is an object of the invention to according to the deficiencies in the prior art part, construction work amount can be reduced by providing one kind, contracting The short construction period, reduce the power transmission sequence matrix assembly type cable slot and its method for paving of construction cost.
Matrix assembly type cable slot of the present invention is realized by following approach:
Power transmission sequence matrix assembly type cable slot, its structural feature is that the cable duct is sequentially connected by plural number section ditch body head and the tail Composition is connect, the cross section for often saving ditch body is constructed in matrix, including bottom plate and biside plate;The medial surface of biside plate is embedded with multiple grooves Type cable bearer built-in fitting, the groove profile cable bearer built-in fitting is perpendicular to backplane;Often the front end face of section ditch body is provided with Tenon, rear end face then be mortise, tenon with it is previous section ditch body rear end face mortise joggle, and mortise then with later section ditch body front end The tenon joggle in face, forms in the gap at end to end construction, joggle and is pressed with hydro-expansive rubber bar;Often section ditch body with Forward and backward section ditch body junction is fixedly connected in joggle using a plurality of single ended bolts.
The ditch body of merogenesis concave configuration of the present invention can be prefabricated in factory, meanwhile, groove profile cable bearer built-in fitting Also it is mounted on the biside plate of ditch body, in construction work, just prefabricated components can be transported from processing factory in advance while ditch body is prefabricated It is defeated to be installed to job site, the problem of solving on power transmission sequence without prefabricated site condition is employed, on the other hand, is proposed Longitudinal direction is connected by screw bolts, the connected mode of tenon type interface plus hydro-expansive rubber sealing, and power transmission sequence is solved well The problem of environment is complicated, meets the waterproof demand of raceway groove.Thus the present invention is by ditch body member segments are prefabricated, Assembling, no But the weight of single prefabricated components is reduced, body of the prefabricated components during processing, transport, storage etc. is also substantially reduced Product, so, just can improve the efficiency of long-distance transport, solve the problems, such as the long-distance transport from processing factory to transmission line of electricity, expand The scope that assembly type cable slot is applied in KV Electric Transmissions.Moreover, often using tenon shape interface and chance between section cable duct The mode that water-expansible rubber bar is combined carries out water-proofing treatment, is not only able to meet structurally waterproof requirement, but also substantially reduce The workload of Site Welding.The groove profile cable bearer built-in fitting is to be used to install groove profile cable bearer, by this built-in fitting in work Just prefabricated processing is together carried out when factory is prefabricated, it is not only easy to operate, and " zero welding " that horizontal lateral frame is installed can be realized Process, substantially reduces the field erected quantities of cable bearer, improves operating efficiency.
The present invention can be specially further:
Often the weight of section ditch body is less than 20 tons, and multiple lifting suspension hooks are distributed with biside plate upper end edge.
For power transmission sequence prefabricated member production separated with fabricating yard, transport and lifting condition be limited the features such as, carry The measures such as suspension hook lifting, control single-unit prefabricated components weight are gone out, so that transport and assembling further for component provides basis Condition.According to the data of experimental project, matrix assembly type cable slot is obvious compared with the lifting of cast-type cable duct duration, and an operation is followed Duration in ring can be foreshortened to about 10 days by 40 days, be improved with obvious efficiency, cost is reduced and preferable economy.
Often section ditch body length is 3.0 ~ 6.0m.
The size of ditch body is controlled from size, in order to the transport and lifting of prefabricated components, according to the scene of power transmission sequence Condition, can be constructed using small-size hoisting machine tool.
At least two bolt hole is often distributed with the bottom plate and biside plate of section ditch body respectively, every section ditch body is distributed in On front and rear end.
The bolt hole is to be used to single ended bolt connection use, and the connection of single ended bolt is uniformly distributed in bottom plate and biside plate On, so that comprehensive achieves a fixed connection and waterproof homework.
The method for paving of above-mentioned matrix assembly type cable slot, it is characterized by, and comprises the following steps:
