CN101425670B CN2008101628050A CN200810162805A CN101425670B CN 101425670 B CN101425670 B CN 101425670B CN 2008101628050 A CN2008101628050 A CN 2008101628050A CN 200810162805 A CN200810162805 A CN 200810162805A CN 101425670 B CN101425670 B CN 101425670B
Authority
CN
China
Prior art keywords
assembly type
type cable
armored concrete
cable slot
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008101628050A
Other languages
Chinese (zh)
Other versions
CN101425670A (en
Inventor
黄达余
安春秀
吴亮
梅狄克
徐建国
童建国
吴志力
冯仁祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Energy source in China construction group Zhejiang Province Power Design Institute Co., Ltd
State Grid Zhejiang Electric Power Co Ltd
Original Assignee
Zhejiang Electric Power Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Electric Power Design Institute filed Critical Zhejiang Electric Power Design Institute
Priority to CN2008101628050A priority Critical patent/CN101425670B/en
Publication of CN101425670A publication Critical patent/CN101425670A/en
Application granted granted Critical
Publication of CN101425670B publication Critical patent/CN101425670B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a transformer substation assembly type cable trench body and a pavement method. The transformer substation assembly type cable trench body is mainly formed by connecting a plurality of sections of water-proof reinforced concrete trench bodies with U-shaped transverse cross-sections in sequence; a flange section and a groove which can be connected in tandem are respective arranged at the front and the rear ends of the trench body, a tongue-and-groove lapped back and forth is formed, and a rubber strip is installed between the trench bodies connected in tandem; the pavement method comprises the following steps: the cement bonded sand with thickness of 100 mm is paved on the conventional C15 plain concrete cushion course, and is used for the equalization of the assembly type cable trench body installed later; then the sections of the well prefabricated trench bodies are connected together through the lap-joint tongue-and-groove in sequence, and the rubber strip is underlaid at the connected point; and compared with the prior art, the invention has the advantages of reduced construction period, reduced pavement cost, improved work efficiency and labor productivity, greatly improved appearance quality and better popularization and application values.