1)Cable duct foundation trench is excavated, and carries out groove inner surface treatment;
2)L63X5 angle steel earthing pole is set along the bottom surface of cable duct foundation trench along side;
3)Cushion construction:Laid using the plain concrete of C15 labels or more, laying depth is 100mm;
4)The prefabrication ditch body that well matrix as described above is constructed, and job site is transported to by haulage vehicle;
5)Setting-out comparison is carried out to the position of channel floors standard element;
6)Hanging device is provided, the ditch body that matrix is constructed is lifted on the grooved position compared;
7)Often further spliced between section ditch body and front and rear section ditch body after longitudinal joggle by single ended bolt, during splicing, seam Press-fit hydro-expansive rubber bar in gap;
8)Cable bearer and its earthed system are installed to the groove profile cable branch being distributed on matrix construction ditch body biside plate medial surface On frame built-in fitting;
9)The wall earthen backfill of ditch side, compacting, and raceway groove inner cable and its annex are further installed, finally cover prefabricated cover plate, mortar Smear seam.
In summary, it is pre- using ditch body member segments the invention provides a kind of power transmission sequence matrix assembly type cable slot System, Assembling, not only reduce the weight of single prefabricated components, also substantially reduce prefabricated components in processing, transport, storage Volume Deng during, it is proposed that longitudinal direction is connected by screw bolts, the connected mode of tenon type interface plus hydro-expansive rubber sealing, very Good solves the problem of power transmission sequence environment is complicated, meets the waterproof demand of raceway groove.So, construction work can just be reduced Amount, shortens the construction period, improves the efficiency of long-distance transport, reduces construction cost, expands assembly type cable slot in power transmission sequence The scope applied in engineering.
Brief description of the drawings
Fig. 1 illustrates for the facade structures of the matrix construction ditch body in power transmission sequence matrix assembly type cable slot of the present invention Figure.
The present invention is described further with reference to embodiment.
Embodiment
Most preferred embodiment:
Referring to the drawings 1, power transmission sequence matrix assembly type cable slot is made up of, often section ditch body the sequentially connection of plural number section ditch body head and the tail Cross section constructed in matrix, including bottom plate 1 and biside plate 2;Often section ditch body longitudinally takes 3.0 ~ 6.0m mono- to save, single prefabricated components Overall weight control it is prefabricated in factory in 20t, can be constructed using small-size hoisting machine tool.
Often the medial surface of the side plate 2 of section ditch body is that to be embedded with groove profile cable bearer pre- by 1.0 ~ 1.25m per spacing along longitudinal direction Embedded part 6, for installing groove profile cable bearer, while often section sets a company that can connect cable bearer built-in fitting with outside Fitting, to meet follow-up earthed system installation requirement, and is connected by groove profile, can save the welding engineering of live ironware Amount.L-type stepped 4 is set to along side on biside plate 2, for putting cover plate, cover plate is yi word pattern, after being equally prefabricated in the factory Transport in-site installation.Multiple lifting suspension hooks 5 often are distributed with the biside plate upper end edge of section ditch body, are easy to hanging for prefabricated components Dress.
Often the front end face of section ditch body is provided with tenon 7(Convex configuration), rear end face is then mortise 8(Spill groove bar), tenon With the mortise joggle of previous section ditch body rear end face, and the tenon joggle of mortise then with later section ditch body front end face forms head and the tail phase Hydro-expansive rubber bar is pressed with gap at the elongated construction connect, joggle.In addition to joggle, the transverse joint of cable duct, Two splice bolt holes 3 are often distributed with respectively on the bottom plate 1 and biside plate 2 of section ditch body, using single during every two sections ditch body split Hook bolt is connected, and bolt specification is M20 ~ M30, further affixed and improve waterproof effect.
The present invention is characterized by, it is proposed that longitudinal direction is connected by screw bolts, tenon type interface plus hydro-expansive rubber sealing Connected mode, solves the problem of power transmission sequence environment is complicated, meets the waterproof demand of raceway groove.The prefabricated, Assembling of segmentation, Weight and size are controlled, the problems such as solving prefabricated, transport and lift;Cable built-in fitting fixed form is used in addition, reduces scene Construction workload, improves operating efficiency.
The not described part of the present invention is same as the prior art.