Description

Transforming plant assembly type cable slot body and method for paving
Technical field
What the present invention relates to is universal assembly type cable slot of a kind of transformer station and installation method, belongs to the design-build technical field in transformer station, power plant.
Background technology
At present the cable trough of the above transformer station of 220kV designs, and according to the height of burried depth, load size, level of ground water, makes forms such as brick, plain concrete, armored concrete cable slot body respectively, to satisfy the requirement of transformer station, power plant cable laying.But along with the development of China's electric utility, the cable slot body of this field fabrication also is faced with the problem of following several respects:
1) on-the-spot masonry project amount is big, and the engineering time is long: with the 220kV power transformation example of doing, be converted to the 1.1x0.85m cable slot body, the about 1100m of its total length.Brick cable slot body budgetary estimate expense is 625 yuan/m 3(pressing sky in the ditch, down together), the construction period is 35 days; Plain concrete cable slot body budgetary estimate expense is 820 yuan/m 3, the construction period is 25 days; Armored concrete cable slot body budgetary estimate expense is 1120 yuan/m 3, the construction period is 30 days;
2) above cable slot body all needs interior exterior plaster, the also outer water-repellent paint of doing of brick, plain concrete cable slot body, and the time cost is many; Use more material, resource is taken many; The most frequently used brick, plain concrete cable slot body regular meeting on soft soil foundation has sedimentation excessive and problem cracking takes place;
3) present State Grid Corporation of China's transformer substation construction, be to carry out by " amphitypy one is changed " standard, promptly environmentally friendly, resource-conserving, industrialization, in addition along with the fast development of electric utility, the construction period of transformer station also is required to shorten greatly, full assembled transformer station will be a developing direction, but the field fabrication cable slot body will hinder applying of full assembled transformer station.
Summary of the invention
The objective of the invention is to overcome the deficiency that prior art exists, and provide a kind of construction requirements that can comply with full assembled transformer station to cable slot body, install by prefabrication production, job site assembled, thereby can satisfy the transforming plant assembly type cable slot body and the method for paving of transformer station's cable laying requirement.
The objective of the invention is to finish by following technical solution, described transforming plant assembly type cable slot body, the waterproof armored concrete ditch body that it mainly is the U type by a section cross section joins successively and forms, it is characterized in that described armored concrete ditch body rear and front end be respectively arranged with can before and after the flange sections and the recessed access slot that join, and constitute front and back overlap joint tongue and groove, between the armored concrete ditch body that front and back join the rubber bar is installed; Described rubber sliver transvers section is the plain cushion sheet that is linked to each other by two circles, and it is placed on the peripheral wall surfaces of flange sections, is sandwiched between flange sections and the recessed access slot.
A kind of method for paving of transforming plant assembly type cable slot as mentioned above, at first on the C15 of routine plain concrete cushion layer, the dried sand 100mm that lays cement is thick for it, is used for the leveling of the assembly type cable slot body of back installation; Be connected together mutually by the overlap joint tongue and groove successively before and after then that a section is the prefabricated armored concrete ditch body, and be lined with the rubber bar in the joint.
Before described two armored concrete ditch bodies join, earlier with rubber bar three limits be pressed in wherein-the flange sections periphery wall of ditch body on, be inserted in then in the recessed access slot of another armored concrete ditch body, and make top line become smooth shape, carry out the welding and the installation of cable bearer again in the cable slot body after armored concrete ditch body joins.
Water proof structure and material that can be by the junction when the present invention installs, forms a kind of can prefabrication, on-the-spot installation, be the clear-water concrete presentation quality, can constitute the full assembly type cable slot body of whole antiseepage again.
After adopting the present invention's " transforming plant assembly type cable slot body " design and product utilization, since brought into play simultaneously on-the-spot direct assembling, again do not need again in exterior plaster, do water-repellent paint outward, therefore aspect transformer station's cable slot body scene duration, can taper to 10 days, total duration generally can save 15 days, about 10%; The Technological Economy aspect considers that the minimizing of labour cost, the expense of whitewashing waterproof material reduce, after the increase of installation cost, the about 650 yuan/m of its budgetary estimate expense 3, fair with brick cable trough economy commonly used; Presentation quality is greatly improved, and labor productivity improves, and application value is preferably arranged.
Description of drawings
Fig. 1 is the Facad structure schematic diagram of ditch body of the present invention.
Fig. 2 is the A-A sectional structure schematic diagram among Fig. 1.
Fig. 3 is the local structure for amplifying schematic diagram of the I among Fig. 1.
Embodiment
The present invention will be described in detail below in conjunction with accompanying drawing.Figure 1 shows that the ditch body plan structure schematic diagram that is paved on the bottom surface, and Fig. 2 is the cross-sectional structure schematic diagram of ditch body.Described transforming plant assembly type cable slot body, the waterproof armored concrete ditch body 1 that it mainly is the U type by a section cross section joins successively and forms.Described ditch body 1 rear and front end be respectively arranged with can before and after the flange sections 2 and the recessed access slot 3 that join, and constitute front and back overlap joint tongue and groove, between the armored concrete ditch body 1 that front and back join rubber bar 4 is installed.
Shown in Figure 3, described rubber bar 4 cross sections are the plain cushion sheet that is linked to each other by two circles, and it is placed on the peripheral wall surfaces of flange sections 2, is sandwiched between flange sections 2 and the recessed access slot 3.
The method for paving of transforming plant assembly type cable slot body of the present invention, at first on the C15 of routine plain concrete cushion layer, the dried sand 100mm that lays cement is thick, is used for the leveling of the assembly type cable slot body of back installation; Be connected together mutually by the overlap joint tongue and groove successively before and after then that a section is the prefabricated armored concrete ditch body, and be lined with the rubber bar in the joint.
Before described two armored concrete ditch bodies join, be pressed on the flange sections periphery wall of an armored concrete ditch body wherein earlier with rubber bar three limits, be inserted in then in the recessed access slot of another armored concrete ditch body, and make top line become smooth shape, carry out the welding and the installation of cable bearer again in the cable slot body after armored concrete ditch body joins.
Embodiment 1, and main composition of the present invention is: C30~C40 armored concrete or steel fiber reinforced concrete (clear-water concrete appearance ratings) and two P outward appearance are met water microdilatancy rubber bar.
Make: adopt the customization steel mold, zone, precasting yard ground on-site, on-the-spot batch production is made, the moisture-heat preservation maintenance; It is that specialized factory decides processing that two P outward appearances are met water microdilatancy rubber bar.
Install: (1) at first on the C15 of routine plain concrete cushion layer, the dried sand 100mm that lays cement is thick, is used for the leveling of the assembly type cable slot body of back installation; (2) utilize the standing P200 in building site to excavate transportation and installation in the airport; Make full use of the overlap joint tongue and groove of this assembly type cable slot body invention when (3) connecting, install up and down, simultaneously of the present invention pair of P outward appearance met water microdilatancy rubber bar three limits and compress, top line is if any trickle horizontal problem, with rubber hammer hammering leveling; (4) pea gravel concreten looks for the mechanical perforate in slope and back to place drainage pipe.

Claims (3)

1. transforming plant assembly type cable slot body, the waterproof armored concrete ditch body that it mainly is the U type by a section cross section joins successively and forms, it is characterized in that described armored concrete ditch body rear and front end be respectively arranged with can before and after the flange sections and the recessed access slot that join, and constitute front and back overlap joint tongue and groove, between the armored concrete ditch body that front and back join the rubber bar is installed; Described rubber sliver transvers section is the plain cushion sheet that is linked to each other by two circles, and it is placed on the peripheral wall surfaces of flange sections, is sandwiched between flange sections and the recessed access slot.
2. method for paving of transforming plant assembly type cable slot body according to claim 1 is characterized in that it at first on the C15 of routine plain concrete cushion layer, and the dried sand 100mm that lays cement is thick, is used for the leveling of the assembly type cable slot body installed the back; Be connected together mutually by the overlap joint tongue and groove successively before and after then that a section is the prefabricated armored concrete ditch body, and be lined with the rubber bar in the joint.
3. the method for paving of transforming plant assembly type cable slot body according to claim 2, before it is characterized in that described two armored concrete ditch bodies join, be pressed on the flange sections periphery wall of a ditch body wherein earlier with rubber bar three limits, be inserted in then in the recessed access slot of another armored concrete ditch body, and make top line become smooth shape, carry out the welding and the installation of cable bearer again in the cable slot body after armored concrete ditch body joins.
CN2008101628050A 2008-12-11 2008-12-11 Transforming plant assembly type cable duct body and spreading method Expired - Fee Related CN101425670B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101628050A CN101425670B (en) 2008-12-11 2008-12-11 Transforming plant assembly type cable duct body and spreading method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101628050A CN101425670B (en) 2008-12-11 2008-12-11 Transforming plant assembly type cable duct body and spreading method