Claims (5)

1. power transmission sequence matrix assembly type cable slot, it is characterised in that the cable duct is sequentially connected by plural number section ditch body head and the tail Composition, the cross section for often saving ditch body is constructed in matrix, including bottom plate and biside plate;The medial surface of biside plate is embedded with multiple groove profiles Cable bearer built-in fitting, the groove profile cable bearer built-in fitting is perpendicular to backplane;Often the front end face of section ditch body is provided with tenon Head, rear end face then be mortise, tenon with it is previous section ditch body rear end face mortise joggle, and mortise then with later section ditch body front end face Tenon joggle, formed in the gap at end to end construction, joggle and be pressed with hydro-expansive rubber bar;Often section ditch body with Forward and backward section ditch body junction is fixedly connected in joggle using a plurality of single ended bolts.
2. power transmission sequence matrix assembly type cable slot according to claim 1, it is characterised in that the weight for often saving ditch body is small In 20 tons, and multiple lifting suspension hooks are distributed with biside plate upper end edge.
3. power transmission sequence matrix assembly type cable slot according to claim 1, it is characterised in that often saving ditch body length is 3.0~6.0m。
4. power transmission sequence matrix assembly type cable slot according to claim 1, it is characterised in that often save ditch body bottom plate and At least two bolt hole is distributed with biside plate respectively, on the front and rear end for being distributed in every section ditch body.
5. the method for paving of power transmission sequence matrix assembly type cable slot, it is characterised in that comprise the following steps:
1)Cable duct foundation trench is excavated, and carries out groove inner surface treatment;
2)L63X5 angle steel earthing pole is set along the bottom surface of cable duct foundation trench along side;
3)Cushion construction:Laid using the plain concrete of C15 labels or more, laying depth is 100mm;
4)The prefabrication ditch body that well matrix as claimed in claim 1 is constructed, and job site is transported to by haulage vehicle;
5)Setting-out comparison is carried out to the position of channel floors standard element;
6)Hanging device is provided, the ditch body that matrix is constructed is lifted on the grooved position compared;
7)Often further spliced between section ditch body and front and rear section ditch body after longitudinal joggle by single ended bolt, during splicing, seam Press-fit hydro-expansive rubber bar in gap;
8)Cable bearer and its earthed system are installed to the groove profile cable branch being distributed on matrix construction ditch body biside plate medial surface On frame built-in fitting;
9)The wall earthen backfill of ditch side, compacting, and raceway groove inner cable and its annex are further installed, finally cover prefabricated cover plate, mortar Smear seam.
CN201710606578.5A 2017-07-24 2017-07-24 Power transmission sequence matrix assembly type cable slot and its method for paving Pending CN107332187A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710606578.5A CN107332187A (en) 2017-07-24 2017-07-24 Power transmission sequence matrix assembly type cable slot and its method for paving

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710606578.5A CN107332187A (en) 2017-07-24 2017-07-24 Power transmission sequence matrix assembly type cable slot and its method for paving

Publications (1)

Publication Number Publication Date
CN107332187A true CN107332187A (en) 2017-11-07

Family

ID=60199895

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710606578.5A Pending CN107332187A (en) 2017-07-24 2017-07-24 Power transmission sequence matrix assembly type cable slot and its method for paving

Country Status (1)

Country Link
CN (1) CN107332187A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107834488A (en) * 2017-12-05 2018-03-23 国网江苏省电力公司南通供电公司 A kind of assembled cable bearer
CN108462138A (en) * 2018-02-09 2018-08-28 温州嘉成工程项目管理有限公司 A kind of cable duct and its construction method
CN109274057A (en) * 2018-11-02 2019-01-25 国网四川省电力公司广安供电公司 A kind of the cable duct structure and its construction method of prefabricated
CN113793978A (en) * 2021-09-28 2021-12-14 广东博力威科技股份有限公司 Assembly structure and method of large cylindrical battery cell

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB201316484D0 (en) * 2013-09-17 2013-10-30 Airbus Operations Ltd Cable raceway
CN104092173A (en) * 2014-07-23 2014-10-08 新疆拓源节能技术开发有限责任公司 Assembly-type underground cable trench based on comprehensive wiring of city
CN104466869A (en) * 2014-12-05 2015-03-25 浙江省电力设计院 Reinforced concrete assembly type cable duct and manufacturing method
CN205681082U (en) * 2016-06-20 2016-11-09 国家电网公司 Conduit line and cover plate
CN106451300A (en) * 2016-08-29 2017-02-22 山东电力工程咨询院有限公司 Cable trench of general assembly type GIS empty casing foundation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB201316484D0 (en) * 2013-09-17 2013-10-30 Airbus Operations Ltd Cable raceway
CN104092173A (en) * 2014-07-23 2014-10-08 新疆拓源节能技术开发有限责任公司 Assembly-type underground cable trench based on comprehensive wiring of city
CN104466869A (en) * 2014-12-05 2015-03-25 浙江省电力设计院 Reinforced concrete assembly type cable duct and manufacturing method
CN205681082U (en) * 2016-06-20 2016-11-09 国家电网公司 Conduit line and cover plate
CN106451300A (en) * 2016-08-29 2017-02-22 山东电力工程咨询院有限公司 Cable trench of general assembly type GIS empty casing foundation

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107834488A (en) * 2017-12-05 2018-03-23 国网江苏省电力公司南通供电公司 A kind of assembled cable bearer
CN107834488B (en) * 2017-12-05 2023-07-14 国网江苏省电力公司南通供电公司 Assembled cable support
CN108462138A (en) * 2018-02-09 2018-08-28 温州嘉成工程项目管理有限公司 A kind of cable duct and its construction method
CN108462138B (en) * 2018-02-09 2019-10-15 温州嘉成工程项目管理有限公司 A kind of cable duct and its construction method
CN109274057A (en) * 2018-11-02 2019-01-25 国网四川省电力公司广安供电公司 A kind of the cable duct structure and its construction method of prefabricated
CN113793978A (en) * 2021-09-28 2021-12-14 广东博力威科技股份有限公司 Assembly structure and method of large cylindrical battery cell

Similar Documents

Publication Publication Date Title
CN107332187A (en) Power transmission sequence matrix assembly type cable slot and its method for paving
CN105908862B (en) A kind of production method of masonry shell in 3D printing reinforced masonry shear wall
CN205377242U (en) Assembly -type cable trench
CN104466869A (en) Reinforced concrete assembly type cable duct and manufacturing method
CN206233403U (en) Wall transverse direction dry type attachment structure based on assembled architecture wall
CN105401593A (en) Assembly type square underground pipe gallery
CN107794946B (en) Underground comprehensive pipe rack structure deeply buried in soft soil and construction method thereof
CN105672355A (en) Plate type prefabricated concrete comprehensive pipe gallery
CN106436966A (en) Wall transverse full-dry type connection structure based on assembled type building wall and assembly method of wall transverse full-dry type connection structure
CN110306396A (en) A kind of assembly concrete road surface and construction method
CN106760173B (en) Prefabricated plate at post-pouring zone of basement outer wall
CN101425670B (en) Transforming plant assembly type cable duct body and spreading method
CN110565682B (en) Ring main unit prefabricated foundation module segmentation method and installation connection method thereof
CN111064155B (en) Calandria array installation and encapsulation construction method
CN204243698U (en) A kind of steel reinforced concrete assembling cable trough
CN204551532U (en) Assembling cable shaft
CN205116220U (en) Pour cable pit after assembly of L type precast concrete spare
CN107332188A (en) Power transmission sequence L-type assembly type cable slot and its method for paving
CN207117134U (en) Power transmission sequence L-type assembly type cable slot
CN207117132U (en) Power transmission sequence matrix assembly type cable slot
CN204098066U (en) The square underground pipe gallery of assembling
CN206245465U (en) Suitable for the wall transverse direction dry type attachment structure of assembled architecture
CN207117133U (en) The type assembly type cable slot of power transmission sequence one
CN203284814U (en) Transformer substation prefabricated concrete water-scattering device
CN206195316U (en) Cable pit block and adopt cable pit that this cable pit block made

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 350003 Gulou District, Fujian, Fuzhou No. 54 Road, No. 268

Applicant after: POWERCHINA FUJIAN ELECTRIC POWER SURVEY & DESIGN INSTITUTE Co.,Ltd.

Applicant after: STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

Applicant after: STATE GRID FUJIAN ECONOMIC Research Institute

Address before: 350003 Gulou District, Fujian, Fuzhou No. 54 Road, No. 268

Applicant before: FUJIAN ELECTRIC POWER SURVEY & DESIGN INSTITUTE

Applicant before: STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

Applicant before: STATE GRID FUJIAN ECONOMIC Research Institute

RJ01 Rejection of invention patent application after publication

Application publication date: 20171107