Publications (2)

Publication Number Publication Date
CN101425670A CN101425670A (en) 2009-05-06
CN101425670B true CN101425670B (en) 2011-07-27

Family

ID=40616077

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101628050A Expired - Fee Related CN101425670B (en) 2008-12-11 2008-12-11 Transforming plant assembly type cable duct body and spreading method

Country Status (1)

Country Link
CN (1) CN101425670B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101820156B (en) * 2010-03-26 2012-05-23 黄贺明 Combined cable trench
CN104466869A (en) * 2014-12-05 2015-03-25 浙江省电力设计院 Reinforced concrete assembly type cable duct and manufacturing method
CN104410030A (en) * 2014-12-05 2015-03-11 浙江省电力设计院 Light concrete laminated slab assembly type cable trench and forming method thereof
CN110690679A (en) * 2018-07-04 2020-01-14 山西太钢不锈钢股份有限公司 Multi-loop same-groove cable direct-buried laying method

Also Published As

Publication number Publication date
CN101425670A (en) 2009-05-06

Similar Documents

Publication Publication Date Title
CN104805866A (en) Prefabricated comprehensive pipe gallery and construction method
CN107313517B (en) Connecting node for laminated wall and laminated floor slab in middle layer
CN109133800B (en) Semi-flexible composite pavement precast block and manufacturing method thereof, pavement prepared by adopting precast block and manufacturing method thereof
CN104466869A (en) Reinforced concrete assembly type cable duct and manufacturing method
CN201738479U (en) Roof expansion joint integrated cover plate waterproof structure
CN101425670B (en) Transforming plant assembly type cable duct body and spreading method
CN104612282A (en) Prefabricated steel fiber sludge-made ceramisite concrete wall based on T-shaped groove connection and construction method of prefabricated steel fiber sludge-made ceramisite concrete wall
CN106522359A (en) Total-prefabricated rural residential class composite wall structure system and construction method thereof
CN204753627U (en) Prefabricated comprehensive piping lane
CN111997088A (en) Groove type prefabricated assembly type cable duct bank and working well installation and construction method
CN105401593A (en) Assembly type square underground pipe gallery
CN105544849A (en) Assembly type composite wallboard based on XPS sandwich insulation treatment and preparation method thereof
CN107332187A (en) Power transmission sequence matrix assembly type cable slot and its method for paving
CN105113435A (en) Culvert mouth of corrugated steel pipe culvert
CN107268675A (en) The laying method and structure of a kind of many storehouse underground pipe galleries of combined type
CN108729692A (en) A kind of method of construction of assembled Low-rise Lightweight system of steel residential structure
CN201345526Y (en) Fabricated cable trench body of transformer substation
CN102425228A (en) Multifunctional environment-friendly movable water tank
CN211079875U (en) Soil covering corrugated steel plate bridge based on gravel grouting filling layer
CN202247719U (en) Corresponding corrugated pre-stressed anti-sedimentation culvert pipe for bridge
CN203284814U (en) Transformer substation prefabricated concrete water-scattering device
CN205753309U (en) Prefabricated cable duct
CN110056071A (en) A kind of municipal administration storm sewer assembling module and construction method
CN206205140U (en) A kind of full assembled villages and small towns local-style dwelling houses class composite wall structure system
CN105544829A (en) Steel fiber regeneration brick granule concrete single-rib baseboard composite floor slab and manufacturing method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID ZHEJIANG ELECTRIC POWER COMPANY

Effective date: 20131226

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20131226

Address after: Hangzhou City, Zhejiang province 310012 GUCUI Road No. 68

Patentee after: Zhejiang Electric Power Design Institute

Patentee after: State Grid Zhejiang Electric Power Company

Address before: Hangzhou City, Zhejiang province 310012 GUCUI Road No. 68

Patentee before: Zhejiang Electric Power Design Institute

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110727

Termination date: 20141211

EXPY Termination of patent right or utility model
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Hangzhou City, Zhejiang province 310012 GUCUI Road No. 68

Patentee after: Energy source in China construction group Zhejiang Province Power Design Institute Co., Ltd

Patentee after: State Grid Zhejiang Electric Power Company

Address before: Hangzhou City, Zhejiang province 310012 GUCUI Road No. 68

Patentee before: Zhejiang Electric Power Design Institute

Patentee before: State Grid Zhejiang Electric Power Company